1310.1 Piping Underground. 1310.0 Gas Piping Installation. Underground gas piping

California Mechanical Code (Title 24, Part 4) · 2019 edition · updated 2026-09-10 · California

Italicized text is a California amendment to the model code, as printed in the official publication.

shall be installed with approved clearance from any other underground structure to avoid contact therewith, to allow maintenance, and to protect against damage from proximity to other structures. In addition, underground plastic piping shall be installed with approved clearance or shall be insulated from any source of heat so as to prevent the heat from impairing the serviceability of the pipe. [NFPA 54:7.1.1]

1310.1.1 Cover Requirements. Underground piping systems shall be installed with a minimum of 12 inches (305 mm) of cover. The minimum cover shall be increased to 18 inches (457 mm) if external damage to the pipe or tubing from external forces is likely to result. Where a minimum of 12 inches (305 mm) of cover cannot be provided, the pipe shall be installed in conduit or bridged (shielded). [NFPA 54:7.1.2.1] 1310.1.2 Trenches. The trench shall be graded so that the pipe has a firm, substantially continuous bearing on the bottom of the trench. [NFPA 54:7.1.2.2]

Upon successful verification testing in accor dance with Section 1310.1.3.4(1) and Section

(1) The piping shall be made of corrosion-resistant

material that is suitable for the environment in which it will be installed. (2) Pipe shall have a factory-applied, electrically

insulating coating. Fittings and joints between

1308.13.1 Special Local Conditions. Where local conditions include earthquake, tornado, unstable ground, or flood hazards, special consideration shall be given to increased strength and flexibility of piping supports and connections. [NFPA 54:5.14.2]

(2) Pipe shall have a factory-applied, electrically

insulating coating. Fittings and joints between sections of coated pipe shall be coated in accordance with the coating manufacturer’s instructions. (3) The piping shall have a cathodic protection sys tem installed, and the system shall be main

(3) The piping shall have a cathodic protection sys tem installed, and the system shall be maintained in accordance with Section 1310.1.3.3 or Section 1310.1.3.6. [NFPA 54:7.1.3.2] 1310.1.3.3 Cathodic Protection. Cathodic protection systems shall be monitored by testing and the results shall be documented. The test results shall demonstrate one of the following: (1) A pipe-to-soil voltage of −0.85 volts or more

negative is produced, with reference to a satu

(1) A pipe-to-soil voltage of −0.85 volts or more

negative is produced, with reference to a saturated copper-copper sulfate half cell. (2) A pipe-to-soil voltage of −0.78 volts or more

negative is produced, with reference to a satu

(2) A pipe-to-soil voltage of −0.78 volts or more

negative is produced, with reference to a saturated KCl calomel half cell. (3) A pipe-to-soil voltage of −0.80 volts or more

negative is produced, with reference to a silver

(3) A pipe-to-soil voltage of −0.80 volts or more

negative is produced, with reference to a silversilver chloride half cell. (4) Compliance with a method described in Appen dix D of Title 49 of the Code of Federal Regu

(4) Compliance with a method described in Appen dix D of Title 49 of the Code of Federal Regulations, Part 192. [NFPA 54:7.1.3.3] 1310.1.3.4 Sacrificial Anodes. Sacrificial anodes shall be tested in accordance with the following: (1) Upon installation of the cathodic protection sys tem, except where prohibited by climatic con

(1) Upon installation of the cathodic protection sys tem, except where prohibited by climatic conditions, in which case the testing shall be performed not later than 180 days after the installation of the system. (2) 12 to 18 months after the initial test. (3) Upon successful verification testing in accor dance with Section 1310.1.3.4(1) and Section

258 2019 CALIFORNIA MECHANICAL CODE

FUEL GAS PIPING

1310.1.3.4(2), periodic follow-up testing shall be performed at intervals not to exceed 36 months. [NFPA 54:7.1.3.4] 1310.1.3.5 System Failing Tests. Systems failing a test shall be repaired not more than 180 days after the date of the failed testing. The testing schedule shall be restarted as required in Section 1310.1.3.4(1) and Section 1310.1.3.4(2), and the results shall comply with Section 1310.1.3.3. [NFPA 54:7.1.3.5] 1310.1.3.6 Impressed Current Cathodic Pro-tection. Impressed current cathodic protection systems shall be inspected and tested in accordance with the following schedule: (1) The impressed current rectifier voltage output

shall be checked at intervals not exceeding two

(1) The impressed current rectifier voltage output

shall be checked at intervals not exceeding two months. (2) The pipe-to-soil voltage shall be tested at least

annually. [NFPA 54:7.1.3.6]

retains the full pressure of the pipe, the conduit shall be designed for the same pressure as the pipe. The conduit shall extend at least 4 inches (102 mm) outside the building, be vented outdoors above finished ground level, and be installed so as to prevent the entrance of water and insects. [NFPA 54:7.1.6.1] ing Indoors. 1310.1.6.2 Conduit with Both Ends Terminat- Where the conduit originates and terminates within the same building, the conduit shall originate and terminate in an accessible portion of the building and shall not be sealed. [NFPA 54:7.1.6.2] 1310.1.7 Plastic Piping. Plastic piping shall be installed outdoors, underground only. Exceptions: (1) Plastic piping shall be permitted to terminate above ground where an anodeless riser is used.

(1) Plastic piping shall be permitted to terminate above ground where an anodeless riser is used. (2) Plastic piping shall be permitted to terminate with a

wall head adapter aboveground in buildings, includ

» » » »

(2) The pipe-to-soil voltage shall be tested at least

annually. [NFPA 54:7.1.3.6] 1310.1.3.7 Documentation. Documentation of the results of the two most recent tests shall be retained. [NFPA 54:7.1.3.7] 1310.1.3.8 Dissimilar Metals. Where dissimilar metals are joined underground, an insulating coupling or fitting shall be used. [NFPA 54:7.1.3.8] 1310.1.3.9 Steel Risers. Steel risers, other than anodeless risers, connected to plastic piping shall be cathodically protected by means of a welded anode.

[NFPA 54:7.1.3.9] 1310.1.4 Protection Against Freezing. Where the formation of hydrates or ice is known to occur, piping shall be protected against freezing. [NFPA 54:7.1.4] 1310.1.5 Piping through Foundation Wall. Underground piping, where installed through the outer foundation or basement wall of a building shall be encased in a protective sleeve or protected by an approved device or method. The space between the gas piping and the sleeve and between the sleeve and the wall shall be sealed to prevent entry of gas and water. [NFPA 54:7.1.5] 1310.1.6 Piping Underground Beneath Buildings. Where gas piping is installed underground beneath buildings, the piping shall be either of the following: (1) Encased in an approved conduit designed to with stand the imposed loads and installed in accordance

A piping/encasement system listed for installation

beneath buildings. [NFPA 54:7.1.6] 1310.1.6.1 Conduit with One End Terminat-ing Outdoors. The conduit shall extend into an accessible portion of the building and, at the point where the conduit terminates in the building, the space between the conduit and the gas piping shall be sealed to prevent the possible entrance of any gas leakage. Where the end sealing is of a type that

Plastic piping shall be permitted to terminate with a

wall head adapter aboveground in buildings, including basements, where the plastic piping is inserted in a piping material permitted for use in buildings.

[NFPA 54:7.1.7.1] 1310.1.7.1 Connections Between Metallic andPlastic Piping. Connections made between metallic and plastic piping shall be made with fittings conforming to one of the following: (1) ASTM D2513 Category I transition fittings (2) ASTM F1973 (3) ASTM F2509 [NFPA 54:7.1.7.2] 1310.1.7.2 Tracer Wire. An electrically continuous corrosion-resistant tracer shall be buried with the plastic pipe to facilitate locating. The tracer shall be one of the following: (1) A product specifically designed for that pur pose.

(1) A product specifically designed for that pur pose. (2) Insulated copper conductor not less than 14

AWG.

« « « « «

(1) Encased in an approved conduit designed to with stand the imposed loads and installed in accordance with Section 1310.1.6.1 or Section 1310.1.6.2. (2) A piping/encasement system listed for installation

beneath buildings. [NFPA 54:7.1.6]

(2) Insulated copper conductor not less than 14

AWG. Where tracer wire is used, access shall be provided from aboveground or one end of the tracer wire or tape shall be brought aboveground at a building wall or riser. [NFPA 54:7.1.7.3 – 7.1.7.3.2]

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — California Mechanical Code (Title 24, Part 4)
California Mechanical Code (Title 24, Part 4)
  1. Chapter 1 — GENERAL CODE PROVISIONS
  2. Chapter 2 — DEFINITIONS
  3. Chapter 3 — GENERAL REGULATIONS
  4. Chapter 4 — VENTILATION AIR
  5. Chapter 5 — EXHAUST SYSTEMS
  6. Chapter 6 — DUCT SYSTEMS
  7. Chapter 7 — COMBUSTION AIR
  8. Chapter 8 — CHIMNEYS AND VENTS
  9. Chapter 9 — INSTALLATION OF SPECIFIC APPLIANCES
  10. Chapter 10 — BOILERS AND PRESSURE VESSELS
  11. Chapter 11 — REFRIGERATION
  12. Chapter 12 — HYDRONICS
  13. Chapter 13 — FUEL GAS PIPING
    Overview
    1. 1301.1 Applicability. 1301.0 Scope of Gas Piping. The regulati…
    2. 1302.1 General. 1302.0 Coverage of Piping System. Coverage of …
    3. 1302.2 Piping System Requirements. Requirements for
    4. 1302.3 Applications. This code shall not apply to the followin…
    5. 1303.2 Excavation. Excavations required for the installation o…
    6. 1303.3 Type of Inspections. The Authority Having Jurisdiction …
    7. 1303.4 Inspection Waived. In cases where the work
    8. 1304.1 Issuance. 1304.0 Certificate of Inspection. Where upon …
    9. 1304.2 Gas Supplier. A copy of the certificate of such final
    10. 1304.3 Unlawful. It shall be unlawful for a serving gas suppli…
    11. 1305.1 Authorized Personnel.1305.0 Authority to Render Gas Ser…
    12. 1305.2 Outlets. It shall be unlawful to turn on or connect gas
    13. 1306.2 Notice. Where such disconnection has been made, a
    14. 1306.3 Capped Outlets. It shall be unlawful to remove or
    15. 1308.1 Installation of Piping System.Components. Where required
    16. 1308.2 Provision for Location of Point of Delivery.
    17. 1308.3 Interconnections Between Gas Piping Sys-
    18. 1308.4 Sizing of Gas Piping Systems. Gas piping systems shall …
    19. 1308.6 Gas Meters. Gas meters shall be selected for the
    20. 1308.7 Gas Pressure Regulators. A line pressure regulator or g…
    21. 1308.9 Pressure Limitation Requirements. Where piping systems …
    22. 1308.10 Backpressure Protection. Protective devices
    23. 1308.10 Backpressure Protection. Protective devices
    24. 1308.8 Overpressure Protection. Where the serving gas
    25. 1308.11 Low-Pressure Protection. A protective device
    26. 1308.12 Shutoff Valves. Shutoff valves shall be approved
    27. 1308.13 Expansion and Flexibility. Piping systems shall
    28. 1309.1 General.1309.0 Excess Flow Valve. Where automatic exces…
    29. 1310.1 Piping Underground. 1310.0 Gas Piping Installation. Und…
    30. 1310.2 Installation of Piping. Piping installed aboveground sh…
    31. 1310.3 Concealed Piping in Buildings. Gas piping in
    32. 1310.4 Piping in Vertical Chases. Where gas piping
    33. 1310.6 Appliance Overpressure Protection. The maximum operatin…
    34. 1310.7 Gas Pipe Turns. Changes in direction of gas pipe
    35. 1310.5 Maximum Design Operating Pressure. The
    36. 1310.8 Drips and Sediment Traps. For other than dry gas
    37. 1310.9 Outlets. Outlets shall be located and installed in
    38. 1310.10 Branch Pipe Connection. When a branch outlet
    39. 1310.11 Manual Gas Shutoff Valves. An accessible gas
    40. 1310.12 Prohibited Devices. No device shall be placed
    41. 1312.1 Connecting Appliances and Equipment.
    42. 1311.4 Lightning Protection System. Where a lightning
    43. 1311.5 Electrical Circuits. Electrical circuits shall not util…
    44. 1311.6 Electrical Connections. All electrical connections
    45. 1311.1 Pipe and Tubing Other than CSST. 1311.0 Electrical Bond…
    46. 1311.2 Bonding of CSST Gas Piping. CSST gas piping
    47. 1311.3 Grounding Conductor of Electrode. Gas piping
    48. 1312.2 Suspended Low-Intensity Infrared Tube
    49. 1312.3 Use of Gas Hose Connectors. Listed gas hose
    50. 1312.7 Quick-Disconnect Devices. Quick-disconnect
    51. 1312.8 Gas Convenience Outlets. Appliances shall be
    52. 1312.4 Injection (Bunsen) Burners. Injection (Bunsen)
    53. 1312.9 Sediment Trap. Where a sediment trap is not incorporate…
    54. 1313.2 Test Preparation. Test preparation shall comply
    55. 1313.3 Test Pressure. This inspection shall include an air,
    56. 1312.10 Installation of Piping. Piping shall be installed in
    57. 1313.1 Piping Installations. 1313.0 Pressure Testing and Inspe…
    58. 1313.4 Detection of Leaks and Defects. The piping system shall…
    59. 1313.5 Piping System Leak Test. Leak checks using fuel
    60. 1313.6 Purging Requirements. The purging of piping
    61. 1314.0 Required Gas Supply. 1314.1 General. The following regu…
    62. 1314.2 Volume. The hourly volume of gas required at each
    63. 1314.3 Gas Appliances. Where the gas appliances to be
    64. 1314.4 Size of Piping Outlets. The size of the supply piping o…
    65. 1315.0 Required Gas Piping Size.1315.1 Pipe Sizing Methods. Wh…
    66. 1315.2 Tables for Sizing Gas Piping Systems. Table
    67. 1315.3 Sizing Equations. The inside diameter of smooth
    68. 1315.4 Sizing of Piping Sections. To determine the size
    69. 1315.5 Engineering Methods. For conditions other than
    70. 1315.6 Variable Gas Pressures. Where the supply gas
  14. Chapter 14 — PROCESS PIPING
  15. Chapter 15 — SOLAR ENERGY SYSTEMS
  16. Chapter 16 — STATIONARY POWER PLANTS
  17. Chapter 17 — REFERENCED STANDARDS
  18. Appendix A — RESIDENTIAL PLAN EXAMINER REVIEW FORM FOR HVAC SY…
  19. Appendix B — PROCEDURES TO BE FOLLOWED TO PLACE GAS EQUIPMENT …
  20. Appendix C — INSTALLATION AND TESTING OF OIL (LIQUID) FUEL-FIR…
  21. Appendix D — FUEL SUPPLY: MANUFACTURED/MOBILE HOME PARKS AND R…
  22. Appendix E — SUSTAINABLE PRACTICES
  23. Appendix F — SIZING OF VENTING SYSTEMS AND OUTDOOR COMBUSTION …
  24. Appendix G — EXAMPLE CALCULATION OF OUTDOOR AIR RATE

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.