Example Project in ZIP code 76469
HUD Section 8 Renewal Policy Guidebook · 2026 edition · updated 2026-07-29 · United States
Owner’s Gross Renewal Rent Potential Calculation
| Unit Size | Number of Units |
RCS Rent | Utility Allowance |
Gross Rent Potential |
|---|---|---|---|---|
| 1 Bedroom |
50 | $800 | $40 | $42,000 |
| 2 Bedroom |
75 | $1,100 | $45 | $85,875 |
| Total Gross Renewal Rent |
$127,875 |
SAFMR Gross Rent Potential Calculation
| Unit Size | Number of Units | SAFMR Rent | Gross Rent Potential |
|---|---|---|---|
| 1 Bedroom | 50 | $610 | $36,600 |
| 2 Bedroom | 75 | $800 | $60,000 |
| Total Gross SAFMR Rent $96,600 |
|||
| 150% of SAFMR Gross Rent $144,900 |
Owner’s gross renewal rent is less than 150 percent of SAFMR gross rent, so the RCS does not exceed the mandatory market rent threshold.
C. When Project’s gross renewal rent exceeds the Threshold. If the RCS-based gross renewal rent for the subject project’s assisted units exceeds 150 percent of the SAFMR gross rent for the project’s ZIP code, then a HUD-commissioned RCS will be required. In such a scenario, HUD will use independent third-party appraisal services procured through its Contracting Officer to prepare an RCS for the subject project. For an RCS that includes both “as-is” and “post-rehabilitation” market rent estimates, if either the “as-is” estimate or the “post-rehabilitation” estimate exceeds the threshold, then a HUDcommissioned RCS will be required. If the “as-is” rents do not exceed the mandatory market rent threshold, then a HUD-commissioned RCS will be procured only for the “post-rehabilitation” condition of the property. HUD shall not commission a third-party RCS until the Owner’s RCS has been substantively reviewed and deemed acceptable, with no outstanding appeals. HUD is the only intended user of the HUD-commissioned RCS, however a copy will be shared with the Owner upon written request.
D. Funding for HUD-Commissioned RCS. A HUD-commissioned RCS may be ordered for either an insured or an uninsured property. Contract funds to pay for the studies will come from the following respective sources:
FHA Insured: Technical Discipline Contract PAS Code: MTF.
Noninsured: Section 8 program funds. PAS Code: CRE.
26
Chapter Nine – Published March 2023
E. Differences in Comparability Studies. HUD is not required to perform a substantive review of the HUD-commissioned RCS but may perform such a review for the purpose of quality control of the contractor’s work product. HUD will review each HUDcommissioned RCS using the Initial Checklist (included in Appendix 9-5) to determine if all the required material has been submitted. If so, HUD will compare the gross rent potential conclusions of the HUD-commissioned RCS and the Owner-contracted RCS (as reviewed by HUD and following any appeals or adjustments) and the final market rent for the subject project will be determined as follows:
When the HUD comparable gross rent potential is greater than the Owner’s comparable gross rent potential, the final comparable market rents will be the Owner’s comparable market rents.
When the HUD comparable gross rent potential is less than the Owner’s comparable gross rent potential, the final comparable market rents will be determined as follows:
a. If the Owner’s comparable gross rent potential is less than 105 percent of the HUD comparable rent potential, then the final comparable market rents will be the Owner comparable market rents.
- b. If the Owner’s comparable gross rent potential is greater than or equal to 105 percent of the HUD comparable rent potential, then the final comparable market rents will be 105 percent of the market rents as determined by the HUD-commissioned RCS.F. Transparency of HUD-Commissioned RCS. The Owner may request a copy of the HUDcommissioned RCS for informational purposes only. There are no negotiations allowed, however the Owner may identify factual discrepancies regarding a mistake of square footage, a mistake regarding the presence/absence of a characteristic resulting in an adjustment, a mathematical miscalculation, or other material mistake of fact and HUD will review the discrepancy. These alleged discrepancies should be presented in a numbered list, and the HUD AE will indicate whether each item is a factual discrepancy, not a factual discrepancy, or a matter of professional discretion not subject to appeal. If such discrepancies are indeed errors in the RCS, HUD will work with the third-party appraiser to correct such errors and adjust the rent conclusions. For other issues of professional discretion, such as the choice of comparables, the amount of adjustments, or derivation of concluded rent, the HUD-commissioned RCS will prevail and cannot be appealed by the Owner. HUD reserves the right to correct or return a HUDcommissioned RCS to the contractor pursuant to quality control protocols.
G. HUD allows the use of a lender ordered MAP appraisal to serve as a substitute for the required HUD-commissioned RCS if the following conditions are met.
- The appraisal must be ordered, paid for, and underwritten by the lender in accordance with the requirements established in the MAP Guide. The MAP appraiser must follow the existing requirements as stated in Chapter 9 of this Guide to determine the rent. In cases where the property is participating in the Chapter 15 Capital Repairs program, comparable market rents must be estimated
Chapter Nine – Published March 2023
27
both before and after repairs. The MAP Guide will be used for the remainder of the assignment.
The MAP appraiser must use the form HUD 92273-S8 in lieu of the form HUD 92273. The 92273-S8 form will be used in all Section 8 related appraisals. The 92273 form will continue to be used for non-Section 8 assignments.
Lender appraisers and HUD reviewers must follow the most current USPAP standards.
Any appeals regarding the MAP appraisal are to be made by the lender to the processing Regional Centers/Satellite Offices office. No direct appeals to Headquarters by the Owner will be accepted.
To set the Section 8 rents, HUD staff shall use the lender-supplied appraisal and the HUD 92273-S8 as they would have used the HUD-commissioned RCS and use Section 9-14(E) to determine the final comparable market rents for the project.
The appraiser must be in compliance with all applicable civil rights laws and statutes and must not have a disciplinary citation or finding related to discrimination within the last three years.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — HUD Section 8 Renewal Policy Guidebook
- U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT
- SPECIAL ATTENTION OF
- TRANSMITTAL
- A. Purpose
- Explanation of Changes
- Section 8 Renewal Policy Guidebook
- Office of Multifamily Housing
- Table of Contents
- Chapter One
- Introduction
- Chapter 1: Introduction
- Chapter 2: Section 8 Renewals
- Chapter 3: Option One: Mark-Up-To-Market
- Chapter 4: Option Two: Contract Renewals For Other Projects wi…
- Chapter 5: Option Three: Referral to Recap
- Chapter 6: Option Four: Renewal of Projects Exempt from or not…
- Chapter 7: Option Five: Renewal of Portfolio Reengineering Dem…
- Chapter 8: Option Six: Opt-Outs
- Chapter 9: Rent Comparability Studies
- Chapter 10: Residual Receipts
- Chapter 11: Tenant Issues
- Chapter 12: Physical Condition of the Project
- Chapter 13: HUD’s Refusal to Renew Section 8 Contracts
- Chapter 14: Rural Housing Service (RHS) Section 515/8
- Chapter 15: Section 8 Preservation Efforts
- — Chapter 16: “Old Regulation” State Housing Finance Agency Pr…
- 1-2. LEGISLATIVE HISTORY
- 1-3. RULEMAKING
- 1-4. ADMINISTRATIVE POLICY
- 1-5. APPLICABILITY
- 1-6. PAPERWORK REDUCTION ACT
- Chapter Two
- Section 8 Renewals
- 2-1. INTRODUCTION
- 2-2. OWNER OPTIONS
- 2-3. TYPES OF RENEWALS
- 2-4. EARLY TERMINATION OF A CONTRACT
- 2-5. RENT COMPARABILITY STUDY (RCS)
- Note: The AE/CA shall not lower the comparable market rents in…
- Note: A RCS is not required at any subsequent renewal of an EL…
- 2-6. CONTRACTS
- 2-8. SHORT-TERM CONTRACT RENEWALS
- 2-10. COMBINING CONTRACTS
- 2-11. REQUEST FOR A CONTRACT EXTENSION
- 2-12. DISTRIBUTIONS
- Note: The conditions listed above for receiving access to incr…
- 2-13. RENT ADJUSTMENTS
- 2-14. OPERATING COST ADJUSTMENT FACTOR (OCAF)
- 2-15. BUDGET-BASED RENT ADJUSTMENT REQUESTS
- 2-16. INCREASES IN DEPOSITS TO THE RESERVE FOR REPLACEMENT
- 2-17. PROCESSING INSTRUCTIONS
- Note: If the project has a budget approved by the AE/CA less t…
- Note: HUD does not accept the RHS utility analysis. The owner …
- 2-18. WAIVERS
- 2-19. DUNS NUMBER
- Chapter Three
- 3-1. OVERVIEW
- 3-3. OPTION ONE-A ENTITLEMENT MARK-UP-TO-MARKET ELIGIBILITY
- Note: Nonprofit controlled for profit entities as described in…
- 3-4. 150 PERCENT RENT CAP FOR OPTION ONE-A
- 3-5. EXCEEDING THE 150 PERCENT OF FMR CAP
- 3-6. OPTION ONE-B DISCRETIONARY MUTM ELIGIBILITY
- Note: Non-profit owned projects that meet one of the three cri…
- 3-7. RENEWAL REQUESTS
- 3-8. PROCESSING INSTRUCTIONS
- 3-9. ANNUAL RENT ADJUSTMENTS DURING A MULTIYEAR CONTRACT
- Chapter Four
- 4-1. ELIGIBILITY
- Note: Projects currently renewed under either Option Two or Op…
- 4-2. CONTRACT RENEWAL
- 4-3. ANNUAL RENT ADJUSTMENTS DURING A MULTIYEAR CONTRACT
- 4-4. PROCESSING INSTRUCTIONS
- Chapter Five
- Note: WAIVERS TO CHAPTER FIVE WILL BE IN ACCORDANCE WITH RECAP…
- Note: Risk Sharing Projects do not meet the definition of “eli…
- 5-2. BINDING COMMITMENT
- 5-3. ENTRY INTO RECAP
- Note: In cases where a CA makes the determination that contrac…
- 5-4. CONTRACT RENEWALS — RENT OR DEBT RESTRUCTURING
- 5-5. SUBSEQUENT RENEWALS
- 5-6. “WATCH LIST” MTM PROJECTS
- 5-7. GENERAL INFORMATION
- Chapter Six
- 6-1. ELIGIBILITY
- Note: State and local government financed projects that are no…
- Note: In cases where referral to Recap is necessary, CAs must …
- Note: Section 202 and 811 Capital Advance projects are not eli…
- Note: Projects financed under the risk-sharing loan programs u…
- 6-2. RENEWALS
- Reminder: For projects (including 202 projects) that are being…
- 6-3. RENT ADJUSTMENTS FOR MULTI-YEAR CONTRACTS
- 6-4. SECTION 202 REFINANCINGS
- Chapter Seven
- 7-1. ELIGIBILITY
- Portfolio Reengineering Demonstration Program Projects
- 7-2. RENEWAL OF PORTFOLIO REENGINEERING DEMONSTRATION PROJECTS
- FIVE
- Note: Owners can request that the existing Demo Program Use Ag…
- 7-4. PROCESSING INSTRUCTIONS FOR DEMONSTRATION PROJECTS
- 7-5. PRESERVATION PROJECTS (LIHPRHA AND ELIHPA)
- 7-6. OWNER’S SUBMISSION FOR PRESERVATION PROJECTS
- Note: Owners can request that the existing Preservation Use Ag…
- 7-7. PROCESSING INSTRUCTIONS FOR PRESERVATION PROJECTS
- 7-8. PROJECT SPECIFIC RENTS (PSRS)
- Chapter Eight
- 8-1. OVERVIEW
- 8-2. OWNER REQUIREMENTS FOR TENANT NOTIFICATION
- 8-3. PROCESSING INSTRUCTIONS
- Note: If proper notification was not provided, the owner must …
- Chapter Nine
- 9-1. BACKGROUND
- 9-2. APPLICABILITY OF CHAPTER NINE
- 9-3. ROAD MAP TO CHAPTER NINE
- 9-4. ALTERNATIVES TO RENT COMPARABILITY STUDY
- 9-6. METHOD TWO: COMPARING PROPOSED SECTION 8 RENTS WITH RENTS…
- 9-7. PREPARING A RENT COMPARABILITY STUDY
- 9-8. APPRAISER QUALIFICATIONS
- 9-9. ANALYZING THE SUBJECT PROJECT
- Note: Appraisers should not take into consideration demographi…
- Note: Government boundaries like state or county lines often d…
- 9-10. SELECTING COMPARABLE UNITS
- 9-11. COLLECTING AND DOCUMENTING DATA ON COMPARABLE UNITS
- 9-12. COMPUTING ADJUSTED RENTS FOR COMPARABLE UNITS
- 9-13. DERIVING ESTIMATED MARKET RENTS
- 9-14. PROCEDURE FOR MANDATORY MARKET RENT THRESHOLD
- Example Project in ZIP code 76469
- 9-15. HUD REVIEW OF RENT COMPARABILITY STUDY
- 9-16. INITIAL AND SUBSTANTIVE REVIEW OF OWNER’S RCS
- 9-17. COMMUNICATING RESULTS OF HUD/CA REVIEWS
- 9-18. OWNER APPEALS
- 9-19. IMPOSING SANCTIONS ON APPRAISERS
- APPENDICES
- - Instructions for Completing the HUD Form 92273 S8
- Part A: Rents Charged (lines 1 through 5)
- Part B. Design, Location, Condition (lines 6 through 10)
- Part C. Unit Equipment/Amenities (lines 11 through 23)
- Part D. Site Equipment/Amenities (lines 24 through 32)
- Part E. Utilities (lines 33 through 39)
- Part F. Adjustments Recap (lines 40 through 43)
- Part G. Adjusted Rents (lines 44 through 45)
- Required Contents of a Rent Comparability Study
- Comparable Project Profile