5605-1 - Standards of construction.

In all areas of special flood hazards the following standards are required:

(a)

Anchoring. All new construction and substantial improvements of structures, including manufactured homes, shall be adequately anchored to prevent flotation, collapse or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy.

(b)

Construction Materials and Methods. All new construction and substantial improvements of structures, including manufactured homes, shall be constructed:

(1)

With flood resistant materials, and utility equipment resistant to flood damage for areas below the base flood elevation;

(2)

Using methods and practices that minimize flood damage;

(3)

With electrical, heating, ventilation, plumbing and air conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding; and

(4)

Within FIRM Zones AH or AO, so that there are adequate drainage paths around structures on slopes to guide flood waters around and away from proposed structures.

(c)

Elevation and Floodproofing.

(1)

Residential construction. All new construction or substantial improvements of residential structures shall have the lowest floor, including basement:

a.

In FIRM AE, AH, A1-30 Zones, elevated one (1) foot above the base flood elevation.

b.

In an AO zone, elevated above the highest adjacent grade to a height one (1) foot above the depth number specified in feet on the FIRM, or elevated at least two (2) feet above the highest adjacent grade if no depth number is specified.

c.

In a FIRM A Zone, without BFE's specified on the FIRM [unnumbered A Zone], elevated one (1) foot above the base flood elevation, as determined under Section 5604-2(c).

Upon the completion of the structure, the elevation of the lowest floor, including basement, shall be certified by a registered civil engineer or licensed land surveyor, and verified by the County building inspector to be properly elevated. Such certification and verification shall be provided to the Floodplain Administrator.

(2)

Nonresidential construction. All new construction or substantial improvements of nonresidential structures shall either be elevated to conform with Section 5605-1(c)(1) or:

a.

Be floodproofed, together with attendant utility and sanitary facilities, below the elevation recommended under Section 5605-1(c)(1), so that the structure is watertight with walls substantially impermeable to the passage of water;

b.

Have structural components capable of resisting hydrostatic and hydrodynamic loads and effects of buoyancy; and

c.

Be certified by a registered civil engineer or architect that the standards of Section 5605-1(c)(2)a and b are satisfied. Such certification shall be provided to the Floodplain Administrator.

(3)

Flood openings. All new construction and substantial improvements of structures with fully enclosed areas below the lowest floor (excluding basements) that are usable solely for parking of vehicles, building access or storage, and which are subject to flooding, shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwater. Designs for meeting this requirement must meet the following minimum criteria:

a.

For non-engineered openings:

Have a minimum of two (2) openings on different sides having a total net area of not less than one (1) square inch for every square foot of enclosed area subject to flooding;

The bottom of all openings shall be no higher than one (1) foot above grade;

Openings may be equipped with screens, louvers, valves or other coverings or devices provided that they permit the automatic entry and exit of floodwater; and

Buildings with more than one (1) enclosed area must have openings on exterior walls for each area to allow flood water to directly enter; or

b.

Be certified by a registered civil engineer or architect.

(4)

Manufactured homes.

a.

See Section 5905-4.

(5)

Garages and low cost accessory structures.

a.

Attached garages.

A garage attached to a residential structure, constructed with the garage floor slab below the BFE, must be designed to allow for the automatic entry of flood waters. See Section 5605-1(c)(3). Areas of the garage below the BFE must be constructed with flood resistant materials. See Section 5605-1(b).

A garage attached to a nonresidential structure must meet the above requirements or be dry floodproofed. For guidance on below- grade parking areas, see FEMA Technical Bulletin TB 6.

b.

Detached garages and accessory structures.

An accessory structure used solely for parking (two-car detached garages or smaller) or limited storage (small, low-cost sheds), as defined in Article 2, may be constructed such that its floor is below the base flood elevation (BFE), provided the structure is designed and constructed in accordance with the following requirements:

a)

Use of the accessory structure must be limited to parking or limited storage;

b)

The portions of the accessory structure located below the BFE must be built using flood-resistant materials;

c)

The accessory structure must be adequately anchored to prevent flotation, collapse and lateral movement;

d)

Any mechanical and utility equipment in the accessory structure must be elevated or floodproofed to or above the BFE;

e)

The accessory structure must comply with floodplain encroachment provisions in Section 5605-6; and

f)

The accessory structure must be designed to allow for the automatic entry of flood waters in accordance with Section 5605-1(c)(3).

c.

Detached garages and accessory structures not meeting the above standards must be constructed in accordance with all applicable standards in Section 5605-1.

(6)

Crawl space construction. This sub-section applies to buildings with crawl spaces up to two (2) feet below grade. Below-grade crawl space construction in accordance with the requirements listed below will not be considered basements.

a.

The building must be designed and adequately anchored to resist flotation, collapse, and lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy. Crawl space construction is not allowed in areas with flood velocities greater than five (5) feet per second unless the design is reviewed by a qualified design professional, such as a registered architect or professional engineer;

b.

The crawl space is an enclosed area below the BFE and, as such, must have openings that equalize hydrostatic pressures by allowing for the automatic entry and exit of floodwaters. For guidance on flood openings, see FEMA Technical Bulletin TB 1-93;

c.

Crawl space construction is not permitted in FIRM V Zones. Open pile or column foundations that withstand storm surge and wave forces are required in V Zones;

d.

Portions of the building below the BFE must be constructed with materials resistant to flood damage. This includes not only the foundation walls of the crawl space used to elevate the building, but also any joists, insulation or other materials that extend below the BFE;

e.

Any building utility systems within the crawl space must be elevated above BFE or designed so that floodwaters cannot enter or accumulate within the system components during flood conditions.

f.

Requirements for all below-grade crawl space construction, in addition to the above requirements, to include the following:

The interior grade of a crawl space below the BFE must not be more than two (2) feet below the lowest adjacent exterior grade (LAG), shown as D in figure 3 of Technical Bulletin TB 11-01;

The height of the below-grade crawl space, measured from the interior grade of the crawl space to the top of the crawl space foundation wall must not exceed four (4) feet (shown as L in figure 3 of Technical Bulletin TB 11-01) at any point;

There must be an adequate drainage system that removes floodwaters from the interior area of the crawl space within a reasonable period of time after a flood event, not to exceed seventy-two (72) hours; and

The velocity of floodwaters at the site should not exceed five (5) feet per second for any crawl space. For velocities in excess of five (5) feet per second, other foundation types should be used.

(7)

Other Standards.

a.

Where average velocities of flow exceed five (5) feet per second, any fill material used to support the structure and its foundations shall be armored to prevent loss of the fill material.

b.

When fill is not used and velocities of flow are equal to or greater than five (5) feet per second and equal to or less than ten (10) feet per second, the components used to support the structure shall be designed to resist hydrostatic and hydrodynamic loads.

c.

When fill is not used and velocities of flow exceed ten (10) feet per second, the use of structural components to support a structure is prohibited.

d.

When depths of water exceed three (3) feet, structural components used to support the structure shall be designed for impact loads.

(Ord. No. 4521, § 5.1, 3-27-2018)

5605-2 - Standards for utilities.

(a)

All new and replacement water supply and sanitary sewage systems shall be designed to minimize or eliminate:

(1)

Infiltration of flood waters into the systems; and

(2)

Discharge from the systems into flood waters.

(b)

On-site waste disposal systems shall be located to avoid impairment to them, or contamination from them, during flooding.

(Ord. No. 4521, § 5.2, 3-27-2018)

5605-3 - Standards for subdivisions and other proposed development.

(a)

All new subdivision proposals and other proposed development, including proposals for manufactured home parks and subdivisions, greater than fifty (50) lots or five (5) acres, whichever is the lesser, shall:

(1)

Identify the special flood hazard areas and base flood elevations.

(2)

Identify the elevations of the lowest floors of all proposed structures and pads on the final plans.

(3)

If the site is filled above the base flood elevation, include the following as-built information for each structure certified by a registered civil engineer or licensed land surveyor and provided as part of an application for a Letter of Map Revision based on Fill (LOMR-F) to the Floodplain Administrator:

a.

Lowest floor elevation.

b.

Pad elevation.

c.

Lowest adjacent grade.

(b)

All subdivision proposals and other proposed development shall be consistent with the need to minimize flood damage.

(c)

All subdivision proposals and other proposed development shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage.

(d)

All subdivisions and other proposed development shall provide adequate drainage to reduce exposure to flood hazards.

(Ord. No. 4521, § 5.3, 3-27-2018)

5605-4 - Standards for manufactured homes.

(a)

All manufactured homes that are placed or substantially improved, on sites located: (1) outside of a manufactured home park or subdivision, (2) in a new manufactured home park or subdivision, (3) in an expansion to an existing manufactured home park or subdivision or (4) in an existing manufactured home park or subdivision, upon which a manufactured home has incurred substantial damage as the result of a flood, shall:

(1)

Within Zones A1-30, AH, and AE on the community's Flood Insurance Rate Map, be elevated on a permanent foundation such that the lowest floor of the manufactured home is elevated one (1) foot above the base flood elevation and be securely fastened to an adequately anchored foundation system to resist flotation, collapse, and lateral movement.

(2)

Within Zones V1-30, V and VE on the community's Flood Insurance Rate Map, meet the requirements of Section 5605-7.

(b)

All manufactured homes to be placed or substantially improved on sites in an existing manufactured home park or subdivision within Zones A1-30, AH, AE, V1-30, V and VE on the community's Flood Insurance Rate Map that are not subject to the provisions of Section 5605-4(a) will be securely fastened to an adequately anchored foundation system to resist flotation, collapse, and lateral movement, and be elevated so that either the:

(1)

Lowest floor of the manufactured home is at least one (1) foot above the base flood elevation; or

(2)

Manufactured home chassis is supported by reinforced piers or other foundation elements of at least equivalent strength that are no less than thirty-six (36) inches in height above grade.

Upon the completion of the structure, the elevation of the lowest floor including basement shall be certified by a registered civil engineer or licensed land surveyor and verified by the County building inspector to be properly elevated. Such certification and verification shall be provided to the Floodplain Administrator.

(Ord. No. 4521, § 5.4, 3-27-2018)

5605-5 - Standards for recreational vehicles.

(a)

All recreational vehicles placed in FIRM Zones A1-30, AH, AE, V1-30 and VE will either:

(1)

Be on the site for fewer than one hundred eighty (180) consecutive days; or

(2)

Be fully licensed and ready for highway use. A recreational vehicle is ready for highway use if it is on its wheels or jacking system, is attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached additions; or

(3)

Meet the permit requirements of Section 5604-3 of this Chapter and the elevation and anchoring requirements for manufactured homes in Section 5605-4.

(b)

Recreational vehicles placed on sites within Zones V1-30, V and VE on the community's Flood Insurance Rate Map will meet the requirements of Section 5605-5(a) and Section 5605-7.

(Ord. No. 4521, § 5.5, 3-27-2018)

5605-6 - Floodways.

Since floodways are an extremely hazardous area due to the velocity of flood waters which carry debris, potential projectiles, and erosion potential, the following provisions apply:

(a)

Until a regulatory floodway is adopted, no new construction, substantial development, or other development (including fill) shall be permitted within FIRM Zones A1-30 and AE, unless it is demonstrated that the cumulative effect of the proposed development, when combined with all other development, will not increase the water surface elevation of the base flood more than one (1) foot at any point within the unincorporated areas of Ventura County.

(b)

Encroachments, including fill, new construction, substantial improvements, and other development, are prohibited within an adopted regulatory floodway unless certification by a registered civil engineer is provided demonstrating that the proposed encroachment will not result in any increase in flood levels during the occurrence of the base flood discharge. Placement of new residential structiures within the adopted regulatory floodway is prohibited.

(c)

If Sections 5605-6(a) and (b) are satisfied, all new construction, substantial improvement, and other proposed new development shall comply with all other applicable flood hazard reduction provisions of Article 5.

(Ord. No. 4521, § 5.6, 3-27-2018)

5605-7 - Coastal high hazard areas.

Within coastal high hazard areas, Zones V, V1-30 and VE, as established under Section 5603-2, the following standards shall apply:

(a)

All new residential and non-residential construction, including substantial improvement and substantial damage, shall be elevated on adequately anchored pilings or columns and securely anchored to such pilings or columns so that the bottom of the lowest horizontal structural member of the lowest floor (excluding the pilings or columns) is elevated one (1) foot above the base flood level. The pile or column foundation and structure attached thereto shall be anchored to resist flotation, collapse, and lateral movement due to the effects of wind and water loads acting simultaneously on all building components. Water loading values used shall be those associated with the base flood. Wind loading values used shall be those required by applicable state or local building standards.

(b)

All new construction and other development shall be located on the landward side of the reach of mean high tide.

(c)

All new construction and substantial improvement shall have the space below the lowest floor free of obstructions or constructed with breakaway walls as defined in Article 2 of this Chapter. Such enclosed space shall not be used for human habitation and will be usable solely for parking of vehicles, building access or storage.

(d)

Fill shall not be used for structural support of buildings.

(e)

Man-made alteration of sand dunes which would increase potential flood damage is prohibited.

(f)

The Floodplain Administrator shall obtain and maintain the following records:

(1)

Certification by a registered engineer or architect that a proposed structure complies with Section 5605-7(a); and

(2)

The elevation (in relation to mean sea level) of the bottom of the lowest horizontal structural member of the lowest floor (excluding pilings or columns) of all new and substantially improved structures, and whether such structures contain a basement.

(Ord. No. 4521, § 5.7, 3-27-2018)

5605-8 - Alluvial fans.

Areas subject to alluvial fan flooding have irregular flow paths that result in erosion of existing channels and the undermining of the fill material. Those areas are identified on the Flood Insurance Rate Map as AO zones with velocities. In such areas:

(a)

All structures must be securely anchored to minimize the impact of the flood and sediment damage.

(b)

All new construction and substantial improvements of structures shall have the lowest floor, including basement, elevated to or above the depth number plus one (1) foot.

(c)

All fill materials must be armored to protect the material from the velocity of the flood flow.

(d)

All proposals for subdivision development must provide a mitigation plan that identifies the engineering methods used to:

(1)

Protect the structures from erosion and scour caused by the velocity of the flood flow; and

(2)

Capture or transport flood and sediment flow through the subdivision to a safe point of disposition.

(Ord. No. 4521, § 5.8, 3-27-2018)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — VenturaCounty Municipal Code
VenturaCounty Municipal Code
  1. 2.04 of Title 2.
  2. Division 1 — Government
  3. Chapter 1 — Business Taxes and Certificates
  4. Article 1 — General Provisions
  5. Article 2 — Definitions
  6. Article 3 — Imposition of Tax and Exemptions from Taxation
  7. Article 4 — Payment of Business Taxes
  8. Article 5 — Application and Renewal—Business Tax Certificate
  9. Article 6 — Penalties and Interest
  10. Article 7 — Refund of Overpayment
  11. Article 8 — Hearings and Appeals
  12. Article 9 — Enforcement and Violations
  13. Article 10 — Additional Tax Collector Powers
  14. Article 11 — Miscellaneous Provisions
  15. Chapter 2 — Licenses
  16. Article 2 — License Applications— Procedures and Appeals
  17. Article 1 — Temporary Shows
  18. Article 2 — Dance Halls
  19. Article 2.5 — Teen-Age Dances
  20. Article 3 — Billiard Rooms
  21. Article 4 — Motor Vehicle Races
  22. Article 5 — Card Rooms
  23. Article 1 — Auctioneer
  24. Article 2 — Collectors, Dealers and Brokers
  25. Article 3 — Peddlers, Solicitors, and Telephone Solicitors
  26. Article 1 — Rubbish Collection
  27. Article 2 — Ambulances
  28. Article 3 — Private Patrolmen
  29. Article 4 — Taxicabs
  30. Article 5 — Massage Businesses and Massage Technicians
  31. Article 5.5 — Solemnization of Marriages
  32. Article 6 — Kennels
  33. Article 1 — Licensing of Cannabis Operations
  34. Article 2 — Tax on Cannabis Operations
  35. Chapter 6 — Sidewalk Vending
  36. Chapter 1 — Standards and Permits
  37. Chapter 2 — Facilities Fees
  38. Article 1 — Sheriff's Facilities
  39. Article 2 — Fire Protection Facilities
  40. Article 1 — Nuisance
  41. Article 3 — Power of Arrest
  42. Article 1 — Tents and Lean-tos
  43. Article 2 — Enforcement
  44. Article 3 — Tents and House Courts
  45. Article 4 — Violation
  46. Article 1 — Camps
  47. Article 2 — Camp Fires
  48. Article 3 — Bathing, Surfing, Surfboards
  49. Chapter 4 — Animals
  50. Article 1 — License Tag
  51. Article 2 — Animal Shelter
  52. Article 3 — Dogs Used by Peace Officers
  53. Article 4 — Rabies Control
  54. Article 5 — Animal Control
  55. Article 6 — General
  56. Article 7 — Wild Animal Control
  57. Article 8 — Administrative Enforcement Alternative
  58. Article 9 — Roosters
  59. Chapter 5 — Hazardous Substances
  60. Article 1 — Unified Program Generally
  61. Article 1.1 — Unified Program— Hazardous Waste Producers
  62. Article 1.2 — Unified Program—Underground Storage of Hazardous…
  63. Article 1.3 — Unified Program—Aboveground Storage of Hazardous…
  64. Article 1.4 — Unified Program—Business Plan/Risk Management Plan
  65. Article 1.5 — Unified Program—Inspection of State Authorized F…
  66. Article 1.6 — Participating Agency Fees
  67. Article 1.7 — Unified Program Hearing Procedure
  68. Article 2 — Liability for Violation of Hazardous Waste and Sub…
  69. Article 3 — Medical Waste Management and Safe Body Art
  70. Article 5 — Business Plans and Risk Management and Prevention …
  71. Article 1 — General
  72. Chapter 7 — Regulation of Solid Waste Storage, Collection, Dis…
  73. Article 1 — Regulation of the Disposal and Handling of Solid W…
  74. Article 3 — Solid Waste Programs for Unincorporated Areas
  75. Article 4 — County Integrated Waste Management Plan Fee
  76. Article 1 — Groundwater Conservation
  77. Article 2 — Private and State Small Water Systems
  78. Article 3 — Administrative Enforcement of Private and State Sm…
  79. Chapter 9 — Alcoholic Beverage Warning Signs
  80. Chapter 10 — Safer Sex in the Adult Film Industry
  81. Chapter 1 — Fire Protection
  82. Article 1 — Discharge
  83. Chapter 3 — Public Emergency
  84. Article 1 — General
  85. Article 2 — Emergency Planning Council
  86. Chapter 4 — Prices of Emergency Items and Services
  87. Chapter 5 — Courthouse Security Screening
  88. Article 1 — Preliminary Matters
  89. Article 3 — General Provisions
  90. Article 4 — Administration and Permitting
  91. Article 5 — Provisions for Flood Hazard Reduction
  92. Article 6 — Variance Procedure
  93. Chapter 7 — Protection of Watercourses and Related Critical Pu…
  94. Article 1 — Alcoholic Beverages
  95. Article 1.1 — Social Hosts Liability
  96. Article 2 — Nudism
  97. Article 3 — Prostitution & Lewd Acts
  98. Article 4 — Unlawful Exposure of Private Parts and Female Brea…
  99. Article 5 — Harmful Substances
  100. Article 6 — Sale and Display of Drug Paraphernalia to Minors
  101. Article 7 — Place of Business Where Drug Paraphernalia is Kept…
  102. Article 1 — Imprisonment
  103. Article 2 — Juvenile Confinement
  104. Article 3 — Registration of Hotel and Motel Guests
  105. Article 4 — Miscellaneous
  106. Article 4.5 — Bingo Game Licenses
  107. Article 5 — Enclosing Swimming Pools and Other Bodies of Water
  108. Article 6 — Bicycle Registration and Licensing
  109. Article 7 — Abandoned or Inoperative Motor Vehicles
  110. Article 7.1 — Abandoned Vehicles
  111. Article 8 — Alarm Systems
  112. Article 9 — Commercial Weighing and Measuring Instruments
  113. Article 9.5 — Consumer Protection Business Permit
  114. Article 10 — Graffiti
  115. Article 11 — Loud or Raucous Nighttime Noise in Residential Zo…
  116. Chapter 3 — Ventura County Parks
  117. Article 1 — Applicability and Authority
  118. Article 2 — Definitions
  119. Article 3 — Powers and Duties of the Director
  120. Article 4 — Permits
  121. Article 5 — General Regulations
  122. Article 6 — Public Health and Sanitation
  123. Article 7 — Public Safety
  124. Article 8 — Preservation of County Parks
  125. Article 9 — Overnight Camping
  126. Chapter 4 — Ventura County Harbor Ordinance
  127. Article 1 — Definitions
  128. Article 2 — Powers and Duties of the Director
  129. Article 3 — Applicability and Authority
  130. Article 4 — Regulations Concerning Speed and Safety
  131. Article 5 — Navigation
  132. Article 6 — General Regulations
  133. Article 7 — Regulations Covering Mooring, Floats, and Other Ha…
  134. Article 8 — Health and Sanitation
  135. Article 9 — Severability and Preeminence
  136. Article 10 — Parking Area Regulations
  137. Chapter 5 — Ventura County Airport
  138. Article 3 — Powers and Duties
  139. Article 4 — Fire Regulations
  140. Article 5 — Aircraft Fuel Servicing
  141. Article 6 — Aircraft Operations/Aeronautical Activities
  142. Article 7 — Airports Regulations
  143. Article 8 — Traffic Regulations
  144. Article 9 — Health, Environment and Sanitation
  145. Article 11 — General Conditions
  146. Article 12 — Administration of System
  147. Article 13 — Wastewater Discharge Into County Sewerage System
  148. Article 14 — Pretreatment Requirements
  149. Article 15 — Industrial Discharge Permit System
  150. Article 16 — Industrial Wastewater Monitoring & Reporting
  151. Article 17 — Fees, Charges and Computations
  152. Article 18 — Enforcement
  153. Article 19 — Miscellaneous Provisions
  154. Chapter 6 — Regulation of Parking Facilities
  155. Chapter 6.5 — Regulation of Skateboarding and Similar Activiti…
  156. Chapter 7 — Ventura County Comprehensive Smoke-Free Regulations
  157. Chapter 8 — Regulating Tobacco Vending Machines
  158. Chapter 8.5 — Sale of Flavored Vaping Products and Flavored Va…
  159. Chapter 9 — Stormwater Quality Management
  160. Article 2 — Prohibition of Non-Stormwater Discharges
  161. Article 3 — Prohibition of Illicit Connections
  162. Article 4 — Reduction of Pollutants in Stormwater
  163. Article 5 — Requirements for the Control of Urban Runoff
  164. Article 6 — Inspections
  165. Article 7 — Enforcement
  166. Article 8 — Permits
  167. Article 9 — Miscellaneous
  168. Chapter 10 — Rincon Parkway
  169. Article 1 — Applicability and Authority
  170. Article 2 — Definitions
  171. Article 3 — Powers and Duties of the Director
  172. Article 4 — Permits
  173. Article 5 — General Regulations
  174. Article 6 — Public Health and Sanitation
  175. Article 7 — Public Safety
  176. Article 8 — Recreational Vehicle Parking Meter Zone
  177. Article 9 — Preservation of Rincon Parkway
  178. Chapter 1 — Traffic Ordinance
  179. Chapter 2 — Regulation of Riding and Hiking Trails in the Los …
  180. Chapter 3 — Large Truck Terminal Access
  181. Article 1 — Authority, Purpose, and Application of Chapter
  182. Article 3 — Establishment of Zones, Boundaries and Maps
  183. Article 4 — Purposes of Zones
  184. Article 5 — Uses and Structures by Zone
  185. Article 6 — Lot Area and Coverage, Setbacks, Height and Relate…
  186. Article 7 — Standards for Specific Uses
  187. Article 8 — Parking and Loading Requirements
  188. Article 9 — Standards for Specific Zones and Zone Types
  189. Article 10 — Sign Requirements
  190. Article 11 — Entitlements—Process and Procedures
  191. Article 12 — Limitations on Issuance of Building Permits in th…
  192. Article 13 — Nonconformities and Substandard Lots
  193. Article 14 — Enforcement and Penalties
  194. Article 15 — Amendments to This Chapter
  195. Article 16 — Density Bonus and Affordable Housing Incentives P…
  196. Article 17 — Mobilehome Park Closure Permit Requirements
  197. Article 18 — Official Zoning Data
  198. Article 19 — Specific Standards for Area Plans
  199. Article 1 — Authority, Purpose, and Application of Chapter
  200. Article 3 — Purposes of Zones
  201. Article 4 — Permitted Uses
  202. Article 5 — Development Standards/Conditions—Uses
  203. Article 6 — Parking and Loading Requirements
  204. Article 7 — Standards For Specific Zones
  205. Article 8 — General Development Standards/Conditions—Resource …
  206. Article 9 — Zoning Maps
  207. Article 11 — Entitlements—Process and Procedures
  208. Article 12 — Nonconformities and Substandard Lots
  209. Article 13 — Enforcement and Penalties
  210. Article 14 — Amendment to the local coastal program
  211. Chapter 2 — Subdivisions
  212. Article 1 — Authority, Purpose, and Application of Chapter
  213. Article 3 — Fees and Charges
  214. Article 4 — Parcel Map Waivers
  215. Article 5 — Tentative Maps
  216. Article 6 — Final and Parcel Map Requirements
  217. Article 7 — Amendment of Recorded Final and Parcel Maps
  218. Article 8 — Improvements, Dedications, Reservations and Fees
  219. Article 9 — Lot Line Adjustments
  220. Article 10 — Voluntary Mergers
  221. Article 11 — Conservation Subdivision
  222. Article 12 — Reversions to Acreage
  223. Article 13 — Mobilehome Park Conversions to Resident Ownership…
  224. Article 14 — Certificates of Compliance and Conditional Certif…
  225. Article 15 — Notice, Hearings, and Decisions
  226. Article 16 — Appeals
  227. Article 17 — Enforcement
  228. Article 18 — Amendments to this Chapter
  229. Chapter 3 — Places
  230. Article 1 — House Numbering
  231. Chapter 4 — Urban Area Development
  232. Chapter 6 — Traffic Impact Mitigation Fees for Maintenance and…
  233. Chapter 7 — Protection of Flood Control Facilities
  234. Chapter 8 — SE (Miscellaneous) Projects
  235. Chapter 9 — School Facilities Fee/Dedication Ordinance
  236. Chapter 10 — Mobile Home Park Rent Control
  237. Chapter 11 — Augmented Piru Transportation Impact Mitigation Fee
  238. Article 1 — Fees
  239. Article 2 — Right-To-Farm
  240. Article 3 — Mediation Services
  241. Article 1 — Regulations
  242. Article 1 — Identification of Agricultural Commodities Being T…
  243. Article 1 — Certification
  244. Chapter 5 — Apple Maggot Infestation Control
  245. Chapter 6 — Cultivation of Industrial Hemp
  246. Division 10 — Domestic Partnership Registration
  247. Chapter 1 — General
  248. Chapter 2 — Specific Provisions
  249. Article 1 — Imposition of Tax
  250. Article 2 — Registration
  251. Article 3 — Reporting and Remitting
  252. Article 4 — Penalties and Interest
  253. Article 5 — Failure to Collect and Report Tax
  254. Article 6 — Appeal
  255. Article 7 — Refunds
  256. Chapter 3 — Enforcement
  257. Article 1 — Civil Action
  258. Article 2 — Violations
  259. Division 12 — Highway Encroachments
  260. Chapter 1 — Definitions and Construction of Division
  261. Chapter 2 — General Provisions
  262. Chapter 3 — Encroachment Work Standards
  263. Chapter 4 — Application Requirements
  264. Chapter 5 — Permit Issuance
  265. Chapter 6 — Permit Fees and Deposits
  266. Chapter 7 — Maintenance and Repair of Sidewalks
  267. Chapter 8 — Wireless Telecommunication Facilities-Public Right…
  268. Chapter 9 — Transportation Permits
  269. Chapter 10 — Appeal and Violation
  270. Division 13 — Abatement of Public Nuisances

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.