5-6. “WATCH LIST” MTM PROJECTS
HUD Section 8 Renewal Policy Guidebook · 2026 edition · updated 2026-07-29 · United States
- A. Watch List Contracts are used when:
Chapter Five – Published March 2023
8
Recap decides of ineligibility under Section 516(a) of MAHRA; or,
An owner refuses to change his/her election from a Lite to a Full after Recap has determined that a renewal without a debt restructuring would not be sufficient to maintain adequate debt service coverage and/or the physical integrity of the project; or,
An owner refuses to execute a Restructuring Commitment or close on a Full; or,
Recap concludes that the restructuring process will not result in an economically and/or financially feasible project.
See Chapter Six, “Approvals, Ineligibility, and Appeals” in the OPG for further information on ineligibility and discontinuance in Recap.
Use the Watch List Renewal Contract (HUD-9643). These contracts are limited to one year terms; multi-year contract terms are not permitted for projects placed on the Watch List. See HUD-9643, Section 4d (2).
B. Processing Watch List Contracts: Once the PAE completes the processing, Recap prepares a new one-year Watch List Renewal Contract HUD-9643 and forwards a copy of the contract to the AE/CA.
Market Rents and Term: The Watch List Contract reduces rents to market using Recap’s determination, and requires the owner to submit monthly accounting reports. The project is placed on the Watch List, and defined in IREMS as a project subject to a loan that failed M2M restructuring and is therefore operating under a Watch List Section 8 HAP Contract, to be monitored by a designated Account Resolution Specialist.
Term and Rent Adjustments: Unless the project meets the conditions listed below for removal, a project remains on the Watch List for three years and would receive three contracts, each of one year’s duration. No rent adjustments are allowed during the term of each contract, but OCAF adjustments are permitted between contracts. For example, there could be an OCAF adjustment for the rents established in the second Watch List contract and the third Watch List contract.
Continued Mark-to-Market Eligibility: If, after the effective date of the Watch List Contract, the owner chooses a full debt restructuring, he/she must submit a HUD 9624, Contract Renewal Request Form, to the AE/CA. Recap reserves the right to reassess the eligibility and suitability of the project and the owner. If approved for re-entry, the owner must execute an Interim (Full) Mark-to-Market Renewal Contract at current market rents. Prior to Sunset, the owner must have a binding commitment to restructure the debt in order for processing to continue after Sunset. See Section 5-2.
Removal from the Watch List: A project can only be removed from the Watch List if any one of the following is satisfied:
- (a) The owner requests to return to Recap, and Recap approves;
Chapter Five – Published March 2023
9
(b) The project has been on the Watch List for three years, and the Account Resolution Specialist has determined that the project is not experiencing physical, financial, or managerial signs of deterioration;
(c) The owner has prepaid the mortgage; or
(d) The owner has opted out of the Section 8 Program.
Multifamily Regional Center may request removal of a project from the Watch List by submitting written justification to Recap Headquarters.
C. Monitoring Watch List Contracts: Projects on the “Watch List” list are considered to be at greater risk and have questionable long-term financial viability. As a result, these projects must be monitored closely. Refer to Handbook 4350.1 and other guidance for policies and procedures that must be applied to all projects on the Watch List.
D. File Return and IREMS Documentation: The PAE will return project files to the appropriate AE who is responsible for entering the following information in the problem statement screen in IREMS:
The monitoring category and the reason(s) why, i.e., defined as loans that failed M2M restructuring and are therefore operating under a Watch List Renewal Section 8 HAP Contract, and
Any other relevant information provided by the PAE/ Recap process that indicate the physical, financial and/or management problems that should be closely monitored over the term of the contract.
E. If, over the term of the contract, the project shows signs of deterioration, the AE/CA should take immediate actions that are consistent with Handbook 4350.1, Multifamily Asset Management and Project Servicing Guide (See Chapter Thirteen of this Guide if it is determined that the housing assistance payments should be abated).
F. Owner Prepayments: If the owner prepays the mortgage while under a Watch List Contract, the AE will notify Recap, the project will be removed from the Watch List, and the AE will issue a Basic Renewal Contract at the comparable market rents established under the Watch List Contract.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — HUD Section 8 Renewal Policy Guidebook
- U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT
- SPECIAL ATTENTION OF
- TRANSMITTAL
- A. Purpose
- Explanation of Changes
- Section 8 Renewal Policy Guidebook
- Office of Multifamily Housing
- Table of Contents
- Chapter One
- Introduction
- Chapter 1: Introduction
- Chapter 2: Section 8 Renewals
- Chapter 3: Option One: Mark-Up-To-Market
- Chapter 4: Option Two: Contract Renewals For Other Projects wi…
- Chapter 5: Option Three: Referral to Recap
- Chapter 6: Option Four: Renewal of Projects Exempt from or not…
- Chapter 7: Option Five: Renewal of Portfolio Reengineering Dem…
- Chapter 8: Option Six: Opt-Outs
- Chapter 9: Rent Comparability Studies
- Chapter 10: Residual Receipts
- Chapter 11: Tenant Issues
- Chapter 12: Physical Condition of the Project
- Chapter 13: HUD’s Refusal to Renew Section 8 Contracts
- Chapter 14: Rural Housing Service (RHS) Section 515/8
- Chapter 15: Section 8 Preservation Efforts
- — Chapter 16: “Old Regulation” State Housing Finance Agency Pr…
- 1-2. LEGISLATIVE HISTORY
- 1-3. RULEMAKING
- 1-4. ADMINISTRATIVE POLICY
- 1-5. APPLICABILITY
- 1-6. PAPERWORK REDUCTION ACT
- Chapter Two
- Section 8 Renewals
- 2-1. INTRODUCTION
- 2-2. OWNER OPTIONS
- 2-3. TYPES OF RENEWALS
- 2-4. EARLY TERMINATION OF A CONTRACT
- 2-5. RENT COMPARABILITY STUDY (RCS)
- Note: The AE/CA shall not lower the comparable market rents in…
- Note: A RCS is not required at any subsequent renewal of an EL…
- 2-6. CONTRACTS
- 2-8. SHORT-TERM CONTRACT RENEWALS
- 2-10. COMBINING CONTRACTS
- 2-11. REQUEST FOR A CONTRACT EXTENSION
- 2-12. DISTRIBUTIONS
- Note: The conditions listed above for receiving access to incr…
- 2-13. RENT ADJUSTMENTS
- 2-14. OPERATING COST ADJUSTMENT FACTOR (OCAF)
- 2-15. BUDGET-BASED RENT ADJUSTMENT REQUESTS
- 2-16. INCREASES IN DEPOSITS TO THE RESERVE FOR REPLACEMENT
- 2-17. PROCESSING INSTRUCTIONS
- Note: If the project has a budget approved by the AE/CA less t…
- Note: HUD does not accept the RHS utility analysis. The owner …
- 2-18. WAIVERS
- 2-19. DUNS NUMBER
- Chapter Three
- 3-1. OVERVIEW
- 3-3. OPTION ONE-A ENTITLEMENT MARK-UP-TO-MARKET ELIGIBILITY
- Note: Nonprofit controlled for profit entities as described in…
- 3-4. 150 PERCENT RENT CAP FOR OPTION ONE-A
- 3-5. EXCEEDING THE 150 PERCENT OF FMR CAP
- 3-6. OPTION ONE-B DISCRETIONARY MUTM ELIGIBILITY
- Note: Non-profit owned projects that meet one of the three cri…
- 3-7. RENEWAL REQUESTS
- 3-8. PROCESSING INSTRUCTIONS
- 3-9. ANNUAL RENT ADJUSTMENTS DURING A MULTIYEAR CONTRACT
- Chapter Four
- 4-1. ELIGIBILITY
- Note: Projects currently renewed under either Option Two or Op…
- 4-2. CONTRACT RENEWAL
- 4-3. ANNUAL RENT ADJUSTMENTS DURING A MULTIYEAR CONTRACT
- 4-4. PROCESSING INSTRUCTIONS
- Chapter Five
- Note: WAIVERS TO CHAPTER FIVE WILL BE IN ACCORDANCE WITH RECAP…
- Note: Risk Sharing Projects do not meet the definition of “eli…
- 5-2. BINDING COMMITMENT
- 5-3. ENTRY INTO RECAP
- Note: In cases where a CA makes the determination that contrac…
- 5-4. CONTRACT RENEWALS — RENT OR DEBT RESTRUCTURING
- 5-5. SUBSEQUENT RENEWALS
- 5-6. “WATCH LIST” MTM PROJECTS
- 5-7. GENERAL INFORMATION
- Chapter Six
- 6-1. ELIGIBILITY
- Note: State and local government financed projects that are no…
- Note: In cases where referral to Recap is necessary, CAs must …
- Note: Section 202 and 811 Capital Advance projects are not eli…
- Note: Projects financed under the risk-sharing loan programs u…
- 6-2. RENEWALS
- Reminder: For projects (including 202 projects) that are being…
- 6-3. RENT ADJUSTMENTS FOR MULTI-YEAR CONTRACTS
- 6-4. SECTION 202 REFINANCINGS
- Chapter Seven
- 7-1. ELIGIBILITY
- Portfolio Reengineering Demonstration Program Projects
- 7-2. RENEWAL OF PORTFOLIO REENGINEERING DEMONSTRATION PROJECTS
- FIVE
- Note: Owners can request that the existing Demo Program Use Ag…
- 7-4. PROCESSING INSTRUCTIONS FOR DEMONSTRATION PROJECTS
- 7-5. PRESERVATION PROJECTS (LIHPRHA AND ELIHPA)
- 7-6. OWNER’S SUBMISSION FOR PRESERVATION PROJECTS
- Note: Owners can request that the existing Preservation Use Ag…
- 7-7. PROCESSING INSTRUCTIONS FOR PRESERVATION PROJECTS
- 7-8. PROJECT SPECIFIC RENTS (PSRS)
- Chapter Eight
- 8-1. OVERVIEW
- 8-2. OWNER REQUIREMENTS FOR TENANT NOTIFICATION
- 8-3. PROCESSING INSTRUCTIONS
- Note: If proper notification was not provided, the owner must …
- Chapter Nine
- 9-1. BACKGROUND
- 9-2. APPLICABILITY OF CHAPTER NINE
- 9-3. ROAD MAP TO CHAPTER NINE
- 9-4. ALTERNATIVES TO RENT COMPARABILITY STUDY
- 9-6. METHOD TWO: COMPARING PROPOSED SECTION 8 RENTS WITH RENTS…
- 9-7. PREPARING A RENT COMPARABILITY STUDY
- 9-8. APPRAISER QUALIFICATIONS
- 9-9. ANALYZING THE SUBJECT PROJECT
- Note: Appraisers should not take into consideration demographi…
- Note: Government boundaries like state or county lines often d…
- 9-10. SELECTING COMPARABLE UNITS
- 9-11. COLLECTING AND DOCUMENTING DATA ON COMPARABLE UNITS
- 9-12. COMPUTING ADJUSTED RENTS FOR COMPARABLE UNITS
- 9-13. DERIVING ESTIMATED MARKET RENTS
- 9-14. PROCEDURE FOR MANDATORY MARKET RENT THRESHOLD
- Example Project in ZIP code 76469
- 9-15. HUD REVIEW OF RENT COMPARABILITY STUDY
- 9-16. INITIAL AND SUBSTANTIVE REVIEW OF OWNER’S RCS
- 9-17. COMMUNICATING RESULTS OF HUD/CA REVIEWS
- 9-18. OWNER APPEALS
- 9-19. IMPOSING SANCTIONS ON APPRAISERS
- APPENDICES
- - Instructions for Completing the HUD Form 92273 S8
- Part A: Rents Charged (lines 1 through 5)
- Part B. Design, Location, Condition (lines 6 through 10)
- Part C. Unit Equipment/Amenities (lines 11 through 23)
- Part D. Site Equipment/Amenities (lines 24 through 32)
- Part E. Utilities (lines 33 through 39)
- Part F. Adjustments Recap (lines 40 through 43)
- Part G. Adjusted Rents (lines 44 through 45)
- Required Contents of a Rent Comparability Study
- Comparable Project Profile