Article 16 — Industrial Wastewater Monitoring & Reporting
VenturaCounty Municipal Code · 2026-09 edition · updated 2026-09-27 · VenturaCounty
6516-0 - Records and monitoring.
A.
All industrial users discharging or proposing to discharge industrial wastewater to the County's sewerage system shall maintain records of its raw materials and usage, processes, effluent flows, pollutant concentrations and related factors. These records shall be necessary to demonstrate compliance with the requirements of this ordinance and any applicable Federal or State pretreatment standards. Any industrial user subject to the reporting requirements of this ordinance shall be required to retain for a minimum of three
years any records of monitoring activities and results. This period of retention shall be extended during the course of any unresolved litigation regarding the industrial user or POTW or when requested by the Airport Administrator or the approval authority.
B.
All such records relating to compliance with pretreatment standards shall be made available for inspection and copying at the company facility or, if located elsewhere, at the other location to officials of the EPA, Approval Authority and the Airports Administrator. (Federal Pretreatment Regulations 40 CFR 403.12 (o)(2)). (See Section 6512-2(B)).
C.
The owner and/or occupant of any premises of facility discharging industrial wastewater into the County's sewerage system shall install at its or their own expense suitable monitoring equipment as may be required by this ordinance to facilitate the accurate observation, sampling, and measurement of regulated constituents. Such equipment shall be maintained in proper working order and kept safe and accessible at all times.
D.
If the Airports Administrator requires or the owner or operator chooses to install a flow meter, the flow meter must be calibrated every six months and a photocopy of the calibration must be sent to the County. The calibration must be performed by one of the following:
- the manufacturer; or 2) a qualified Civil Engineer. Flow charts are to be held by the user for a minimum of three years and made available to the County upon request. Totalizer readings shall be recorded daily and every month a report shall be submitted to the County showing total daily flows and total monthly flow.
E.
All industrial users required to periodically sample and analyze their wastewater shall use sampling methods and sampling locations approved by the Airports Administrator. For each sample collected and analyzed the user shall maintain a record of:
The date, exact place, method and time of sampling and the names of the person or persons taking samples;
The dates and analysis where performed;
Who performed the analyses;
The analytical techniques/methods used;
The results of such analyses.
F.
Whether constructed on public or private property, the approved sampling point shall be constructed in accordance with the County's requirements. An industry may request approval from the County for sampling wells installed prior to the effective date of this ordinance, which meet the design and accessibility requirements for sampling purposes.
6516-1 - Sampling well.
A.
Sampling well(s) of a design approved by the Airports Administrator shall be furnished and installed by designated industrial user to facilitate inspection, sampling and flow measurements. The sampling well(s) shall be located in an accessible location and the location shall be designated by the Airports Administrator.
B.
Unrestricted access to the sampling well(s) shall be provided to authorized personnel of the County at all times.
6516-2 - Sampling and analysis.
A.
Compliance determinations shall be made by the Airports Administrator with respect to Section 6513-1 and 6513-2 on the basis of either instantaneous grab or composite sampling of the wastewater. Grab samples may be taken as deemed necessary by the Airports Administrator to meet the needs of the specific circumstances. If routine grab or composite sampling reveals non-compliance by the discharger with the mass emission rates or conditions specified in the user's permit, then the user shall pay to the County fees as specified in the Rent & Fee Resolution and may be assessed all other costs incurred during the subsequent evaluation period for sampling and analysis, including labor, equipment, materials and overhead.
B.
All analyses shall be performed in accordance with procedures established pursuant to Section 304(g) et seq. of the Federal Clean Water Act and contained in 40 CFR 136 and amendments thereto.
C.
Sampling of industrial wastewater and wastes for the purpose of compliance determination shall be conducted at intervals specified by the Airports Administrator. However, it is the intention of the Airports Administrator to conduct compliance sampling for all industrial users at least once per year, for the constituents set forth in the user's industrial wastewater discharge permit.
6516-3 - Self-monitoring reports.
A.
All industrial users required to do so by the Airports Administrator shall monitor and report on the quantity and quality of their industrial wastewater discharge. The items to be included in the report and the frequency with which this report shall be submitted to the Airports Administrator will be detailed in the user's industrial wastewater discharge permit. The frequency of self-monitoring and reporting for those industrial dischargers not regulated by Federal pretreatment regulations will be based on the following factors:
The effect of the wastewater on the County's sewerage system;
The degree of toxic material which may pass through the treatment plant;
The quantity, nature, and type of the industrial wastewater discharge;
The extent to which the discharge could contribute to violation of the County's NPDES permit.
B.
All reports submitted by the industrial user shall be required to be signed by an authorized representative of the user.
C.
These reports shall be subject to the provisions of 18 U.S.C. Section 1001 relating to false statements and fraud and the provisions of Section 309(c)(2) of the Clean Water Act governing false statements.
D.
Each self-monitoring report and all reports as required within this Article shall contain the following completed declaration:
"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Executed on this___ day of _______ at
(City, State)
___________(Signature)
___________(Typed Name)
___________(Title)"
E.
The following reports will be required pursuant to promulgation of Section 307 et seq. of the Clean Water Act and the establishment of any pretreatment standards and regulations:
One hundred and eighty (180) days after the promulgation of pretreatment standards all existing industries subject to such standards shall be required to submit to the County a report containing:
a.
The name and address of the user;
b.
The location of the discharge;
c.
The nature, average production rate, and standard industrial classification of the operations carried out by such user;
d.
The average and maximum flow of the discharge in million gallons per day;
e.
The nature and concentration of pollutants in the discharge from each regulated process and identification of applicable pretreatment standards. The concentration shall be reported as a maximum or average as provided for in applicable pretreatment standards;
f.
A statement reviewed by an authorized representative of the industrial user and certified by a qualified professional indicating whether the pretreatment standards are being met on a consistent basis and if not, whether operation and maintenance improvements or additional pretreatment is required for compliance;
g.
If additional pretreatment or operation and maintenance improvements are required the shortest schedule by which such operation or maintenance improvements or additional pretreatment will be completed. The completion date submitted shall not be later than the compliance date established in the applicable pretreatment standard.
New sources and sources that become industrial users subsequent to the promulgation of applicable categorical standards shall be required to submit to the Airports Administrator the information listed in (a) through (e) above at least 90 days prior to commencement of discharge.
Within 30 days following the final date of compliance with a pretreatment standard the industrial user subject to pretreatment standards and requirements shall submit a report to the County indicating the nature and concentration of all pollutants regulated by the pretreatment standard the average and maximum daily flow for the industrial process units. The report shall also state whether pretreatment standards or requirements are being met and if not, the operation and maintenance and/or pretreatment will be necessary to bring the discharge into compliance.
After the final compliance report for a pretreatment standard, the subject industrial user shall periodically submit a report to the County indicating the nature and concentration of pollutants in the effluent which are limited by the pretreatment standard. These reports shall be submitted in June and December of each year unless required more frequently by the Airports Administrator.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — VenturaCounty Municipal Code
- 2.04 of Title 2.
- Division 1 — Government
- Chapter 1 — Business Taxes and Certificates
- Article 1 — General Provisions
- Article 2 — Definitions
- Article 3 — Imposition of Tax and Exemptions from Taxation
- Article 4 — Payment of Business Taxes
- Article 5 — Application and Renewal—Business Tax Certificate
- Article 6 — Penalties and Interest
- Article 7 — Refund of Overpayment
- Article 8 — Hearings and Appeals
- Article 9 — Enforcement and Violations
- Article 10 — Additional Tax Collector Powers
- Article 11 — Miscellaneous Provisions
- Chapter 2 — Licenses
- Article 2 — License Applications— Procedures and Appeals
- Article 1 — Temporary Shows
- Article 2 — Dance Halls
- Article 2.5 — Teen-Age Dances
- Article 3 — Billiard Rooms
- Article 4 — Motor Vehicle Races
- Article 5 — Card Rooms
- Article 1 — Auctioneer
- Article 2 — Collectors, Dealers and Brokers
- Article 3 — Peddlers, Solicitors, and Telephone Solicitors
- Article 1 — Rubbish Collection
- Article 2 — Ambulances
- Article 3 — Private Patrolmen
- Article 4 — Taxicabs
- Article 5 — Massage Businesses and Massage Technicians
- Article 5.5 — Solemnization of Marriages
- Article 6 — Kennels
- Article 1 — Licensing of Cannabis Operations
- Article 2 — Tax on Cannabis Operations
- Chapter 6 — Sidewalk Vending
- Chapter 1 — Standards and Permits
- Chapter 2 — Facilities Fees
- Article 1 — Sheriff's Facilities
- Article 2 — Fire Protection Facilities
- Article 1 — Nuisance
- Article 3 — Power of Arrest
- Article 1 — Tents and Lean-tos
- Article 2 — Enforcement
- Article 3 — Tents and House Courts
- Article 4 — Violation
- Article 1 — Camps
- Article 2 — Camp Fires
- Article 3 — Bathing, Surfing, Surfboards
- Chapter 4 — Animals
- Article 1 — License Tag
- Article 2 — Animal Shelter
- Article 3 — Dogs Used by Peace Officers
- Article 4 — Rabies Control
- Article 5 — Animal Control
- Article 6 — General
- Article 7 — Wild Animal Control
- Article 8 — Administrative Enforcement Alternative
- Article 9 — Roosters
- Chapter 5 — Hazardous Substances
- Article 1 — Unified Program Generally
- Article 1.1 — Unified Program— Hazardous Waste Producers
- Article 1.2 — Unified Program—Underground Storage of Hazardous…
- Article 1.3 — Unified Program—Aboveground Storage of Hazardous…
- Article 1.4 — Unified Program—Business Plan/Risk Management Plan
- Article 1.5 — Unified Program—Inspection of State Authorized F…
- Article 1.6 — Participating Agency Fees
- Article 1.7 — Unified Program Hearing Procedure
- Article 2 — Liability for Violation of Hazardous Waste and Sub…
- Article 3 — Medical Waste Management and Safe Body Art
- Article 5 — Business Plans and Risk Management and Prevention …
- Article 1 — General
- Chapter 7 — Regulation of Solid Waste Storage, Collection, Dis…
- Article 1 — Regulation of the Disposal and Handling of Solid W…
- Article 3 — Solid Waste Programs for Unincorporated Areas
- Article 4 — County Integrated Waste Management Plan Fee
- Article 1 — Groundwater Conservation
- Article 2 — Private and State Small Water Systems
- Article 3 — Administrative Enforcement of Private and State Sm…
- Chapter 9 — Alcoholic Beverage Warning Signs
- Chapter 10 — Safer Sex in the Adult Film Industry
- Chapter 1 — Fire Protection
- Article 1 — Discharge
- Chapter 3 — Public Emergency
- Article 1 — General
- Article 2 — Emergency Planning Council
- Chapter 4 — Prices of Emergency Items and Services
- Chapter 5 — Courthouse Security Screening
- Article 1 — Preliminary Matters
- Article 3 — General Provisions
- Article 4 — Administration and Permitting
- Article 5 — Provisions for Flood Hazard Reduction
- Article 6 — Variance Procedure
- Chapter 7 — Protection of Watercourses and Related Critical Pu…
- Article 1 — Alcoholic Beverages
- Article 1.1 — Social Hosts Liability
- Article 2 — Nudism
- Article 3 — Prostitution & Lewd Acts
- Article 4 — Unlawful Exposure of Private Parts and Female Brea…
- Article 5 — Harmful Substances
- Article 6 — Sale and Display of Drug Paraphernalia to Minors
- Article 7 — Place of Business Where Drug Paraphernalia is Kept…
- Article 1 — Imprisonment
- Article 2 — Juvenile Confinement
- Article 3 — Registration of Hotel and Motel Guests
- Article 4 — Miscellaneous
- Article 4.5 — Bingo Game Licenses
- Article 5 — Enclosing Swimming Pools and Other Bodies of Water
- Article 6 — Bicycle Registration and Licensing
- Article 7 — Abandoned or Inoperative Motor Vehicles
- Article 7.1 — Abandoned Vehicles
- Article 8 — Alarm Systems
- Article 9 — Commercial Weighing and Measuring Instruments
- Article 9.5 — Consumer Protection Business Permit
- Article 10 — Graffiti
- Article 11 — Loud or Raucous Nighttime Noise in Residential Zo…
- Chapter 3 — Ventura County Parks
- Article 1 — Applicability and Authority
- Article 2 — Definitions
- Article 3 — Powers and Duties of the Director
- Article 4 — Permits
- Article 5 — General Regulations
- Article 6 — Public Health and Sanitation
- Article 7 — Public Safety
- Article 8 — Preservation of County Parks
- Article 9 — Overnight Camping
- Chapter 4 — Ventura County Harbor Ordinance
- Article 1 — Definitions
- Article 2 — Powers and Duties of the Director
- Article 3 — Applicability and Authority
- Article 4 — Regulations Concerning Speed and Safety
- Article 5 — Navigation
- Article 6 — General Regulations
- Article 7 — Regulations Covering Mooring, Floats, and Other Ha…
- Article 8 — Health and Sanitation
- Article 9 — Severability and Preeminence
- Article 10 — Parking Area Regulations
- Chapter 5 — Ventura County Airport
- Article 3 — Powers and Duties
- Article 4 — Fire Regulations
- Article 5 — Aircraft Fuel Servicing
- Article 6 — Aircraft Operations/Aeronautical Activities
- Article 7 — Airports Regulations
- Article 8 — Traffic Regulations
- Article 9 — Health, Environment and Sanitation
- Article 11 — General Conditions
- Article 12 — Administration of System
- Article 13 — Wastewater Discharge Into County Sewerage System
- Article 14 — Pretreatment Requirements
- Article 15 — Industrial Discharge Permit System
- Article 16 — Industrial Wastewater Monitoring & Reporting
- Article 17 — Fees, Charges and Computations
- Article 18 — Enforcement
- Article 19 — Miscellaneous Provisions
- Chapter 6 — Regulation of Parking Facilities
- Chapter 6.5 — Regulation of Skateboarding and Similar Activiti…
- Chapter 7 — Ventura County Comprehensive Smoke-Free Regulations
- Chapter 8 — Regulating Tobacco Vending Machines
- Chapter 8.5 — Sale of Flavored Vaping Products and Flavored Va…
- Chapter 9 — Stormwater Quality Management
- Article 2 — Prohibition of Non-Stormwater Discharges
- Article 3 — Prohibition of Illicit Connections
- Article 4 — Reduction of Pollutants in Stormwater
- Article 5 — Requirements for the Control of Urban Runoff
- Article 6 — Inspections
- Article 7 — Enforcement
- Article 8 — Permits
- Article 9 — Miscellaneous
- Chapter 10 — Rincon Parkway
- Article 1 — Applicability and Authority
- Article 2 — Definitions
- Article 3 — Powers and Duties of the Director
- Article 4 — Permits
- Article 5 — General Regulations
- Article 6 — Public Health and Sanitation
- Article 7 — Public Safety
- Article 8 — Recreational Vehicle Parking Meter Zone
- Article 9 — Preservation of Rincon Parkway
- Chapter 1 — Traffic Ordinance
- Chapter 2 — Regulation of Riding and Hiking Trails in the Los …
- Chapter 3 — Large Truck Terminal Access
- Article 1 — Authority, Purpose, and Application of Chapter
- Article 3 — Establishment of Zones, Boundaries and Maps
- Article 4 — Purposes of Zones
- Article 5 — Uses and Structures by Zone
- Article 6 — Lot Area and Coverage, Setbacks, Height and Relate…
- Article 7 — Standards for Specific Uses
- Article 8 — Parking and Loading Requirements
- Article 9 — Standards for Specific Zones and Zone Types
- Article 10 — Sign Requirements
- Article 11 — Entitlements—Process and Procedures
- Article 12 — Limitations on Issuance of Building Permits in th…
- Article 13 — Nonconformities and Substandard Lots
- Article 14 — Enforcement and Penalties
- Article 15 — Amendments to This Chapter
- Article 16 — Density Bonus and Affordable Housing Incentives P…
- Article 17 — Mobilehome Park Closure Permit Requirements
- Article 18 — Official Zoning Data
- Article 19 — Specific Standards for Area Plans
- Article 1 — Authority, Purpose, and Application of Chapter
- Article 3 — Purposes of Zones
- Article 4 — Permitted Uses
- Article 5 — Development Standards/Conditions—Uses
- Article 6 — Parking and Loading Requirements
- Article 7 — Standards For Specific Zones
- Article 8 — General Development Standards/Conditions—Resource …
- Article 9 — Zoning Maps
- Article 11 — Entitlements—Process and Procedures
- Article 12 — Nonconformities and Substandard Lots
- Article 13 — Enforcement and Penalties
- Article 14 — Amendment to the local coastal program
- Chapter 2 — Subdivisions
- Article 1 — Authority, Purpose, and Application of Chapter
- Article 3 — Fees and Charges
- Article 4 — Parcel Map Waivers
- Article 5 — Tentative Maps
- Article 6 — Final and Parcel Map Requirements
- Article 7 — Amendment of Recorded Final and Parcel Maps
- Article 8 — Improvements, Dedications, Reservations and Fees
- Article 9 — Lot Line Adjustments
- Article 10 — Voluntary Mergers
- Article 11 — Conservation Subdivision
- Article 12 — Reversions to Acreage
- Article 13 — Mobilehome Park Conversions to Resident Ownership…
- Article 14 — Certificates of Compliance and Conditional Certif…
- Article 15 — Notice, Hearings, and Decisions
- Article 16 — Appeals
- Article 17 — Enforcement
- Article 18 — Amendments to this Chapter
- Chapter 3 — Places
- Article 1 — House Numbering
- Chapter 4 — Urban Area Development
- Chapter 6 — Traffic Impact Mitigation Fees for Maintenance and…
- Chapter 7 — Protection of Flood Control Facilities
- Chapter 8 — SE (Miscellaneous) Projects
- Chapter 9 — School Facilities Fee/Dedication Ordinance
- Chapter 10 — Mobile Home Park Rent Control
- Chapter 11 — Augmented Piru Transportation Impact Mitigation Fee
- Article 1 — Fees
- Article 2 — Right-To-Farm
- Article 3 — Mediation Services
- Article 1 — Regulations
- Article 1 — Identification of Agricultural Commodities Being T…
- Article 1 — Certification
- Chapter 5 — Apple Maggot Infestation Control
- Chapter 6 — Cultivation of Industrial Hemp
- Division 10 — Domestic Partnership Registration
- Chapter 1 — General
- Chapter 2 — Specific Provisions
- Article 1 — Imposition of Tax
- Article 2 — Registration
- Article 3 — Reporting and Remitting
- Article 4 — Penalties and Interest
- Article 5 — Failure to Collect and Report Tax
- Article 6 — Appeal
- Article 7 — Refunds
- Chapter 3 — Enforcement
- Article 1 — Civil Action
- Article 2 — Violations
- Division 12 — Highway Encroachments
- Chapter 1 — Definitions and Construction of Division
- Chapter 2 — General Provisions
- Chapter 3 — Encroachment Work Standards
- Chapter 4 — Application Requirements
- Chapter 5 — Permit Issuance
- Chapter 6 — Permit Fees and Deposits
- Chapter 7 — Maintenance and Repair of Sidewalks
- Chapter 8 — Wireless Telecommunication Facilities-Public Right…
- Chapter 9 — Transportation Permits
- Chapter 10 — Appeal and Violation
- Division 13 — Abatement of Public Nuisances