1-2. LEGISLATIVE HISTORY
HUD Section 8 Renewal Policy Guidebook · 2026 edition · updated 2026-07-29 · United States
- A. The Multifamily Assisted Housing Reform and Affordability Act of 1997 (MAHRA), Title V of the HUD Fiscal Year 1998 Appropriations Act, Pub. L. 105-65, was enacted on October 27, 1997. MAHRA established new policies for the renewal of Section 8 project-based contracts based on market rents instead of the Fair Market Rent (FMR) standard. For most insured projects with rents above market, the Act transferred Section 8 processing functions from the Multifamily Regional Centers and Satellite Offices Centers to Recap. For further information on renewals by Recap, see Chapter Five.
In general, MAHRA originally required that expiring Section 8 project-based contracts be renewed under Section 524(a)(1) or 524(a)(2).
Section 524(a)(1) renewals required a RCS. If the RCS indicated rents were at or below comparable market rents, the contract was renewed at current rents adjusted by OCAF, unless the owner submitted documentation justifying a budget-based rent increase or participation in MUTM. In no case could renewal rents exceed comparable market rents. If the RCS indicated rents above comparable market rents, the contract was referred to Recap for debt restructuring and/or rent reduction.
Section 524(a)(2) renewals were for projects identified as “exception” projects that were not eligible for Recap. In some cases, these projects had rents greater than market. Examples of projects that do not qualify as eligible multifamily housing projects pursuant to Section 512(2) of MAHRA include a project that is not subject to a HUD-held or insured mortgage; or, a project that has FHA mortgage insurance or is HUD-held with rents at or below comparable market rents.
B. The Preserving Affordable Housing for Senior Citizens and Families Into the 21[st] Century Act of 1999, Titles II and V of the HUD Fiscal Year 2000 Appropriations Act, Pub. L. 106-74, was enacted on October 20, 1999. This legislation made modifications to the previous Section 8 renewal policies and established specific provisions for rent adjustments in subsequent years after an initial renewal under MAHRA. On December 29, 1999, Notice H99-36 was issued to implement these changes. Specifically, the Act
- Modified Sections 524(a)(1) and 524(a)(2) of the original MAHRA. Projects that previously fell under section 524(a)(1), are now covered under section 524(a), and projects that previously fell under section 524(a)(2), are now covered by section 524(b).
Chapter One – Published March 2023
4
- Specifically addressed Preservation projects and Portfolio Reengineering Demonstration projects in sections 524(e)(1) and 524(e)(2) of MAHRA.
- Was the impetus for Notice H 1999 36 which created six options for owners to choose from when their Section 8 contracts expire. These options are detailed throughout this Guide.
C. The Quality Housing and Work Responsibility Act (QHWRA) of 1998, Title V of HUD’s Fiscal Year 1999 Appropriations Act, enacted on October 21, 1998, made only minor modifications to the tenant notification requirements stated in MAHRA. On May 27, 1999, HUD issued Notice H 99-08 implementing these changes. Specifically, QHWRA:
Required owners who intended to renew their expiring Section 8 contract to notify their tenants of their intent to do so. This requirement was amended by subsequent legislation (see Chapter Eleven for tenant notification requirements).
QHWRA changed the tenant notification requirement from one year to six months for contracts that were renewed for five year terms. The six-month notification was to be provided to the tenants by the owners six months before expiration of the five-year contract. This requirement was changed back to a one-year notification by subsequent legislation.
D. The FY 2001 Military Construction and FY 2000 Emergency Supplemental Appropriations Act amended the enhanced voucher statute at Section 8(t) of the United States Housing Act to grant enhanced voucher families the right to remain.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — HUD Section 8 Renewal Policy Guidebook
- U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT
- SPECIAL ATTENTION OF
- TRANSMITTAL
- A. Purpose
- Explanation of Changes
- Section 8 Renewal Policy Guidebook
- Office of Multifamily Housing
- Table of Contents
- Chapter One
- Introduction
- Chapter 1: Introduction
- Chapter 2: Section 8 Renewals
- Chapter 3: Option One: Mark-Up-To-Market
- Chapter 4: Option Two: Contract Renewals For Other Projects wi…
- Chapter 5: Option Three: Referral to Recap
- Chapter 6: Option Four: Renewal of Projects Exempt from or not…
- Chapter 7: Option Five: Renewal of Portfolio Reengineering Dem…
- Chapter 8: Option Six: Opt-Outs
- Chapter 9: Rent Comparability Studies
- Chapter 10: Residual Receipts
- Chapter 11: Tenant Issues
- Chapter 12: Physical Condition of the Project
- Chapter 13: HUD’s Refusal to Renew Section 8 Contracts
- Chapter 14: Rural Housing Service (RHS) Section 515/8
- Chapter 15: Section 8 Preservation Efforts
- — Chapter 16: “Old Regulation” State Housing Finance Agency Pr…
- 1-2. LEGISLATIVE HISTORY
- 1-3. RULEMAKING
- 1-4. ADMINISTRATIVE POLICY
- 1-5. APPLICABILITY
- 1-6. PAPERWORK REDUCTION ACT
- Chapter Two
- Section 8 Renewals
- 2-1. INTRODUCTION
- 2-2. OWNER OPTIONS
- 2-3. TYPES OF RENEWALS
- 2-4. EARLY TERMINATION OF A CONTRACT
- 2-5. RENT COMPARABILITY STUDY (RCS)
- Note: The AE/CA shall not lower the comparable market rents in…
- Note: A RCS is not required at any subsequent renewal of an EL…
- 2-6. CONTRACTS
- 2-8. SHORT-TERM CONTRACT RENEWALS
- 2-10. COMBINING CONTRACTS
- 2-11. REQUEST FOR A CONTRACT EXTENSION
- 2-12. DISTRIBUTIONS
- Note: The conditions listed above for receiving access to incr…
- 2-13. RENT ADJUSTMENTS
- 2-14. OPERATING COST ADJUSTMENT FACTOR (OCAF)
- 2-15. BUDGET-BASED RENT ADJUSTMENT REQUESTS
- 2-16. INCREASES IN DEPOSITS TO THE RESERVE FOR REPLACEMENT
- 2-17. PROCESSING INSTRUCTIONS
- Note: If the project has a budget approved by the AE/CA less t…
- Note: HUD does not accept the RHS utility analysis. The owner …
- 2-18. WAIVERS
- 2-19. DUNS NUMBER
- Chapter Three
- 3-1. OVERVIEW
- 3-3. OPTION ONE-A ENTITLEMENT MARK-UP-TO-MARKET ELIGIBILITY
- Note: Nonprofit controlled for profit entities as described in…
- 3-4. 150 PERCENT RENT CAP FOR OPTION ONE-A
- 3-5. EXCEEDING THE 150 PERCENT OF FMR CAP
- 3-6. OPTION ONE-B DISCRETIONARY MUTM ELIGIBILITY
- Note: Non-profit owned projects that meet one of the three cri…
- 3-7. RENEWAL REQUESTS
- 3-8. PROCESSING INSTRUCTIONS
- 3-9. ANNUAL RENT ADJUSTMENTS DURING A MULTIYEAR CONTRACT
- Chapter Four
- 4-1. ELIGIBILITY
- Note: Projects currently renewed under either Option Two or Op…
- 4-2. CONTRACT RENEWAL
- 4-3. ANNUAL RENT ADJUSTMENTS DURING A MULTIYEAR CONTRACT
- 4-4. PROCESSING INSTRUCTIONS
- Chapter Five
- Note: WAIVERS TO CHAPTER FIVE WILL BE IN ACCORDANCE WITH RECAP…
- Note: Risk Sharing Projects do not meet the definition of “eli…
- 5-2. BINDING COMMITMENT
- 5-3. ENTRY INTO RECAP
- Note: In cases where a CA makes the determination that contrac…
- 5-4. CONTRACT RENEWALS — RENT OR DEBT RESTRUCTURING
- 5-5. SUBSEQUENT RENEWALS
- 5-6. “WATCH LIST” MTM PROJECTS
- 5-7. GENERAL INFORMATION
- Chapter Six
- 6-1. ELIGIBILITY
- Note: State and local government financed projects that are no…
- Note: In cases where referral to Recap is necessary, CAs must …
- Note: Section 202 and 811 Capital Advance projects are not eli…
- Note: Projects financed under the risk-sharing loan programs u…
- 6-2. RENEWALS
- Reminder: For projects (including 202 projects) that are being…
- 6-3. RENT ADJUSTMENTS FOR MULTI-YEAR CONTRACTS
- 6-4. SECTION 202 REFINANCINGS
- Chapter Seven
- 7-1. ELIGIBILITY
- Portfolio Reengineering Demonstration Program Projects
- 7-2. RENEWAL OF PORTFOLIO REENGINEERING DEMONSTRATION PROJECTS
- FIVE
- Note: Owners can request that the existing Demo Program Use Ag…
- 7-4. PROCESSING INSTRUCTIONS FOR DEMONSTRATION PROJECTS
- 7-5. PRESERVATION PROJECTS (LIHPRHA AND ELIHPA)
- 7-6. OWNER’S SUBMISSION FOR PRESERVATION PROJECTS
- Note: Owners can request that the existing Preservation Use Ag…
- 7-7. PROCESSING INSTRUCTIONS FOR PRESERVATION PROJECTS
- 7-8. PROJECT SPECIFIC RENTS (PSRS)
- Chapter Eight
- 8-1. OVERVIEW
- 8-2. OWNER REQUIREMENTS FOR TENANT NOTIFICATION
- 8-3. PROCESSING INSTRUCTIONS
- Note: If proper notification was not provided, the owner must …
- Chapter Nine
- 9-1. BACKGROUND
- 9-2. APPLICABILITY OF CHAPTER NINE
- 9-3. ROAD MAP TO CHAPTER NINE
- 9-4. ALTERNATIVES TO RENT COMPARABILITY STUDY
- 9-6. METHOD TWO: COMPARING PROPOSED SECTION 8 RENTS WITH RENTS…
- 9-7. PREPARING A RENT COMPARABILITY STUDY
- 9-8. APPRAISER QUALIFICATIONS
- 9-9. ANALYZING THE SUBJECT PROJECT
- Note: Appraisers should not take into consideration demographi…
- Note: Government boundaries like state or county lines often d…
- 9-10. SELECTING COMPARABLE UNITS
- 9-11. COLLECTING AND DOCUMENTING DATA ON COMPARABLE UNITS
- 9-12. COMPUTING ADJUSTED RENTS FOR COMPARABLE UNITS
- 9-13. DERIVING ESTIMATED MARKET RENTS
- 9-14. PROCEDURE FOR MANDATORY MARKET RENT THRESHOLD
- Example Project in ZIP code 76469
- 9-15. HUD REVIEW OF RENT COMPARABILITY STUDY
- 9-16. INITIAL AND SUBSTANTIVE REVIEW OF OWNER’S RCS
- 9-17. COMMUNICATING RESULTS OF HUD/CA REVIEWS
- 9-18. OWNER APPEALS
- 9-19. IMPOSING SANCTIONS ON APPRAISERS
- APPENDICES
- - Instructions for Completing the HUD Form 92273 S8
- Part A: Rents Charged (lines 1 through 5)
- Part B. Design, Location, Condition (lines 6 through 10)
- Part C. Unit Equipment/Amenities (lines 11 through 23)
- Part D. Site Equipment/Amenities (lines 24 through 32)
- Part E. Utilities (lines 33 through 39)
- Part F. Adjustments Recap (lines 40 through 43)
- Part G. Adjusted Rents (lines 44 through 45)
- Required Contents of a Rent Comparability Study
- Comparable Project Profile