15-13. PROJECT ELIGIBILITY
HUD Section 8 Renewal Policy Guidebook · 2026 edition · updated 2026-07-29 · United States
The AE checks that, if applicable, the rehabilitation proposal is:
A. Compliant with HUD’s environmental regulations at 24 CFR Part 50, and.
All repair or rehabilitation actions under the Capital Repairs Program will require environmental review. HUD environmental policy requires that there be a limitation of activities or actions by any direct or indirect parties to the transaction until HUD has completed the environmental review process. As such, the environmental review must be completed before the AE approves capital repair plans.
The AE will review documentation submitted by the owner. The AE should document compliance for the environmental review on the HUD Environmental Review Online System (HEROS) – Form HUD 4128. Guidance for completing the HEROS – Form HUD 4128 can be found at the Multifamily Accelerated Processing (MAP) Guide, Chapter 9; in Handbook 1390.2, “Environmental
Chapter Fifteen – Published March 2023
7
Assessment Guide for Housing;” and at HUD’s environmental website: https://www.hudexchange.info/programs/environmental-review/
Field/Regional Environmental Clearance Officers and other appropriate HUD staff may be contacted to assist in the environmental review. Contact information for HUD’s environmental officers may be accessed through the above website.
In accordance with 24 CFR Part 50.20(a)(2), the following actions, activities and programs are categorically excluded from National Environmental Policy Act requirements. They are not excluded from the individual compliance requirements of the other environmental statutes, Executive orders and HUD standards cited in 24 CFR Part 50.4 and must complete a categorically excluded review in HEROS– Form HUD 4128:
a. Rehabilitation of buildings and improvements when the following conditions are met:
- Unit density is not changed more than 20 percent;
- The project does not involve changes in land use from residential to non-residential; and
- The estimated cost of rehabilitation is less than 75 percent of the total estimated cost of replacement after rehabilitation.
Any actions, activities and programs that do not meet the qualifications at 15-13. A.4., above, require an environmental review under the National Environmental Policy Act and in accordance with the laws and authorities listed at 24 CFR Part 50.4.
A new Phase I ESA in accordance with ASTM E 1527-05 (or the most recent edition), as well as a Vapor Encroachment Screen in accordance with ASTM E 2600-10 (or the most recent edition), will be required if the activity being approved involves:
a. Significant ground disturbance (digging) or construction not contemplated in the original application;
b. A change in land use not contemplated by the original risk-based mitigation conducted on the site;
c. Site expansion or addition;
d. Any other activities which may result in contaminant exposure pathways or activities not contemplated in the original application.
HUD’s lead based paint testing and abatement requirements for the management and removal of lead-based paint are applicable to housing built before 1978, and are found at 24 CFR Part 35.
Owners of HUD-insured properties are required to comply with Environmental Protection Agency (EPA) and the Department of Labor - Occupational Safety and Health Administration (OSHA) requirements concerning the management/abatement (e.g. maintenance, removal, disposal and encapsulation)
Chapter Fifteen – Published March 2023
8
of asbestos when an owner takes an action, such as renovation or demolition, which involves the disturbance of asbestos or presence of damaged friable asbestos. Any abatement that is undertaken should only be done with EPA trained and accredited contractors who are experienced in working with asbestos and knowledgeable in federal, state and local requirements. All asbestos abatement must be done in accordance with EPA requirements for air pollution prevention pursuant to 40 CFR Subpart M, especially 40 CFR Part 61.145, and OSHA requirements for Worker Protection, pursuant to 29 CFR Part 1926.1101. Any local or state asbestos abatement and worker protection rules also apply.
HUD-insured properties are required to comply with the Toxic Substances Control Act, 15 U.S.C. 2605(e), and EPA regulations, 40 CFR Part 761, governing Polychlorinated Biphenyls (PCBs). PCBs are toxic substances formerly used in electrical equipment. The Toxic Substances Control Act and implementing EPA regulations require the registration, and in some cases, the removal and replacement of PCBs. In accordance with EPA regulations, owners of residential projects must have transformers inspected, and replaced if PCB is found. An employee of the utility company can inspect the transformers at the owner’s request and inform the project owner/manager of any evidence of PCBs in the electrical system.
When an application for the Section 8 Renewal Capital Repairs Program is submitted along with an application to the Office of Multifamily Programs for FHA multifamily mortgage insurance, the environmental review that is conducted by HUD staff under Chapter 9 of the MAP Guide as part of the multifamily mortgage insurance application process will satisfy the requirements of this section.
Rehabilitation performed under Chapter 15 does not trigger Davis-bacon Prevailing Wage Rate requirements. Davis-Bacon requirements ae applicable under certain HUD mortgage insurance programs.
B. Has a relocation plan for the residents during the rehabilitation acceptable to HUD, including, but not limited, to arrangements to continue reasonable accommodations granted to persons with disabilities or otherwise plan for and accommodate the needs of persons with disabilities.
C. Complies with physical accessibility requirements and standards – including, but not limited to, requirements for multifamily housing projects under HUD’s regulations at 24 CFR Part 8.23 and for covered multifamily dwellings at 24 CFR Part 100. The AE/CA will review proposed activities for compliance with accessibility standards in consultation with FHEO.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — HUD Section 8 Renewal Policy Guidebook
- U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT
- SPECIAL ATTENTION OF
- TRANSMITTAL
- A. Purpose
- Explanation of Changes
- Section 8 Renewal Policy Guidebook
- Office of Multifamily Housing
- Table of Contents
- Chapter One
- Introduction
- Chapter 1: Introduction
- Chapter 2: Section 8 Renewals
- Chapter 3: Option One: Mark-Up-To-Market
- Chapter 4: Option Two: Contract Renewals For Other Projects wi…
- Chapter 5: Option Three: Referral to Recap
- Chapter 6: Option Four: Renewal of Projects Exempt from or not…
- Chapter 7: Option Five: Renewal of Portfolio Reengineering Dem…
- Chapter 8: Option Six: Opt-Outs
- Chapter 9: Rent Comparability Studies
- Chapter 10: Residual Receipts
- Chapter 11: Tenant Issues
- Chapter 12: Physical Condition of the Project
- Chapter 13: HUD’s Refusal to Renew Section 8 Contracts
- Chapter 14: Rural Housing Service (RHS) Section 515/8
- Chapter 15: Section 8 Preservation Efforts
- — Chapter 16: “Old Regulation” State Housing Finance Agency Pr…
- 1-2. LEGISLATIVE HISTORY
- 1-3. RULEMAKING
- 1-4. ADMINISTRATIVE POLICY
- 1-5. APPLICABILITY
- 1-6. PAPERWORK REDUCTION ACT
- Chapter Two
- Section 8 Renewals
- 2-1. INTRODUCTION
- 2-2. OWNER OPTIONS
- 2-3. TYPES OF RENEWALS
- 2-4. EARLY TERMINATION OF A CONTRACT
- 2-5. RENT COMPARABILITY STUDY (RCS)
- Note: The AE/CA shall not lower the comparable market rents in…
- Note: A RCS is not required at any subsequent renewal of an EL…
- 2-6. CONTRACTS
- 2-8. SHORT-TERM CONTRACT RENEWALS
- 2-10. COMBINING CONTRACTS
- 2-11. REQUEST FOR A CONTRACT EXTENSION
- 2-12. DISTRIBUTIONS
- Note: The conditions listed above for receiving access to incr…
- 2-13. RENT ADJUSTMENTS
- 2-14. OPERATING COST ADJUSTMENT FACTOR (OCAF)
- 2-15. BUDGET-BASED RENT ADJUSTMENT REQUESTS
- 2-16. INCREASES IN DEPOSITS TO THE RESERVE FOR REPLACEMENT
- 2-17. PROCESSING INSTRUCTIONS
- Note: If the project has a budget approved by the AE/CA less t…
- Note: HUD does not accept the RHS utility analysis. The owner …
- 2-18. WAIVERS
- 2-19. DUNS NUMBER
- Chapter Three
- 3-1. OVERVIEW
- 3-3. OPTION ONE-A ENTITLEMENT MARK-UP-TO-MARKET ELIGIBILITY
- Note: Nonprofit controlled for profit entities as described in…
- 3-4. 150 PERCENT RENT CAP FOR OPTION ONE-A
- 3-5. EXCEEDING THE 150 PERCENT OF FMR CAP
- 3-6. OPTION ONE-B DISCRETIONARY MUTM ELIGIBILITY
- Note: Non-profit owned projects that meet one of the three cri…
- 3-7. RENEWAL REQUESTS
- 3-8. PROCESSING INSTRUCTIONS
- 3-9. ANNUAL RENT ADJUSTMENTS DURING A MULTIYEAR CONTRACT
- Chapter Four
- 4-1. ELIGIBILITY
- Note: Projects currently renewed under either Option Two or Op…
- 4-2. CONTRACT RENEWAL
- 4-3. ANNUAL RENT ADJUSTMENTS DURING A MULTIYEAR CONTRACT
- 4-4. PROCESSING INSTRUCTIONS
- Chapter Five
- Note: WAIVERS TO CHAPTER FIVE WILL BE IN ACCORDANCE WITH RECAP…
- Note: Risk Sharing Projects do not meet the definition of “eli…
- 5-2. BINDING COMMITMENT
- 5-3. ENTRY INTO RECAP
- Note: In cases where a CA makes the determination that contrac…
- 5-4. CONTRACT RENEWALS — RENT OR DEBT RESTRUCTURING
- 5-5. SUBSEQUENT RENEWALS
- 5-6. “WATCH LIST” MTM PROJECTS
- 5-7. GENERAL INFORMATION
- Chapter Six
- 6-1. ELIGIBILITY
- Note: State and local government financed projects that are no…
- Note: In cases where referral to Recap is necessary, CAs must …
- Note: Section 202 and 811 Capital Advance projects are not eli…
- Note: Projects financed under the risk-sharing loan programs u…
- 6-2. RENEWALS
- Reminder: For projects (including 202 projects) that are being…
- 6-3. RENT ADJUSTMENTS FOR MULTI-YEAR CONTRACTS
- 6-4. SECTION 202 REFINANCINGS
- Chapter Seven
- 7-1. ELIGIBILITY
- Portfolio Reengineering Demonstration Program Projects
- 7-2. RENEWAL OF PORTFOLIO REENGINEERING DEMONSTRATION PROJECTS
- FIVE
- Note: Owners can request that the existing Demo Program Use Ag…
- 7-4. PROCESSING INSTRUCTIONS FOR DEMONSTRATION PROJECTS
- 7-5. PRESERVATION PROJECTS (LIHPRHA AND ELIHPA)
- 7-6. OWNER’S SUBMISSION FOR PRESERVATION PROJECTS
- Note: Owners can request that the existing Preservation Use Ag…
- 7-7. PROCESSING INSTRUCTIONS FOR PRESERVATION PROJECTS
- 7-8. PROJECT SPECIFIC RENTS (PSRS)
- Chapter Eight
- 8-1. OVERVIEW
- 8-2. OWNER REQUIREMENTS FOR TENANT NOTIFICATION
- 8-3. PROCESSING INSTRUCTIONS
- Note: If proper notification was not provided, the owner must …
- Chapter Nine
- 9-1. BACKGROUND
- 9-2. APPLICABILITY OF CHAPTER NINE
- 9-3. ROAD MAP TO CHAPTER NINE
- 9-4. ALTERNATIVES TO RENT COMPARABILITY STUDY
- 9-6. METHOD TWO: COMPARING PROPOSED SECTION 8 RENTS WITH RENTS…
- 9-7. PREPARING A RENT COMPARABILITY STUDY
- 9-8. APPRAISER QUALIFICATIONS
- 9-9. ANALYZING THE SUBJECT PROJECT
- Note: Appraisers should not take into consideration demographi…
- Note: Government boundaries like state or county lines often d…
- 9-10. SELECTING COMPARABLE UNITS
- 9-11. COLLECTING AND DOCUMENTING DATA ON COMPARABLE UNITS
- 9-12. COMPUTING ADJUSTED RENTS FOR COMPARABLE UNITS
- 9-13. DERIVING ESTIMATED MARKET RENTS
- 9-14. PROCEDURE FOR MANDATORY MARKET RENT THRESHOLD
- Example Project in ZIP code 76469
- 9-15. HUD REVIEW OF RENT COMPARABILITY STUDY
- 9-16. INITIAL AND SUBSTANTIVE REVIEW OF OWNER’S RCS
- 9-17. COMMUNICATING RESULTS OF HUD/CA REVIEWS
- 9-18. OWNER APPEALS
- 9-19. IMPOSING SANCTIONS ON APPRAISERS
- APPENDICES
- - Instructions for Completing the HUD Form 92273 S8
- Part A: Rents Charged (lines 1 through 5)
- Part B. Design, Location, Condition (lines 6 through 10)
- Part C. Unit Equipment/Amenities (lines 11 through 23)
- Part D. Site Equipment/Amenities (lines 24 through 32)
- Part E. Utilities (lines 33 through 39)
- Part F. Adjustments Recap (lines 40 through 43)
- Part G. Adjusted Rents (lines 44 through 45)
- Required Contents of a Rent Comparability Study
-
▸ Comparable Project Profile
Overview- Address
- Place Photo Below:
- By my/our signature below, I/We certify that, to the best of m…
- Sample RCS Appraiser’s Transmittal Letter
- Re: Rent Comparability Study/[Project Name]
- Mandatory Market Rent Threshold Test
- Sample Owner’s Cover Letter
- RCS Submittal Cover Letter for [Project Name]
- Owner’s Materials
- RCS Materials
- Mandatory Market Rent Threshold Materials
- Owner’s Signature & Date
- Notes for Rent Grid Analysis and Triggers for Secondary Review
- Sample Issues Memo from Substantive Reviewer
- Special Project Types
- Forms Used in Preparation and Review of an RCS
- Chapter Ten
- Residual Recei pts
- Chapter Eleven
- 11-1. DEFINITIONS
- 11-2. HOUSING CONVERSION ACTIONS
- 11-3. TENANT PROTECTIONS
- 11-4. OWNER NOTIFICATION REQUIREMENTS
- Note: The one-year notification is not required when an owner …
- Note: Taping the Notice to the outside of each unit is not acc…
- 11-5. LIMITED ENGLISH PROFICIENCY ASSISTANCE
- 11-6. EFFECTIVE COMMUNICATIONS
- ( Date )
- THIS LETTER IS TO NOTIFY YOU THAT WE DO NOT INTEND TO RENEW TH…
- HUD Web
- ( Date )
- THIS LETTER IS TO NOTIFY YOU THAT WE INTEND TO RENEW THE CURRE…
- HUD Web
- ( Date )
- HUD Web
- Chapter Twelve
- 12-1. PHYSICAL CONDITION
- 12-2. EXIGENT HEALTH AND SAFETY (EH&S) DEFICIENCY NOTICE AND P…
- Note: hud@work is an internal site with no access for the publ…
- Chapter Thirteen
- 13-1. HUD’S REFUSAL TO RENEW A SECTION 8 HAP CONTRACT
- 13-2. HUD’S DECISION NOT TO RENEW THE EXPIRING CONTRACT
- 13-3. OWNER’S APPEAL OF HUD’S REFUSAL TO RENEW A SECTION 8 HAP…
- 13-4. HUD’S TENANT NOTIFICATION OF REFUSAL TO RENEW
- Chapter Fourteen
- 14-1. OVERVIEW
- 14-2. PROCESSING
- Note: HUD does not accept the RHS utility analysis. The owner …
- Note: If the owner of the project is a for profit who is not r…
- Note: RHS projects are exempted from debt restructuring under …
- Chapter Fifteen
- Section 8 Preservation Efforts
- 15-1. OVERVIEW
- PART ONE: DEFINITION OF NONPROFIT OWNER
- 15-2. NONPROFIT OWNER/PURCHASER
- 15-3. NONPROFIT CONTROLLED FOR PROFIT ENTITY (OWNER OR PURCHAS…
- PART TWO: GENERAL CRITERIA FOR BOTH CAPITAL REPAIRS AND TRANSF…
- 15-4. APPLICABILITY
- 15-5. BASIC REQUIREMENTS
- Note: HUD lacks the authority to allow a project to reduce ren…
- 15-6. RENT INCREASES
- 15-7. UNASSISTED UNITS IN A HUD PROJECT
- 15-8. CAP ON MARKET RENTS
- 15-9. PROJECT CAPITAL NEEDS ASSESSMENT AND INCREASED DEPOSITS …
- Note: For a non-insured project with an old regulation/LMSA/PD…
- PART THREE: CAPITAL REPAIRS PROGRAM
- 15-11. GENERAL
- 15-12. ADDITIONAL ACCEPTABILITY REQUIREMENTS FOR THE OWNER
- 15-13. PROJECT ELIGIBILITY
- Part Four: Transfer Program
- 15-14. GENERAL
- 15-15. ADDITIONAL PURCHASER REQUIREMENTS
- 15-16. PROJECT ELIGIBILITY
- 15-17. TRANSFER OF PHYSICAL ASSETS (TPA) FOR A HUD INSURED TRA…
- Chapter Sixteen
- 16-1. BACKGROUND, APPLICABILITY AND OVERVIEW
- 16-2. OWNER OPTIONS
- 16-3. TIMELINESS
- Rent Comparability Study (RCS) . See Comparability Study.