Skip to content

Note: In cases where a CA makes the determination that contract rents exceed comparable…

HUD Section 8 Renewal Policy Guidebook · 2026 edition · updated 2026-07-29 · United States

  • B. Currently At-Market Projects: Prior to Sunset, any project that had above-market rents at the time of the initial renewal on or after October 1, 1998, may be eligible for a full debt restructuring even if the current rents are at-or below-market. An owner of such project can request a debt restructuring as follows:

    1. Owners with Watch List contracts may request re-entry into Recap for restructuring, but must have a binding commitment as set forth in Section 5-2, above, prior to Sunset, for any restructuring to occur after Sunset. If approved by Recap for re-entry, terminate the Watch List Renewal Contract and issue the Interim (Full) Mark-to-Market Renewal Contract.

    2. Owners who were originally eligible for Recap, but whose rents were reduced without the benefit of debt restructuring may request entry into Recap prior to Sunset. Generally, this group includes any project, including previously approved Lite projects, that had above market rents at the time of the initial renewal and are otherwise eligible. Use the Interim (Full) Mark-to-Market Renewal Contract.

  • C.

  • Required Owner Submissions:

  1. For Lite Rent Restructuring: The owner submits a Contract Renewal Request Form (HUD-9624), including a certification that project rents exceed comparable market rents (or exceeded comparable rents on or after October 1, 1998), and neither the owner nor any affiliate is suspended nor debarred. If the owner or any affiliate is suspended or debarred, the project may continue to be eligible for a Lite. (Refer to Chapter 6, Approvals, Ineligibility and Appeals”, of the Recap Operating Procedures Guide.) The AE/CA executes the Interim (Lite) Mark-toMarket Renewal Contract for a term determined by Recap, not to exceed 12 months.

An owner requesting a Lite is also required to submit:

  • a. A physical inspection report,

  • b. A copy of the most recent audited financial statements (all financial statements must be official electronic submissions to HUD); and

Chapter Five – Published March 2023

3

  - c. A RCS. 
  1. For Full Debt Restructuring: The owner submits a Contract Renewal Request Form, including a certification that project rents exceed comparable market rents (or exceeded comparable rents at a renewal on or after October 1, 1998), and that neither the owner nor any affiliate is suspended nor debarred. If the owner is suspended nor debarred, a request for a debt restructuring may be rejected by the Secretary, unless the debt restructuring includes a transfer of the project to a HUDapproved purchaser. If any affiliate is suspended or debarred, the project may continue to be eligible for contract renewal with restructuring at the Secretary’s discretion. (Refer to Chapter 6, “Approvals, Ineligibility and Appeals” of the Recap Operating Procedures Guide.)
  • D. The AE/CA:
  1. If the project is entering Recap for a debt restructuring, the AE/CA executes the Interim (Full) Mark-to-Market Renewal Contract and forwards it to Recap for processing. The Interim (Full) Mark-to-Market Renewal Contract expires by its terms upon the earlier of: 1) twelve (12) months; 2) last day of the month of closing under the Restructuring Commitment; 3) upon a final determination as defined in MAHRA and the Regulations (“Final Determination”) that results in the discontinuance of the Restructuring process or that the owner is in default under the renewal contract.

    1. If a project subject to a Watch List Renewal Contract (HUD-9643) is re-entering Recap, the AE/CA terminates the Watch List Renewal Contract and replaces it with the Interim (Full) Mark-to-Market Renewal Contract for a specific period determined by Recap to complete the processing.

    2. If a completed Lite project wants to return to Recap for a debt restructuring, the AE/CA executes the contract for a specific period (12 months or less) determined by Recap to complete the processing. Use the Interim (Full) Mark-to-Market Renewal Contract to complete the processing.

  • E. Extensions of Interim Contracts:

    1. Recap/Participating Administrative Entity (PAE)/HUD Delays: The AE, Recap or the PAE may request an extension of the Interim Contract at above market rents for any project that has exceeded the one year period. Extensions at above market rents may not exceed the approved expiration date. Recap projects with approved extensions must use the appropriate interim contract.

    2. Owner Delays: There will be no extension at above-market rents when HUD determines that the owner is the cause of the delay. In these cases, where additional time is required, the AE/CA will extend the Interim Full Renewal contract at market rents. Recap will direct the AE/CA to extend the contract for a sufficient period required to bring the project to closing.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — HUD Section 8 Renewal Policy Guidebook
HUD Section 8 Renewal Policy Guidebook
  1. U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT
  2. SPECIAL ATTENTION OF
  3. TRANSMITTAL
  4. A. Purpose
  5. Explanation of Changes
  6. Section 8 Renewal Policy Guidebook
  7. Office of Multifamily Housing
  8. Table of Contents
  9. Chapter One
  10. Introduction
  11. Chapter 1: Introduction
  12. Chapter 2: Section 8 Renewals
  13. Chapter 3: Option One: Mark-Up-To-Market
  14. Chapter 4: Option Two: Contract Renewals For Other Projects wi…
  15. Chapter 5: Option Three: Referral to Recap
  16. Chapter 6: Option Four: Renewal of Projects Exempt from or not…
  17. Chapter 7: Option Five: Renewal of Portfolio Reengineering Dem…
  18. Chapter 8: Option Six: Opt-Outs
  19. Chapter 9: Rent Comparability Studies
  20. Chapter 10: Residual Receipts
  21. Chapter 11: Tenant Issues
  22. Chapter 12: Physical Condition of the Project
  23. Chapter 13: HUD’s Refusal to Renew Section 8 Contracts
  24. Chapter 14: Rural Housing Service (RHS) Section 515/8
  25. Chapter 15: Section 8 Preservation Efforts
  26. — Chapter 16: “Old Regulation” State Housing Finance Agency Pr…
  27. 1-2. LEGISLATIVE HISTORY
  28. 1-3. RULEMAKING
  29. 1-4. ADMINISTRATIVE POLICY
  30. 1-5. APPLICABILITY
  31. 1-6. PAPERWORK REDUCTION ACT
  32. Chapter Two
  33. Section 8 Renewals
  34. 2-1. INTRODUCTION
  35. 2-2. OWNER OPTIONS
  36. 2-3. TYPES OF RENEWALS
  37. 2-4. EARLY TERMINATION OF A CONTRACT
  38. 2-5. RENT COMPARABILITY STUDY (RCS)
  39. Note: The AE/CA shall not lower the comparable market rents in…
  40. Note: A RCS is not required at any subsequent renewal of an EL…
  41. 2-6. CONTRACTS
  42. 2-8. SHORT-TERM CONTRACT RENEWALS
  43. 2-10. COMBINING CONTRACTS
  44. 2-11. REQUEST FOR A CONTRACT EXTENSION
  45. 2-12. DISTRIBUTIONS
  46. Note: The conditions listed above for receiving access to incr…
  47. 2-13. RENT ADJUSTMENTS
  48. 2-14. OPERATING COST ADJUSTMENT FACTOR (OCAF)
  49. 2-15. BUDGET-BASED RENT ADJUSTMENT REQUESTS
  50. 2-16. INCREASES IN DEPOSITS TO THE RESERVE FOR REPLACEMENT
  51. 2-17. PROCESSING INSTRUCTIONS
  52. Note: If the project has a budget approved by the AE/CA less t…
  53. Note: HUD does not accept the RHS utility analysis. The owner …
  54. 2-18. WAIVERS
  55. 2-19. DUNS NUMBER
  56. Chapter Three
  57. 3-1. OVERVIEW
  58. 3-3. OPTION ONE-A ENTITLEMENT MARK-UP-TO-MARKET ELIGIBILITY
  59. Note: Nonprofit controlled for profit entities as described in…
  60. 3-4. 150 PERCENT RENT CAP FOR OPTION ONE-A
  61. 3-5. EXCEEDING THE 150 PERCENT OF FMR CAP
  62. 3-6. OPTION ONE-B DISCRETIONARY MUTM ELIGIBILITY
  63. Note: Non-profit owned projects that meet one of the three cri…
  64. 3-7. RENEWAL REQUESTS
  65. 3-8. PROCESSING INSTRUCTIONS
  66. 3-9. ANNUAL RENT ADJUSTMENTS DURING A MULTIYEAR CONTRACT
  67. Chapter Four
  68. 4-1. ELIGIBILITY
  69. Note: Projects currently renewed under either Option Two or Op…
  70. 4-2. CONTRACT RENEWAL
  71. 4-3. ANNUAL RENT ADJUSTMENTS DURING A MULTIYEAR CONTRACT
  72. 4-4. PROCESSING INSTRUCTIONS
  73. Chapter Five
  74. Note: WAIVERS TO CHAPTER FIVE WILL BE IN ACCORDANCE WITH RECAP…
  75. Note: Risk Sharing Projects do not meet the definition of “eli…
  76. 5-2. BINDING COMMITMENT
  77. 5-3. ENTRY INTO RECAP
  78. Note: In cases where a CA makes the determination that contrac…
  79. 5-4. CONTRACT RENEWALS — RENT OR DEBT RESTRUCTURING
  80. 5-5. SUBSEQUENT RENEWALS
  81. 5-6. “WATCH LIST” MTM PROJECTS
  82. 5-7. GENERAL INFORMATION
  83. Chapter Six
  84. 6-1. ELIGIBILITY
  85. Note: State and local government financed projects that are no…
  86. Note: In cases where referral to Recap is necessary, CAs must …
  87. Note: Section 202 and 811 Capital Advance projects are not eli…
  88. Note: Projects financed under the risk-sharing loan programs u…
  89. 6-2. RENEWALS
  90. Reminder: For projects (including 202 projects) that are being…
  91. 6-3. RENT ADJUSTMENTS FOR MULTI-YEAR CONTRACTS
  92. 6-4. SECTION 202 REFINANCINGS
  93. Chapter Seven
  94. 7-1. ELIGIBILITY
  95. Portfolio Reengineering Demonstration Program Projects
  96. 7-2. RENEWAL OF PORTFOLIO REENGINEERING DEMONSTRATION PROJECTS
  97. FIVE
  98. Note: Owners can request that the existing Demo Program Use Ag…
  99. 7-4. PROCESSING INSTRUCTIONS FOR DEMONSTRATION PROJECTS
  100. 7-5. PRESERVATION PROJECTS (LIHPRHA AND ELIHPA)
  101. 7-6. OWNER’S SUBMISSION FOR PRESERVATION PROJECTS
  102. Note: Owners can request that the existing Preservation Use Ag…
  103. 7-7. PROCESSING INSTRUCTIONS FOR PRESERVATION PROJECTS
  104. 7-8. PROJECT SPECIFIC RENTS (PSRS)
  105. Chapter Eight
  106. 8-1. OVERVIEW
  107. 8-2. OWNER REQUIREMENTS FOR TENANT NOTIFICATION
  108. 8-3. PROCESSING INSTRUCTIONS
  109. Note: If proper notification was not provided, the owner must …
  110. Chapter Nine
  111. 9-1. BACKGROUND
  112. 9-2. APPLICABILITY OF CHAPTER NINE
  113. 9-3. ROAD MAP TO CHAPTER NINE
  114. 9-4. ALTERNATIVES TO RENT COMPARABILITY STUDY
  115. 9-6. METHOD TWO: COMPARING PROPOSED SECTION 8 RENTS WITH RENTS…
  116. 9-7. PREPARING A RENT COMPARABILITY STUDY
  117. 9-8. APPRAISER QUALIFICATIONS
  118. 9-9. ANALYZING THE SUBJECT PROJECT
  119. Note: Appraisers should not take into consideration demographi…
  120. Note: Government boundaries like state or county lines often d…
  121. 9-10. SELECTING COMPARABLE UNITS
  122. 9-11. COLLECTING AND DOCUMENTING DATA ON COMPARABLE UNITS
  123. 9-12. COMPUTING ADJUSTED RENTS FOR COMPARABLE UNITS
  124. 9-13. DERIVING ESTIMATED MARKET RENTS
  125. 9-14. PROCEDURE FOR MANDATORY MARKET RENT THRESHOLD
  126. Example Project in ZIP code 76469
  127. 9-15. HUD REVIEW OF RENT COMPARABILITY STUDY
  128. 9-16. INITIAL AND SUBSTANTIVE REVIEW OF OWNER’S RCS
  129. 9-17. COMMUNICATING RESULTS OF HUD/CA REVIEWS
  130. 9-18. OWNER APPEALS
  131. 9-19. IMPOSING SANCTIONS ON APPRAISERS
  132. APPENDICES
  133. - Instructions for Completing the HUD Form 92273 S8
  134. Part A: Rents Charged (lines 1 through 5)
  135. Part B. Design, Location, Condition (lines 6 through 10)
  136. Part C. Unit Equipment/Amenities (lines 11 through 23)
  137. Part D. Site Equipment/Amenities (lines 24 through 32)
  138. Part E. Utilities (lines 33 through 39)
  139. Part F. Adjustments Recap (lines 40 through 43)
  140. Part G. Adjusted Rents (lines 44 through 45)
  141. Required Contents of a Rent Comparability Study
  142. Comparable Project Profile

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.