13-2. HUD’S DECISION NOT TO RENEW THE EXPIRING CONTRACT
HUD Section 8 Renewal Policy Guidebook · 2026 edition · updated 2026-07-29 · United States
- A. Regional and Headquarters Roles.
The Regional Center or Satellite Office must follow guidance issued by OAMPO in Headquarters when a decision is made by the Regional Center Director or Satellite Office Director to not renew the contract based on a REAC physical inspection before the contract can be abated or allowed to expire.
- B. Process.
When OAMPO in Headquarters determines the contract should not be renewed, the following actions should be taken.
If more than 120 days remain on the contract the AE/CA must:
a. Notify the owner that because the EH&S deficiencies have not been corrected and the re-inspection score is less than 60, a Notice of Default has been issued and that HUD intends to abate or allow the contract to expire and, if possible transfer the project’s budget authority to another project via the 8bb process. (See Housing Notice 2014-14 for details.)
b. Immediately begin the process for obtaining regular Housing Choice Vouchers (HCVs) following the instructions in Notice PIH 2001-41 (HA), Section 8 Tenant-Based Assistance (Enhanced and Regular Housing Choice Vouchers) For Housing Conversion Actions – Policy and Guidance, or current guidance, allowing up to 120 days for issuance of the HCVs. Notice PIH 2001-41 (HA) can be found at:
http://www.hud.gov/offices/adm/hudclips/notices/pih/01pihnotices .cfm.
- c. Monitor the processing of the vouchers with the assigned Public Housing Agency (PHA), the Office of Public and Indian Housing (PIH), and the owner, until the vouchers have been issued.
If less than 120 days remain on the contract the AE/CA must:
- a. Notify the owner that because the EH&S deficiencies have not been corrected and the re-inspection score is less than 60, a Notice of Default has been issued and that HUD intends to abate the contract and, if possible transfer the project’s budget authority to another project via the 8bb process. (See Housing Notice 2014-14 for details.).
Chapter Thirteen – Published March 2023
2
- b. Immediately begin the process for obtaining regular Housing Choice Vouchers (HCVs) following the instructions in Notice PIH 2001-41 (HA), Section 8 Tenant-Based Assistance (Enhanced and Regular Housing Choice Vouchers) _For Housing Conversion Actions – Policy and Guidance_ , or current guidance.
- c. Enter into a short-term renewal of the contract at current rents with the owner, using the Basic Renewal One Year contract (HUD-9636) at current rents, or if a determination has been made as to market rents based on a RCS, renew at rents that do not exceed market rent.
- d. Monitor the processing of the vouchers with the assigned Public Housing Agency (PHA), PIH, and the owner, until the vouchers have been issued.
If the contract will be abated and HUD is going to relocate the tenants to other acceptable housing, the Regional Center/PC Director must obtain authority to conduct a relocation program from the Director of OAMPO in Headquarters. The AE must alert the Property Disposition Center that a request to relocate the tenants will be submitted to the OAMPO.
Make sure the Regional Center has a written disposition plan in place and shared with the owner before abating a contract with an underlying insured or Secretaryheld mortgage.
Terminate the contract after vouchers have been issued to eligible residents and, if possible transfer the project’s budget authority to another project via the 8bb process. (See Housing Notice 2014-14 for details.)
Flag the owner in the APPS/2530 system.
Designate the project as troubled.
C.
Appeals
If the owner appeals HUD’s decision to not renew the Section 8 HAP contract based on the physical inspection, or otherwise asks for relief from the physical inspection score, follow the instructions in Chapter 13, HUD’s Refusal to Renew Section 8 HAP Contract, of this Guide.
D.
iREMS Reporting Requirements.
The AE must record all activities related to bringing a project into regulatory and contractual compliance because of a REAC physical inspection in the Workload Management screen of iREMS.
Compliance with the EH&S and REAC physical inspection protocols must be entered as this may influence future decisions on renewal of the Section 8 HAP contract and because it is important to have a complete and accurate administrative record should HUD proceed with enforcement actions.
The AE must record all closeout activities regarding physical inspections and any related matters and must share them with the owner.
Chapter Thirteen – Published March 2023
3
- The AE must record a project designated as troubled in the Risk Management screen, if applicable.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸ Contents — HUD Section 8 Renewal Policy Guidebook
- U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT
- SPECIAL ATTENTION OF
- TRANSMITTAL
- A. Purpose
- Explanation of Changes
- Section 8 Renewal Policy Guidebook
- Office of Multifamily Housing
- Table of Contents
- Chapter One
- Introduction
- Chapter 1: Introduction
- Chapter 2: Section 8 Renewals
- Chapter 3: Option One: Mark-Up-To-Market
- Chapter 4: Option Two: Contract Renewals For Other Projects wi…
- Chapter 5: Option Three: Referral to Recap
- Chapter 6: Option Four: Renewal of Projects Exempt from or not…
- Chapter 7: Option Five: Renewal of Portfolio Reengineering Dem…
- Chapter 8: Option Six: Opt-Outs
- Chapter 9: Rent Comparability Studies
- Chapter 10: Residual Receipts
- Chapter 11: Tenant Issues
- Chapter 12: Physical Condition of the Project
- Chapter 13: HUD’s Refusal to Renew Section 8 Contracts
- Chapter 14: Rural Housing Service (RHS) Section 515/8
- Chapter 15: Section 8 Preservation Efforts
- — Chapter 16: “Old Regulation” State Housing Finance Agency Pr…
- 1-2. LEGISLATIVE HISTORY
- 1-3. RULEMAKING
- 1-4. ADMINISTRATIVE POLICY
- 1-5. APPLICABILITY
- 1-6. PAPERWORK REDUCTION ACT
- Chapter Two
- Section 8 Renewals
- 2-1. INTRODUCTION
- 2-2. OWNER OPTIONS
- 2-3. TYPES OF RENEWALS
- 2-4. EARLY TERMINATION OF A CONTRACT
- 2-5. RENT COMPARABILITY STUDY (RCS)
- Note: The AE/CA shall not lower the comparable market rents in…
- Note: A RCS is not required at any subsequent renewal of an EL…
- 2-6. CONTRACTS
- 2-8. SHORT-TERM CONTRACT RENEWALS
- 2-10. COMBINING CONTRACTS
- 2-11. REQUEST FOR A CONTRACT EXTENSION
- 2-12. DISTRIBUTIONS
- Note: The conditions listed above for receiving access to incr…
- 2-13. RENT ADJUSTMENTS
- 2-14. OPERATING COST ADJUSTMENT FACTOR (OCAF)
- 2-15. BUDGET-BASED RENT ADJUSTMENT REQUESTS
- 2-16. INCREASES IN DEPOSITS TO THE RESERVE FOR REPLACEMENT
- 2-17. PROCESSING INSTRUCTIONS
- Note: If the project has a budget approved by the AE/CA less t…
- Note: HUD does not accept the RHS utility analysis. The owner …
- 2-18. WAIVERS
- 2-19. DUNS NUMBER
- Chapter Three
- 3-1. OVERVIEW
- 3-3. OPTION ONE-A ENTITLEMENT MARK-UP-TO-MARKET ELIGIBILITY
- Note: Nonprofit controlled for profit entities as described in…
- 3-4. 150 PERCENT RENT CAP FOR OPTION ONE-A
- 3-5. EXCEEDING THE 150 PERCENT OF FMR CAP
- 3-6. OPTION ONE-B DISCRETIONARY MUTM ELIGIBILITY
- Note: Non-profit owned projects that meet one of the three cri…
- 3-7. RENEWAL REQUESTS
- 3-8. PROCESSING INSTRUCTIONS
- 3-9. ANNUAL RENT ADJUSTMENTS DURING A MULTIYEAR CONTRACT
- Chapter Four
- 4-1. ELIGIBILITY
- Note: Projects currently renewed under either Option Two or Op…
- 4-2. CONTRACT RENEWAL
- 4-3. ANNUAL RENT ADJUSTMENTS DURING A MULTIYEAR CONTRACT
- 4-4. PROCESSING INSTRUCTIONS
- Chapter Five
- Note: WAIVERS TO CHAPTER FIVE WILL BE IN ACCORDANCE WITH RECAP…
- Note: Risk Sharing Projects do not meet the definition of “eli…
- 5-2. BINDING COMMITMENT
- 5-3. ENTRY INTO RECAP
- Note: In cases where a CA makes the determination that contrac…
- 5-4. CONTRACT RENEWALS — RENT OR DEBT RESTRUCTURING
- 5-5. SUBSEQUENT RENEWALS
- 5-6. “WATCH LIST” MTM PROJECTS
- 5-7. GENERAL INFORMATION
- Chapter Six
- 6-1. ELIGIBILITY
- Note: State and local government financed projects that are no…
- Note: In cases where referral to Recap is necessary, CAs must …
- Note: Section 202 and 811 Capital Advance projects are not eli…
- Note: Projects financed under the risk-sharing loan programs u…
- 6-2. RENEWALS
- Reminder: For projects (including 202 projects) that are being…
- 6-3. RENT ADJUSTMENTS FOR MULTI-YEAR CONTRACTS
- 6-4. SECTION 202 REFINANCINGS
- Chapter Seven
- 7-1. ELIGIBILITY
- Portfolio Reengineering Demonstration Program Projects
- 7-2. RENEWAL OF PORTFOLIO REENGINEERING DEMONSTRATION PROJECTS
- FIVE
- Note: Owners can request that the existing Demo Program Use Ag…
- 7-4. PROCESSING INSTRUCTIONS FOR DEMONSTRATION PROJECTS
- 7-5. PRESERVATION PROJECTS (LIHPRHA AND ELIHPA)
- 7-6. OWNER’S SUBMISSION FOR PRESERVATION PROJECTS
- Note: Owners can request that the existing Preservation Use Ag…
- 7-7. PROCESSING INSTRUCTIONS FOR PRESERVATION PROJECTS
- 7-8. PROJECT SPECIFIC RENTS (PSRS)
- Chapter Eight
- 8-1. OVERVIEW
- 8-2. OWNER REQUIREMENTS FOR TENANT NOTIFICATION
- 8-3. PROCESSING INSTRUCTIONS
- Note: If proper notification was not provided, the owner must …
- Chapter Nine
- 9-1. BACKGROUND
- 9-2. APPLICABILITY OF CHAPTER NINE
- 9-3. ROAD MAP TO CHAPTER NINE
- 9-4. ALTERNATIVES TO RENT COMPARABILITY STUDY
- 9-6. METHOD TWO: COMPARING PROPOSED SECTION 8 RENTS WITH RENTS…
- 9-7. PREPARING A RENT COMPARABILITY STUDY
- 9-8. APPRAISER QUALIFICATIONS
- 9-9. ANALYZING THE SUBJECT PROJECT
- Note: Appraisers should not take into consideration demographi…
- Note: Government boundaries like state or county lines often d…
- 9-10. SELECTING COMPARABLE UNITS
- 9-11. COLLECTING AND DOCUMENTING DATA ON COMPARABLE UNITS
- 9-12. COMPUTING ADJUSTED RENTS FOR COMPARABLE UNITS
- 9-13. DERIVING ESTIMATED MARKET RENTS
- 9-14. PROCEDURE FOR MANDATORY MARKET RENT THRESHOLD
- Example Project in ZIP code 76469
- 9-15. HUD REVIEW OF RENT COMPARABILITY STUDY
- 9-16. INITIAL AND SUBSTANTIVE REVIEW OF OWNER’S RCS
- 9-17. COMMUNICATING RESULTS OF HUD/CA REVIEWS
- 9-18. OWNER APPEALS
- 9-19. IMPOSING SANCTIONS ON APPRAISERS
- APPENDICES
- - Instructions for Completing the HUD Form 92273 S8
- Part A: Rents Charged (lines 1 through 5)
- Part B. Design, Location, Condition (lines 6 through 10)
- Part C. Unit Equipment/Amenities (lines 11 through 23)
- Part D. Site Equipment/Amenities (lines 24 through 32)
- Part E. Utilities (lines 33 through 39)
- Part F. Adjustments Recap (lines 40 through 43)
- Part G. Adjusted Rents (lines 44 through 45)
- Required Contents of a Rent Comparability Study
-
▸ Comparable Project Profile
Overview- Address
- Place Photo Below:
- By my/our signature below, I/We certify that, to the best of m…
- Sample RCS Appraiser’s Transmittal Letter
- Re: Rent Comparability Study/[Project Name]
- Mandatory Market Rent Threshold Test
- Sample Owner’s Cover Letter
- RCS Submittal Cover Letter for [Project Name]
- Owner’s Materials
- RCS Materials
- Mandatory Market Rent Threshold Materials
- Owner’s Signature & Date
- Notes for Rent Grid Analysis and Triggers for Secondary Review
- Sample Issues Memo from Substantive Reviewer
- Special Project Types
- Forms Used in Preparation and Review of an RCS
- Chapter Ten
- Residual Recei pts
- Chapter Eleven
- 11-1. DEFINITIONS
- 11-2. HOUSING CONVERSION ACTIONS
- 11-3. TENANT PROTECTIONS
- 11-4. OWNER NOTIFICATION REQUIREMENTS
- Note: The one-year notification is not required when an owner …
- Note: Taping the Notice to the outside of each unit is not acc…
- 11-5. LIMITED ENGLISH PROFICIENCY ASSISTANCE
- 11-6. EFFECTIVE COMMUNICATIONS
- ( Date )
- THIS LETTER IS TO NOTIFY YOU THAT WE DO NOT INTEND TO RENEW TH…
- HUD Web
- ( Date )
- THIS LETTER IS TO NOTIFY YOU THAT WE INTEND TO RENEW THE CURRE…
- HUD Web
- ( Date )
- HUD Web
- Chapter Twelve
- 12-1. PHYSICAL CONDITION
- 12-2. EXIGENT HEALTH AND SAFETY (EH&S) DEFICIENCY NOTICE AND P…
- Note: hud@work is an internal site with no access for the publ…
- Chapter Thirteen
- 13-1. HUD’S REFUSAL TO RENEW A SECTION 8 HAP CONTRACT
- 13-2. HUD’S DECISION NOT TO RENEW THE EXPIRING CONTRACT
- 13-3. OWNER’S APPEAL OF HUD’S REFUSAL TO RENEW A SECTION 8 HAP…
- 13-4. HUD’S TENANT NOTIFICATION OF REFUSAL TO RENEW
- Chapter Fourteen
- 14-1. OVERVIEW
- 14-2. PROCESSING
- Note: HUD does not accept the RHS utility analysis. The owner …
- Note: If the owner of the project is a for profit who is not r…
- Note: RHS projects are exempted from debt restructuring under …
- Chapter Fifteen
- Section 8 Preservation Efforts
- 15-1. OVERVIEW
- PART ONE: DEFINITION OF NONPROFIT OWNER
- 15-2. NONPROFIT OWNER/PURCHASER
- 15-3. NONPROFIT CONTROLLED FOR PROFIT ENTITY (OWNER OR PURCHAS…
- PART TWO: GENERAL CRITERIA FOR BOTH CAPITAL REPAIRS AND TRANSF…
- 15-4. APPLICABILITY
- 15-5. BASIC REQUIREMENTS
- Note: HUD lacks the authority to allow a project to reduce ren…
- 15-6. RENT INCREASES
- 15-7. UNASSISTED UNITS IN A HUD PROJECT
- 15-8. CAP ON MARKET RENTS
- 15-9. PROJECT CAPITAL NEEDS ASSESSMENT AND INCREASED DEPOSITS …
- Note: For a non-insured project with an old regulation/LMSA/PD…
- PART THREE: CAPITAL REPAIRS PROGRAM
- 15-11. GENERAL
- 15-12. ADDITIONAL ACCEPTABILITY REQUIREMENTS FOR THE OWNER
- 15-13. PROJECT ELIGIBILITY
- Part Four: Transfer Program
- 15-14. GENERAL
- 15-15. ADDITIONAL PURCHASER REQUIREMENTS
- 15-16. PROJECT ELIGIBILITY
- 15-17. TRANSFER OF PHYSICAL ASSETS (TPA) FOR A HUD INSURED TRA…
- Chapter Sixteen
- 16-1. BACKGROUND, APPLICABILITY AND OVERVIEW
- 16-2. OWNER OPTIONS
- 16-3. TIMELINESS
- Rent Comparability Study (RCS) . See Comparability Study.