h.
Prepare a contract renewal.
- The AE/CA establishes the renewal rent per requirements for the renewal option selected.
- For the appropriate term:
a) Less than one year;
b) One year; or
c) Multiyear.
- For the expiration date of the contract:
The contract expiration date must be on the last day of the month.
- For the effective fiscal year for records effective October 1 in iREMS:
- If a contract or amend rents record expires on September 30, the last day of the fiscal year, the effective date of the new contract or
Chapter Two – Published March 2023
19
Amend Rents record is October 1, the first day of the new HUD fiscal year.
- For all Option One Renewal Contracts and for Option Two Renewal Contract where the term of the Renewal Contract is 20 years, insure that Exhibit B of the Basic Renewal Contract is attached to allow access to increased distributions.
- For contracts which are renewed following an early termination insure that the Preservation Exhibit is attached to the Renewal Contract and for any contract renewed following the early termination of a non-MAHRA contract insure that HUD-93184 “Rider to Original Section 8 Housing Assistance Payments Contract” is attached to the Renewal Contract.
B. Annual Rent Adjustments for Multiyear Contracts for Projects Participating In and Eligible for Auto OCAF in years of Amend Rents
Projects eligible for Auto OCAF rent adjustments are projects with contracts in years of Amend Rents and at the fifth-year adjustment to comparables. Projects may have renewed under any of the following Options:
Option One
Option Two — Project renewed under a Multi-Year Term Contract
Option Three
Option Four — Projects renewed under a Multi-Term Contract
Option Five — Demos with restructured loans only, for life of Use Agreement.
For projects that have tenant paid utilities, the owner must submit an analysis of the project’s Utility Allowance (see Housing Notice 2015-04) so that processing may be completed and any resulting change be effective on the date of the contract anniversary. To utilize the Auto OCAF process to its maximum benefit, owners are encouraged to submit their analysis prior to 150 days from contract anniversary, but should not submit more than 180 days. In the event the owner’s utility analysis results in a possible decrease in the utility allowance(s) to the tenants, owners must follow the tenant notification procedures in 24 CFR Part 245.
At 150 calendar days before the anniversary date of the contract, the AE/CA will receive a system notification to process an Auto OCAF. The AE/CA will:
- a. Access the Amend Rents record in iREMS and review the calculation of contracts rents performed by iREMS. Make any adjustments necessary based on current documentation.
b. Generate the Auto OCAF letter to the owner/agent (O/A) (Form HUD9626 for Options One and Three, Form HUD-9627 for Options Two and Four), and the Exhibit A Rent Schedule. Review documents for accuracy.
- c. Send letter and Exhibit A to O/A.
Chapter Two – Published March 2023
20
Upon receipt of the letter and the Exhibit A, the owner will review the OCAF adjusted rents and calculations and:
a. Elect to receive the Auto OCAF rent adjustment, or
b. Request a budget-based rent adjustment (if permitted under the terms of the renewal contract governing contract rent adjustment). An O/A may request a zero budget-based rent adjustment to maintain current rents. By checking the appropriate box on HUD 9626 or HUD-9627 an owner does not need to submit a budget if requesting a “$0” budget based rent increase.
Should the O/A select the Auto OCAF rent adjustment, the O/A must complete and return to AE/CA a signed HUD-Form 9626 or HUD-Form 9627.
Should the O/A select a budget-based adjustment, the O/A must return to AE/CA:
a. Signed HUD-Form 9626 or HUD-Form 9627.
b. All documentation required for a budget-based rent adjustment as defined in HUD Handbook 4350.1, Chapter 7.
Upon receipt of the O/As submission, AE/CA:
a. Should review O/As rent adjustment documentation.
b. If acceptable, update iREMS.
c. If the rent increase does not exceed five percent, then the CA processes the increase. If the rent increase equals or exceeds five percent, then the CA should forward the request to the AE for review.
d. Execute Rent Schedule Low Income Housing, Form HUD-92458, and return to O/A.
C. Annual Rent Adjustments for Multiyear Contracts for Projects not Participating in Auto OCAF
Before submitting the annual rent adjustment request under 2. Below, the owner must follow the tenant notification procedures in 24 CFR Part 245 Subpart D if the rent increase is not an OCAF rent adjustment. Whenever an owner’s utility analysis results in a possible decrease in the utility allowance(s) to the project tenant notification procedures in 24 CFR Part 245 must also be followed even if the rent adjustment was made by the OCAF. Should a notice need to be issued for both a rent increase and a utility allowance decrease, a single notice is sufficient if the owner clearly identifies both items in the notice.
At least 120 days but no earlier than 180 days before the anniversary date of the contract, the owner submits:
a. OCAF Rent Adjustment Worksheet, Form HUD-9625;
b. An analysis of the project’s Utility Allowances (See Housing Notice 201504 or subsequent notices); and
c. If applicable:
- A RCS; and/or
Chapter Two – Published March 2023
21
- 2) A budget-based adjustment, prepared in accordance with paragraph 2-15 of this Guide or a RHS approved budget that does not exceed comparable market rents.
- The AE/CA should complete the review of an owner’s submission within 30 calendar days.
a. If applicable, review the RCS and the charts on the worksheet (HUD9625) to verify that the calculations provided include only those Section 8 units in the expiring contract and ascertain the accuracy of the computations.
b. Prepare an amended Exhibit A, Rent Schedule, for the MAHRA contract to be issued to the owner and update iREMS. If applicable:
- The resulting rents cannot exceed the OCAF-adjusted RCS.
- The OCAF-adjusted RCS serves as the market cap.
- If the rents are above the OCAF adjusted RCS rents or market rents determined by an alternative method (See Chapter 9), HUD will not approve the budget-based request. The owner would receive the OCAF adjustment or could resubmit the budget that is limited to market. This requirement is not applicable when processing Option Five preservation projects.
- If a budget-based rent increase does not exceed five percent then the CA processes the increase. If a budget-based rent increase equals or exceeds five percent, then the CA should forward the request to the AE for review.
Under Option One, Mark-Up-To-Market, Option Two, Contract Renewals for Other Projects with Current Rents at or Below Comparable Market Rents, and Option Five, Portfolio Re-engineering Demonstration Program (Demo) contracts, if the contract is for a period greater than five years:
a. The owner submits a new RCS at the end of each 5-year life cycle of the RCS. The new RCS must be reviewed in accordance with the instructions in Chapter 9 of this Guide.
b. If rents are:
- Above market, the AE/CA will reduce the rent to the comparable market rent.
- Below market, the AE/CA will increase the rents to comparable market rents.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — HUD Section 8 Renewal Policy Guidebook
- U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT
- SPECIAL ATTENTION OF
- TRANSMITTAL
- A. Purpose
- Explanation of Changes
- Section 8 Renewal Policy Guidebook
- Office of Multifamily Housing
- Table of Contents
- Chapter One
- Introduction
- Chapter 1: Introduction
- Chapter 2: Section 8 Renewals
- Chapter 3: Option One: Mark-Up-To-Market
- Chapter 4: Option Two: Contract Renewals For Other Projects wi…
- Chapter 5: Option Three: Referral to Recap
- Chapter 6: Option Four: Renewal of Projects Exempt from or not…
- Chapter 7: Option Five: Renewal of Portfolio Reengineering Dem…
- Chapter 8: Option Six: Opt-Outs
- Chapter 9: Rent Comparability Studies
- Chapter 10: Residual Receipts
- Chapter 11: Tenant Issues
- Chapter 12: Physical Condition of the Project
- Chapter 13: HUD’s Refusal to Renew Section 8 Contracts
- Chapter 14: Rural Housing Service (RHS) Section 515/8
- Chapter 15: Section 8 Preservation Efforts
- — Chapter 16: “Old Regulation” State Housing Finance Agency Pr…
- 1-2. LEGISLATIVE HISTORY
- 1-3. RULEMAKING
- 1-4. ADMINISTRATIVE POLICY
- 1-5. APPLICABILITY
- 1-6. PAPERWORK REDUCTION ACT
- Chapter Two
- Section 8 Renewals
- 2-1. INTRODUCTION
- 2-2. OWNER OPTIONS
- 2-3. TYPES OF RENEWALS
- 2-4. EARLY TERMINATION OF A CONTRACT
- 2-5. RENT COMPARABILITY STUDY (RCS)
- Note: The AE/CA shall not lower the comparable market rents in…
- Note: A RCS is not required at any subsequent renewal of an EL…
- 2-6. CONTRACTS
- 2-8. SHORT-TERM CONTRACT RENEWALS
- 2-10. COMBINING CONTRACTS
- 2-11. REQUEST FOR A CONTRACT EXTENSION
- 2-12. DISTRIBUTIONS
- Note: The conditions listed above for receiving access to incr…
- 2-13. RENT ADJUSTMENTS
- 2-14. OPERATING COST ADJUSTMENT FACTOR (OCAF)
- 2-15. BUDGET-BASED RENT ADJUSTMENT REQUESTS
- 2-16. INCREASES IN DEPOSITS TO THE RESERVE FOR REPLACEMENT
- 2-17. PROCESSING INSTRUCTIONS
- Note: If the project has a budget approved by the AE/CA less t…
- Note: HUD does not accept the RHS utility analysis. The owner …
- 2-18. WAIVERS
- 2-19. DUNS NUMBER
- Chapter Three
- 3-1. OVERVIEW
- 3-3. OPTION ONE-A ENTITLEMENT MARK-UP-TO-MARKET ELIGIBILITY
- Note: Nonprofit controlled for profit entities as described in…
- 3-4. 150 PERCENT RENT CAP FOR OPTION ONE-A
- 3-5. EXCEEDING THE 150 PERCENT OF FMR CAP
- 3-6. OPTION ONE-B DISCRETIONARY MUTM ELIGIBILITY
- Note: Non-profit owned projects that meet one of the three cri…
- 3-7. RENEWAL REQUESTS
- 3-8. PROCESSING INSTRUCTIONS
- 3-9. ANNUAL RENT ADJUSTMENTS DURING A MULTIYEAR CONTRACT
- Chapter Four
- 4-1. ELIGIBILITY
- Note: Projects currently renewed under either Option Two or Op…
- 4-2. CONTRACT RENEWAL
- 4-3. ANNUAL RENT ADJUSTMENTS DURING A MULTIYEAR CONTRACT
- 4-4. PROCESSING INSTRUCTIONS
- Chapter Five
- Note: WAIVERS TO CHAPTER FIVE WILL BE IN ACCORDANCE WITH RECAP…
- Note: Risk Sharing Projects do not meet the definition of “eli…
- 5-2. BINDING COMMITMENT
- 5-3. ENTRY INTO RECAP
- Note: In cases where a CA makes the determination that contrac…
- 5-4. CONTRACT RENEWALS — RENT OR DEBT RESTRUCTURING
- 5-5. SUBSEQUENT RENEWALS
- 5-6. “WATCH LIST” MTM PROJECTS
- 5-7. GENERAL INFORMATION
- Chapter Six
- 6-1. ELIGIBILITY
- Note: State and local government financed projects that are no…
- Note: In cases where referral to Recap is necessary, CAs must …
- Note: Section 202 and 811 Capital Advance projects are not eli…
- Note: Projects financed under the risk-sharing loan programs u…
- 6-2. RENEWALS
- Reminder: For projects (including 202 projects) that are being…
- 6-3. RENT ADJUSTMENTS FOR MULTI-YEAR CONTRACTS
- 6-4. SECTION 202 REFINANCINGS
- Chapter Seven
- 7-1. ELIGIBILITY
- Portfolio Reengineering Demonstration Program Projects
- 7-2. RENEWAL OF PORTFOLIO REENGINEERING DEMONSTRATION PROJECTS
- FIVE
- Note: Owners can request that the existing Demo Program Use Ag…
- 7-4. PROCESSING INSTRUCTIONS FOR DEMONSTRATION PROJECTS
- 7-5. PRESERVATION PROJECTS (LIHPRHA AND ELIHPA)
- 7-6. OWNER’S SUBMISSION FOR PRESERVATION PROJECTS
- Note: Owners can request that the existing Preservation Use Ag…
- 7-7. PROCESSING INSTRUCTIONS FOR PRESERVATION PROJECTS
- 7-8. PROJECT SPECIFIC RENTS (PSRS)
- Chapter Eight
- 8-1. OVERVIEW
- 8-2. OWNER REQUIREMENTS FOR TENANT NOTIFICATION
- 8-3. PROCESSING INSTRUCTIONS
- Note: If proper notification was not provided, the owner must …
- Chapter Nine
- 9-1. BACKGROUND
- 9-2. APPLICABILITY OF CHAPTER NINE
- 9-3. ROAD MAP TO CHAPTER NINE
- 9-4. ALTERNATIVES TO RENT COMPARABILITY STUDY
- 9-6. METHOD TWO: COMPARING PROPOSED SECTION 8 RENTS WITH RENTS…
- 9-7. PREPARING A RENT COMPARABILITY STUDY
- 9-8. APPRAISER QUALIFICATIONS
- 9-9. ANALYZING THE SUBJECT PROJECT
- Note: Appraisers should not take into consideration demographi…
- Note: Government boundaries like state or county lines often d…
- 9-10. SELECTING COMPARABLE UNITS
- 9-11. COLLECTING AND DOCUMENTING DATA ON COMPARABLE UNITS
- 9-12. COMPUTING ADJUSTED RENTS FOR COMPARABLE UNITS
- 9-13. DERIVING ESTIMATED MARKET RENTS
- 9-14. PROCEDURE FOR MANDATORY MARKET RENT THRESHOLD
- Example Project in ZIP code 76469
- 9-15. HUD REVIEW OF RENT COMPARABILITY STUDY
- 9-16. INITIAL AND SUBSTANTIVE REVIEW OF OWNER’S RCS
- 9-17. COMMUNICATING RESULTS OF HUD/CA REVIEWS
- 9-18. OWNER APPEALS
- 9-19. IMPOSING SANCTIONS ON APPRAISERS
- APPENDICES
- - Instructions for Completing the HUD Form 92273 S8
- Part A: Rents Charged (lines 1 through 5)
- Part B. Design, Location, Condition (lines 6 through 10)
- Part C. Unit Equipment/Amenities (lines 11 through 23)
- Part D. Site Equipment/Amenities (lines 24 through 32)
- Part E. Utilities (lines 33 through 39)
- Part F. Adjustments Recap (lines 40 through 43)
- Part G. Adjusted Rents (lines 44 through 45)
- Required Contents of a Rent Comparability Study
- Comparable Project Profile