2-3. TYPES OF RENEWALS
HUD Section 8 Renewal Policy Guidebook · 2026 edition · updated 2026-07-29 · United States
When requesting a renewal, an owner must submit the Contract Renewal Request Form, Form HUD-9624, available on HUDCLIPS, and any required supporting documentation to the HUD Account Executive or the Contract Administrator/Performance Based Contract Administrator (AE/CA) for processing. (See Section 2-22 for detailed processing instructions.) The HUDCLIPS web address is:
= http://portal.hud.gov/hudportal/HUD?src /program offices/administration/hudclips
- A. Initial Renewal.
Generally, the first renewal of a project’s Section 8 contract or contract stage processed under MAHRA’s rules is the initial renewal of the contract.
- B. Subsequent Renewal.
The renewal of a MAHRA contract after the initial renewal is considered the subsequent renewal of the contract.
C. Renewal Options.
- Generally, an owner may renew the contract under any option in which the project is eligible at the time of renewal (i.e., the expiration date of the existing contract or, if applicable, the date of termination by mutual agreement of the existing contract).
Chapter Two – Published March 2023
3
Exceptions to the general rule include:
- a. Projects with Watch List Contracts can only be renewed under Option Three, Re-entry into Recap, for three consecutive one-year renewals, using the Watch List Contract. At the end of the third one-year renewal, if the project has demonstrated physical, financial and managerial improvement to HUD’s satisfaction, the project can renew under any option in which the project is eligible at the time of renewal.
Note: Certain housing finance agency HAP contracts may terminate at the prepayment of the original financing (See Chapter 16 for more information. An owner who wishes to terminate early any HFA contract that does not terminate at the prepayment of the original financing must obtain HFA approval prior to the termination of the contract.
b. Projects with contracts that are renewed under Section 515 of MAHRA (Full Mark-to-Market Renewal Contract) must renew under Option Three during the life of the MTM Use Agreement. (See Section 5-5.C for more information)
c. Owners of Preservation projects and Owners of Portfolio Reengineering Demonstration projects must renew under Option Five during the life of the LIHPHRA or ELIPHRA Use Agreements or of the Demo Use Agreement, except that the owner of a Preservation Project may request Mark-to-Market debt-restructuring any time prior to Sunset if the project is being transferred or sold. (See section 5-1. D)
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — HUD Section 8 Renewal Policy Guidebook
- U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT
- SPECIAL ATTENTION OF
- TRANSMITTAL
- A. Purpose
- Explanation of Changes
- Section 8 Renewal Policy Guidebook
- Office of Multifamily Housing
- Table of Contents
- Chapter One
- Introduction
- Chapter 1: Introduction
- Chapter 2: Section 8 Renewals
- Chapter 3: Option One: Mark-Up-To-Market
- Chapter 4: Option Two: Contract Renewals For Other Projects wi…
- Chapter 5: Option Three: Referral to Recap
- Chapter 6: Option Four: Renewal of Projects Exempt from or not…
- Chapter 7: Option Five: Renewal of Portfolio Reengineering Dem…
- Chapter 8: Option Six: Opt-Outs
- Chapter 9: Rent Comparability Studies
- Chapter 10: Residual Receipts
- Chapter 11: Tenant Issues
- Chapter 12: Physical Condition of the Project
- Chapter 13: HUD’s Refusal to Renew Section 8 Contracts
- Chapter 14: Rural Housing Service (RHS) Section 515/8
- Chapter 15: Section 8 Preservation Efforts
- — Chapter 16: “Old Regulation” State Housing Finance Agency Pr…
- 1-2. LEGISLATIVE HISTORY
- 1-3. RULEMAKING
- 1-4. ADMINISTRATIVE POLICY
- 1-5. APPLICABILITY
- 1-6. PAPERWORK REDUCTION ACT
- Chapter Two
- Section 8 Renewals
- 2-1. INTRODUCTION
- 2-2. OWNER OPTIONS
- 2-3. TYPES OF RENEWALS
- 2-4. EARLY TERMINATION OF A CONTRACT
- 2-5. RENT COMPARABILITY STUDY (RCS)
- Note: The AE/CA shall not lower the comparable market rents in…
- Note: A RCS is not required at any subsequent renewal of an EL…
- 2-6. CONTRACTS
- 2-8. SHORT-TERM CONTRACT RENEWALS
- 2-10. COMBINING CONTRACTS
- 2-11. REQUEST FOR A CONTRACT EXTENSION
- 2-12. DISTRIBUTIONS
- Note: The conditions listed above for receiving access to incr…
- 2-13. RENT ADJUSTMENTS
- 2-14. OPERATING COST ADJUSTMENT FACTOR (OCAF)
- 2-15. BUDGET-BASED RENT ADJUSTMENT REQUESTS
- 2-16. INCREASES IN DEPOSITS TO THE RESERVE FOR REPLACEMENT
- 2-17. PROCESSING INSTRUCTIONS
- Note: If the project has a budget approved by the AE/CA less t…
- Note: HUD does not accept the RHS utility analysis. The owner …
- 2-18. WAIVERS
- 2-19. DUNS NUMBER
- Chapter Three
- 3-1. OVERVIEW
- 3-3. OPTION ONE-A ENTITLEMENT MARK-UP-TO-MARKET ELIGIBILITY
- Note: Nonprofit controlled for profit entities as described in…
- 3-4. 150 PERCENT RENT CAP FOR OPTION ONE-A
- 3-5. EXCEEDING THE 150 PERCENT OF FMR CAP
- 3-6. OPTION ONE-B DISCRETIONARY MUTM ELIGIBILITY
- Note: Non-profit owned projects that meet one of the three cri…
- 3-7. RENEWAL REQUESTS
- 3-8. PROCESSING INSTRUCTIONS
- 3-9. ANNUAL RENT ADJUSTMENTS DURING A MULTIYEAR CONTRACT
- Chapter Four
- 4-1. ELIGIBILITY
- Note: Projects currently renewed under either Option Two or Op…
- 4-2. CONTRACT RENEWAL
- 4-3. ANNUAL RENT ADJUSTMENTS DURING A MULTIYEAR CONTRACT
- 4-4. PROCESSING INSTRUCTIONS
- Chapter Five
- Note: WAIVERS TO CHAPTER FIVE WILL BE IN ACCORDANCE WITH RECAP…
- Note: Risk Sharing Projects do not meet the definition of “eli…
- 5-2. BINDING COMMITMENT
- 5-3. ENTRY INTO RECAP
- Note: In cases where a CA makes the determination that contrac…
- 5-4. CONTRACT RENEWALS — RENT OR DEBT RESTRUCTURING
- 5-5. SUBSEQUENT RENEWALS
- 5-6. “WATCH LIST” MTM PROJECTS
- 5-7. GENERAL INFORMATION
- Chapter Six
- 6-1. ELIGIBILITY
- Note: State and local government financed projects that are no…
- Note: In cases where referral to Recap is necessary, CAs must …
- Note: Section 202 and 811 Capital Advance projects are not eli…
- Note: Projects financed under the risk-sharing loan programs u…
- 6-2. RENEWALS
- Reminder: For projects (including 202 projects) that are being…
- 6-3. RENT ADJUSTMENTS FOR MULTI-YEAR CONTRACTS
- 6-4. SECTION 202 REFINANCINGS
- Chapter Seven
- 7-1. ELIGIBILITY
- Portfolio Reengineering Demonstration Program Projects
- 7-2. RENEWAL OF PORTFOLIO REENGINEERING DEMONSTRATION PROJECTS
- FIVE
- Note: Owners can request that the existing Demo Program Use Ag…
- 7-4. PROCESSING INSTRUCTIONS FOR DEMONSTRATION PROJECTS
- 7-5. PRESERVATION PROJECTS (LIHPRHA AND ELIHPA)
- 7-6. OWNER’S SUBMISSION FOR PRESERVATION PROJECTS
- Note: Owners can request that the existing Preservation Use Ag…
- 7-7. PROCESSING INSTRUCTIONS FOR PRESERVATION PROJECTS
- 7-8. PROJECT SPECIFIC RENTS (PSRS)
- Chapter Eight
- 8-1. OVERVIEW
- 8-2. OWNER REQUIREMENTS FOR TENANT NOTIFICATION
- 8-3. PROCESSING INSTRUCTIONS
- Note: If proper notification was not provided, the owner must …
- Chapter Nine
- 9-1. BACKGROUND
- 9-2. APPLICABILITY OF CHAPTER NINE
- 9-3. ROAD MAP TO CHAPTER NINE
- 9-4. ALTERNATIVES TO RENT COMPARABILITY STUDY
- 9-6. METHOD TWO: COMPARING PROPOSED SECTION 8 RENTS WITH RENTS…
- 9-7. PREPARING A RENT COMPARABILITY STUDY
- 9-8. APPRAISER QUALIFICATIONS
- 9-9. ANALYZING THE SUBJECT PROJECT
- Note: Appraisers should not take into consideration demographi…
- Note: Government boundaries like state or county lines often d…
- 9-10. SELECTING COMPARABLE UNITS
- 9-11. COLLECTING AND DOCUMENTING DATA ON COMPARABLE UNITS
- 9-12. COMPUTING ADJUSTED RENTS FOR COMPARABLE UNITS
- 9-13. DERIVING ESTIMATED MARKET RENTS
- 9-14. PROCEDURE FOR MANDATORY MARKET RENT THRESHOLD
- Example Project in ZIP code 76469
- 9-15. HUD REVIEW OF RENT COMPARABILITY STUDY
- 9-16. INITIAL AND SUBSTANTIVE REVIEW OF OWNER’S RCS
- 9-17. COMMUNICATING RESULTS OF HUD/CA REVIEWS
- 9-18. OWNER APPEALS
- 9-19. IMPOSING SANCTIONS ON APPRAISERS
- APPENDICES
- - Instructions for Completing the HUD Form 92273 S8
- Part A: Rents Charged (lines 1 through 5)
- Part B. Design, Location, Condition (lines 6 through 10)
- Part C. Unit Equipment/Amenities (lines 11 through 23)
- Part D. Site Equipment/Amenities (lines 24 through 32)
- Part E. Utilities (lines 33 through 39)
- Part F. Adjustments Recap (lines 40 through 43)
- Part G. Adjusted Rents (lines 44 through 45)
- Required Contents of a Rent Comparability Study
- Comparable Project Profile