Part E. Utilities (lines 33 through 39)
HUD Section 8 Renewal Policy Guidebook · 2026 edition · updated 2026-07-29 · United States
Lines 33 through 39. Since tenants make housing choices based upon total shelter cost (rent + utilities), estimated outlays for utilities reduce, dollar for dollar, the amount a prospective tenant is willing to pay for rent. If a utility is included in the subject’s rent, but not in the rent of the comparable (or vice versa), the RCS appraiser must estimate the rental value of that utility and adjust accordingly. For projects with typical utility costs, the ‘rental value’ is probably close to what prospective tenants would expect to pay. However, for projects with unusually low utility costs, prospective tenants initially may overestimate utility costs, putting rental value slightly above actual cost. For projects with unusually high utility costs, the reverse may be true. Prospective tenants initially may underestimate utility outlays, causing rental value to be less than utility costs they incur following move-in.
For lines 33 through 39, the RCS appraiser must enter “Y” if the service is included in the rent and “N” if it is not. The RCS appraiser must follow the Y or N entry with a slant bar and the energy source for the utility addressed on that line. If the project does not have a utility listed here, the RCS appraiser may leave the space blank. “Other Electric” on line 37 includes the cost of electricity for things not listed separately on the form (e.g., lights and outlets).
When making adjustments on lines 33 through 39, the RCS appraiser must consider if a utility is:
excluded from the comparable rent but included in the subject rent, the RCS appraiser must enter a positive adjustment that reflects the amount prospective tenants would reasonably expect to pay for that utility at the comparable.
included in the comparable rent but not the subject rent, the RCS appraiser must enter a negative adjustment that reflects what prospective tenants would reasonably expect to pay for that utility at the subject. Since tenants make housing choices based upon total shelter cost (i.e., rent + utilities), estimated outlays for utilities reduce the amount a prospective tenant is willing to pay for rent.
Appendix 9-1-1 – Published March 2023
14
- included in the rent at both the subject and the comparable, a prospective tenant would probably perceive these as equal choices even if the energy sources (gas, electric, or oil) differ, and no adjustment would usually be needed by the RCS appraiser. However, if the RCS appraiser has evidence that the type of utility affects tenant preferences and rents, then the RCS appraiser may consider adjustments for tenant preferences. Example: Tenants may prefer gas over electric heat in severely cold locations. Such adjustments, when applicable, should not exceed a nominal amount of $10 or 2 percent of unadjusted rent of the comparable, whichever is larger; the RCS appraiser needs to explain any adjustment exceeding that nominal amount.
erences and rents, then the RCS appraiser may consider adjustments for tenant preferences. Example: Tenants may prefer gas over electric heat in severely cold locations. Such adjustments, when applicable, should not exceed a nominal amount of $10 or 2 percent of unadjusted rent of the comparable, whichever is larger; the RCS appraiser needs to explain any adjustment exceeding that nominal amount.
The RCS appraisers may use any reasonable method to value expected utility outlays, but must identify the method used and explain how the dollar adjustment was derived. Some data sources commonly used to value utility adjustments are listed below.
Regional Utility allowances published by independent public agencies. When using this source as the basis of adjustment in any utility item, RCS appraisers must be mindful that such published allowances typically represent the very high end of a reasonable range for each respective utility item.
Data gathered from utility providers.
Data gathered from tenants and landlords.
A HUD/CA approved utility allowance if the type of service and building attributes considered in developing the utility allowance are similar to the comparable being adjusted.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — HUD Section 8 Renewal Policy Guidebook
- U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT
- SPECIAL ATTENTION OF
- TRANSMITTAL
- A. Purpose
- Explanation of Changes
- Section 8 Renewal Policy Guidebook
- Office of Multifamily Housing
- Table of Contents
- Chapter One
- Introduction
- Chapter 1: Introduction
- Chapter 2: Section 8 Renewals
- Chapter 3: Option One: Mark-Up-To-Market
- Chapter 4: Option Two: Contract Renewals For Other Projects wi…
- Chapter 5: Option Three: Referral to Recap
- Chapter 6: Option Four: Renewal of Projects Exempt from or not…
- Chapter 7: Option Five: Renewal of Portfolio Reengineering Dem…
- Chapter 8: Option Six: Opt-Outs
- Chapter 9: Rent Comparability Studies
- Chapter 10: Residual Receipts
- Chapter 11: Tenant Issues
- Chapter 12: Physical Condition of the Project
- Chapter 13: HUD’s Refusal to Renew Section 8 Contracts
- Chapter 14: Rural Housing Service (RHS) Section 515/8
- Chapter 15: Section 8 Preservation Efforts
- — Chapter 16: “Old Regulation” State Housing Finance Agency Pr…
- 1-2. LEGISLATIVE HISTORY
- 1-3. RULEMAKING
- 1-4. ADMINISTRATIVE POLICY
- 1-5. APPLICABILITY
- 1-6. PAPERWORK REDUCTION ACT
- Chapter Two
- Section 8 Renewals
- 2-1. INTRODUCTION
- 2-2. OWNER OPTIONS
- 2-3. TYPES OF RENEWALS
- 2-4. EARLY TERMINATION OF A CONTRACT
- 2-5. RENT COMPARABILITY STUDY (RCS)
- Note: The AE/CA shall not lower the comparable market rents in…
- Note: A RCS is not required at any subsequent renewal of an EL…
- 2-6. CONTRACTS
- 2-8. SHORT-TERM CONTRACT RENEWALS
- 2-10. COMBINING CONTRACTS
- 2-11. REQUEST FOR A CONTRACT EXTENSION
- 2-12. DISTRIBUTIONS
- Note: The conditions listed above for receiving access to incr…
- 2-13. RENT ADJUSTMENTS
- 2-14. OPERATING COST ADJUSTMENT FACTOR (OCAF)
- 2-15. BUDGET-BASED RENT ADJUSTMENT REQUESTS
- 2-16. INCREASES IN DEPOSITS TO THE RESERVE FOR REPLACEMENT
- 2-17. PROCESSING INSTRUCTIONS
- Note: If the project has a budget approved by the AE/CA less t…
- Note: HUD does not accept the RHS utility analysis. The owner …
- 2-18. WAIVERS
- 2-19. DUNS NUMBER
- Chapter Three
- 3-1. OVERVIEW
- 3-3. OPTION ONE-A ENTITLEMENT MARK-UP-TO-MARKET ELIGIBILITY
- Note: Nonprofit controlled for profit entities as described in…
- 3-4. 150 PERCENT RENT CAP FOR OPTION ONE-A
- 3-5. EXCEEDING THE 150 PERCENT OF FMR CAP
- 3-6. OPTION ONE-B DISCRETIONARY MUTM ELIGIBILITY
- Note: Non-profit owned projects that meet one of the three cri…
- 3-7. RENEWAL REQUESTS
- 3-8. PROCESSING INSTRUCTIONS
- 3-9. ANNUAL RENT ADJUSTMENTS DURING A MULTIYEAR CONTRACT
- Chapter Four
- 4-1. ELIGIBILITY
- Note: Projects currently renewed under either Option Two or Op…
- 4-2. CONTRACT RENEWAL
- 4-3. ANNUAL RENT ADJUSTMENTS DURING A MULTIYEAR CONTRACT
- 4-4. PROCESSING INSTRUCTIONS
- Chapter Five
- Note: WAIVERS TO CHAPTER FIVE WILL BE IN ACCORDANCE WITH RECAP…
- Note: Risk Sharing Projects do not meet the definition of “eli…
- 5-2. BINDING COMMITMENT
- 5-3. ENTRY INTO RECAP
- Note: In cases where a CA makes the determination that contrac…
- 5-4. CONTRACT RENEWALS — RENT OR DEBT RESTRUCTURING
- 5-5. SUBSEQUENT RENEWALS
- 5-6. “WATCH LIST” MTM PROJECTS
- 5-7. GENERAL INFORMATION
- Chapter Six
- 6-1. ELIGIBILITY
- Note: State and local government financed projects that are no…
- Note: In cases where referral to Recap is necessary, CAs must …
- Note: Section 202 and 811 Capital Advance projects are not eli…
- Note: Projects financed under the risk-sharing loan programs u…
- 6-2. RENEWALS
- Reminder: For projects (including 202 projects) that are being…
- 6-3. RENT ADJUSTMENTS FOR MULTI-YEAR CONTRACTS
- 6-4. SECTION 202 REFINANCINGS
- Chapter Seven
- 7-1. ELIGIBILITY
- Portfolio Reengineering Demonstration Program Projects
- 7-2. RENEWAL OF PORTFOLIO REENGINEERING DEMONSTRATION PROJECTS
- FIVE
- Note: Owners can request that the existing Demo Program Use Ag…
- 7-4. PROCESSING INSTRUCTIONS FOR DEMONSTRATION PROJECTS
- 7-5. PRESERVATION PROJECTS (LIHPRHA AND ELIHPA)
- 7-6. OWNER’S SUBMISSION FOR PRESERVATION PROJECTS
- Note: Owners can request that the existing Preservation Use Ag…
- 7-7. PROCESSING INSTRUCTIONS FOR PRESERVATION PROJECTS
- 7-8. PROJECT SPECIFIC RENTS (PSRS)
- Chapter Eight
- 8-1. OVERVIEW
- 8-2. OWNER REQUIREMENTS FOR TENANT NOTIFICATION
- 8-3. PROCESSING INSTRUCTIONS
- Note: If proper notification was not provided, the owner must …
- Chapter Nine
- 9-1. BACKGROUND
- 9-2. APPLICABILITY OF CHAPTER NINE
- 9-3. ROAD MAP TO CHAPTER NINE
- 9-4. ALTERNATIVES TO RENT COMPARABILITY STUDY
- 9-6. METHOD TWO: COMPARING PROPOSED SECTION 8 RENTS WITH RENTS…
- 9-7. PREPARING A RENT COMPARABILITY STUDY
- 9-8. APPRAISER QUALIFICATIONS
- 9-9. ANALYZING THE SUBJECT PROJECT
- Note: Appraisers should not take into consideration demographi…
- Note: Government boundaries like state or county lines often d…
- 9-10. SELECTING COMPARABLE UNITS
- 9-11. COLLECTING AND DOCUMENTING DATA ON COMPARABLE UNITS
- 9-12. COMPUTING ADJUSTED RENTS FOR COMPARABLE UNITS
- 9-13. DERIVING ESTIMATED MARKET RENTS
- 9-14. PROCEDURE FOR MANDATORY MARKET RENT THRESHOLD
- Example Project in ZIP code 76469
- 9-15. HUD REVIEW OF RENT COMPARABILITY STUDY
- 9-16. INITIAL AND SUBSTANTIVE REVIEW OF OWNER’S RCS
- 9-17. COMMUNICATING RESULTS OF HUD/CA REVIEWS
- 9-18. OWNER APPEALS
- 9-19. IMPOSING SANCTIONS ON APPRAISERS
- APPENDICES
- - Instructions for Completing the HUD Form 92273 S8
- Part A: Rents Charged (lines 1 through 5)
- Part B. Design, Location, Condition (lines 6 through 10)
- Part C. Unit Equipment/Amenities (lines 11 through 23)
- Part D. Site Equipment/Amenities (lines 24 through 32)
- Part E. Utilities (lines 33 through 39)
- Part F. Adjustments Recap (lines 40 through 43)
- Part G. Adjusted Rents (lines 44 through 45)
- Required Contents of a Rent Comparability Study
- Comparable Project Profile