Owner’s Gross Renewal Rent Potential Calculation

Unit Size Number of
Units
RCS Rent Utility
Allowance
Gross Rent Potential
1
Bedroom
50 $800 $40 $42,000
2
Bedroom
75 $1,100 $45 $85,875
Total Gross
Renewal Rent
$127,875

SAFMR Gross Rent Potential Calculation

Unit Size Number of Units SAFMR Rent Gross Rent Potential
1 Bedroom 50 $610 $36,600
2 Bedroom 75 $800 $60,000
Total Gross SAFMR Rent
$96,600
150% of SAFMR Gross Rent
$144,900

Owner’s gross renewal rent is less than 150 percent of SAFMR gross rent, so the RCS does not exceed the mandatory market rent threshold.

  • C. When Project’s gross renewal rent exceeds the Threshold. If the RCS-based gross renewal rent for the subject project’s assisted units exceeds 150 percent of the SAFMR gross rent for the project’s ZIP code, then a HUD-commissioned RCS will be required. In such a scenario, HUD will use independent third-party appraisal services procured through its Contracting Officer to prepare an RCS for the subject project. For an RCS that includes both “as-is” and “post-rehabilitation” market rent estimates, if either the “as-is” estimate or the “post-rehabilitation” estimate exceeds the threshold, then a HUDcommissioned RCS will be required. If the “as-is” rents do not exceed the mandatory market rent threshold, then a HUD-commissioned RCS will be procured only for the “post-rehabilitation” condition of the property. HUD shall not commission a third-party RCS until the Owner’s RCS has been substantively reviewed and deemed acceptable, with no outstanding appeals. HUD is the only intended user of the HUD-commissioned RCS, however a copy will be shared with the Owner upon written request.

  • D. Funding for HUD-Commissioned RCS. A HUD-commissioned RCS may be ordered for either an insured or an uninsured property. Contract funds to pay for the studies will come from the following respective sources:

    1. FHA Insured: Technical Discipline Contract PAS Code: MTF.

    2. Noninsured: Section 8 program funds. PAS Code: CRE.

26

Chapter Nine – Published March 2023

  • E. Differences in Comparability Studies. HUD is not required to perform a substantive review of the HUD-commissioned RCS but may perform such a review for the purpose of quality control of the contractor’s work product. HUD will review each HUDcommissioned RCS using the Initial Checklist (included in Appendix 9-5) to determine if all the required material has been submitted. If so, HUD will compare the gross rent potential conclusions of the HUD-commissioned RCS and the Owner-contracted RCS (as reviewed by HUD and following any appeals or adjustments) and the final market rent for the subject project will be determined as follows:

    1. When the HUD comparable gross rent potential is greater than the Owner’s comparable gross rent potential, the final comparable market rents will be the Owner’s comparable market rents.

    2. When the HUD comparable gross rent potential is less than the Owner’s comparable gross rent potential, the final comparable market rents will be determined as follows:

  • a. If the Owner’s comparable gross rent potential is less than 105 percent of the HUD comparable rent potential, then the final comparable market rents will be the Owner comparable market rents.

    - b. If the Owner’s comparable gross rent potential is greater than or equal to 105 percent of the HUD comparable rent potential, then the final comparable market rents will be 105 percent of the market rents as determined by the HUD-commissioned RCS. 
    
  • F. Transparency of HUD-Commissioned RCS. The Owner may request a copy of the HUDcommissioned RCS for informational purposes only. There are no negotiations allowed, however the Owner may identify factual discrepancies regarding a mistake of square footage, a mistake regarding the presence/absence of a characteristic resulting in an adjustment, a mathematical miscalculation, or other material mistake of fact and HUD will review the discrepancy. These alleged discrepancies should be presented in a numbered list, and the HUD AE will indicate whether each item is a factual discrepancy, not a factual discrepancy, or a matter of professional discretion not subject to appeal. If such discrepancies are indeed errors in the RCS, HUD will work with the third-party appraiser to correct such errors and adjust the rent conclusions. For other issues of professional discretion, such as the choice of comparables, the amount of adjustments, or derivation of concluded rent, the HUD-commissioned RCS will prevail and cannot be appealed by the Owner. HUD reserves the right to correct or return a HUDcommissioned RCS to the contractor pursuant to quality control protocols.

  • G. HUD allows the use of a lender ordered MAP appraisal to serve as a substitute for the required HUD-commissioned RCS if the following conditions are met.

    1. The appraisal must be ordered, paid for, and underwritten by the lender in accordance with the requirements established in the MAP Guide. The MAP appraiser must follow the existing requirements as stated in Chapter 9 of this Guide to determine the rent. In cases where the property is participating in the Chapter 15 Capital Repairs program, comparable market rents must be estimated

Chapter Nine – Published March 2023

27

both before and after repairs. The MAP Guide will be used for the remainder of the assignment.

  1. The MAP appraiser must use the form HUD 92273-S8 in lieu of the form HUD 92273. The 92273-S8 form will be used in all Section 8 related appraisals. The 92273 form will continue to be used for non-Section 8 assignments.

  2. Lender appraisers and HUD reviewers must follow the most current USPAP standards.

  3. Any appeals regarding the MAP appraisal are to be made by the lender to the processing Regional Centers/Satellite Offices office. No direct appeals to Headquarters by the Owner will be accepted.

  4. To set the Section 8 rents, HUD staff shall use the lender-supplied appraisal and the HUD 92273-S8 as they would have used the HUD-commissioned RCS and use Section 9-14(E) to determine the final comparable market rents for the project.

  5. The appraiser must be in compliance with all applicable civil rights laws and statutes and must not have a disciplinary citation or finding related to discrimination within the last three years.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — HUD Section 8 Renewal Policy Guidebook
HUD Section 8 Renewal Policy Guidebook
  1. U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT
  2. SPECIAL ATTENTION OF
  3. TRANSMITTAL
  4. A. Purpose
  5. Explanation of Changes
  6. Section 8 Renewal Policy Guidebook
  7. Office of Multifamily Housing
  8. Table of Contents
  9. Chapter One
  10. Introduction
  11. Chapter 1: Introduction
  12. Chapter 2: Section 8 Renewals
  13. Chapter 3: Option One: Mark-Up-To-Market
  14. Chapter 4: Option Two: Contract Renewals For Other Projects wi…
  15. Chapter 5: Option Three: Referral to Recap
  16. Chapter 6: Option Four: Renewal of Projects Exempt from or not…
  17. Chapter 7: Option Five: Renewal of Portfolio Reengineering Dem…
  18. Chapter 8: Option Six: Opt-Outs
  19. Chapter 9: Rent Comparability Studies
  20. Chapter 10: Residual Receipts
  21. Chapter 11: Tenant Issues
  22. Chapter 12: Physical Condition of the Project
  23. Chapter 13: HUD’s Refusal to Renew Section 8 Contracts
  24. Chapter 14: Rural Housing Service (RHS) Section 515/8
  25. Chapter 15: Section 8 Preservation Efforts
  26. — Chapter 16: “Old Regulation” State Housing Finance Agency Pr…
  27. 1-2. LEGISLATIVE HISTORY
  28. 1-3. RULEMAKING
  29. 1-4. ADMINISTRATIVE POLICY
  30. 1-5. APPLICABILITY
  31. 1-6. PAPERWORK REDUCTION ACT
  32. Chapter Two
  33. Section 8 Renewals
  34. 2-1. INTRODUCTION
  35. 2-2. OWNER OPTIONS
  36. 2-3. TYPES OF RENEWALS
  37. 2-4. EARLY TERMINATION OF A CONTRACT
  38. 2-5. RENT COMPARABILITY STUDY (RCS)
  39. Note: The AE/CA shall not lower the comparable market rents in…
  40. Note: A RCS is not required at any subsequent renewal of an EL…
  41. 2-6. CONTRACTS
  42. 2-8. SHORT-TERM CONTRACT RENEWALS
  43. 2-10. COMBINING CONTRACTS
  44. 2-11. REQUEST FOR A CONTRACT EXTENSION
  45. 2-12. DISTRIBUTIONS
  46. Note: The conditions listed above for receiving access to incr…
  47. 2-13. RENT ADJUSTMENTS
  48. 2-14. OPERATING COST ADJUSTMENT FACTOR (OCAF)
  49. 2-15. BUDGET-BASED RENT ADJUSTMENT REQUESTS
  50. 2-16. INCREASES IN DEPOSITS TO THE RESERVE FOR REPLACEMENT
  51. 2-17. PROCESSING INSTRUCTIONS
  52. Note: If the project has a budget approved by the AE/CA less t…
  53. Note: HUD does not accept the RHS utility analysis. The owner …
  54. 2-18. WAIVERS
  55. 2-19. DUNS NUMBER
  56. Chapter Three
  57. 3-1. OVERVIEW
  58. 3-3. OPTION ONE-A ENTITLEMENT MARK-UP-TO-MARKET ELIGIBILITY
  59. Note: Nonprofit controlled for profit entities as described in…
  60. 3-4. 150 PERCENT RENT CAP FOR OPTION ONE-A
  61. 3-5. EXCEEDING THE 150 PERCENT OF FMR CAP
  62. 3-6. OPTION ONE-B DISCRETIONARY MUTM ELIGIBILITY
  63. Note: Non-profit owned projects that meet one of the three cri…
  64. 3-7. RENEWAL REQUESTS
  65. 3-8. PROCESSING INSTRUCTIONS
  66. 3-9. ANNUAL RENT ADJUSTMENTS DURING A MULTIYEAR CONTRACT
  67. Chapter Four
  68. 4-1. ELIGIBILITY
  69. Note: Projects currently renewed under either Option Two or Op…
  70. 4-2. CONTRACT RENEWAL
  71. 4-3. ANNUAL RENT ADJUSTMENTS DURING A MULTIYEAR CONTRACT
  72. 4-4. PROCESSING INSTRUCTIONS
  73. Chapter Five
  74. Note: WAIVERS TO CHAPTER FIVE WILL BE IN ACCORDANCE WITH RECAP…
  75. Note: Risk Sharing Projects do not meet the definition of “eli…
  76. 5-2. BINDING COMMITMENT
  77. 5-3. ENTRY INTO RECAP
  78. Note: In cases where a CA makes the determination that contrac…
  79. 5-4. CONTRACT RENEWALS — RENT OR DEBT RESTRUCTURING
  80. 5-5. SUBSEQUENT RENEWALS
  81. 5-6. “WATCH LIST” MTM PROJECTS
  82. 5-7. GENERAL INFORMATION
  83. Chapter Six
  84. 6-1. ELIGIBILITY
  85. Note: State and local government financed projects that are no…
  86. Note: In cases where referral to Recap is necessary, CAs must …
  87. Note: Section 202 and 811 Capital Advance projects are not eli…
  88. Note: Projects financed under the risk-sharing loan programs u…
  89. 6-2. RENEWALS
  90. Reminder: For projects (including 202 projects) that are being…
  91. 6-3. RENT ADJUSTMENTS FOR MULTI-YEAR CONTRACTS
  92. 6-4. SECTION 202 REFINANCINGS
  93. Chapter Seven
  94. 7-1. ELIGIBILITY
  95. Portfolio Reengineering Demonstration Program Projects
  96. 7-2. RENEWAL OF PORTFOLIO REENGINEERING DEMONSTRATION PROJECTS
  97. FIVE
  98. Note: Owners can request that the existing Demo Program Use Ag…
  99. 7-4. PROCESSING INSTRUCTIONS FOR DEMONSTRATION PROJECTS
  100. 7-5. PRESERVATION PROJECTS (LIHPRHA AND ELIHPA)
  101. 7-6. OWNER’S SUBMISSION FOR PRESERVATION PROJECTS
  102. Note: Owners can request that the existing Preservation Use Ag…
  103. 7-7. PROCESSING INSTRUCTIONS FOR PRESERVATION PROJECTS
  104. 7-8. PROJECT SPECIFIC RENTS (PSRS)
  105. Chapter Eight
  106. 8-1. OVERVIEW
  107. 8-2. OWNER REQUIREMENTS FOR TENANT NOTIFICATION
  108. 8-3. PROCESSING INSTRUCTIONS
  109. Note: If proper notification was not provided, the owner must …
  110. Chapter Nine
  111. 9-1. BACKGROUND
  112. 9-2. APPLICABILITY OF CHAPTER NINE
  113. 9-3. ROAD MAP TO CHAPTER NINE
  114. 9-4. ALTERNATIVES TO RENT COMPARABILITY STUDY
  115. 9-6. METHOD TWO: COMPARING PROPOSED SECTION 8 RENTS WITH RENTS…
  116. 9-7. PREPARING A RENT COMPARABILITY STUDY
  117. 9-8. APPRAISER QUALIFICATIONS
  118. 9-9. ANALYZING THE SUBJECT PROJECT
  119. Note: Appraisers should not take into consideration demographi…
  120. Note: Government boundaries like state or county lines often d…
  121. 9-10. SELECTING COMPARABLE UNITS
  122. 9-11. COLLECTING AND DOCUMENTING DATA ON COMPARABLE UNITS
  123. 9-12. COMPUTING ADJUSTED RENTS FOR COMPARABLE UNITS
  124. 9-13. DERIVING ESTIMATED MARKET RENTS
  125. 9-14. PROCEDURE FOR MANDATORY MARKET RENT THRESHOLD
  126. Example Project in ZIP code 76469
  127. 9-15. HUD REVIEW OF RENT COMPARABILITY STUDY
  128. 9-16. INITIAL AND SUBSTANTIVE REVIEW OF OWNER’S RCS
  129. 9-17. COMMUNICATING RESULTS OF HUD/CA REVIEWS
  130. 9-18. OWNER APPEALS
  131. 9-19. IMPOSING SANCTIONS ON APPRAISERS
  132. APPENDICES
  133. - Instructions for Completing the HUD Form 92273 S8
  134. Part A: Rents Charged (lines 1 through 5)
  135. Part B. Design, Location, Condition (lines 6 through 10)
  136. Part C. Unit Equipment/Amenities (lines 11 through 23)
  137. Part D. Site Equipment/Amenities (lines 24 through 32)
  138. Part E. Utilities (lines 33 through 39)
  139. Part F. Adjustments Recap (lines 40 through 43)
  140. Part G. Adjusted Rents (lines 44 through 45)
  141. Required Contents of a Rent Comparability Study
  142. Comparable Project Profile