9-4. ALTERNATIVES TO RENT COMPARABILITY STUDY
HUD Section 8 Renewal Policy Guidebook · 2026 edition · updated 2026-07-29 · United States
In lieu of procuring an RCS to demonstrate that proposed Section 8 rents do not exceed comparable market rents, an Owner requesting renewal under the renewal options indicated below may, with prior written approval from HUD, rely on one of the following two alternative methods for establishing comparable market rent levels. These alternatives may also be available for fifth-year comparability adjustments, subject to a determination by the assigned AE that market conditions have not significantly changed since the prior comparability adjustment.
Method One: Available only to Owners requesting renewal or fifth-year comparability adjustment under Option Two, this method involves comparing the proposed Section 8 rents to Small Area Fair Market Rents (SAFMRs). (See Section 9-5.)
Method Two: Available only to Owners requesting renewal or fifth-year comparability adjustment under Options One or Two, this method involves comparing proposed Section 8 rents to rents charged for comparable unassisted units in the same project. (See Section 9-6.)
Both of these alternative methods are intended to provide additional flexibility and local market specificity, subject to the Owner’s discretion, to avoid the cost and processing time associated with obtaining an RCS. Use is limited to a HUD determination that market indicators strongly suggest that the proposed Section 8 rents do not exceed comparable market rents, and an Owner must obtain HUD’s prior written approval to use an alternative method. If such approval is granted, then SAFMR or unassisted comparable rent level establishes a comparable market rent for the Section 8 rents which is used in rent conclusions pursuant to the chosen renewal option.
9-5. METHOD ONE: COMPARING PROPOSED SECTION 8 RENTS WITH SAFMRS
A. Small Area Fair Market Rents (SAFMRs). Under this method, the SAFMR rent level serves as the comparable market rent ceiling that is otherwise established by an RCS. The SAFMR is an estimate of rent plus the cost of utilities for a ZIP code area, set at the 40th percentile level (i.e., the dollar amount below which the rent for 40 percent of standard quality rental housing units within the ZIP code area falls). HUD publishes SAFMRs annually, by posting them to https://www.huduser.gov/portal/datasets/fmr/ smallarea/index.html. SAFMRs are published for ZIP codes in metropolitan areas only; HUD does not calculate SAFMRs for ZIP codes in nonmetropolitan counties. For properties in nonmetropolitan areas, FMR should be used instead: https://www.huduser.gov/portal/datasets/fmr.html
B. Eligibility. An Owner who requests renewal under Option Two or who wishes to use Method One to establish a fifth-year comparability adjustment rent ceiling may request HUD approval to establish a comparable market rent ceiling using Method One if the proposed Section 8 gross rent potential at renewal is less than 90 percent of the SAFMR potential for the units under the HAP contract being renewed. Since the SAFMRs are inclusive of utilities, the Section 8 gross rent potential must include utilities in order to make the two figures comparable.
eiling may request HUD approval to establish a comparable market rent ceiling using Method One if the proposed Section 8 gross rent potential at renewal is less than 90 percent of the SAFMR potential for the units under the HAP contract being renewed. Since the SAFMRs are inclusive of utilities, the Section 8 gross rent potential must include utilities in order to make the two figures comparable.
C. Owner’s Request. To request renewal using this method, an Owner must submit the following no later than 120 days before the expiration of the Section 8 contract:
- Request to Renew HAP Using FMRs as Market Ceiling (Form HUD-9630).
Chapter Nine – Published March 2023
4
- a. The proposed Section 8 gross rent potential used in the above comparison must be the current rent potential, adjusted by the OCAF or budget;
- b. The potential must be the gross potential (contract rent plus utilities) to make the figure comparable to SAFMRs, which include utilities; and
- c. The Section 8 gross rent potential must be less than 90 percent of the SAFMR potential for the units being renewed under the request.
Cover Sheet (Form HUD-9624). The Owner must identify all HAP contracts to which the project is subject, including the HAP contract for which renewal is being requested.
Either Budget Worksheet: Income and Expense Projections (Form HUD-92547A), if seeking a budget-based adjustment; or Steps 1 and 2 of the Operating Cost -
Adjustment Factor (OCAF) Worksheet (Form HUD 9625), if seeking an OCAFdriven adjustment.
D. HUD processing. The Account Executive (AE) will review the Owner’s request to determine whether the use of SAFMRs is appropriate and will render a decision within 20 calendar days of receiving the request, documenting the decision on the Request to Renew HAP Using FMRs as Market Ceiling, as completed by the Owner, and in the Integrated Real Estate Management System (iREMS). The AE may consult the Production Technical Specialist Branch Chief to assist with this determination.
Due Diligence. The AE who processes the request must be familiar with the project’s condition and amenities and must seek a state-certified appraiser’s input as to prevailing rent levels in the subject’s market area. In addition to verifying and validating the Owner’s computations, the AE must consider the following questions:
a. Are the subject project’s units unusually small or large? Are they substantially similar to or different from units typically offered in the market area?
b. Did an RCS completed on another project in the market area within the last three years produce market rents that were significantly lower than the SAFMRs?
c. Does the project’s prior RCS show that the project’s Section 8 rents exceeded rents in the market area?
Approval/Denial. The AE must approve the Owner’s request to use SAFMRs in lieu of an RCS unless, based on the AE’s due diligence review and/or the input of a state-certified appraiser, the AE concludes that the proposed rents are above market.
a. If HUD denies the Owner’s request, HUD may, upon the Owner’s request, issue a short-term renewal contract to allow the Owner a reasonable period of time to obtain an RCS prepared in accordance with Sections 9-9 through 9-13. Chapter Two explains how to set rent levels for short-term renewal contracts.
5
Chapter Nine – Published March 2023
- b. An Owner may not appeal HUD’s denial of their request to use SAFMRs in lieu of submitting an RCS.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — HUD Section 8 Renewal Policy Guidebook
- U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT
- SPECIAL ATTENTION OF
- TRANSMITTAL
- A. Purpose
- Explanation of Changes
- Section 8 Renewal Policy Guidebook
- Office of Multifamily Housing
- Table of Contents
- Chapter One
- Introduction
- Chapter 1: Introduction
- Chapter 2: Section 8 Renewals
- Chapter 3: Option One: Mark-Up-To-Market
- Chapter 4: Option Two: Contract Renewals For Other Projects wi…
- Chapter 5: Option Three: Referral to Recap
- Chapter 6: Option Four: Renewal of Projects Exempt from or not…
- Chapter 7: Option Five: Renewal of Portfolio Reengineering Dem…
- Chapter 8: Option Six: Opt-Outs
- Chapter 9: Rent Comparability Studies
- Chapter 10: Residual Receipts
- Chapter 11: Tenant Issues
- Chapter 12: Physical Condition of the Project
- Chapter 13: HUD’s Refusal to Renew Section 8 Contracts
- Chapter 14: Rural Housing Service (RHS) Section 515/8
- Chapter 15: Section 8 Preservation Efforts
- — Chapter 16: “Old Regulation” State Housing Finance Agency Pr…
- 1-2. LEGISLATIVE HISTORY
- 1-3. RULEMAKING
- 1-4. ADMINISTRATIVE POLICY
- 1-5. APPLICABILITY
- 1-6. PAPERWORK REDUCTION ACT
- Chapter Two
- Section 8 Renewals
- 2-1. INTRODUCTION
- 2-2. OWNER OPTIONS
- 2-3. TYPES OF RENEWALS
- 2-4. EARLY TERMINATION OF A CONTRACT
- 2-5. RENT COMPARABILITY STUDY (RCS)
- Note: The AE/CA shall not lower the comparable market rents in…
- Note: A RCS is not required at any subsequent renewal of an EL…
- 2-6. CONTRACTS
- 2-8. SHORT-TERM CONTRACT RENEWALS
- 2-10. COMBINING CONTRACTS
- 2-11. REQUEST FOR A CONTRACT EXTENSION
- 2-12. DISTRIBUTIONS
- Note: The conditions listed above for receiving access to incr…
- 2-13. RENT ADJUSTMENTS
- 2-14. OPERATING COST ADJUSTMENT FACTOR (OCAF)
- 2-15. BUDGET-BASED RENT ADJUSTMENT REQUESTS
- 2-16. INCREASES IN DEPOSITS TO THE RESERVE FOR REPLACEMENT
- 2-17. PROCESSING INSTRUCTIONS
- Note: If the project has a budget approved by the AE/CA less t…
- Note: HUD does not accept the RHS utility analysis. The owner …
- 2-18. WAIVERS
- 2-19. DUNS NUMBER
- Chapter Three
- 3-1. OVERVIEW
- 3-3. OPTION ONE-A ENTITLEMENT MARK-UP-TO-MARKET ELIGIBILITY
- Note: Nonprofit controlled for profit entities as described in…
- 3-4. 150 PERCENT RENT CAP FOR OPTION ONE-A
- 3-5. EXCEEDING THE 150 PERCENT OF FMR CAP
- 3-6. OPTION ONE-B DISCRETIONARY MUTM ELIGIBILITY
- Note: Non-profit owned projects that meet one of the three cri…
- 3-7. RENEWAL REQUESTS
- 3-8. PROCESSING INSTRUCTIONS
- 3-9. ANNUAL RENT ADJUSTMENTS DURING A MULTIYEAR CONTRACT
- Chapter Four
- 4-1. ELIGIBILITY
- Note: Projects currently renewed under either Option Two or Op…
- 4-2. CONTRACT RENEWAL
- 4-3. ANNUAL RENT ADJUSTMENTS DURING A MULTIYEAR CONTRACT
- 4-4. PROCESSING INSTRUCTIONS
- Chapter Five
- Note: WAIVERS TO CHAPTER FIVE WILL BE IN ACCORDANCE WITH RECAP…
- Note: Risk Sharing Projects do not meet the definition of “eli…
- 5-2. BINDING COMMITMENT
- 5-3. ENTRY INTO RECAP
- Note: In cases where a CA makes the determination that contrac…
- 5-4. CONTRACT RENEWALS — RENT OR DEBT RESTRUCTURING
- 5-5. SUBSEQUENT RENEWALS
- 5-6. “WATCH LIST” MTM PROJECTS
- 5-7. GENERAL INFORMATION
- Chapter Six
- 6-1. ELIGIBILITY
- Note: State and local government financed projects that are no…
- Note: In cases where referral to Recap is necessary, CAs must …
- Note: Section 202 and 811 Capital Advance projects are not eli…
- Note: Projects financed under the risk-sharing loan programs u…
- 6-2. RENEWALS
- Reminder: For projects (including 202 projects) that are being…
- 6-3. RENT ADJUSTMENTS FOR MULTI-YEAR CONTRACTS
- 6-4. SECTION 202 REFINANCINGS
- Chapter Seven
- 7-1. ELIGIBILITY
- Portfolio Reengineering Demonstration Program Projects
- 7-2. RENEWAL OF PORTFOLIO REENGINEERING DEMONSTRATION PROJECTS
- FIVE
- Note: Owners can request that the existing Demo Program Use Ag…
- 7-4. PROCESSING INSTRUCTIONS FOR DEMONSTRATION PROJECTS
- 7-5. PRESERVATION PROJECTS (LIHPRHA AND ELIHPA)
- 7-6. OWNER’S SUBMISSION FOR PRESERVATION PROJECTS
- Note: Owners can request that the existing Preservation Use Ag…
- 7-7. PROCESSING INSTRUCTIONS FOR PRESERVATION PROJECTS
- 7-8. PROJECT SPECIFIC RENTS (PSRS)
- Chapter Eight
- 8-1. OVERVIEW
- 8-2. OWNER REQUIREMENTS FOR TENANT NOTIFICATION
- 8-3. PROCESSING INSTRUCTIONS
- Note: If proper notification was not provided, the owner must …
- Chapter Nine
- 9-1. BACKGROUND
- 9-2. APPLICABILITY OF CHAPTER NINE
- 9-3. ROAD MAP TO CHAPTER NINE
- 9-4. ALTERNATIVES TO RENT COMPARABILITY STUDY
- 9-6. METHOD TWO: COMPARING PROPOSED SECTION 8 RENTS WITH RENTS…
- 9-7. PREPARING A RENT COMPARABILITY STUDY
- 9-8. APPRAISER QUALIFICATIONS
- 9-9. ANALYZING THE SUBJECT PROJECT
- Note: Appraisers should not take into consideration demographi…
- Note: Government boundaries like state or county lines often d…
- 9-10. SELECTING COMPARABLE UNITS
- 9-11. COLLECTING AND DOCUMENTING DATA ON COMPARABLE UNITS
- 9-12. COMPUTING ADJUSTED RENTS FOR COMPARABLE UNITS
- 9-13. DERIVING ESTIMATED MARKET RENTS
- 9-14. PROCEDURE FOR MANDATORY MARKET RENT THRESHOLD
- Example Project in ZIP code 76469
- 9-15. HUD REVIEW OF RENT COMPARABILITY STUDY
- 9-16. INITIAL AND SUBSTANTIVE REVIEW OF OWNER’S RCS
- 9-17. COMMUNICATING RESULTS OF HUD/CA REVIEWS
- 9-18. OWNER APPEALS
- 9-19. IMPOSING SANCTIONS ON APPRAISERS
- APPENDICES
- - Instructions for Completing the HUD Form 92273 S8
- Part A: Rents Charged (lines 1 through 5)
- Part B. Design, Location, Condition (lines 6 through 10)
- Part C. Unit Equipment/Amenities (lines 11 through 23)
- Part D. Site Equipment/Amenities (lines 24 through 32)
- Part E. Utilities (lines 33 through 39)
- Part F. Adjustments Recap (lines 40 through 43)
- Part G. Adjusted Rents (lines 44 through 45)
- Required Contents of a Rent Comparability Study
- Comparable Project Profile