Appendix E — SUSTAINABLE PRACTICES
California Mechanical Code (Title 24, Part 4) · 2019 edition · updated 2026-09-10 · California
Italicized text is a California amendment to the model code, as printed in the official publication.
(Matrix Adoption Tables are non-regulatory, intended only as an aid to the code user. See Chapter 1 for state agency authority and building applications.)
| Adopting Agency | BSC | BSC- CG |
SFM | HCD | DSA | OSHPD | BSCC | DPH | AGR | DWR | CEC | CA | SL | SLC | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Adopting Agency |
**BSC ** | BSC- CG |
SFM | 1 | 2 | 1-AC | **AC ** | SS | SS/CC | 1 | 1R | 2 | 3 | 4 | 5 | 5 | 5 | 5 | 5 | 5 | 5 | 5 | 5 |
amended (amended sections listed below) |
|||||||||||||||||||||||
that are listed below |
|||||||||||||||||||||||
The Office of the State Fire Marshal’s adoption of this chapter or individual sections is applicable to structures regulated by other state agencies pursuant to Section 1.11.0.
2019 CALIFORNIA MECHANICAL CODE 363
364 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
SUSTAINABLE PRACTICES
The provisions contained in this appendix are not mandatory unless specifically adopted by a state agency, or referenced in the adopting ordinance.
«
E 101.1 Applicability.E 101.0 General. The purpose of this appendix is to provide a comprehensive set of technically sound provisions that encourage sustainable practices and works towards enhancing the design and construction of mechanical systems that result in a positive long-term environmental impact. This appendix is not intended to circumvent the health, safety, and general welfare requirements of this code. E 101.2 Definition of Terms. For the purposes of this code, the definitions shall apply to this appendix.
No attempt is made to define ordinary words, which are
«
«
the definitions shall apply to this appendix.
No attempt is made to define ordinary words, which are used in accordance with their established dictionary meanings, except where a word has been used loosely, and it is necessary to define its meaning as used in this appendix to avoid misunderstanding.
The definitions of terms are arranged alphabetically
misunderstanding.
The definitions of terms are arranged alphabetically according to the first word of the term.
« «
E 201.9 Maintenance. The upkeep of property or equipment by the owner of the property in accordance with the requirements of this appendix. E 201.10 Minimum Efficiency Reporting Value (MERV). Filter minimum efficiency reporting value, in accordance with ASHRAE 52.2. E 201.11 Multi-Occupant Spaces. Indoor spaces used for presentations and training, including classrooms and conference rooms. E 201.12 Recirculation System. A system of hot water supply and return piping with shutoff valves, balancing valves, circulating pumps, and a method of controlling the circulating system. E 201.13 Seam, Longitudinal. Joints oriented in the direction of airflow. E 201.14 Seasonal Energy Efficiency Ratio (SEER). The total cooling output of an air conditioner during its normal annual usage period for cooling in Btu (kW•h) divided by the total electric energy input during the same period in Btu (kW•h). [ASHRAE 90.1:3.2]
E 301.0 General Regulations.E 301.1 Installation. Mechanical systems covered by this appendix shall be installed in accordance with this code, other applicable codes, and the manufacturer’s installation and operating instructions. E 301.2 Qualifications. Where permits are required, the Authority Having Jurisdiction shall have the authority to require contractors, installers, or service technicians to demonstrate competency. Where determined by the Authority Having Jurisdiction, the contractor, installer or service technician shall be licensed to perform such work.
E 302.1 Disposal.E 302.0 Disposal of Liquid Waste. It shall be unlawful for a person to cause, suffer, or permit the disposal of liquid wastes, in a place or manner, except through and by means of an approved drainage system, installed and maintained in accordance with the provisions of the plumbing code. E 302.2 Connections to Plumbing System Required. Equipment and appliances, used to receive or discharge liquid wastes or sewage, shall be connected to the drainage system of the building or premises in accordance with the requirements of the plumbing code and this appendix.
E 303.0 Abandonment.E 303.1 General. An abandoned system or part thereof covered under the scope of this appendix shall be disconnected from remaining systems, drained, plugged, and capped in an approved manner.
» » » » »
E 201.0 Definitions. E 201.1 Cycles of Concentration for Cooling Towers. Cycles of concentration equals the specific conductance of the water in the cooling tower basin divided by the combined flow-weighted average specific conductance of the makeup water(s) to the cooling tower. E 201.2 Duct Wall Penetrations. Includes pipe, tubing, rods, and wire. Screws and other fasteners are not considered to be ductwork penetrations. E 201.3 Energy Star. A joint program of the U.S. Environmental Protection Agency and the U.S. Department of Energy. Energy Star is a voluntary program designed to identify and promote energy-efficient products and practices. E 201.4 Geothermal. Renewable energy generated by deepearth. E 201.5 Heating Seasonal Performance Factor (HSPF). The total heating output of a heat pump during its normal annual usage period for heating in British thermal units (Btu) (kW•h) divided by the total electric energy input during the same period. [ASHRAE 90.1:3.2] E 201.6 Integrated Energy Efficiency Ratio (IEER). A single-number figure of merit expressing cooling part-load EER efficiency for commercial unitary air-conditioning and heat pump equipment on the basis of weighted operation at various load capacities for the equipment. [ASHRAE 90.1:3.2] E 201.7 Integrated Part-Load Value (IPLV). A single-number figure of merit based on part-load EER, COP, or kW/ton expressing part-load efficiency for air-conditioning and heat pump equipment on the basis of weighted operation at various load capacities for the equipment. [ASHRAE 90.1:3.2] E 201.8 Joint, Transverse . Connections of two duct sections oriented perpendicular to airflow.
2019 CALIFORNIA MECHANICAL CODE 365
APPENDIX E any other purpose or distributed to any other persons or parti es.
E 401.0 Water Conservation and Efficiency.E 401.1 General. The provisions of this section establish the means of conserving potable and nonpotable water used in and around a building.
E 402.1 Required.E 402.0 Meters. A water meter shall be required for buildings connected to a public water system, including municipally supplied reclaimed (recycled) water. In other than single-family houses, multi-family structures not exceeding three stories above grade, and modular houses, a separate meter or submeter shall be installed in the following locations: (1) The makeup water supply to cooling towers, evaporative
condensers, and fluid coolers.
to maximum water use. Water use expressed in maximum water use per ton-hour (kW•h) of cooling, shall be marked on the device and included in the product user manual, product information literature, and manufacturer’s installation instructions. Water use information shall be readily available at the time of code compliance inspection.
(1) The makeup water supply to cooling towers, evaporative
condensers, and fluid coolers. (2) The makeup water supply to one or more boilers collec tively exceeding 1 000 000 British thermal units per hour
(2) The makeup water supply to one or more boilers collec tively exceeding 1 000 000 British thermal units per hour (Btu/h) (293 kW). (3) The water supply to a water-using process where the con sumption exceeds 1000 gallons per day (gal/d) (0.0438
(3) The water supply to a water-using process where the con sumption exceeds 1000 gallons per day (gal/d) (0.0438 L/s), except for manufacturing processes. (4) The makeup water supply to an evaporative cooler hav ing an air flow exceeding 30 000 cubic feet per minute
(4) The makeup water supply to an evaporative cooler hav ing an air flow exceeding 30 000 cubic feet per minute (ft 3 /min) (14.1584 m 3 /s). E 402.2 Consumption Data. A means of communicating water consumption data from submeters to the water consumer shall be provided. E 402.3 Access. Meters and submeters shall be accessible.
E 403.0 HVAC Water Use.E 403.1 Once-Through Cooling. Once-through cooling using potable water is prohibited. Cooling towers and evaporative coolers shall be equipped E 403.2 Cooling Towers and Evaporative Coolers. with makeup water and blow down meters, conductivity controllers, and overflow alarms. Cooling towers shall be equipped with efficiency drift eliminators that achieve drift reduction to 0.002 percent of the circulated water volume for counterflow towers and 0.005 percent for cross-flow towers. E 403.3 Cooling Tower Makeup Water. Not less than 5 cycles of concentration is required for air-conditioning cooling tower makeup water having a total hardness of less than 11 grains per gallon (gr/gal) (188 mg/L) expressed as calcium carbonate. Not less than 3.5 cycles of concentration is required for air-conditioning cooling tower makeup water having a total hardness equal to or exceeding 11 gr/gal (188 mg/L) expressed as calcium carbonate. Exception: Air-conditioning cooling tower makeup water having discharge conductivity range not less than 7 gr/gal (120 mg/L) to 9 gr/gal (154 mg/L) of silica measured as silicon dioxide. E 403.4 Evaporative Cooler Water Use. Evaporative cooling systems shall use 3.5 gallons (13.2 L) or less of water per ton-hour (kW•h) of cooling where system controls are set
xpressed as calcium carbonate. Exception: Air-conditioning cooling tower makeup water having discharge conductivity range not less than 7 gr/gal (120 mg/L) to 9 gr/gal (154 mg/L) of silica measured as silicon dioxide. E 403.4 Evaporative Cooler Water Use. Evaporative cooling systems shall use 3.5 gallons (13.2 L) or less of water per ton-hour (kW•h) of cooling where system controls are set
E 403.4.1 Overflow Alarm. Cooling systems shall be equipped with an overflow alarm to alert building owners, tenants, or maintenance personnel where the water refill valve continues to allow water to flow into the reservoir where the reservoir is full. The alarm shall have a sound pressure level rating of not less than 85 dBa measured at a distance of 10 feet (3048 mm). E 403.4.2 Automatic Pump Shut-Off. Cooling systems shall automatically cease pumping water to the evaporation pads where airflow across evaporation pads ceases. E 403.4.3 Cooler Reservoir Discharge. A water quality management system (either timer or water quality sensor) shall be provided. Where timers are used, the time interval between discharge of reservoir water shall be set to 6 or more hours of cooler operation. Where water quality sensors are used, the discharge of reservoir water shall be set for 800 ppm or more of total dissolved solids (TDS). Continuous discharge or continuous bleed systems shall not be installed. E 403.4.4 Discharge Water Reuse. Discharge water shall be reused where applications exist on site. Where a nonpotable water source system exists on site, evaporative cooler discharge water shall be collected and discharged to the collection system. Exception: Where the reservoir water affects the quality of the nonpotable water supply making the nonpotable water unusable for its intended purposes. E 403.4.5 Discharge Water to Drain. Where discharge water is not recovered for reuse, the sump overflow line shall not be directly connected to a drain. Where the discharge water is discharged into a sanitary drain, an air gap of not less than 6 inches (152 mm) shall be provided between the termination of the discharge line and the drain opening. The discharge line shall terminate in a location that is visible to the building owner, tenants, or maintenance personnel. Treated Nonpotable Water for Cooling.E 403.5 Use of Reclaimed (Recycled) and On-Site Where approved for use by the water or wastewater utility and the Authority Having Jurisdiction, reclaimed (recycled), or onsite treated nonpotable water shall be permitted to be used for industrial and commercial cooling or air-conditioning.
E 403.5.1 Drift Eliminator. A drift eliminator shall be utilized in a cooling system, utilizing alternate sources of water, where the aerosolized water is capable of coming in contact with employees or members of the public. E 403.5.2 Disinfection. A biocide shall be used to treat the cooling system recirculation water where the recycled water is capable of coming in contact with employees or members of the public.
366 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
E 501.0 Heating, Ventilation, and Air-Conditioning E 501.1 Scope.Systems and Equipment – Energy Efficiency. The provisions of this section shall establish the means of enhancing energy efficiency associated with mechanical systems in a building.
E 502.0 Heating, Ventilation, and Air-Conditioning E 502.1 General.Low-Rise Residential Buildings. The heating, ventilating, air-conditioning, for single-family houses, multi-family structures not exceeding three stories above grade, and modular houses shall be in accordance with Section E 502.2 through Section E 502.12. The heating, ventilation, and air-conditioning system of other buildings shall be in accordance with Section E 503.0. E 502.2 Heating, Ventilating, and Air-ConditioningSystems and Equipment. This section shall regulate only equipment using single-phase electric power, air conditioners, and heat pumps with rated cooling capacities less than 65 000 British thermal units per hour (Btu/h) (19 kW), warm air furnaces with rated heating capacities less than 225 000 Btu/h (66 kW), boilers less than 300 000 Btu/h (88 kW) input, and heating-only heat pumps with rated heating capacities less than 65 000 Btu/h (19 kW). [ASHRAE 90.2:6.2]
E 502.2.1 Non-Residential Type Systems andEquipment. Heating, ventilating, and air-conditioning systems and equipment that do not fall under the requirements of Section E 502.0 shall be in accordance with the applicable requirements of Section E 503.0. E 502.3 Balancing. The air distribution system design, including outlet grilles, shall provide a means for balancing the air distribution system unless the design procedure provides a system intended to operate within plus or minus 10 percent of design air quantities. [ASHRAE 90.2:6.3]
E 502.3.1 Balancing Dampers. Balancing dampers shall be installed in branch ducts, and the axis of the damper shall be installed parallel to the direction of airflow in the main duct. E 502.4 Ducts. Ducts shall be sized, installed, and tested in accordance with Section E 502.4.1 through Section E 502.4.4.
E 502.4.1 Insulation for Ducts. Portions of the air distribution system installed in or on buildings for heating and cooling shall be R-8. Where the mean outdoor dew-point temperature in a month exceeds 60°F (16°C), vapor retarders shall be installed on conditioned-air supply ducts. Vapor retarders shall have a water vapor permeance not exceeding 0.5 perm [2.87 E-11 kg/(Pa•s•m 2 )] where tested in accordance with Procedure A in ASTM E96.
duct penetrates a conditioned space, the duct penetration shall be sealed to the wall or floor assembly to prevent leakage into an unconditioned space. E 502.4.3 Duct Leakage Test. For systems with a duct or air handler outside of the conditioned space, a duct leakage test shall be performed in accordance with Section E 502.4.3.1.
Ductwork shall be tested to the maximum permitted E 502.4.3.1 Duct Leakage Verification Test. leakage in 1 cubic foot per minute (ft 3 /min) per 100 square feet [0.0001 (m 3 /s)/m 2 ] of duct surface area in accordance with SMACNA HVAC Air Duct Leakage Test Manual. Register penetrations shall be sealed during the test. The test shall be conducted with a pressure differential of 0.1 inch water gauge (0.02 kPa) across the tested system. E 502.4.4 Duct Sizing. Duct systems shall be sized in accordance with ACCA Manual D or other methods approved by the Authority Having Jurisdiction with the velocity in the main duct not to exceed 1000 feet per minute (ft/min) (5.08 m/s) and the velocity in the secondary branch duct not to exceed 600 ft/min (3.048 m/s). E 502.5 Insulation for Piping. HVAC system piping installed to serve buildings and within buildings shall be thermally insulated in accordance with Table E 502.5. [ASHRAE 90.2:6.5] E 502.6 Ventilation and Combustion Air. The building shall be designed to have the capability to provide the ventilation air specified in Table E 502.6. Mechanical ventilation shall be calculated in accordance with Equation E 502.6.
[ASHRAE 90.2:6.6.1]
(Equation E 502.6) Mechanical Ventilation = [(0.35 – Summer ) × Volume ] / 60
Where: Mechanical Ventilation = required mechanical ventilation
rate to supplement summer infiltration, cfm (m 3 /s) Summer = summer design infiltration rate, ACH Volume = volume of conditioned space, ft 3 (m 3 )
Insulation shall not be required where the ducts are within the conditioned space. [ASHRAE 90.2:6.4] E 502.4.2 Ducts and Register Penetrations. Joints, seams, and penetrations of duct systems shall be made airtight by means of mastics, gasketing, or other means in accordance with this code. Register penetrations shall be sealed to the wall or floor assemblies. Where HVAC
(3) Solid fuel burning equipment, NFPA 211 [ASHRAE
90.2:6.6.2] E 502.7 Electric Heating Systems. Electric heating systems shall be installed in accordance with the following requirements. [ASHRAE 90.2:6.7]
E 502.6.1 Combustion Air. Combustion air for fossil fuel heating equipment shall comply with this code or with one of the following: (1) Natural gas and propane heating equipment, NFPA
54
(1) Natural gas and propane heating equipment, NFPA
54 (2) Oil heating equipment, NFPA 31 (3) Solid fuel burning equipment, NFPA 211 [ASHRAE
90.2:6.6.2]
2019 CALIFORNIA MECHANICAL CODE 367
APPENDIX E any other purpose or distributed to any other persons or parti es.
E 502.7.1 Wall, Floor, or Ceiling Electric-Resis- tance Heating. Where wall, floor, or ceiling electricresistance heating units are used, the structure shall be zoned and heaters installed in each zone in accordance with the heat loss of that zone. Where living and sleeping zones are separate, the number of zones shall be not less than two. Where two or more heaters are installed in one room, they shall be controlled by one thermostat.
[ASHRAE 90.2:6.7.1] E 502.7.2 Electric Central Warm Air Heating. Where electric central warm air heating is to be installed, an electric heat pump or an off-peak electric heating system with thermal storage shall be used.
Exceptions: (1) Electric resistance furnaces where the ducts are
located inside the conditioned space, and not less
(1) Electric resistance furnaces where the ducts are
located inside the conditioned space, and not less than two zones are provided where the living and sleeping zones are separate. (2) Packaged air-conditioning units with supplemental
electric heat. [ASHRAE 90.2:6.7.2]
(2) Packaged air-conditioning units with supplemental
electric heat. [ASHRAE 90.2:6.7.2] E 502.8 Bath Ceiling Units. Bath ceiling units providing a combination of heat, light, or ventilation shall be provided with controls permitting separate operation of the heating function. [ASHRAE 90.2:6.8]
TABLE E 502.5 MINIMUM PIPE INSULATIONTHICKNESS 1, 5
[ASHRAE 90.2: TABLE 6.5]
| INSULATION CONDUCTIVITY | NOMINAL PIPE DIAMETER (inches) | ||||||
|---|---|---|---|---|---|---|---|
| FLUID DESIGN OPERATING TEMPERATURE RANGE (°F) |
**Btu•inch/(h•ft2•°F) ** | MEAN RATING TEM- PERATURE(°F) |
<1 | 1 TO 11⁄4 | 11⁄2 TO 31⁄2 | 4 TO6 | EQUAL TO OR GREATER THAN 8 |
| HEATING SYSTEMS (STEAM, STEAM CONDENSATE, AND HOT WATER)2, 3 |
|||||||
| COOLING SYSTEMS (CHILLED WATER, BRINE, ANDREFRIGERANT)4 |
|||||||
Notes: 1 For insulation outside the stated conductivity range, the minimum thickness ( T ) shall be determined as follows: T = r {(1 + t/r) K/k - 1} Where: T = minimum insulation thickness (inches). r = actual outside radius of pipe (inches) (mm). t = insulation thickness listed in this table for applicable fluid temperature and pipe size. K = conductivity of alternate material at mean rating temperature indicated for the applicable fluid temperature [Btu•in/(h•ft 2 •°F)] [W/(m•K)]. k = the upper value of the conductivity range listed in this table for the applicable fluid temperature. 2 These thicknesses are based on energy efficiency considerations only. Additional insulation is sometimes required relative to safety issues/surface temperature. 3 Piping insulation is not required between the control valve and coil on run-outs where the control valve is located within 4 feet (1219 mm) of the coil and the pipe size is 1 inch (25 mm) or less. 4 These thicknesses are based on energy efficiency considerations only. Issues such as water vapor permeability or surface condensation sometimes require vapor retarders, additional insulation or both. 5 For piping exposed to outdoor air, increase insulation thickness by 1⁄2 of an inch (12.7 mm). The outdoor air is defined as any portion of insulation thatis exposed to outdoor air. For example, attic spaces and crawlspaces are considered exposed to outdoor air.
| TABLE E 502.6 VENTILATION AIR [ASHRAE 90.2: TABLE 6.6.1] | ||
|---|---|---|
| CATEGORY |
MINIMUM REQUIREMENT |
CONDITIONS |
standard (a) or (b) is less than 0.35 ACH2. |
||
Notes: 1 Calculate in accordance with Equation E 502.6. 2 Reference standards: (a) ACCA ManualJ (b) ASHRAE GRP-158
368 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
E 502.9 HVAC Equipment, Rated Combinations. HVAC system equipment and system components shall be furnished with the input(s), the output(s), and the value of the appropriate performance descriptor of HVAC products in accordance with federal law or in accordance with Table E 502.9, as applicable. These shall be based on newly produced equipment or components. Manufacturer’s instructions shall be furnished with and attached to the equipment. The manufacturer of electric-resistance heating equipment shall furnish full-load energy input over the range of voltages at which the equipment is intended to operate. [ASHRAE 90.2:6.9] E 502.10 Controls. Each system or each zone within a system shall be provided with not less than one thermostat capable of being set from 55°F (13°C) to 85°F (29°C) and capable of operating the system’s heating and cooling. The thermostat or control system, or both, shall have an adjustable deadband, the range of which includes a setting of 10°F (6°C) between heating and cooling where automatic changeover is provided. Wall-mounted temperature controls shall be mounted on an inside wall. [ASHRAE 90.2:6.10.1]
E 502.10.1 Initial Control Setting. The control shall initially be set for a maximum heating temperature of 70°F (21°C) and a cooling temperature of not less than 78°F (26°C). E 502.10.2 Ventilation Control. Each mechanical ventilation system (supply, exhaust, or both) shall be equipped with a readily accessible switch or other means for shutoff. Manual or automatic dampers installed for the purpose of isolating outside air intakes and exhausts from the air distribution system shall be designed for tight shutoff.
[ASHRAE 90.2:6.10.2] E 502.10.3 Humidity Control. Where additional energy-consuming equipment is provided for adding moisture to maintain specific selected relative humidities in spaces or zones, a humidistat shall be provided. This device shall be capable of being set to prevent energy from being used to produce relative humidity within the space above 30 percent. [ASHRAE 90.2:6.10.3.1]
E 502.10.3.1 Cooling. Where additional energyconsuming equipment is provided for reducing humidity, it shall be equipped with controls capable of being set to prevent energy from being used to
produce a relative humidity within the space below 50 percent during periods of human occupancy and below 60 percent during unoccupied periods.
[ASHRAE 90.2:6.10.3.2] E 502.10.4 Freeze Protection Systems. Freeze protection systems, such as heat tracing of outdoor piping and heat exchangers, including self-regulating heat tracing, shall include automatic controls capable of and configured to shut off the systems where outdoor air temperatures are above 40°F (4°C) or where the conditions of the protected fluid will prevent freezing. Snowand ice-melting systems shall include automatic controls capable of and configured to shut off the systems where the pavement temperature is above 50°F (10°C) and no precipitation is falling and an automatic or manual control that will allow shutoff where the outdoor temperature is above 40°F (4°C) so that the potential for snow or ice accumulation is negligible. [ASHRAE 90.1:6.4.3.7] E 502.10.5 Other Controls. Where setback, zoned, humidity and cooling controls and equipment are provided, they shall be designed and installed in accordance with Section E 502.10 through Section E 502.10.3.1.
[ASHRAE 90.2:6.10.3.3] E 502.11 Whole House Fans. Whole house exhaust fans shall have insulated louvers or covers which close where the fan is off. Covers or louvers shall have an insulation value of not less than R-4.2, and shall be installed in accordance with the manufacturer’s installation instructions. The attic openings shall be sufficient to accommodate the ventilation capacity of the whole house fan. The operation of the whole house fan shall be considered in determining the adequacy of providing combustion air in accordance with this code. E 502.12 Dampers. Dampers shall be installed to close off outdoor air inlets and exhaust outlets where the ventilation system is not operating.
E 503.0 Heating, Ventilation, and Air-Conditioning – Other than Low-Rise Residential Buildings. E 503.1 General. The heating, ventilation, and air-conditioning in buildings, other than single-family houses, multi-family structures of not more than three stories above grade, and modular houses, shall be in accordance with Section E 503.0.
TABLE E 502.9 MINIMUM REQUIREMENTS FOR NON-FEDERALLY COVERED HVAC EQUIPMENT
[ASHRAE 90.2: TABLE 6.9]
| EQUIPMENT TYPE | SUBCATEGORY OR RATING CONDITION | MINIMUM EFFICIENCY | TEST PROCEDURE |
|---|---|---|---|
| Groundwater source heat pump* | ARI 325 | ||
| Groundwater source heat pump* | |||
| Groundwater source heat pump* | |||
| Groundwater source heat pump* | |||
| Unitary A/C |
ARI 210/240 | ||
| Unitary A/C |
|||
| Unitary A/C |
|||
| Unitary A/C |
- Performance for electrically powered equipment with capacity less than 65 000 Btu/h (19 kW) where rated in accordance with ARI 325.
2019 CALIFORNIA MECHANICAL CODE 369
APPENDIX E any other purpose or distributed to any other persons or parti es.
E 503.1.3.4 Piping. New and replacement piping shall comply with Section E 503.4.7.1. Exceptions: (1) For equipment that is being modified or
repaired but not replaced, provided that such
(1) For equipment that is being modified or
repaired but not replaced, provided that such modifications or repairs will not result in an increase in the annual energy consumption of the equipment using the same energy type. (2) Where a replacement or alteration of equipment
requires extensive revisions to other systems,
(2) Where a replacement or alteration of equipment
requires extensive revisions to other systems, equipment, or elements of a building, and such replaced or altered equipment is a like-for-like replacement. (3) For a refrigerant change of existing equipment. (4) For the relocation of existing equipment. (5) For ducts and piping where there is insufficient
space or access to comply with these require
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
E 503.1.1 New Buildings. Mechanical equipment and systems serving the heating, cooling, ventilating, or refrigeration needs of new buildings shall be in accordance with the requirements of this section as described in Section E 503.2. [ASHRAE 90.1:6.1.1.1] E 503.1.2 Additions to Existing Buildings. Mechanical equipment and systems serving the heating, cooling, ventilating, or refrigeration needs of additions to existing buildings shall be in accordance with the requirements of this section as described in Section E 503.2. Exception: Where HVACR to an addition is provided by existing HVACR systems and equipment, such existing systems and equipment shall not be required to be in accordance with this appendix. A new system or equipment installed shall be in accordance with specific requirements applicable to those systems and equipment.
[ASHRAE 90.1:6.1.1.2] E 503.1.3 Alterations to Heating, Ventilating, Air- Conditioning, and Refrigeration in ExistingBuildings. New HVACR equipment as a direct replacement of existing HVACR equipment shall be in accordance with the following sections as applicable for the equipment being replaced: (1) Section E 503.3 (2) Section E 503.4 (3) Section E 503.4.6 (4) Section E 503.4.6.2 (5) Section E 503.4.6.3 (6) Section E 503.4.6.4 (7) Section E 503.4.6.8 (8) Section E 503.4.6.9 (9) Section E 503.4.6.11 (10)Section E 503.5.1 (11) Section E 503.5.3 (12)Section E 503.5.6.1.2 (13)Section E 503.5.6.2 (14)Section E 503.5.6.5 (15)Section E 503.5.7 (16)Section E 503.5.7.2 (17)Section E 503.5.8.1. [ASHRAE 90.1:6.1.1.3.1]
(2) Section E 503.4 (3) Section E 503.4.6 (4) Section E 503.4.6.2 (5) Section E 503.4.6.3 (6) Section E 503.4.6.4 (7) Section E 503.4.6.8 (8) Section E 503.4.6.9 (9) Section E 503.4.6.11 (10)Section E 503.5.1 (11) Section E 503.5.3 (12)Section E 503.5.6.1.2 (13)Section E 503.5.6.2 (14)Section E 503.5.6.5 (15)Section E 503.5.7 (16)Section E 503.5.7.2 (17)Section E 503.5.8.1. [ASHRAE 90.1:6.1.1.3.1]
E 503.1.3.1 New Cooling Systems. New cooling systems installed to serve previously uncooled spaces shall be in accordance with this section as described in Section E 503.2. [ASHRAE 90.1:6.1.1.3.2] E 503.1.3.2 Existing Cooling Systems. Alterations to existing cooling systems shall not decrease economizer capability unless the system is in accordance with Section E 503.5 through Section E 503.5.4.1. [ASHRAE 90.1:6.1.1.3.3] E 503.1.3.3 Ductwork. New and replacement ductwork shall comply with Section E 503.4.7.1 through Section E 503.4.7.2.1. [ASHRAE 90.1:6.1.1.3.4]
(5) For ducts and piping where there is insufficient
space or access to comply with these requirements. [ASHRAE 90.1:6.1.1.3.5] E 503.2 Compliance Path(s). Section E 503.0 shall be achieved in accordance with the requirements of Section E 503.1.1 through Section E 503.1.3.4, Section E 503.6, Section E 503.7, and one of the following: (1) Section E 503.3 and Section E 503.3.1 (2) Section E 503.4 (3) Section E 503.4 and Section E 503.8 [ASHRAE 90.1:6.2.1]
E 503.2.1 Projects Using Energy Cost BudgetMethod. Projects using the energy cost budget method in accordance with ASHRAE 90.1 shall comply with Section E 503.4, the mandatory provisions of this section, as a portion of that compliance path. [ASHRAE 90.1:6.2.2] E 503.3 Simplified Approach Option for HVAC Sys-tems. The simplified approach shall be an optional path for compliance where the following conditions are met: (1) The building is not more than two stories in height. (2) Gross floor area is less than 25 000 square feet (2322.6 m 2 ). (3) The HVAC system in the building is in accordance with
the requirements listed in Section E 503.3.1. [ASHRAE
The HVAC system in the building is in accordance with
the requirements listed in Section E 503.3.1. [ASHRAE 90.1:6.3.1] E 503.3.1 Criteria. The HVAC system shall comply with the following criteria: (1) The system serves a single HVAC zone. (2) The equipment shall comply with the variable flow
requirements of Section E 503.5.6.2.
(2) The equipment shall comply with the variable flow
requirements of Section E 503.5.6.2. (3) Cooling (where any) shall be provided by a unitary
packaged or split-system air conditioner that is either
(3) Cooling (where any) shall be provided by a unitary
packaged or split-system air conditioner that is either air-cooled or evaporatively cooled, with efficiency that is in accordance with the requirements shown in Table E 503.7.1(1), Table E 503.7.1(2), or Table E 503.7.1(4) for the applicable equipment category. (4) The system shall have an air economizer in accor dance with Section E 503.5 and Section E 503.4.6.13.
The system shall have an air economizer in accor dance with Section E 503.5 and Section E 503.4.6.13.
370 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
(5) Heating (where any) shall be provided by a unitary
packaged or split-system heat pump that is in accor
(5) Heating (where any) shall be provided by a unitary
packaged or split-system heat pump that is in accordance with the applicable efficiency requirements shown in Table E 503.7.1(2) or Table E 503.7.1(4), a fuel-fired furnace that is in accordance with the applicable efficiency requirements shown in Table E 503.7.1(5), an electric resistance heater, or a baseboard system connected to a boiler that is in accordance with the applicable efficiency requirements shown in Table E 503.7.1(6). (6) The system shall comply with the exhaust air energy
recovery requirements in accordance with Section E
(b) Is capable of retaining programming and time
setting during a loss of power for a period of not
(b) Is capable of retaining programming and time
setting during a loss of power for a period of not less than 10 hours. (c) Includes an accessible manual override that
allows temporary operation of the system for up
(c) Includes an accessible manual override that
allows temporary operation of the system for up to 2 hours. (d) Is capable of and configured with temperature
setback down to 55°F (13°C) during off hours.
(d) Is capable of and configured with temperature
setback down to 55°F (13°C) during off hours. (e) Is capable of and configured with temperature
setup to 90°F (32°C) during off hours.
(6) The system shall comply with the exhaust air energy
recovery requirements in accordance with Section E 503.5.10. (7) The system shall be controlled by a manual
changeover or dual setpoint thermostat.
(e) Is capable of and configured with temperature
setup to 90°F (32°C) during off hours. (11) Except for piping within manufacturer’s units,
HVAC piping shall be insulated in accordance with
(7) The system shall be controlled by a manual
changeover or dual setpoint thermostat. (8) Where a heat pump equipped with auxiliary internal
electric resistance heaters is installed, controls shall
Where a heat pump equipped with auxiliary internal
electric resistance heaters is installed, controls shall be provided that prevent supplemental heater operation where the heating load is capable of being met by the heat pump alone during both steady-state operation and setback recovery. Supplemental heater operation shall be permitted during outdoor coil defrost cycles. The heat pump shall be controlled in accordance with one of the following: (a) A digital or electronic thermostat designed for
heat pump use that energizes auxiliary heat
(11) Except for piping within manufacturer’s units,
HVAC piping shall be insulated in accordance with Table E 503.7.3(1) and Table E 503.7.3(2). Insulation exposed to weather shall be suitable for outdoor service (e.g., protected by aluminum, sheet metal, painted canvas, or plastic cover). Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation. (12)Ductwork and plenums shall be insulated in accor dance with Table E 503.7.2 and shall be sealed in
(14) Outdoor air intake and exhaust systems shall comply
with Section E 503.4.6.4 through Section E 503.4.6.5. (15)Where separate heating and cooling equipment
serves the same temperature zone, thermostats shall
(12)Ductwork and plenums shall be insulated in accor dance with Table E 503.7.2 and shall be sealed in accordance with Section E 503.4.7.2. (13)Construction documents shall require a ducted sys tem to be air balanced in accordance with industry
(a) A digital or electronic thermostat designed for
heat pump use that energizes auxiliary heat where the heat pump has insufficient capacity to maintain setpoint or to warm up the space at a sufficient rate. (b) A multistage space thermostat and an outdoor
air thermostat wired to energize auxiliary heat
(13)Construction documents shall require a ducted sys tem to be air balanced in accordance with industryaccepted procedures. (14) Outdoor air intake and exhaust systems shall comply
with Section E 503.4.6.4 through Section E 503.4.6.5.
(16)Systems with a design supply air capacity more than
10 000 ft 3 /min (4.7195 m 3 /s) shall have optimum start controls. (17)The system shall comply with the demand control
ventilation requirements of Section E 503.4.6.9 and
(b) A multistage space thermostat and an outdoor
air thermostat wired to energize auxiliary heat on the last stage of the space thermostat and where outdoor air temperature is less than 40°F (4°C). Exceptions: Heat Pumps that comply with the following: (1) Have a minimum efficiency regulated by
NAECA.
(15)Where separate heating and cooling equipment
serves the same temperature zone, thermostats shall be interlocked to prevent simultaneous heating and cooling. (16)Systems with a design supply air capacity more than
10 000 ft 3 /min (4.7195 m 3 /s) shall have optimum
(1) Have a minimum efficiency regulated by
NAECA. (2) In accordance with the requirements shown in
Table E 503.7.1(2).
(17)The system shall comply with the demand control
ventilation requirements of Section E 503.4.6.9 and the ventilation design requirements of Section E 503.5.6.6. (18) The system shall comply with the door switch require ments of Section E 503.5.14. [ASHRAE 90.1:6.3.2]
(2) In accordance with the requirements shown in
Table E 503.7.1(2). (3) Include all usage of internal electric resistance
heating.
(3) Include all usage of internal electric resistance
heating. (9) The system controls shall not permit reheat or other
form of simultaneous heating and cooling for
(9) The system controls shall not permit reheat or other
form of simultaneous heating and cooling for humidity control. (10)Systems serving spaces other than hotel or motel
guest rooms, and other than those requiring contin
(10)Systems serving spaces other than hotel or motel
guest rooms, and other than those requiring continuous operation, which have both a cooling or heating capacity more than 15 000 Btu/h (4.4 kW) and a supply fan motor power more than 0.75 horsepower (hp) (0.56 kW), shall be provided with a time clock that is in accordance with the following: (a) Can start and stop the system under different
schedules for seven different day-types per week.
Can start and stop the system under different
schedules for seven different day-types per week.
(18) The system shall comply with the door switch require ments of Section E 503.5.14. [ASHRAE 90.1:6.3.2] E 503.3.2 Climate Zone Determination. Climate zones identified in this appendix shall be determined in accordance with ASHRAE 90.1. For locations in the United States and its territories, the assigned climate zone and, where required, the assigned climate zone letter shall be in accordance with ASHRAE 169. Exception: Where recorded historical climatic data are available for a construction site, it is permitted to be used to determine compliance where approved by the Authority Having Jurisdiction. [ASHRAE 90.1:5.1.4.1] E 503.4 Mandatory Provisions. Equipment shown in Table E 503.7.1(1) through Table E 503.7.1(16) shall have a minimum performance at the specified rating conditions where tested in accordance with the specified test procedure. Where multiple rating conditions or performance requirements are provided, the equipment shall satisfy the stated requirements unless otherwise exempted by footnotes in the
2019 CALIFORNIA MECHANICAL CODE 371
APPENDIX E any other purpose or distributed to any other persons or parti es.
table. Equipment covered under the Federal Energy Policy Act of 1992 (EPACT) shall have no minimum efficiency requirements for operation at minimum capacity or other than standard rating conditions. Equipment used to provide service water heating functions as part of a combination system shall satisfy the stated requirements for the appropriate space heating or cooling category. Tables are as follows: (1) Table E 503.7.1(1), “Electrically Operated Unitary Air
Conditioners and Condensing Units-Minimum Effi
(1) Table E 503.7.1(1), “Electrically Operated Unitary Air
Conditioners and Condensing Units-Minimum Efficiency Requirements” (2) Table E 503.7.1(2), “Electrically Operated Unitary and
Applied Heat Pumps-Minimum Efficiency Requirements”
(2) Table E 503.7.1(2), “Electrically Operated Unitary and
Applied Heat Pumps-Minimum Efficiency Requirements” (3) Table E 503.7.1(3), “Water-Chilling Packages-Efficiency
Requirements” (See Section E 503.4.1 for water-cooled
(3) Table E 503.7.1(3), “Water-Chilling Packages-Efficiency
Requirements” (See Section E 503.4.1 for water-cooled centrifugal water-chilling packages that are designed to operate at nonstandard conditions.) (4) Table E 503.7.1(4), “Electrically Operated Packaged Ter minal Air Conditioners, Packaged Terminal Heat Pumps,
E 503.4.1 Water-Cooled Centrifugal Chilling Packages. Equipment not designed for operation in accordance with AHRI 550/590 test conditions of 44°F (7°C) leaving chilled fluid temperature and 2.4 gallons per minute per ton (gpm/ton) (0.00015 L/s/kg) evaporator fluid flow and 85°F (29°C) entering condenser-fluid temperature with 3.0 gpm/ton (0.00018 L/s/kg) condenser-fluid flow shall have maximum full-load kW/ton (FL) and part-load rating requirements adjusted in accordance with Equation E 503.4.1(1) through Equation E 503.4.1(3): FLadj = FL / Kadj [Equation E 503.4.1(1)] PLVadj = IPLV / Kadj [Equation E 503.4.1(2)] Kadj = A x B [Equation E 503.4.1(3)] Where: FL = full-load kW/ton value from Table E
503.7.1(3)
(4) Table E 503.7.1(4), “Electrically Operated Packaged Ter minal Air Conditioners, Packaged Terminal Heat Pumps, Single-Package Vertical Air Conditioners, Single-Package Vertical Heat Pumps, Room Air Conditioners, and Room Air Conditioner Heat Pumps-Minimum Efficiency Requirements” (5) Table E 503.7.1(5), “Warm-Air Furnaces and Combina tion Warm-Air Furnaces/Air-Conditioning Units, Warm
FL = full-load kW/ton value from Table E
503.7.1(3) FLadj = maximum full-load kW/ton rating, adjusted
for nonstandard conditions
FLadj = maximum full-load kW/ton rating, adjusted
for nonstandard conditions IPLV = IPLV value from Table E 503.7.1(3) IPLVadj = maximum NPLV rating, adjusted for non standard conditions
(5) Table E 503.7.1(5), “Warm-Air Furnaces and Combina tion Warm-Air Furnaces/Air-Conditioning Units, WarmAir Duct Furnaces, and Unit Heaters-Minimum Efficiency Requirements” Heating, Ventilating, and Air Conditioning (6) Table E 503.7.1(6), “Gas- and Oil-Fired Boilers-Mini mum Efficiency Requirements”
IPLVadj = maximum NPLV rating, adjusted for non standard conditions A = 0.00000014592 x (LIFT ) 4 - 0.0000346496
x ( LIFT ) 3 + 0.00314196 x ( LIFT ) 2
(6) Table E 503.7.1(6), “Gas- and Oil-Fired Boilers-Mini mum Efficiency Requirements” (7) Table E 503.7.1(7), “Performance Requirements for
Heat-Rejection Equipment”
A = 0.00000014592 x (LIFT ) 4 - 0.0000346496
x ( LIFT ) 3 + 0.00314196 x ( LIFT ) 2 0.147199 x ( LIFT ) + 3.9302 B = 0.0015 x LvgEvap + 0.934 LIFT = LvgCond - LvgEvap LvgCond = Full-load condenser leaving fluid tempera ture (°F)
(7) Table E 503.7.1(7), “Performance Requirements for
Heat-Rejection Equipment” (8) Table E 503.7.1(8), “Heat Transfer Equipment” (9) Table E 503.7.1(9), “Electrically Operated Variable Refrigerant-Flow Air Conditioners- Minimum Efficiency
LvgCond = Full-load condenser leaving fluid tempera ture (°F) LvgEvap = Full-load evaporator leaving temperature
(°F)
(°F)
(9) Table E 503.7.1(9), “Electrically Operated Variable Refrigerant-Flow Air Conditioners- Minimum Efficiency Requirements” (10)Table E 503.7.1(10), “Electrically Operated Variable Refrigerant-Flow and Applied Heat Pumps-Minimum
(10)Table E 503.7.1(10), “Electrically Operated Variable Refrigerant-Flow and Applied Heat Pumps-Minimum Efficiency Requirements” (11) Table E 503.7.1(11), “Air Conditioners and Condensing
Units Serving Computer Rooms”
The FLadj and PLVadj values shall only be applicable for centrifugal chillers in accordance with the following full-load design ranges: (1) Minimum Evaporator Leaving Temperature: 36°F
(2°C)
(1) Minimum Evaporator Leaving Temperature: 36°F
(2°C) (2) Maximum Condenser Leaving Temperature: 115°F
(46°C)
(11) Table E 503.7.1(11), “Air Conditioners and Condensing
Units Serving Computer Rooms” (12)Table E 503.7.1(12), “Commercial Refrigerators and
Freezers-Minimum Efficiency Requirements”
(2) Maximum Condenser Leaving Temperature: 115°F
(46°C) (3) LIFT is not less than 20°F (-6°C) and not more than
80°F (27°C)
(12)Table E 503.7.1(12), “Commercial Refrigerators and
Freezers-Minimum Efficiency Requirements” (13)Table E 503.7.1(13), “Commercial Refrigeration-Mini mum Efficiency Requirements”
(13)Table E 503.7.1(13), “Commercial Refrigeration-Mini mum Efficiency Requirements” (14)Table E 503.7.1(14), “Vapor-Compression-Based Indoor
Pool Dehumidifiers-Minimum Efficiency Requirements”
(14)Table E 503.7.1(14), “Vapor-Compression-Based Indoor
Pool Dehumidifiers-Minimum Efficiency Requirements” (15)Table E 503.7.1(15), “Electrically Operated DX-DOAS
Units, Single-Package and Remote Condenser, without
(3) LIFT is not less than 20°F (-6°C) and not more than
80°F (27°C) Manufacturers shall calculate the FLadj and PLVadj before determining whether to label the chiller in accordance with Section E 503.4.4. Chillers that are in accordance with ASHRAE 90.1 shall be labeled on chillers in accordance with the scope of ASHRAE 90.1.
(15)Table E 503.7.1(15), “Electrically Operated DX-DOAS
Units, Single-Package and Remote Condenser, without Energy Recovery-Minimum Efficiency Requirements” (16)Table E 503.7.1(16), “Electrically Operated DX-DOAS
Units, Single-Package and Remote Condenser, with
(16)Table E 503.7.1(16), “Electrically Operated DX-DOAS
Units, Single-Package and Remote Condenser, with Energy Recovery-Minimum Efficiency Requirements”
[ASHRAE 90.1:6.4.1.1]
Centrifugal chillers designed to operate outside of these ranges shall not be covered under this appendix.
Example: Path A, 600 ton (600 000 kg) centrifugal chiller Table E 503.7.1(3) efficiencies. F = 0.560 kW/ton IPLV = 0.500 kW/ton LvgCond = 91.16°F
372 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
LvgEvap = 42°F LIFT = 91.16°F – 42°F = 49.16°F Kadj = A x B A = 0.00000014592 x (49.16) 4 - 0.0000346496
x (49.16) 3 + 0.00314196 x (49.16) 2
A = 0.00000014592 x (49.16) 4 - 0.0000346496
x (49.16) 3 + 0.00314196 x (49.16) 2 0.147199 x (49.16) + 3.9302 = 1.0228 B = 0.0015 x 42 + 0.934 = 0.9970 FLajd = 0.560/(1.0228 x 0.9970) = 0.549 kW/ton PLVadj = 0.500/(1.0228 x 0.9970) = 0.490 kW/ton
[ASHRAE 90.1:6.4.1.2.1]
For SI units: 1 metric ton = 1000 kg, 1000 British thermal units per hour = 0.293 kW, 1 gallon per minute = 0.06 L/s, °C = (°F-32)/1.8
[ASHRAE 90.1:6.4.1.2.1]
E 503.4.1.1 Positive Displacement (air- and water-cooled) Chilling Packages. Equipment with an evaporator leaving fluid temperature more than 32°F (0°C) and water-cooled positive displacement chilling packages with a condenser leaving fluid temperature less than 115°F (46°C) shall be in accordance with Table E 503.7.1(3) where tested or certified with water at standard rating conditions, in accordance with the referenced test procedure.
[ASHRAE 90.1:6.4.1.2.2] E 503.4.2 Equipment not Listed. Equipment not listed in the tables referenced in Section E 503.4 and Section E 503.4.1 shall be permitted to be used. [ASHRAE 90.1:6.4.1.3] E 503.4.3 Verification of Equipment Efficiencies. Equipment efficiency information supplied by manufacturers shall be verified in accordance with one of the following: (1) Equipment covered under EPACT shall be in accor dance with U.S. Department of Energy certification
E 503.4.4 Labeling. Mechanical equipment that is not covered by the U.S. National Appliance Energy Conservation Act (NAECA) of 1987 shall carry a permanent label installed by the manufacturer stating that the equipment is in accordance with the requirements of ASHRAE 90.1. [ASHRAE 90.1:6.4.1.5.1] E 503.4.4.1 Packaged Terminal Air Condi-tioners. Nonstandard-size packaged terminal air conditioners and heat pumps with existing sleeves having an external wall opening of less than 16 inches (406 mm) high or less than 42 inches (1067 mm) wide and having a cross-sectional area less than 670 square inches (0.432 m 2 ) shall be factory labeled in accordance with the following: “Manufactured for nonstandard-size applications only: not to be installed in new construction projects.” [ASHRAE 90.1:6.4.1.5.2] E 503.4.5 Load Calculations. Heating and cooling system design loads for the purpose of sizing systems and equipment shall be determined in accordance with ASHRAE/ACCA 183. [ASHRAE 90.1:6.4.2.1]
(1) Equipment covered under EPACT shall be in accor dance with U.S. Department of Energy certification requirements. (2) Where a certification program exists for a covered
product, and it includes provisions for verification and
(2) Where a certification program exists for a covered
product, and it includes provisions for verification and challenge of equipment efficiency ratings, then the product shall be listed in the certification program. (3) Where a certification program exists for a covered
product, and it includes provisions for verification
(3) Where a certification program exists for a covered
product, and it includes provisions for verification and challenge of equipment efficiency ratings, but the product is not listed in the existing certification program, the ratings shall be verified by an independent laboratory test report. (4) Where no certification program exists for a covered
product, the equipment efficiency ratings shall be
E 503.4.5.1 Pump Head. Pump differential pressure (head) for the purpose of sizing pumps shall be determined in accordance with generally accepted engineering standards and handbooks acceptable to the Authority Having Jurisdiction. The pressure drop through each device and pipe segment in the critical circuit at design conditions shall be calculated.
[ASHRAE 90.1:6.4.2.2] E 503.4.6 Zone Thermostatic Controls. The supply of heating and cooling energy to each zone shall be individually controlled by thermostatic controls responding to temperature within the zone. For the purposes of Section E 503.4.6, a dwelling unit shall be permitted to be considered a single zone. Exceptions: Independent perimeter systems that are designed to offset only building envelope loads shall be permitted to serve one or more zones also served by an interior system provided: (1) the perimeter system includes not less than one ther mostatic control zone for each building exposure
(1) the perimeter system includes not less than one ther mostatic control zone for each building exposure having walls facing only one orientation for 50 contiguous feet (15 240 mm) or more and (2) the perimeter system heating and cooling supply is
controlled by thermostatic controls located within
(4) Where no certification program exists for a covered
product, the equipment efficiency ratings shall be supported by data furnished by the manufacturer. (5) Where components such as indoor or outdoor coils
from different manufacturers are used, the system
(5) Where components such as indoor or outdoor coils
from different manufacturers are used, the system designer shall specify component efficiencies whose combined efficiency is in accordance with the minimum equipment efficiency requirements in Section E 503.4 through Section E 503.4.4.1. (6) Requirements for plate-type liquid-to-liquid heat
exchangers are listed in Table E 503.7.1(8). [ASHRAE
(2) the perimeter system heating and cooling supply is
controlled by thermostatic controls located within the zones served by the system. Exterior walls and semiexterior walls are considered to have different orientations where the exposures they face differ by more than 45 degrees (0.79 rad).
[ASHRAE 90.1:6.4.3.1.1]
ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE
Requirements for plate-type liquid-to-liquid heat
exchangers are listed in Table E 503.7.1(8). [ASHRAE 90.1:6.4.1.4]
E 503.4.6.1 Dead Band. Where used to control both heating and cooling, zone thermostatic controls shall be capable of and configured to provide a temperature range or dead band of not less than 5°F (3°C) within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum.
2019 CALIFORNIA MECHANICAL CODE 373
APPENDIX E any other purpose or distributed to any other persons or parti es.
Exceptions: (1) Thermostats that require manual changeover
between heating and cooling modes.
(1) Thermostats that require manual changeover
between heating and cooling modes. (2) Special occupancy or special applications
where wide temperature ranges are not accept
ASHRAE ASHRAE
ASHRAE ASHRAE
(2) Special occupancy or special applications
where wide temperature ranges are not acceptable (such as retirement homes, process applications, museums, some areas of hospitals) and are approved by the Authority Having Jurisdiction. [ASHRAE 90.1:6.4.3.1.2] Where heating and cooling to a zone are controlled E 503.4.6.2 Setpoint Overlap Restriction. by separate zone thermostatic controls located within the zone, means (such as limit switches, mechanical stops, or, for DDC systems, software programming) shall be provided to prevent the heating setpoint from exceeding the cooling setpoint minus any applicable proportional band. [ASHRAE 90.1:6.4.3.2] E 503.4.6.3 Off-Hour Controls. HVAC systems shall have the off-hour controls required by Section E 503.4.6.3.1 through Section E 503.4.6.3.4. Exceptions: (1) HVAC systems intended to operate continu ously.
(1) HVAC systems intended to operate continu ously. (2) HVAC systems having a design heating capac ity and cooling capacity less than 15 000 Btu/h
HVAC systems having a design heating capac ity and cooling capacity less than 15 000 Btu/h (4.4 kW) that are equipped with readily accessible manual ON/OFF controls. [ASHRAE 90.1:6.4.3.3] HVAC systems shall be equipped with not less E 503.4.6.3.1 Automatic Shutdown. than one of the following: (1) Controls that can start and stop the system
under different time schedules for seven
(1) Controls that can start and stop the system
under different time schedules for seven different day-types per week, are capable of retaining programming and time setting during loss of power for a period of not less than 10 hours, and include an accessible manual override, or equivalent function, that allows temporary operation of the system for up to 2 hours. (2) An occupant sensor that is capable of shut ting the system off where no occupant is
(2) An occupant sensor that is capable of shut ting the system off where no occupant is sensed for a period of up to 30 minutes. (3) A manually operated timer capable of
being adjusted to operate the system for up
ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE
(3) A manually operated timer capable of
being adjusted to operate the system for up to 2 hours. (4) An interlock to a security system that shuts
the system off where the security system is
(4) An interlock to a security system that shuts
the system off where the security system is activated. Exception: Residential occupancies shall be permitted to use controls that can start and stop the system under two different time schedules per week. [ASHRAE 90.1:6.4.3.3.1]
E 503.4.6.3.2 Setback Controls. Heating systems shall be equipped with controls capable of and configured to automatically restart and temporarily operate the system as required to maintain zone temperatures above an adjustable heating setpoint of not less than 10°F (6°C) below the occupied heating setpoint. Cooling systems shall be equipped with controls capable of and configured to automatically restart and temporarily operate the mechanical cooling system as required to maintain zone temperatures below an adjustable cooling setpoint of not less than 5°F (3°C) above the occupied cooling setpoint or to prevent high space humidity levels. Exception: Radiant heating systems capable of and configured with a setback heating setpoint at not less than 4°F (2°C) below the occupied heating setpoint. [ASHRAE 90.1:6.4.3.3.2] E 503.4.6.3.3 Optimum Start Controls. Individual heating and cooling systems with setback controls and DDC shall have optimum start controls. The control algorithm shall, as a minimum, be a function of the difference between space temperature and occupied setpoint, the outdoor temperature, and the amount of time prior to scheduled occupancy. Mass radiant floor slab systems shall incorporate floor temperature into the optimum start algorithm. [ASHRAE 90.1:6.4.3.3.3] E 503.4.6.3.4 Zone Isolation. HVAC systems serving zones that are intended to operate or be occupied nonsimultaneously shall be divided into isolation areas. Zones shall be permitted to be grouped into a single isolation area provided it does not exceed 25 000 square feet (2322.6 m 2 ) of conditioned floor area and does not include more than one floor. Each isolation area shall be equipped with isolation devices capable of and configured to automatically shut off the supply of conditioned air and outdoor air to and exhaust air from the area. Each isolation area shall be controlled independently by a device meeting the requirements of Section E 503.4.6.3.1. For central systems and plants, controls and devices shall be provided to allow stable system and equipment operation for any length of time while serving only the smallest isolation area served by the system or plant. Exceptions: Isolation devices and controls are not required for the following: (1) Exhaust air and outdoor air connections to
isolation zones where the fan system to
(1) Exhaust air and outdoor air connections to
isolation zones where the fan system to which they connect is not more than 5000 ft 3 /min (2.3597 m 3 /s). (2) Exhaust airflow from a single isolation
zone of less than 10 percent of the design
Exhaust airflow from a single isolation
zone of less than 10 percent of the design airflow of the exhaust system to which it connects.
374 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
(4) Dampers shall not be required in exhaust
systems serving Type 1 kitchen exhaust hoods. [ASHRAE 90.1:6.4.3.4.2] E 503.4.6.4.2 Dampers Leakage. Where outdoor air supply, and exhaust or relief dampers are required in Section E 503.4.6.4, they shall have a maximum leakage rate in accordance with Table E 503.4.6.4.2 where tested in accordance with AMCA 500D. [ASHRAE 90.1:6.4.3.4.3] Fans with motors more than 0.75 hp (0.56 kW) E 503.4.6.4.3 Ventilation Fan Controls. shall have automatic controls in accordance with Section E 503.4.6.3.1 that are capable of and configured to shut off fans when not required. Exception: HVAC systems intended to operate continuously. [ASHRAE 90.1:6.4.3.4.4] lation.E 503.4.6.5 Enclosed Parking Garage Venti- Enclosed parking garage ventilation systems shall automatically detect contaminant levels and stage fans or modulate fan airflow rates to 50 percent or less of design capacity, provided acceptable contaminant levels are maintained. Exceptions: (1) Garages not more than 30 000 square feet
(2787.09 m 2 ) with ventilation systems that do not
(3) Dampers shall not be required in ventila tion or exhaust systems serving uncondi
(3) Dampers shall not be required in ventila tion or exhaust systems serving unconditioned spaces. (4) Dampers shall not be required in exhaust
systems serving Type 1 kitchen exhaust
ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
(3) Zones intended to operate continuously or
intended to be inoperative only when all
Zones intended to operate continuously or
intended to be inoperative only when all other zones are inoperative. [ASHRAE 90.1:6.4.3.3.4]
E 503.4.6.4 Ventilation System Controls. Stair and elevator shaft vents shall be equipped with motorized dampers that are capable of and configured to automatically close during normal building operation and are interlocked to open as required by fire and smoke detection systems. [ASHRAE 90.1:6.4.3.4.1]
E 503.4.6.4.1 Shutoff Damper Controls. Outdoor air intake and exhaust systems shall be equipped with motorized dampers that will automatically shut when the systems or spaces served are not in use. Ventilation outdoor air and exhaust or relief dampers shall be capable of and configured to automatically shut off during preoccupancy building warm-up, cooldown, and setback, except when ventilation reduces energy costs or when ventilation shall be supplied to comply with the code requirements. Exceptions:
ASHRAE ASHRAE ASHRAE ASHRAE
(1) Backdraft gravity (nonmotorized) dampers
shall be permitted for exhaust and relief in
(1) Backdraft gravity (nonmotorized) dampers
shall be permitted for exhaust and relief in buildings less than three stories in height and for ventilation air intakes and exhaust and relief dampers in buildings of any height located in Climate Zones 0, 1, 2 and 3. Back-draft dampers for ventilation air intakes shall be protected from direct exposure to wind. (2) Back-draft gravity (nonmotorized) dampers
shall be permitted in systems with a design
(1) Garages not more than 30 000 square feet
(2787.09 m 2 ) with ventilation systems that do not utilize mechanical cooling or mechanical heating. (2) Garages that have a garage area to ventilation
system motor nameplate hp ratio that exceeds
Back-draft gravity (nonmotorized) dampers
shall be permitted in systems with a design outdoor air intake or exhaust capacity of 300 ft 3 /min (0.142 m 3 /s) or less.
(2) Garages that have a garage area to ventilation
system motor nameplate hp ratio that exceeds 1500 square feet per horsepower (ft 2 /hp) (186.8 m 2 /kW) and do not utilize mechanical cooling or heating. (3) Where not permitted by the Authority Having
Jurisdiction. [ASHRAE 90.1:6.4.3.4.5]
Jurisdiction. [ASHRAE 90.1:6.4.3.4.5]
TABLE E 503.4.6.4.2 MAXIMUM DAMPER LEAKAGE (cubic foot per minute per square foot) at 1.0 in. w.g
[ASHRAE 90.1: TABLE 6.4.3.4.3]
| VENTILATION AIR INTAKE | EXHAUST/RELIEF | |||
|---|---|---|---|---|
| CLIMATE ZONE |
NONMOTORIZED* |
MOTORIZED |
NONMOTORIZED |
MOTORIZED |
any height |
20 |
4 |
20 |
4 |
any height |
20 |
10 |
20 |
10 |
less than 3 stories 3 or more stories |
not allowed not allowed |
10 10 |
20 not allowed |
10 10 |
less than 3 stories 3 or more stories |
not allowed not allowed |
4 4 |
20 not allowed |
4 4 |
- Dampers smaller than 24 inches (610 mm) in either dimension shall be permitted to have leakage of 40 ft 3 /min per square foot [0.203 (m 3 /s)/m 2 ].
2019 CALIFORNIA MECHANICAL CODE 375
APPENDIX E any other purpose or distributed to any other persons or parti es.
E 503.4.6.6 Heat Pump Auxiliary Heat Con- trol. Heat pumps equipped with internal electric resistance heaters shall have controls that prevent supplemental heater operation where the heating load is capable of being met by the heat pump alone during both steady-state operation and setback recovery. Supplemental heater operation shall be permitted during outdoor coil defrost cycles. Exception: Heat pumps whose minimum efficiency is regulated by U.S. National Appliance Energy Conservation Act (NAECA) and whose ratings are in accordance with the requirements shown in Table E 503.7.1(2) and includes the use of an internal electric resistance heating. [ASHRAE 90.1:6.4.3.5] E 503.4.6.7 Humidification and Dehumidifica- tion. Humidity control shall prevent the use of fossil fuel or electricity to produce relative humidity (RH) more than 30 percent in the warmest zone served by the humidification system and to reduce the RH valve to less than 60 percent in the coldest zone served by the dehumidification system. Where a zone is served by a system or systems with both humidification and dehumidification capability, means (such as limit switches, mechanical stops, or, for DDC systems, software programming) shall be provided capable of preventing simultaneous operation of humidification and dehumidification equipment. Exceptions: (1) Zones served by desiccant systems used with
direct evaporative cooling in series.
than 40°F (4°C) so that the potential for snow or ice accumulation is negligible. [ASHRAE 90.1:6.4.3.7] E 503.4.6.9 Ventilation Controls for High-Occupancy Areas. Demand control ventilation (DCV) shall be required for spaces that are more than 500 square feet (46.45 m 2 ) and with a design occupancy for ventilation of not less than 25 people per 1000 square feet (92.9 m 2 ) of floor area and served by systems with one or more of the following: (1) Air- economizer. (2) Automatic modulating control of outdoor air
damper.
(2) Automatic modulating control of outdoor air
damper. (3) Design outdoor airflow more than 3000 ft 3 /min
(1.4158 m 3 /s).
(3) Design outdoor airflow more than 3000 ft 3 /min
(1.4158 m 3 /s). Exceptions: (1) Systems with exhaust air energy recovery in
accordance with Section E 503.5.10.
(1) Systems with exhaust air energy recovery in
accordance with Section E 503.5.10. (2) Multiple-zone systems without DDC of individ ual zones communicating with a central control
(2) Multiple-zone systems without DDC of individ ual zones communicating with a central control panel. (3) Systems with a design outdoor airflow less than
750 ft 3 /min (0.3540 m 3 /s).
(3) Systems with a design outdoor airflow less than
750 ft 3 /min (0.3540 m 3 /s). (4) Spaces where more than 75 percent of the space
design outdoor airflow is required for makeup
(1) Zones served by desiccant systems used with
direct evaporative cooling in series. (2) Systems serving zones where specific humidity
levels are required, such as museums and hos
(4) Spaces where more than 75 percent of the space
design outdoor airflow is required for makeup air that is exhausted from the space or transfer air that is required for makeup air that is exhausted from other spaces. (5) Spaces with one of the following occupancy cat egories in accordance with Chapter 4 or
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
(2) Systems serving zones where specific humidity
levels are required, such as museums and hospitals, and approved by the Authority Having Jurisdiction or required by accreditation standards and humidity controls are configured to maintain a deadband of not less than 10 percent RH where no active humidification or dehumidification takes place. (3) Systems serving zones where humidity levels
are required to be maintained with precision of
(5) Spaces with one of the following occupancy cat egories in accordance with Chapter 4 or ASHRAE 62.1: correctional cells, daycare sickrooms, science labs, barbers, beauty and nail salons, and bowling alley seating. [ASHRAE 90.1:6.4.3.8] E 503.4.6.10 Outdoor Heating. Radiant heat systems shall be used to provide heat outdoors. Outdoor radiant heating systems shall be provided with controls that sense the presence of occupants or other device that automatically shuts down the system where no occupants are in the heating area. E 503.4.6.11 Heated or Cooled Vestibules. Heating for vestibules and for air curtains with integral heating shall include automatic controls capable of and configured to shut off the heating system when outdoor air temperatures are more than 45°F (7.2°C) Vestibule heating and cooling systems shall be controlled by a thermostat in the vestibule capable of and configured to limit heating to a maximum of 60°F (15.5°C) and cooling to a minimum of 85°F (29.4°C). Exception: Heating or cooling provided by siterecovered energy or by transfer air that would otherwise be exhausted. [ASHRAE 90.1:6.4.3.9] E 503.4.6.12 Direct Digital Control (DDC) Requirements. Direct digital control shall be required in accordance with Section E 503.4.6.12.1 through Section E 503.4.6.12.3. [ASHRAE 90.1:6.4.3.10]
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE
(3) Systems serving zones where humidity levels
are required to be maintained with precision of not more than ± 5 percent RH to comply with applicable codes or accreditation standards or as approved by the Authority Having Jurisdiction. [ASHRAE 90.1:6.4.3.6] E 503.4.6.8 Freeze Protection and Snow or Ice Melting Systems. Freeze protection systems, such as heat tracing of outdoor piping and heat exchangers, including self-regulating heat tracing, shall include automatic controls capable of and configured to shut off the systems when outdoor air temperatures are more than 40°F (4°C) or when the conditions of the protected fluid will prevent freezing. Snow and ice melting systems shall include automatic controls capable of and configured to shut off the systems when the pavement temperature is more than 50°F (10°C) and no precipitation is falling, and an automatic or manual control that will allow shutoff when the outdoor temperature is more
376 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
E 503.4.6.12.1 DDC Applications. DDC shall be provided in the applications and qualifications in accordance with Table E 503.4.6.12.1. Exception: DDC is not required for systems using the simplified approach to compliance in accordance with Section E 503.3. [ASHRAE 90.1:6.4.3.10.1] E 503.4.6.12.2 DDC Controls. Where DDC is required by Section E 503.4.6.12.1, the DDC system shall be capable of and configured with all of the following, as required, to provide the control logic required in Section E 503.5: (1) Monitoring zone and system demand for
fan pressure, pump pressure, heating, and
E 503.4.6.13 Economizer Fault DetectionDiagnostics (FDD). Air-cooled direct-expansion cooling units listed in Tables E 503.7.1(1) and E 503.7.1(2), where an air economizer is installed in accordance with Section E 503.5, shall include a fault detection and diagnostics (FDD) system complying with the following: (1) The following temperature sensors shall be per manently installed to monitor system operation:
(1) Monitoring zone and system demand for
fan pressure, pump pressure, heating, and cooling. (2) Transferring zone and system demand infor mation from zones to air distribution system
The following temperature sensors shall be per manently installed to monitor system operation: (a) Outdoor air (b) Supply air (c) Return air, where required for economizer
control
(2) Transferring zone and system demand infor mation from zones to air distribution system controllers and from air distribution systems to heating and cooling plant controllers. (3) Automatically detecting those zones and
systems that are capable of excessively driv
(c) Return air, where required for economizer
control (2) The system shall have the capability of dis playing the value of each sensor.
(2) The system shall have the capability of dis playing the value of each sensor. (3) The FDD system or unit controls shall be capa ble of and configured to provide system status
(3) Automatically detecting those zones and
systems that are capable of excessively driving the reset logic and generate an alarm or other indication to the system operator. (4) Readily allowing operator removal of
zone(s) from the reset algorithm. [ASHRAE
(4) Readily allowing operator removal of
zone(s) from the reset algorithm. [ASHRAE 90.1:6.4.3.10.2] E 503.4.6.12.3 DDC Display. Where DDC is required in accordance with Section E 503.4.6.12.1 for new buildings, the DDC system shall be capable of trending and graphically displaying input and output points. [ASHRAE 90.1:6.4.3.10.3]
(3) The FDD system or unit controls shall be capa ble of and configured to provide system status by indicating the following: (a) Free cooling available (b) Economizer enabled (c) Compressor enabled (d) Heating enabled (e) Mixed-air low-limit cycle active (4) The FDD system or unit controls shall have pro visions to manually initiate each operating
The FDD system or unit controls shall have pro visions to manually initiate each operating mode so that the operation of compressors, economizers, fans, and the heating system can be independently tested and verified.
TABLE E 503.4.6.12.1 DDC APPLICATIONS AND QUALIFICATIONS
[ASHRAE 90.1:6.4.3.10.1]
| BUILDING STATUS | APPLICATION | QUALIFICATIONS |
|---|---|---|
the system |
with fan system bhp of 10 hp or more |
|
units served by the system |
design cooling capacity of 300 000 Btu/h or more |
|
units served by the system |
design heating capacity of 300 000 Btu/h or more |
|
chilled-water, or hot-water system have DDC |
||
served by the same chilled- or hot-water plant have DDC |
||
| Alteration or addition |
served by the system |
and supplying more than three zones and more than 75 per- cent of zones are new |
ity is 300 000 Btu/h or more |
||
is 300 000 Btu/h or more |
2019 CALIFORNIA MECHANICAL CODE 377
APPENDIX E any other purpose or distributed to any other persons or parti es.
(5) The FDD system shall be capable of and con figured to detect the following faults:
The FDD system shall be capable of and con figured to detect the following faults: (a) Air temperature sensor failure/fault (b) Not economizing when the unit should be
economizing
(3) For runouts less than 10 feet (3048 mm) in
length to air terminals or air outlets, the
(b) Not economizing when the unit should be
economizing (c) Economizing when the unit should not be
economizing
(3) For runouts less than 10 feet (3048 mm) in
length to air terminals or air outlets, the rated R-value of insulation shall not be required to exceed R-3.5. (4) Backs of air outlets and outlet plenums
exposed to unconditioned or indirectly con
(4) Backs of air outlets and outlet plenums
exposed to unconditioned or indirectly conditioned spaces with face areas exceeding 5 square feet (0.5 m 2 ) shall not be required to exceed R-2; those not exceeding 5 square feet (0.5 m 2 ) shall not be required to be insulated. [ASHRAE 90.1:6.4.4.1.2] E 503.4.7.1.2 Piping Insulation. Piping shall be thermally insulated in accordance with Table E 503.7.3(1) and Table E 503.7.3(2). Exceptions: (1) Factory-installed piping within HVAC
equipment tested and rated in accordance
(c) Economizing when the unit should not be
economizing (d) Damper not modulating (e) Excess outdoor air (6) The FDD system shall be capable of and con figured to report faults to a fault management
(6) The FDD system shall be capable of and con figured to report faults to a fault management application or DDC system accessible by operating or service personnel, or annunciated locally on zone thermostats. [ASHRAE 90.1: 6.4.3.12] lation.E 503.4.7 HVAC System Construction and Insu- HVAC Ducts shall be constructed in accordance with provisions contained in the SMACNA HVAC Duct Construction Standard. HVAC system construction and insulation shall comply with Section E 503.4.7.1 and Section E 503.4.7.2.
(3) Piping that conveys fluids that have not
been heated or cooled through the use of fossil fuels or electricity (such as roof and condensate drains, domestic cold water supply, or natural gas piping). (4) Where heat gain or heat loss will not increase
energy usage (such as liquid refrigerant pip
(1) Factory-installed piping within HVAC
equipment tested and rated in accordance with Section E 503.4 through Section E 503.4.4.1. (2) Piping that conveys fluids having a design
operating temperature range between 60°F
E 503.4.7.1 Insulation. Insulation required by this section shall be installed in accordance with industry-accepted standards. These requirements shall not apply to HVAC equipment. Insulation shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind, but not limited to the following: (1) Insulation exposed to weather shall be suitable
for outdoor service (e.g., protected by alu
(2) Piping that conveys fluids having a design
operating temperature range between 60°F (16°C) and 105°F (41°C), inclusive. (3) Piping that conveys fluids that have not
been heated or cooled through the use of
(1) Insulation exposed to weather shall be suitable
for outdoor service (e.g., protected by aluminum, sheet metal, painted canvas, or plastic cover). Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that is capable of causing degradation of the material. (2) Insulation covering chilled-water piping, refrig erant suction piping, or cooling ducts located
(4) Where heat gain or heat loss will not increase
energy usage (such as liquid refrigerant piping). (5) For piping 1 inch (25.4 mm) or less, insula tion shall not be required for strainers, con
Insulation covering chilled-water piping, refrig erant suction piping, or cooling ducts located outside the conditioned space shall include a vapor retardant located outside the insulation (unless the insulation is inherently vapor retardant), penetrations and joints of which shall be sealed. [ASHRAE 90.1:6.4.4.1.1] tion.E 503.4.7.1.1 Duct and Plenum Insula- Supply and return ducts and plenums installed as part of an HVAC air distribution system shall be thermally insulated in accordance with Table E 503.7.2. Exceptions: (1) Factory-installed plenums, casings, or
ductwork furnished as a part of HVAC
(1) Factory-installed plenums, casings, or
ductwork furnished as a part of HVAC equipment tested and rated in accordance with Section E 503.4 through Section E 503.4.4.1. (2) Ducts or plenums located in heated spaces,
semi-heated spaces, or cooled spaces.
(5) For piping 1 inch (25.4 mm) or less, insula tion shall not be required for strainers, control valves, and balancing valves. [ASHRAE 90.1:6.4.4.1.3] E 503.4.7.1.3 Sensible Heating Panel. Thermally ineffective panel surfaces of sensible heating panels, including U-bends and headers, shall be insulated with not less than R-3.5. Adjacent building envelope insulation shall be applied to this insulation value. [ASHRAE 90.1:6.4.4.1.4] E 503.4.7.1.4 Radiant Floor Heating. The bottom surfaces of floor structures incorporating radiant heating shall be insulated not less than R-3.5. Adjacent building envelope insulation shall be applied to this insulated value. Exception: Heated slab-on-grade floors incorporating radiant heating shall be in accordance with ASHRAE 90.1. [ASHRAE 90.1:6.4.4.1.5] E 503.4.7.2 Ductwork and Plenum Leakage. Transverse joints, longitudinal seams, and duct wall penetrations shall be sealed. Pressure-sensitive tape shall not be used as the primary sealant, unless it has been certified to comply with UL 181A or UL 181B by an independent testing laboratory and the tape is
Ducts or plenums located in heated spaces,
semi-heated spaces, or cooled spaces.
378 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
used in accordance with that certification. All other connections shall be considered transverse joints, including but not limited to spin-ins, taps, other branch connections, access door frames and jambs, and duct connections to equipment. Exceptions: (1) Rods that penetrate the duct wall that shall be
permitted to move in order to function properly
Zones 0, 1B, and 2 through 4; less than 1 400 000 Btu/h (410 kW) in Climate Zones 5 through 8; or any size in Climate Zone 1A. (3) Systems that include nonparticulate air treatment in
accordance with ASHRAE 62.1.
(1) Rods that penetrate the duct wall that shall be
permitted to move in order to function properly (control rod for volume damper) shall not be sealed in a fashion that prevents them from working properly. (2) Spiral lock seams in a round or flat oval duct.
(3) Systems that include nonparticulate air treatment in
accordance with ASHRAE 62.1. (4) In hospitals and ambulatory surgery centers, where more
than 75 percent of the air designed to be supplied by the
E 503.4.7.2.1 Duct Leakage Tests. Ductwork shall be leak-tested in accordance with the SMACNA HVAC Air Duct Leakage Test Manual. Representative sections totaling not less than 20 percent of the total installed duct area shall be tested. Where the tested 20 percent fail to comply with the requirements of this section, then 40 percent of the total installed duct area shall be tested. Where the tested 40 percent fail to comply with the requirements of this section, then 100 percent of the total installed duct area shall be tested. Sections shall be selected by the building owner or designated representative of the building owner. Positive pressure leakage testing shall be permitted for negative pressure ductwork. The permitted duct leakage shall be not more than the following: Lmax = CLP 0.65 (Equation E 503.4.7.2.1)
(4) In hospitals and ambulatory surgery centers, where more
than 75 percent of the air designed to be supplied by the system is to spaces that are required to be humidified more than 35°F (2°C) dew-point temperature to comply with applicable codes or accreditation standards; in all other buildings, where more than 25 percent of the air designed to be supplied by the system is to spaces that are designed to be humidified more than 35°F (2°C) dewpoint temperature to satisfy process needs. This exception shall not apply to computer rooms. (5) Systems that include a condenser heat recovery system
with a minimum capacity in accordance with Section E
(10)For comfort cooling where the cooling efficiency is not
less than the efficiency improvement requirements in accordance with Table E 503.5(2). (11) Systems primarily serving computer rooms where in
accordance with one of the following:
(5) Systems that include a condenser heat recovery system
with a minimum capacity in accordance with Section E 503.5.10.1.2. (6) Systems that serve residential spaces where the system
capacity is less than five times the requirement listed in
(6) Systems that serve residential spaces where the system
capacity is less than five times the requirement listed in Table E 503.5(1). (7) Systems that serve spaces whose sensible cooling load
at design conditions, excluding transmission and infil
(7) Systems that serve spaces whose sensible cooling load
at design conditions, excluding transmission and infiltration loads, is less than or equal to transmission and infiltration losses at an outdoor temperature of 60°F (16°C). (8) Systems expected to operate less than 20 hours per week. (9) Where the use of outdoor air for cooling will affect
supermarket open refrigerated casework systems.
(9) Where the use of outdoor air for cooling will affect
supermarket open refrigerated casework systems. (10)For comfort cooling where the cooling efficiency is not
less than the efficiency improvement requirements in
(11) Systems primarily serving computer rooms where in
accordance with one of the following: (a) The total design cooling load of all computer rooms
in the building is less than 3 000 000 Btu/h (879 kW)
(a) The total design cooling load of all computer rooms
in the building is less than 3 000 000 Btu/h (879 kW) and the building in which they are located is not served by a centralized chilled water plant. (b) The room total design cooling load is less than 600
000 Btu/h (176 kW) and the building in which they
(b) The room total design cooling load is less than 600
000 Btu/h (176 kW) and the building in which they are located is served by a centralized chilled water plant. (c) The local water authority does not permit cooling
towers.
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
Where: Lmax = maximum permitted leakage, (ft 3 /min)/100 square feet [0.0001 (m 3 /s)/m 2 ] duct surface area. CL = Six, duct leakage class, (ft 3 /min)/100 square feet [0.0001 (m 3 /s)/m 2 ] duct surface area at 1 inch water column (0.2 kPa). P = test pressure, which shall be equal to the design duct pressure class rating, inch water column (kPa). E 503.5 Prescriptive Path, Economizers. Cooling systems shall include either an air economizer or fluid economizer in accordance with Section E 503.5.1 through Section E 503.5.4.1. Exceptions: Economizers shall not be required for the following systems: (1) Individual fan-cooling units with a supply capacity less
than the minimum listed in Table E 503.5(1).
Chilled-water cooling systems without a fan or that use
induced airflow, where the total capacity of these systems is less than 1 000 000 Btu/h (293 kW) in Climate
(d) Less than 600 000 Btu/h (176 kW) of computer
room cooling equipment capacity is being added to an existing building. (12)Dedicated systems for computer rooms where a mini mum of 75 percent of the design load serves one of the
(c) The local water authority does not permit cooling
towers. (d) Less than 600 000 Btu/h (176 kW) of computer
room cooling equipment capacity is being added to
(1) Individual fan-cooling units with a supply capacity less
than the minimum listed in Table E 503.5(1). (2) Chilled-water cooling systems without a fan or that use
induced airflow, where the total capacity of these sys
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE
ASHRAE
ASHRAE
ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE
ASHRAE
ASHRAE
ASHRAE
(12)Dedicated systems for computer rooms where a mini mum of 75 percent of the design load serves one of the following: (a) Spaces classified as an essential facility. (b) Spaces having a design of Tier IV in accordance
with TIA 942.
(b) Spaces having a design of Tier IV in accordance
with TIA 942. (c) Spaces classified as Critical Operations Power Sys tems (COPS) in accordance with NFPA 70.
tems (COPS) in accordance with NFPA 70.
2019 CALIFORNIA MECHANICAL CODE 379
APPENDIX E any other purpose or distributed to any other persons or parti es.
from space temperature (such as single-zone systems). [ASHRAE 90.1:6.5.1.1.2] E 503.5.1.2 High-Limit Shutoff. Air economizers shall be capable of and configured to automatically reduce outdoor air intake to the design minimum outdoor air quantity where outdoor air intake will no longer reduce cooling energy use. High-limit shutoff control types and associated setpoints for specific climate zones shall be chosen from Table E 503.5.1.2. [ASHRAE 90.1:6.5.1.1.3] E 503.5.1.3 Dampers. Return air, exhaust or relief, and outdoor air dampers shall comply with Section E 503.4.6.4.2. [ASHRAE 90.1:6.5.1.1.4] E 503.5.1.4 Relief of Excess Outdoor Air. Systems shall provide a means to relieve excess outdoor air during air economizer operation to prevent overpressurizing the building. The relief air outlet shall be located to avoid recirculation into the building.
[ASHRAE 90.1:6.5.1.1.5] E 503.5.1.5 Sensor Accuracy. Outdoor air, return air, mixed air, and supply air sensors shall be calibrated within the following accuracies: (1) Dry-bulb and wet-bulb temperatures shall be
accurate to ±2°F (1.1°C) over the range of 40°F
ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
(d) Spaces where core clearing and settlement services
are performed such that their failure to settle pending financial transactions is capable of systemic risk in accordance with “The Interagency Paper on Sound Practices to Strengthen the Resilience of the US Financial System” (April 7, 2003). [ASHRAE 90.1:6.5.1]
TABLE E 503.5(1) MINIMUM FAN-COOLING UNIT SIZE WHERE AN ECONOMIZER IS REQUIRED
[ASHRAE 90.1: TABLE 6.5.1-1]
| CLIMATE ZONES | * EFFICIENCY IMPROVEMENT |
|---|---|
E 503.5.1.1 Control Signal. Economizer controls shall be capable of and configured to sequence the dampers with the mechanical cooling equipment and shall not be controlled by only mixed air temperature. Exception: The use of mixed air temperature limit control shall be permitted for systems controlled
COOLING CAPACITY WHERE AN CLIMATE ZONES
0A, 0B, 1A, 1B No economizer requirement ECONOMIZER IS REQUIRED
2A, 2B, 3A, 4A, 5A, 6A, 3B,
≥54 000 Btu/h
3C, 4B, 4C, 5B, 5C, 6B, 7, 8
For SI units: 1000 British thermal units per hour = 0.293 kW
TABLE E 503.5(2) ELIMINATE REQUIRED ECONOMIZER FOR COMFORT
COOLING BY INCREASING COOLING EFFICIENCY
[ASHRAE 90.1: TABLE 6.5.1-2]
[ASHRAE 90.1: TABLE 6.5.1-2]
(1) Dry-bulb and wet-bulb temperatures shall be
accurate to ±2°F (1.1°C) over the range of 40°F (4.4°C) to 80°F (27°C). (2) Enthalpy and the value of a differential enthalpy
sensor shall be accurate to ±3 Btu/lb (7 E+03
(2) Enthalpy and the value of a differential enthalpy
sensor shall be accurate to ±3 Btu/lb (7 E+03 J/kg) over the range of 20 Btu/lb (4.6 E+04 J/kg) to 36 Btu/lb (8.4 E+04 J/kg). (3) Relative humidity shall be accurate to ±5 per cent over the range of 20 percent to 80 percent
required economizer, the minimum cooling efficiency of the HVAC unit shall be increased by the percentage shown. Where the HVAC unit is rated with a full load metric like EER cooling, these shall be increased by the percentage shown.
(3) Relative humidity shall be accurate to ±5 per cent over the range of 20 percent to 80 percent relative humidity. [ASHRAE 90.1:6.5.1.1.6] Fluid economizer systems shall be capable of providing E 503.5.2 Fluid Economizers, Design Capacity. up to 100 percent of the expected system cooling load at outdoor air temperatures of not more than 50°F (10°C) dry bulb or 45°F (7°C) wet bulb. Exceptions: (1) Systems primarily serving computer rooms in which
100 percent of the expected system cooling load at
E 503.5.1 Air Economizers, Design Capacity. Air economizer systems shall be capable of and configured to modulate outdoor air and return air dampers to provide up to 100 percent of the design supply air quantity as outdoor air for cooling. [ASHRAE 90.1:6.5.1.1.1]
(1) Systems primarily serving computer rooms in which
100 percent of the expected system cooling load at the dry bulb and wet bulb temperatures in accordance with Table E 503.5.2 is met with water-cooled fluid economizers. (2) Systems primarily serving computer rooms in which
100 percent of the expected system cooling load at
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE
(2) Systems primarily serving computer rooms in which
100 percent of the expected system cooling load at the dry bulb temperatures listed in Table E 503.5.2 is met with air-cooled fluid economizers. (3) Systems where dehumidification requirements are
not capable of being met using outdoor air temper
Systems where dehumidification requirements are
not capable of being met using outdoor air temperatures of 50°F (10°C) dry bulb or 45°F (7°C) wet bulb and where 100 percent of the expected system cooling load at 45°F (7°C) dry bulb or 40°F (4°C) wet bulb is met with water-cooled fluid economizers. [ASHRAE 90.1:6.5.1.2.1]
380 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
TABLE E 503.5.1.2 HIGH-LIMIT SHUTOFF CONTROL SETTINGS FOR AIR ECONOMIZERS 2
[ASHRAE 90.1: TABLE 6.5.1.1.3]
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
| CONTROLTYPE | ALLOWED ONLY IN CLIMATE ZONE AT LISTED SETPOINT |
REQUIRED HIGH LIMIT (ECONOMIZER OFF WHERE): | |
|---|---|---|---|
| CONTROLTYPE |
ALLOWED ONLY IN CLIMATE ZONE AT LISTED SETPOINT |
EQUATION |
DESCRIPTION |
4B, 4C, 5B, 5C, 6B, 7, 8 |
|||
perature |
5A, 5B, 5C, 6A, 6B, 7, 8 |
temperature |
|
dry-bulb temperature |
or Toa> 75°F |
air1 or outdoor air temperature exceeds 75°F |
|
fixed dry-bulb temperature |
Toa> 75°F |
or outdoor air temperature exceeds 75°F |
| CLIMATE ZONE | WATER COOLED | AIR COOLED | ||
|---|---|---|---|---|
| CLIMATE ZONE |
CLIMATE ZONE |
DRY BULB, °F |
WET BULB, °F |
DRY BULB, °F |
Drop.E 503.5.2.1 Maximum Hydronic Pressure Precooling coils and fluid-to-water heat exchangers used as part of a fluid economizer system shall either have a water-side pressure drop of less than 15 feet of water (45 kPa), or a secondary loop shall be created so that the coil or heat exchanger pressure drop is not seen by the circulating pumps where the system is in the normal cooling (non-economizer) mode. [ASHRAE 90.1:6.5.1.2.2]
ressure** Precooling coils and fluid-to-water heat exchangers used as part of a fluid economizer system shall either have a water-side pressure drop of less than 15 feet of water (45 kPa), or a secondary loop shall be created so that the coil or heat exchanger pressure drop is not seen by the circulating pumps where the system is in the normal cooling (non-economizer) mode. [ASHRAE 90.1:6.5.1.2.2]
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
1 At altitudes substantially different than sea level, the fixed enthalpy limit shall be set to the enthalpy value at 75°F (24°C) and 50 percent relative humidity. As an example, at approximately 6000 feet (1829 m) elevation, the fixed enthalpy limit shall be approximately 30.7 Btu/lb (71 408 J/kg). 2 Devices with selectable rather than adjustable setpoints shall be capable of being set to within 2°F (1°C) and 2 Btu/lb (4649 J/kg) of the setpoint listed.
TABLE E 503.5.2 WATER ECONOMIZER SIZING DRY-BULB AND WET-BULB REQUIREMENTS FOR COMPUTER ROOMS*
[ASHRAE 90.1: TABLE 6.5.1.2.1]
E 503.5.3 Integrated Economizer Control. Economizer systems shall be integrated with the mechanical cooling system and be capable of and configured to provide partial cooling even where additional mechanical cooling is required to be in accordance with the remainder of the cooling load. Controls shall not false load the mechanical cooling systems by limiting or disabling the economizer or by other means, such as hot gas bypass, except at the lowest stage of mechanical cooling.
2019 CALIFORNIA MECHANICAL CODE 381
APPENDIX E any other purpose or distributed to any other persons or parti es.
Units that include an air economizer shall comply with the following: (1) Unit controls shall have the mechanical cooling
capacity control interlocked with the air economizer
(3) Mixing or simultaneously supplying air that has
been previously mechanically heated and air that has been previously cooled, either by mechanical cooling or by economizer systems. (4) Other simultaneous operation of heating and cool ing systems to the same zone.
(1) Reheating. (2) Recooling. (3) Mixing or simultaneously supplying air that has
been previously mechanically heated and air that has
Other simultaneous operation of heating and cool ing systems to the same zone. Exceptions: (1) Zones for which the volume of air that is
reheated, recooled, or mixed is less than the
Zones for which the volume of air that is
reheated, recooled, or mixed is less than the larger of the following: (a) Twenty percent of the zone design peak
supply for systems with DDC and 30 per
ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE
ASHRAE
(1) Unit controls shall have the mechanical cooling
capacity control interlocked with the air economizer controls such that the outdoor air damper is at the 100 percent open position when mechanical cooling is on, and the outdoor air damper does not begin to close to prevent coil freezing due to minimum compressor run time until the leaving air temperature is less than 45°F (7°C). (2) DX units with a rated capacity no less than 65 000
Btu/h (18 kW) that control the capacity of the
(2) DX units with a rated capacity no less than 65 000
Btu/h (18 kW) that control the capacity of the mechanical cooling directly based on occupied space temperature shall have not less than two stages of mechanical cooling capacity. (3) Other DX units, including those that control space
temperature by modulating the airflow to the space,
| RATING CAPACITY, Btu/h |
MINIMUM NUMBER OF MECHANICAL COOLING STAGES |
MINIMUM * COMPRESSOR DISPLACEMENT |
|---|---|---|
HVAC system design and economizer controls shall be E 503.5.4 Economizer Heating System Impact. such that economizer operation does not increase the building heating energy use during normal operation. Exception: Economizers on variable air valve (VAV) systems that cause zone level heating to increase due to a reduction in supply air temperature. [ASHRAE 90.1:6.5.1.4] tem Impact.E 503.5.4.1 Economizer Humidification Sys- Systems with hydronic cooling and humidification systems designed to maintain inside humidity at a dew-point temperature more than 35°F (2°C) shall use a fluid economizer where an economizer is required in accordance with Section E 503.5 through Section E 503.5.4.1. [ASHRAE 90.1:6.5.1.5] Limitation, Zone Controls. E 503.5.5 Simultaneous Heating and Cooling Zone thermostatic controls shall prevent the following:
The airflow rate required in accor dance with applicable codes or accreditation standards, such as pressure relationships or minimum air change rates.
ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
(3) Other DX units, including those that control space
temperature by modulating the airflow to the space, shall comply with the requirements of Table E 503.5.3. [ASHRAE 90.1:6.5.1.3]
(a) Twenty percent of the zone design peak
supply for systems with DDC and 30 percent for other systems. (b) The outdoor airflow rate required to be in
accordance with the ventilation require
(b) The outdoor airflow rate required to be in
accordance with the ventilation requirements of Chapter 4 or ASHRAE 62.1 for the zone. (c) A higher rate that is capable of demon strating, to the satisfaction of the Author
TABLE E 503.5.3 DX COOLING STAGE REQUIREMENTS FOR
MODULATING AIRFLOW UNITS
[ASHRAE 90.1:6.5.1.3]
(c) A higher rate that is capable of demon strating, to the satisfaction of the Authority Having Jurisdiction, to reduce overall system annual energy usage by offsetting reheat or recool energy losses through a reduction in outdoor air intake for the system. (d) The airflow rate required to be in accor dance with applicable codes or accreditation
- For mechanical cooling stage control that does not use variable compressor displacement the percent displacement shall be equivalent to the mechanical cooling capacity reduction evaluated at the full load rating conditions for the compressor.
(d) The airflow rate required to be in accor dance with applicable codes or accreditation standards, such as pressure relationships or minimum air change rates. (2) Zones with DDC that comply with the following:
(a) The airflow rate in dead band between
heating and cooling does not exceed the
The airflow rate in dead band between
heating and cooling does not exceed the larger of the following: (1) Twenty percent of the zone design
peak supply rate.
(1) Twenty percent of the zone design
peak supply rate. (2) The outdoor airflow rate required to be
in accordance with the ventilation
(2) The outdoor airflow rate required to be
in accordance with the ventilation requirements of Chapter 4 or ASHRAE 62.1 for the zone. (3) A higher rate that is capable of demon strating, to the satisfaction of the
(3) A higher rate that is capable of demon strating, to the satisfaction of the Authority Having Jurisdiction, to reduce overall system annual energy usage by offsetting reheat or recool energy losses through a reduction in outdoor air intake. (4) The airflow rate required in accor dance with applicable codes or accred
382 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
(b) The airflow rate that is reheated, recooled,
or mixed shall be less than 50 percent of
(b) The airflow rate that is reheated, recooled,
or mixed shall be less than 50 percent of the zone design peak supply rate. (c) The first stage of heating consists of modu lating the zone supply air temperature set
(3) Reset controls are provided that allow heat ing and cooling supply temperatures at the
(c) The first stage of heating consists of modu lating the zone supply air temperature setpoint up to a maximum setpoint while the airflow is maintained at the dead band flow rate. (d) The second stage of heating consists of
modulating the airflow rate from the dead
(3) Reset controls are provided that allow heat ing and cooling supply temperatures at the changeover point to be not more than 30°F (17°C) apart. [ASHRAE 90.1:6.5.2.2.2] E 503.5.5.2.3 Hydronic (Water Loop)Heat Pump Systems. Hydronic heat pumps connected to a common heat pump water loop with central devices for heat rejection (e.g., cooling tower) and heat addition (e.g., boiler) shall have the following: (1) Controls that are capable of and configured
to provide a heat pump water supply tem
(d) The second stage of heating consists of
modulating the airflow rate from the dead band flow rate up to the heating maximum flow rate. (3) Laboratory exhaust systems in accordance with
Section E 503.5.11.3.
(3) Laboratory exhaust systems in accordance with
Section E 503.5.11.3. (4) Zones where not less than 75 percent of the
energy for reheating or for providing warm air
(4) Zones where not less than 75 percent of the
energy for reheating or for providing warm air in mixing systems is provided from a siterecovered (including condenser heat) or sitesolar energy source. [ASHRAE 90.1:6.5.2.1] Limit.E 503.5.5.1 Supply Air Temperature Reheat Where reheating is permitted in accordance with this appendix, zones that have both supply and return or exhaust air openings more than 6 feet (1829 mm) above the floor shall not supply heating air more than 20°F (11°C) above the space temperature setpoint. Exceptions: (1) Laboratory exhaust systems in accordance with
Section E 503.5.11.3.
(1) Controls that are capable of and configured
to provide a heat pump water supply temperature dead band of not less than 20°F (11°C) between initiation of heat rejection and heat addition by the central devices (e.g., tower and boiler). (2) For climate zone 3 through zone 8, where
a closed-circuit tower (fluid cooler) is used,
(1) Laboratory exhaust systems in accordance with
Section E 503.5.11.3. (2) During preoccupancy building warm-up and
setback. [ASHRAE 90.1:6.5.2.1.1]
(2) During preoccupancy building warm-up and
setback. [ASHRAE 90.1:6.5.2.1.1] E 503.5.5.2 Hydronic System Controls. The heating of fluids in hydronic systems that have been previously mechanically cooled and the cooling of fluids that have been previously mechanically heated shall be limited in accordance with Section E 503.5.5.2.1 through Section E 503.5.5.2.3.
[ASHRAE 90.1:6.5.2.2]
Hydronic systems that use a common return E 503.5.5.2.1 Three-Pipe System. system for both hot water and chilled water shall not be used. [ASHRAE 90.1:6.5.2.2.1] tem.E 503.5.5.2.2 Two-Pipe Changeover Sys- Systems that use a common distribution system to supply both heated and chilled water are acceptable where in accordance with the following: (1) The system is designed to allow a dead
band between changeover from one mode
(2) For climate zone 3 through zone 8, where
a closed-circuit tower (fluid cooler) is used, either an automatic valve shall be installed to bypass all but a minimal flow of water around the tower (for freeze protection) or low-leakage positive closure dampers shall be provided. Where an open-circuit tower is used directly in the heat pump loop, an automatic valve shall be installed to bypass heat pump water flow around the tower. Where an open-circuit tower is used in conjunction with a separate heat exchanger to isolate the tower from the heat pump loop, then heat loss shall be controlled by shutting down the circulation pump on the cooling tower loop. Exception: Where a system loop temperature optimization controller is used to determine the most efficient operating temperature based on real-time conditions of demand and capacity, dead bands of less than 20°F (11°C) shall be permitted.
[ASHRAE 90.1:6.5.2.2.3] E 503.5.5.3 Dehumidification. Where humidity controls are provided, such controls shall prevent reheating, mixing of hot and cold airstreams, or other means of simultaneous heating and cooling of the same airstream. Exceptions: (1) The system is capable of and configured to
reduce supply air volume to 50 percent or less
(1) The system is designed to allow a dead
band between changeover from one mode to the other of not less than 15°F (8°C) outdoor air temperature. (2) The system is designed to operate and is
provided with controls that will allow oper
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
The system is designed to operate and is
provided with controls that will allow operation in one mode for not less than 4 hours before changing over to the other mode.
(1) The system is capable of and configured to
reduce supply air volume to 50 percent or less of the design airflow rate or the minimum outdoor air ventilation rate in accordance with ASHRAE 62.1 or other applicable federal, state, or local code or recognized standard, whichever is larger before simultaneous heating and cooling takes place. (2) The individual fan cooling unit has a design
cooling capacity of not more than 65 000 Btu/h
The individual fan cooling unit has a design
cooling capacity of not more than 65 000 Btu/h (19 kW) and is capable of and configured to unload to 50 percent capacity before simultaneous heating and cooling takes place.
2019 CALIFORNIA MECHANICAL CODE 383
APPENDIX E any other purpose or distributed to any other persons or parti es.
(3) The individual mechanical cooling unit has a
design cooling capacity of not more than 40 000
(3) The individual mechanical cooling unit has a
design cooling capacity of not more than 40 000 Btu/h (11.7 kW). An individual mechanical cooling unit is a single system composed of a fan or fans and a cooling coil capable of providing mechanical cooling. (4) Systems serving spaces where specific humid ity levels are required to satisfy process needs,
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE
(4) Systems serving spaces where specific humid ity levels are required to satisfy process needs, such as vivariums, museums, surgical suites, pharmacies, and buildings with refrigerating systems, such as supermarkets, refrigerated warehouses, and ice arenas, and where the building includes site-recovered energy or site solar energy that provide energy equal to 75 percent or more of the annual energy for reheating or for providing warm air in mixing systems. This exception shall not apply to computer rooms. (5) Not less than 90 percent of the annual energy for
reheating or for providing warm air in mixing
(5) Not less than 90 percent of the annual energy for
reheating or for providing warm air in mixing systems is provided from site-recovered energy (including condenser heat) or site-solar energy. (6) Systems where the heat added to the airstream
is the result of the use of a desiccant system and
(6) Systems where the heat added to the airstream
is the result of the use of a desiccant system and 75 percent of the heat added by the desiccant system is removed by a heat exchanger, either before or after the desiccant system with energy recovery. [ASHRAE 90.1:6.5.2.3] E 503.5.5.4 Humidifier Preheat. Humidifiers with preheating jackets mounted in the airstream shall be provided with an automatic valve to shut off preheat where humidification is not required.
[ASHRAE 90.1:6.5.2.4.1]
E 503.5.5.5 Preheat Coils. Preheat coils shall have controls that stop their heat output where mechanical cooling, including economizer operation, is occurring. [ASHRAE 90.1:6.5.2.5] E 503.5.6 Air System Design and Control. HVAC air system design and control shall be in accordance with the provisions of Section E 503.5.6.1 through Section E 503.5.6.6. E 503.5.6.1 Fan System Power and Efficiency. Each HVAC system having a total fan system motor nameplate horsepower (kW) exceeding 5 hp (3.7 kW) at fan system design conditions shall not exceed the allowable fan system motor nameplate horsepower (kW) (Option 1) or fan system brake horsepower (kW) (Option 2) as shown in Table E 503.5.6.1(1). This shall include supply fans, return or relief fans, exhaust fans, and fan-powered terminal units associated with systems providing heating or cooling capability that operate at fan system design conditions. Single-zone VAV systems shall comply with the constant-volume fan power limitation. Exceptions: (1) Hospital, vivarium, and laboratory systems that
utilize flow control devices on exhaust, return,
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE
E 503.5.5.4.1 Insulation. Humidification system dispersion tube hot surfaces in the airstreams of ducts or air-handling units shall be insulated with a product with an insulating value of not less than R-0.5. Exception: Systems where mechanical cooling, including economizer operation, does not occur simultaneously with humidification. [ASHRAE 90.1:6.5.2.4.2]
(1) Hospital, vivarium, and laboratory systems that
utilize flow control devices on exhaust, return, or both to maintain space pressure relationships necessary for occupant health and safety, or environmental control shall be permitted to use variable-volume fan power limitation. (2) Individual exhaust fans with motor nameplate
horsepower of 1 hp (0.7 kW) or less. [ASHRAE
Individual exhaust fans with motor nameplate
horsepower of 1 hp (0.7 kW) or less. [ASHRAE 90.1:6.5.3.1.1] power.E 503.5.6.1.1 Motor Nameplate Horse- For each fan, the selected fan motor shall be not larger than the first available motor size more than the brake horsepower (bhp) (kW). The fan brake horsepower shall be indicated on the design documents to allow for compliance verification by the Authority Having Jurisdiction.
FAN POWER LIMITATIONTABLE E 503.5.6.1(1) *****
[ASHRAE 90.1: TABLE 6.5.3.1-1]
| LIMIT | CONSTANT VOLUME | VARIABLE VOLUME | |
|---|---|---|---|
- Where: CFMS = the maximum design supply airflow rate to conditioned spaces served by the system in cubic feet per minute (m 3 /s) hp = the maximum combined motor nameplate horsepower (kW)
bhp = the maximum combined fan brake horsepower (kW)
A = sum of ( PD x CFMD /4131) PD = each applicable pressure drop adjustment from Table E 503.5.6.1(2) in inch water column (kPa) CFMD = the design airflow through each applicable device from Table E 503.5.6.1(2) in cubic feet per minute (m 3 /s)
384 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
Exceptions: (1) For fans less than 6 bhp (4.5 kW), where
the first available motor larger than the bhp
(1) For fans less than 6 bhp (4.5 kW), where
the first available motor larger than the bhp (kW) has a nameplate rating within 50 percent of the bhp (kW), the next larger nameplate motor size shall be selected. (2) For fans 6 bhp (4.5 kW) and larger, where
the first available motor larger than the bhp
(2) Multiple fans in series or parallel (e.g., fan
arrays) that have a combined motor name
(2) Multiple fans in series or parallel (e.g., fan
arrays) that have a combined motor nameplate horsepower of 5 hp (3.7 kW) or less and are operated as the functional equivalent of a single fan. (3) Fans that are part of equipment listed under
Section E 503.4.
(3) Fans that are part of equipment listed under
Section E 503.4. (4) Fans included in equipment bearing a third
party-certified seal for air or energy per
ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE
(2) For fans 6 bhp (4.5 kW) and larger, where
the first available motor larger than the bhp (kW) has a nameplate rating within 30 percent of the bhp (kW), the next larger nameplate motor size shall be selected. (3) Systems that are in accordance with Sec tion E 503.5.6.1, Option 1.
(3) Systems that are in accordance with Sec tion E 503.5.6.1, Option 1. (4) Fans with motor nameplate horsepower
of less than 1 hp (0.7 kW). [ASHRAE
(7) Fans that are intended to only operate dur ing emergency conditions. [ASHRAE 90.1:6.5.3.1.3] E 503.5.6.2 Fan Airflow Control. Cooling systems listed in Table E 503.5.6.2 shall be designed to vary the indoor fan airflow as a function of load and shall be in accordance with the following: (1) DX and chilled-water cooling units that control
the capacity of the mechanical cooling directly
(4) Fans with motor nameplate horsepower
of less than 1 hp (0.7 kW). [ASHRAE 90.1:6.5.3.1.2] E 503.5.6.1.2 Fan Efficiency. Fans shall have a fan efficiency grade (FEG) of 67 or more, based on manufacturers' certified data in accordance with AMCA 205. The total efficiency of the fan at the design point of operation shall be within 15 percentage points of the maximum total efficiency of the fan. Exceptions: (1) Individual fans with a motor nameplate
horsepower of 5 hp (3.7 kW) or less that are
(4) Fans included in equipment bearing a third
party-certified seal for air or energy performance of the equipment package. (5) Powered wall/roof ventilators (PRV). (6) Fans outside the scope of AMCA 205. (7) Fans that are intended to only operate dur ing emergency conditions. [ASHRAE
(1) Individual fans with a motor nameplate
horsepower of 5 hp (3.7 kW) or less that are not part of a group operated as the functional equivalent of a single fan.
DX and chilled-water cooling units that control
the capacity of the mechanical cooling directly based on space temperature shall have a minimum of two stages of fan control. Low or minimum speed shall not exceed 66 percent of full speed. At low or minimum speed, the fan system shall draw not more than 40 percent of the fan
TABLE E 503.5.6.1(2) FAN POWER LIMITATION PRESSURE DROP ADJUSTMENT
[ASHRAE 90.1: TABLE 6.5.3.1-2]
| DEVICE | ADJUSTMENT |
|---|---|
| CREDITS |
|
dards to be fully ducted, or systems required to maintain air pressure differentials between adjacent rooms |
|
cally enhanced filters |
tem designcondition |
ground noise goals below NC35) |
|
DEDUCTIONS |
|
2019 CALIFORNIA MECHANICAL CODE 385
APPENDIX E any other purpose or distributed to any other persons or parti es.
power at full fan speed. Low or minimum speed shall be used during periods of low cooling load and ventilation-only operation. (2) Other units, including DX cooling units and
chilled water units that control the space tem
(2) Other units, including DX cooling units and
chilled water units that control the space temperature by modulating the airflow to the space, shall have modulating fan control. Minimum speed shall not exceed 50 percent of full speed. At minimum speed, the fan system shall draw not more than 30 percent of the power at full fan speed. Low or minimum speed shall be used during periods of low cooling load and ventilation-only operation. (3) Units that include an air-side economizer to
comply with Section E 503.5 through Section E
E 503.5.6.2.2 VAV Setpoint Reset. For multiple-zone VAV systems having a total fan system motor nameplate horsepower exceeding 5 hp (3.7 kW) with DDC of individual zones reporting to the central control panel, static pressure setpoint shall be reset based on the zone requiring the most pressure, such as the setpoint is reset lower until one zone damper is nearly wide open. Controls shall provide the following: (1) Monitor zone damper positions or other
indicator of need for static pressure.
(1) Monitor zone damper positions or other
indicator of need for static pressure. (2) Automatically detect those zones that are
capable of excessively driving the reset
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE
ASHRAE
(3) Units that include an air-side economizer to
comply with Section E 503.5 through Section E 503.5.4.1 shall have not less than of two speeds of fan control during economizer operation. Exceptions: (1) Modulating fan control shall not be required for
chilled-water and evaporative cooling units
(2) Automatically detect those zones that are
capable of excessively driving the reset logic and generate an alarm to the system operator. (3) Readily allow operator removal of zones
from the reset algorithm. [ASHRAE
(1) Modulating fan control shall not be required for
chilled-water and evaporative cooling units with less than1 hp (0.7 kW) fan motors where the units are not used to provide ventilation air and the indoor fan cycles with the load. (2) Where the volume of outdoor air required to
comply with the ventilation requirements of
Where the volume of outdoor air required to
comply with the ventilation requirements of Chapter 4 or ASHRAE 62.1 at low speed exceeds the air that would be delivered at the speed defined in Section E 503.5.6.2(1), or Section E 503.5.6.2(2), then the minimum speed shall be selected to provide the required ventilation air. [ASHRAE 90.1:6.5.3.2.1]
(3) Readily allow operator removal of zones
from the reset algorithm. [ASHRAE 90.1:6.5.3.2.3] E 503.5.6.3 Multiple-Zone VAV System Venti- lation Optimization Control. Multiple-zone VAV systems with DDC individual zone boxes reporting to a central control panel shall include a means to automatically reduce outdoor air intake flow below design rates in response to changes in system ventilation efficiency in accordance with ASHRAE 62.1. Exceptions: (1) VAV systems with zonal transfer fans that recir culate air from other zones without directly
ation Control.** Multiple-zone VAV systems with DDC individual zone boxes reporting to a central control panel shall include a means to automatically reduce outdoor air intake flow below design rates in response to changes in system ventilation efficiency in accordance with ASHRAE 62.1. Exceptions: (1) VAV systems with zonal transfer fans that recir culate air from other zones without directly
(1) VAV systems with zonal transfer fans that recir culate air from other zones without directly mixing it with outdoor air, dual-duct dual-fan VAV systems, and VAV systems with fan-powered terminal units. (2) Systems where total design exhaust airflow is
more than 70 percent of total design outdoor air
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
| COOLING SYSTEM TYPE | FAN MOTOR SIZE, (hp) |
MECHANICAL COOLING CAPACITY, (Btu/h) |
|---|---|---|
rative cooling |
~~≥ |
= 0.746 kW, 1 cubic foot per minute = 0.00047 m 3 /s
TABLE E 503.5.6.2 FAN AIRFLOW CONTROL
[ASHRAE 90.1: TABLE 6.5.3.2.1]
Location.E 503.5.6.2.1 VAV Static Pressure Sensor Static pressure sensors used to control VAV fans shall be located such that the controller setpoint is not more than 1.2 inches water column (0.30 kPa). Where this results in the sensor being located downstream of major duct splits, sensors shall be installed in each major branch to ensure that static pressure is maintained in each. Exception: Systems that are in accordance with Section E 503.5.6.2.2. [ASHRAE 90.1:6.5.3.2.2]
(2) Systems where total design exhaust airflow is
more than 70 percent of total design outdoor air intake flow requirements. [ASHRAE 90.1:6.5.3.3] E 503.5.6.4 Supply Air Temperature Reset Controls. Multiple zone HVAC systems shall include controls that automatically reset the supply air temperature in response to representative building loads, or to outdoor air temperature. The controls shall reset the supply air temperature to not less than 25 percent of the difference between the design supply air temperature and the design room air temperature. Controls that adjust the reset based on zone humidity shall be permitted. Zones that are expected to experience relatively constant loads, such as electronic equipment rooms, shall be designed for the fully reset supply temperature. Exceptions: (1) Climate zones 0A, 1A, 2A, and 3A. (2) Systems that prevent reheating, recooling, or
mixing of heated and cooled supply air.
(2) Systems that prevent reheating, recooling, or
mixing of heated and cooled supply air. (3) Systems where not less than 75 percent of the
energy for reheating, on an annual basis, is from
Systems where not less than 75 percent of the
energy for reheating, on an annual basis, is from site recovered or site solar energy sources.
[ASHRAE 90.1:6.5.3.5]
386 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
Motors.E 503.5.6.5 Fractional Horsepower Fan Motors for fans that are 1 ⁄12 hp (62.1 W) or more and less than 1 hp (0.7 kW) shall be electronically-commutated motors or shall have a motor efficiency of not less than 70 percent where rated in accordance with DOE 10 CFR 431. These motors shall also have the means to adjust motor speed for either balancing or remote control. Belt-driven fans shall be permitted to use sheave adjustments for airflow balancing in lieu of a varying motor speed.
(2) Motors installed in space conditioning equip ment certified in accordance with Section E
(2) Motors installed in space conditioning equip ment certified in accordance with Section E 503.4 through Section E 503.4.4.1. (3) Motors shown in Table E 503.5.6.5(1) or Table
E 503.5.6.5(2). [ASHRAE 90.1:6.5.3.6]
Exceptions:
(1) Motors in the airstream within fan coils and ter minal units that operate when providing heat
Motors in the airstream within fan coils and ter minal units that operate when providing heating to the space served.
(3) Motors shown in Table E 503.5.6.5(1) or Table
E 503.5.6.5(2). [ASHRAE 90.1:6.5.3.6] E 503.5.6.6 Ventilation Design. The required minimum outdoor air rate is the larger of the minimum outdoor air rate or the minimum exhaust air rate required by ASHRAE 62.1, ASHRAE 170, or applicable codes or accreditation standards. Outdoor air ventilation systems shall comply with one of the following: (1) Design minimum system outdoor air provided
shall not exceed 135 percent of the required
Design minimum system outdoor air provided
shall not exceed 135 percent of the required minimum outdoor air rate.
| TABLE E 503.5.6.5(1) MINIMUM AVERAGE FULL-LOAD EFFICIENCY FOR POLYPHASE SMALL ELECTRIC MOTORS* [ASHRAE 90.1: TABLE 10.8-3] | |||
|---|---|---|---|
| FULL-LOAD EFFICIENCY, % | FULL-LOAD EFFICIENCY, % | FULL-LOAD EFFICIENCY, % | FULL-LOAD EFFICIENCY, % |
| NUMBER OF POLES | OPEN MOTORS | OPEN MOTORS | OPEN MOTORS |
| NUMBER OF POLES | 2 | 4 | 6 |
| SYNCHRONOUS SPEED (RPM) | 3600 | 1800 | 1200 |
| MOTOR HORSEPOWER |
EFFICIENCY,% |
EFFICIENCY,% |
EFFICIENCY,% |
| TABLE E 503.5.6.5(2) MINIMUM AVERAGE FULL-LOAD EFFICIENCY FOR CAPACITOR-START CAPACITOR-RUN AND CAPACITOR-START INDUCTION-RUN SMALL ELECTRIC MOTORS* [ASHRAE 90.1: TABLE 10.8-4] | |||
|---|---|---|---|
| FULL-LOAD EFFICIENCY, % | FULL-LOAD EFFICIENCY, % | FULL-LOAD EFFICIENCY, % | FULL-LOAD EFFICIENCY, % |
| NUMBER OF POLES | OPEN MOTORS | OPEN MOTORS | OPEN MOTORS |
| NUMBER OF POLES | 2 | 4 | 6 |
| SYNCHRONOUS SPEED (RPM) | 3600 | 1800 | 1200 |
| MOTOR HORSEPOWER |
EFFICIENCY,% |
EFFICIENCY,% |
EFFICIENCY,% |
2019 CALIFORNIA MECHANICAL CODE 387
APPENDIX E any other purpose or distributed to any other persons or parti es.
(2) Dampers, ductwork, and controls shall be pro vided that allow the system to supply no more
(2) Dampers, ductwork, and controls shall be pro vided that allow the system to supply no more than the required minimum outdoor air rate with a single setpoint adjustment. (3) The system includes exhaust air energy recov ery complying with Section E 503.5.10.
Exceptions: (1) Differential pressure set-point reset is not
required where valve position is used to comply
(1) Differential pressure set-point reset is not
required where valve position is used to comply with Section E 503.5.7.3. (2) Variable-pump flow control is not required on
heating-water pumps where more than 50 per
(2) Variable-pump flow control is not required on
heating-water pumps where more than 50 percent of annual heat is generated by an electric boiler. (3) Variable flow is not required for primary pumps
in a primary/secondary system.
(3) The system includes exhaust air energy recov ery complying with Section E 503.5.10.
[ASHRAE 90.1:6.5.3.7] Boiler systems with design input of 1 000 000 Btu/h (293 E 503.5.7 Hydronic System Design and Control. kW) or more shall comply with the turndown ratio in accordance with Table E 503.5.7.
The system turndown requirement shall use multiple single-input boilers, one or more modulating boilers, or a combination of single-input and modulating boilers.
(3) Variable flow is not required for primary pumps
in a primary/secondary system. (4) Variable flow is not required for a coil pump
provided for freeze protection.
Boilers shall comply with the minimum efficiency requirements in Table E 503.7.1(6). [ASHRAE 90.1:6.5.4.1]
(4) Variable flow is not required for a coil pump
provided for freeze protection. (5) Variable flow is not required for heat recovery
coil runaround loops. [ASHRAE 90.1:6.5.4.2]
TABLE E 503.5.7.1 PUMP FLOW CONTROL REQUIREMENTS
[ASHRAE 90.1: TABLE 6.5.4.2]
Variable flow is not required for heat recovery
coil runaround loops. [ASHRAE 90.1:6.5.4.2]
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
TABLE E 503.5.7 BOILER TURNDOWN
[ASHRAE 90.1: TABLE 6.5.4.1]
BOILER SYSTEM DESIGN INPUT, Btu/h MINIMUM TURNDOWN RATIO
BOILER SYSTEM DESIGN INPUT, Btu/h ≥1 000 000 and ≤5 000 000 MINIMUM TURNDOWN RATIO 3 to 1
>5 000 000 and ≤10 000 000 4 to 1
>10 000 000 5 to 1
For SI units: 1000 British thermal units per hour = 0.293 kW
| CHILLED WATER PUMPS IN THESE CLIMATE ZONES |
HEATING WATER PUMPS IN THESE CLIMATE ZONES |
MOTOR NAMEPLATE HORSEPOWER |
|---|---|---|
E 503.5.7.2 Chiller and Boiler Isolation. Where a chilled-water plant includes more than one chiller, provisions shall be made so that the fluid flow through the chiller is automatically shut off where the chiller is shut down. Chillers piped in series for the purpose of increased temperature differential, shall be considered as one chiller. Where constant-speed chilled-water or condenser water pumps are used to serve multiple chillers, the number of pumps shall be not less than the number of chillers and staged on and off with the chillers. [ASHRAE 90.1:6.5.4.3.1]
s automatically shut off where the chiller is shut down. Chillers piped in series for the purpose of increased temperature differential, shall be considered as one chiller. Where constant-speed chilled-water or condenser water pumps are used to serve multiple chillers, the number of pumps shall be not less than the number of chillers and staged on and off with the chillers. [ASHRAE 90.1:6.5.4.3.1]
E 503.5.7.2.1 Boiler Isolation. Where a boiler plant includes more than one boiler, provisions shall be made so that the flow through the boiler is automatically shut off where the boiler is shut down. Where constant-speed hotwater pumps are used to serve multiple boilers, the number of pumps shall be not less than the number of boilers and staged on and off with the boilers. [ASHRAE 90.1:6.5.4.3.2] ture Reset Controls.E 503.5.7.3 Chilled- and Hot-Water Tempera- Chilled- and hotwater systems with a design capacity exceeding 300 000 Btu/h (88 kW) supplying chilled or heated water (or both)
ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE
Chilled- and hot-water distribution systems that E 503.5.7.1 Hydronic Variable Flow Systems. include three or more control valves designed to modulate or step open and close as a function of load shall be designed for variable fluid flow and shall be capable of and configured to reduce pump flow rates to not more than the larger of 25 percent of the design flow rate or the minimum flow required by the heating/cooling equipment manufacturer for the proper operation of equipment. Individual or parallel pumps serving variable-flow heating-water or chilled-water systems, where the nameplate horsepower of the motor or combined parallel motors is not less than the power shown in Table E 503.5.7.1, shall have controls or devices that will result in pump motor demand of not more than 30 percent of design wattage at 50 percent of design water flow. The controls or devices shall be controlled as a function of desired flow or to maintain a minimum required differential pressure. Differential pressure shall be measured at or near the most remote heat exchanger or the heat exchanger requiring the greatest differential pressure. The differential pressure setpoint shall not exceed 110 percent of that required to achieve design flow through the heat exchanger. Where differential pressure control is used to comply with this section, and DDC systems are used, the setpoint shall be reset downward based on valve positions until one valve is nearly wide open.
388 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
to comfort conditioning systems shall include controls that automatically reset supply water temperatures by representative building loads (including return water temperature) or by outdoor air temperature. Where DDC is used to control valves, the set point shall be reset based on valve positions until one valve is nearly wide open or setpoint limits of the system equipment or application have been reached. Exceptions: (1) Where chilled-water supply is already cold,
such as chilled water supplied from a district
(1) Where chilled-water supply is already cold,
such as chilled water supplied from a district cooling or thermal energy storage system, such that blending would be required to achieve the reset chilled-water supply temperature. (2) Where a specific temperature is required for a
process.
the values listed in Table E 503.5.7.5 for the appropriate total annual hours of operation. Pipe size selections for systems that operate under variable flow conditions, such as modulating two-way control valves at coils, and that contain variable-speed pump motors shall be permitted to be made from the “Variable Flow/Variable Speed” columns. All others shall be made from the “Other” columns. Exceptions: (1) Design flow rates exceeding the values in Table
E 503.5.7.5 shall be permitted in specific sec
(2) Where a specific temperature is required for a
process. (3) Water temperature reset is not required where
valve position is used to comply with Section E
(3) Water temperature reset is not required where
valve position is used to comply with Section E 503.5.7. [ASHRAE 90.1:6.5.4.4] E 503.5.7.4 Hydronic (Water Loop) Heat tioners.Pump and Water-Cooled Unitary Air Condi- Hydronic heat pumps and water-cooled unitary air-conditioners shall have a two-position automatic valve interlocked to shut off water flow when the compressor is off. Exception: Units employing water economizers.
[ASHRAE 90.1:6.5.4.5.1]
(1) Design flow rates exceeding the values in Table
E 503.5.7.5 shall be permitted in specific sections of pipe where the pipe is not in the critical circuit at design conditions and is not predicted to be in the critical circuit during 30 percent or more of operating hours. (2) Piping systems that have not more than the total
pressure drop than the same system constructed
E 503.5.7.4.1 Controls. Hydronic heat pumps and water-cooled unitary air-conditioners having a total pump system power exceeding 5 hp (3.7 kW) shall have controls, devices, or both (such as variable speed control) that will result in pump motor demand of not more than 30 percent of design wattage at 50 percent of design water flow. [ASHRAE 90.1:6.5.4.5.2] E 503.5.7.5 Pipe Sizing. Chilled-water and condenser-water piping shall be designed such that the design flow rate in a pipe segment does not exceed
(2) Piping systems that have not more than the total
pressure drop than the same system constructed with standard weight steel pipe with piping and fittings sized in accordance with Table E 503.5.7.5. [ASHRAE 90.1:6.5.4.6] E 503.5.8 Heat Rejection Equipment. Section E 503.5.8 through Section E 503.5.9 apply to heat rejection equipment used in comfort cooling systems such as air-cooled condensers, dry coolers, open-circuit cooling towers, closed-circuit cooling towers, and evaporative condensers. Exception: Heat rejection devices whose energy usage is included in the equipment efficiency ratings listed in Table E 503.7.1(1) through Table E 503.7.1(4).
[ASHRAE 90.1:6.5.5.1]
E 503.5.8.1 Fan Speed Control. The fan system on a heat-rejection device powered by an individual motor or an array of motors with a connected power, including the motor service factor, totaling 5 hp (3.7 kW) or more shall have controls and/or devices (such as variable-speed control) that shall result in fan motor demand of no more than 30 percent of design wattage at 50 percent of the design airflow
TABLE E 503.5.7.5 PIPING SYSTEM DESIGN MAXIMUM FLOW RATE (gallons per minute)
[ASHRAE 90.1: TABLE 6.5.4.6]
| OPERATING HOURS/YEAR | ≤2000 HOURS/YEAR | >2000 AND ≤ 4400 HOURS/YEAR | >4400 HOURS/YEAR | |||
|---|---|---|---|---|---|---|
| NOMINAL PIPE SIZE, (inches) |
OTHER |
VARIABLE FLOW/ VARIABLE SPEED |
OTHER |
VARIABLE FLOW/ VARIABLE SPEED |
OTHER |
VARIABLE FLOW/ VARIABLE SPEED |
14-24 inches in size |
2019 CALIFORNIA MECHANICAL CODE 389
APPENDIX E any other purpose or distributed to any other persons or parti es.
and that shall automatically change the fan speed to control the leaving fluid temperature or condensing temperature or pressure of the heat rejection device. Exceptions: (1) Condenser fans serving multiple refrigerant
circuits or fluid cooling circuits.
(1) Condenser fans serving multiple refrigerant
circuits or fluid cooling circuits. (2) Condenser fans serving flooded condensers.
[ASHRAE 90.1:6.5.5.2.1] E 503.5.8.2 Variable-Speed Fan Drives. Multicell heat rejection equipment with variable-speed fan drives shall: (1) Operate the maximum number of fans allowed
that comply with the manufacturer’s require
Energy recovery systems required by this section shall result in an enthalpy recovery ratio of not less than 50 percent. A fifty percent enthalpy recovery ratio shall mean a change in the enthalpy of the outdoor air supply equal to 50 percent of the difference between the outdoor air and entering exhaust air enthalpies at design conditions. Provision shall be provided to bypass or control the energy recovery system to permit air economizer operation in accordance with Section E 503.5.1. Exceptions: (1) Laboratory systems that are in accordance with Sec tion E 503.5.11.3.
(2) Systems serving spaces that are not cooled and that
are heated to less than 60°F (16°C). (3) Where more than 60 percent of the outdoor air heat ing energy is provided from site-recovered energy
(1) Operate the maximum number of fans allowed
that comply with the manufacturer’s requirements for all system components. (2) Control all fans to the same fan speed required
for the instantaneous cooling duty, as opposed
(1) Laboratory systems that are in accordance with Sec tion E 503.5.11.3. (2) Systems serving spaces that are not cooled and that
are heated to less than 60°F (16°C).
(3) Where more than 60 percent of the outdoor air heat ing energy is provided from site-recovered energy or site-solar energy. (4) Heating energy recovery in Climate Zones 0, 1, and
(2) Control all fans to the same fan speed required
for the instantaneous cooling duty, as opposed to staged (on/off) operation. Minimum fan speed shall comply with the minimum allowable speed of the fan drive system per the manufacturer’s recommendations. [ASHRAE 90.1:6.5.5.2.2] cuit Cooling Towers.E 503.5.9 Limitation on Centrifugal Fan Open-Cir- Centrifugal fan open-circuit cooling towers with a combined rated capacity of 1100 gallons per minute (gpm) (69.39 L/s) or greater at 95°F (35°C) condenser water return, 85°F (29°C) condenser water supply, and 75°F (24°C) outdoor air wet-bulb temperature shall comply with the energy efficiency requirement for axial fan open-circuit cooling towers in accordance with Table E 503.7.1(7). Exception: Centrifugal open-circuit cooling towers that are ducted (inlet or discharge) or require external sound attenuation. [ASHRAE 90.1:6.5.5.3]
(4) Heating energy recovery in Climate Zones 0, 1, and
(5) Cooling energy recovery in climate zones 3C, 4C,
5B, 5C, 6B, 7, and 8.
(5) Cooling energy recovery in climate zones 3C, 4C,
5B, 5C, 6B, 7, and 8. (6) Where the sum of the airflow rates exhausted and
relieved within 20 feet (6096 mm) of each other is
Where the sum of the airflow rates exhausted and
relieved within 20 feet (6096 mm) of each other is less than 75 percent of the design outdoor airflow rate, excluding exhaust air that is; (a) used for another energy recovery system, (b) not allowed by ASHRAE 170 for use in energy
recovery systems with leakage potential, or
(b) not allowed by ASHRAE 170 for use in energy
recovery systems with leakage potential, or (c) of Class 4 as defined in ASHRAE 62.1. (7) Systems requiring dehumidification that employ
energy recovery in series with the cooling coil.
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE
E 503.5.9.1 Tower Flow Turndown. Open-circuit cooling towers used on water-cooled chiller systems that are configured with multiple- or variable-speed condenser water pumps shall be designed so that all open-circuit cooling tower cells can be run in parallel with the larger of the following: (1) The flow that is produced by the smallest pump
at its minimum expected flow rate.
(7) Systems requiring dehumidification that employ
energy recovery in series with the cooling coil. (8) Systems expected to operate less than 20 hours per
week at the outdoor air percentage in accordance
Systems expected to operate less than 20 hours per
week at the outdoor air percentage in accordance with Table E 503.5.10(1). [ASHRAE 90.1:6.5.6.1] E 503.5.10.1 Heat Recovery for Service WaterHeating. Heat recovery shall comply with Section E 503.5.10.1.1 and Section E 503.5.10.1.2.
(1) The flow that is produced by the smallest pump
at its minimum expected flow rate. (2) Fifty percent of the design flow for the cell.
[ASHRAE 90.1:6.5.5.4]
E 503.5.10.1.1 Condenser Heat RecoverySystems. Condenser heat recovery systems shall be installed for the heating or preheating of service hot water where the following conditions exist: (1) The facility operates 24 hours a day. (2) The total installed heat rejection capacity of
the water-cooled system is more than 6 000
(3) The design service water heating load is
more than 1 000 000 Btu/h (293 kW).
[ASHRAE 90.1:6.5.6.2.1] E 503.5.10.1.2 Capacity. The required heat recovery system shall have the capacity to provide the smaller of:
ASHRAE ASHRAE
ASHRAE ASHRAE
(2) Fifty percent of the design flow for the cell.
[ASHRAE 90.1:6.5.5.4] E 503.5.10 Exhaust Air Energy Recovery. Each fan system shall have an energy recovery system where the design supply fan airflow rate exceeds the value listed in Table E 503.5.10(1) and Table E 503.5.10(2), based on the climate zone and percentage of outdoor air at design airflow conditions. Table E 503.5.10(1) shall be used for all ventilation systems that operate less than 8000 hours per year and Table E 503.5.10(2) shall be used for all ventilation systems that operate 8000 or more hours per year.
(2) The total installed heat rejection capacity of
the water-cooled system is more than 6 000 000 Btu/h (1757 kW) of heat rejection. (3) The design service water heating load is
more than 1 000 000 Btu/h (293 kW).
390 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
| TABLE E 503.5.10(1) EXHAUST AIR ENERGY RECOVERY REQUIREMENTS FOR VENTILATION SYSTEMS OPERATING LESS THAN 8000 HOURS PER YEAR* [ASHRAE 90.1: TABLE 6.5.6.1-1] | ||||||||
|---|---|---|---|---|---|---|---|---|
| CLIMATE ZONE |
PERCENT OUTDOOR AIR AT FULL DESIGN AIRFLOW RATE | PERCENT OUTDOOR AIR AT FULL DESIGN AIRFLOW RATE | PERCENT OUTDOOR AIR AT FULL DESIGN AIRFLOW RATE | PERCENT OUTDOOR AIR AT FULL DESIGN AIRFLOW RATE | PERCENT OUTDOOR AIR AT FULL DESIGN AIRFLOW RATE | PERCENT OUTDOOR AIR AT FULL DESIGN AIRFLOW RATE | PERCENT OUTDOOR AIR AT FULL DESIGN AIRFLOW RATE | PERCENT OUTDOOR AIR AT FULL DESIGN AIRFLOW RATE |
| CLIMATE ZONE |
≥10% and <20% |
≥20% and <30% |
≥30% and <40% |
≥40% and <50% |
≥50% and <60% |
≥60% and <70% |
≥70% and <80% |
≥80% |
| CLIMATE ZONE |
DESIGN SUPPLY FAN AIRFLOW RATE (cubic feet per minute) |
DESIGN SUPPLY FAN AIRFLOW RATE (cubic feet per minute) |
DESIGN SUPPLY FAN AIRFLOW RATE (cubic feet per minute) |
DESIGN SUPPLY FAN AIRFLOW RATE (cubic feet per minute) |
DESIGN SUPPLY FAN AIRFLOW RATE (cubic feet per minute) |
DESIGN SUPPLY FAN AIRFLOW RATE (cubic feet per minute) |
DESIGN SUPPLY FAN AIRFLOW RATE (cubic feet per minute) |
DESIGN SUPPLY FAN AIRFLOW RATE (cubic feet per minute) |
4C, 5B |
||||||||
3A, 4A, 5A, 6A |
||||||||
| TABLE E 503.5.10(2) EXHAUST AIR ENERGY RECOVERY REQUIREMENTS FOR VENTILATION SYSTEMS OPERATING NOT LESS THAN 8000 HOURS PER YEAR* [ASHRAE 90.1: TABLE 6.5.6.1-2] | ||||||||
|---|---|---|---|---|---|---|---|---|
| CLIMATE ZONE |
PERCENT OUTDOOR AIR AT FULL DESIGN AIRFLOW RATE | PERCENT OUTDOOR AIR AT FULL DESIGN AIRFLOW RATE | PERCENT OUTDOOR AIR AT FULL DESIGN AIRFLOW RATE | PERCENT OUTDOOR AIR AT FULL DESIGN AIRFLOW RATE | PERCENT OUTDOOR AIR AT FULL DESIGN AIRFLOW RATE | PERCENT OUTDOOR AIR AT FULL DESIGN AIRFLOW RATE | PERCENT OUTDOOR AIR AT FULL DESIGN AIRFLOW RATE | PERCENT OUTDOOR AIR AT FULL DESIGN AIRFLOW RATE |
| CLIMATE ZONE |
≥10% and <20% |
≥20% and <30% |
≥30% and <40% |
≥40% and <50% |
≥50% and <60% |
≥60% and <70% |
≥70% and <80% |
≥80% |
| CLIMATE ZONE |
DESIGN SUPPLY FAN AIRFLOW RATE (cubic feet per minute) |
DESIGN SUPPLY FAN AIRFLOW RATE (cubic feet per minute) |
DESIGN SUPPLY FAN AIRFLOW RATE (cubic feet per minute) |
DESIGN SUPPLY FAN AIRFLOW RATE (cubic feet per minute) |
DESIGN SUPPLY FAN AIRFLOW RATE (cubic feet per minute) |
DESIGN SUPPLY FAN AIRFLOW RATE (cubic feet per minute) |
DESIGN SUPPLY FAN AIRFLOW RATE (cubic feet per minute) |
DESIGN SUPPLY FAN AIRFLOW RATE (cubic feet per minute) |
3B, 4C, 5C |
||||||||
3A, 4B, 5B |
||||||||
6B, 7, 8 |
NR = Not Required
NR = Not Required
(1) Sixty percent of the peak heat rejection
load at design conditions.
(1) Sixty percent of the peak heat rejection
load at design conditions. (2) Preheat of the peak service hot water draw
to 85°F (29°C).
(2) Preheat of the peak service hot water draw
to 85°F (29°C). Exceptions: (1) Facilities that employ condenser heat
recovery for space heating with a heat
(1) Facilities that employ condenser heat
recovery for space heating with a heat recovery design of more than 30 percent of the peak water-cooled condenser load at design conditions. (2) Facilities that provide 60 percent of their
service water heating from site-solar, site
(2) The hood exhaust flow minus the available
transfer air from adjacent spaces. Available transfer air is that portion of outdoor ventilation air not required to satisfy other exhaust needs, such as restrooms, and not required to maintain pressurization of adjacent spaces.
[ASHRAE 90.1:6.5.7.1.2] E 503.5.11.2 Exhaust Flow Rate. Where a kitchen or dining facility has a total kitchen hood exhaust airflow rate exceeding 5000 ft 3 /min (2.3597 m 3 /s), each hood shall have an exhaust rate in accordance with Table E 503.5.11.2. Where a single hood, or hood section, is installed over appliances with different duty ratings, the maximum allowable flow rate for the hood or hood section shall not exceed the values in Table E 503.5.11.2 for the highest
E 503.5.11.1.1 Conditioned Supply Air. Conditioned supply air delivered to a space with a kitchen hood shall not exceed the greater of the following: (1) The supply flow required to be in accor dance with the space heating or cooling
(1) The supply flow required to be in accor dance with the space heating or cooling load. (2) The hood exhaust flow minus the available
transfer air from adjacent spaces. Available
(2) Facilities that provide 60 percent of their
service water heating from site-solar, siterecovered energy, or from other sources.
[ASHRAE 90.1:6.5.6.2.2] E 503.5.11 Exhaust Systems. Exhaust systems shall comply with Section E 503.5.11.1 through Section E 503.5.11.3. Replacement air introduced directly into the hood E 503.5.11.1 Kitchen Exhaust Systems. cavity of kitchen exhaust hoods shall not exceed 10 percent of the hood exhaust airflow rate. [ASHRAE 90.1:6.5.7.2.1]
2019 CALIFORNIA MECHANICAL CODE 391
APPENDIX E any other purpose or distributed to any other persons or parti es.
TABLE E 503.5.11.2 MAXIMUM NET EXHAUST FLOW RATE, CFM PER LINEAR FOOT OF HOOD LENGTH
[ASHRAE 90.1: TABLE 6.5.7.2.2]
| TYPE OF HOOD | LIGHT DUTY EQUIPMENT |
MEDIUM DUTY EQUIPMENT |
HEAVY DUTY EQUIPMENT |
EXTRA HEAVY DUTY EQUIPMENT |
|---|---|---|---|---|
appliance duty rating under the hood or hood sec- tion. Refer to ASHRAE 154 for definitions of hood type, appliance duty, and net exhaust flow rate. Exception: Seventy-five percent or more of the total replacement air is transfer air that would otherwise be exhausted. [ASHRAE 90.1:6.5.7.2.2]
E 503.5.11.3 Laboratory Exhaust Systems. Buildings with laboratory exhaust systems having a total exhaust rate of more than 5000 ft 3 /min (2.3597 m 3 /s) shall include not less than one of the following features: (1) VAV laboratory exhaust and room supply sys tems capable of and configured to reduce exhaust and makeup airflow rates, incorporate a heat recovery system to precondition makeup air from laboratory exhaust, or both and shall be in accordance with the following:
ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE
Where a kitchen or dining facility has a total E 503.5.11.2.1 Kitchen or Dining Facility. kitchen hood exhaust airflow rate more than 5000 ft 3 /min (2.3597 m 3 /s), then one of the following shall be provided: (1) Fifty percent or more of all replacement air
is transfer air that would otherwise be
(1) Fifty percent or more of all replacement air
is transfer air that would otherwise be exhausted. (2) Demand ventilation systems on 75 percent
or more of the exhaust air. Such systems
(3) Listed energy recovery devices that result in
a sensible energy recovery ratio of 40 percent or more on 50 percent or more of the total exhaust airflow. A 40 percent sensible energy recovery ratio shall mean a change in the dry-bulb temperature of the outdoor air supply equal to 40 percent of the difference between the outdoor air and entering exhaust air dry-bulb temperatures at design conditions. [ASHRAE 90.1:6.5.7.2.3] E 503.5.11.2.2 Performance Testing. An approved field test method shall be used to evaluate design air flow rates and demonstrate proper capture and containment performance of installed commercial kitchen exhaust systems. Where demand ventilation systems are utilized to be in accordance with Section E 503.5.11.2.1, additional performance testing shall be provided to demonstrate proper capture and containment at minimum airflow. [ASHRAE 90.1:6.5.7.2.4]
(2) Demand ventilation systems on 75 percent
or more of the exhaust air. Such systems shall be capable of and configured to provide 50 percent or more reduction in exhaust and replacement air system airflow rates, including controls necessary to modulate airflow in response to appliance operation and to maintain full capture and containment of smoke, effluent, and combustion products during cooking and idle. (3) Listed energy recovery devices that result in
a sensible energy recovery ratio of 40 per
A + B •( E/M ) ≥ 50% (Equation E 503.5.11.3)
Where: A = Percentage that the exhaust and makeup air flow rates are capable of being reduced from
(2) VAV laboratory exhaust and room supply sys tems that are required to have minimum circulation rates to be in accordance with the codes or accreditation standards shall be capable of and configured to reduce zone exhaust and makeup airflow rates to the regulated minimum circulation values, or the minimum required to maintain pressurization relationship requirements. Systems serving nonregulated zones shall be capable of and configured to reduce exhaust and makeup airflow rates to 50 percent of the zone design values, or the minimum required to maintain pressurization relationship requirements. (3) Direct makeup (auxiliary) air supply of 75 per cent or more of the exhaust airflow rate, heated
A = Percentage that the exhaust and makeup air flow rates are capable of being reduced from design conditions. B = Sensible energy recovery ratio. E = Exhaust airflow rate through the heat recovery
device at design conditions.
E = Exhaust airflow rate through the heat recovery
device at design conditions. M = Makeup airflow rate of the system at design
conditions.
M = Makeup airflow rate of the system at design
conditions. (2) VAV laboratory exhaust and room supply sys tems that are required to have minimum circula
Direct makeup (auxiliary) air supply of 75 per cent or more of the exhaust airflow rate, heated not more than 2°F (1°C) below room setpoint, cooled to not less than 3°F (2°C) above room setpoint, no humidification added, and no simultaneous heating and cooling are used for dehumidification control. [ASHRAE 90.1:6.5.7.3]
ASHRAE
ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE
392 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
E 503.5.12 Radiant Heating Systems. Radiant heating shall be used when heating is required for unenclosed spaces. Exception: Loading docks equipped with air curtains.
[ASHRAE 90.1:6.5.8.1]
E 503.6 Submittals. The Authority Having Jurisdiction shall require submittal of compliance documentation and supplemental information in accordance with Section E 503.6.1 through Section E 503.6.3.
E 503.5.12.1 Heating Enclosed Spaces. Radiant heating systems that are used as primary or supplemental enclosed space heating shall be in accordance with this appendix, including, but not limited to, the following: (1) Radiant hydronic ceiling or floor panels (used
for heating or cooling).
(1) Radiant hydronic ceiling or floor panels (used
for heating or cooling). (2) Combination or hybrid systems incorporating
radiant heating (or cooling) panels.
(2) Combination or hybrid systems incorporating
radiant heating (or cooling) panels. (3) Radiant heating (or cooling) panels used in con junction with other systems such as VAV or ther
E 503.6.1 Construction Details. Compliance documents shall show the pertinent data and features of the building, equipment, and systems in sufficient detail to permit a determination of compliance by the building official and to indicate compliance with the requirements of this appendix. [ASHRAE 90.1:4.2.2.1] E 503.6.2 Supplemental Information. Supplemental information necessary to verify compliance with this appendix, such as calculations, worksheets, compliance forms, vendor literature, or other data, shall be made available where required by the Authority Having Jurisdiction. [ASHRAE 90.1:4.2.2.2] E 503.6.3 Manuals. Operating and maintenance information shall be provided to the building owner. This information shall include, but not be limited to, the information specified in Section E 503.6.3.1, Section E 503.6.3.2, and Section E 503.6.5.2. [ASHRAE 90.1:4.2.2.3]
(3) Radiant heating (or cooling) panels used in con junction with other systems such as VAV or thermal storage systems. [ASHRAE 90.1:6.5.8.2] E 503.5.13 Hot Gas Bypass Limitation. Cooling systems shall not use hot gas bypass or other evaporator pressure control systems unless the system is designed with multiple steps of unloading or continuous capacity modulation. The capacity of the hot gas bypass shall be limited as indicated in Table E 503.5.13 for VAV units and single-zone VAV units. Hot-gas bypass shall not be used on constant-volume units. [ASHRAE 90.1:6.5.9]
E 503.6.3.1 Required Information. Construction documents shall require that an operating manual and maintenance manual be provided to the building owner. The manuals shall include, at a minimum, the following: (1) Submittal data stating equipment rating and
selected options for each piece of equipment
TABLE E 503.5.13 HOT GAS BYPASS LIMITATION
[ASHRAE 90.1: TABLE 6.5.9]
(1) Submittal data stating equipment rating and
selected options for each piece of equipment requiring maintenance. (2) Operation manuals and maintenance manuals
for each piece of equipment requiring mainte
(2) Operation manuals and maintenance manuals
for each piece of equipment requiring maintenance. Required routine maintenance actions shall be clearly identified. (3) Names and addresses of not less than one qual ified service agency.
| RATED CAPACITY | MAXIMUM HOT GAS BYPASS (percent of total capacity) |
|---|---|
E 503.5.14 Door Switches. Conditioned spaces with doors, including doors with more than one-half glass, opening to the outdoors shall be provided with controls that when any such door is open, the following shall occur: (1) Disable mechanical heating or reset the heating set point to 55°F (13°C) or lower within five minutes
(3) Names and addresses of not less than one qual ified service agency. (4) A complete narrative of how each system is
intended to operate.
(1) Disable mechanical heating or reset the heating set point to 55°F (13°C) or lower within five minutes of the door opening. (2) Disable mechanical cooling or reset the cooling set point to 90°F (32°C) or more within five minutes of
(2) Disable mechanical cooling or reset the cooling set point to 90°F (32°C) or more within five minutes of the door opening. Mechanical cooling shall be permitted to remain enabled where outdoor air temperature is less than the space temperature. Exceptions: (1) Building entries with automatic closing devices. (2) Any space without a thermostat. (3) Alterations to existing buildings. (4) Loading docks. [ASHRAE 90.1:6.5.10]
(4) A complete narrative of how each system is
intended to operate. The Authority Having Jurisdiction shall only check to ensure that the construction documents required are provided to the owner, and shall not expect copies of any of the materials. [ASHRAE 90.1:8.7.2] E 503.6.3.2 Lighting Manuals. Construction documents shall require for all lighting equipment and lighting controls that an operating and maintenance manual be provided to the building owner or the designated representative of the building owner within 90 days after the date of system acceptance. These manuals shall include, at a minimum, the following: (1) Submittal data indicating all selected options
for each piece of lighting equipment, including
Submittal data indicating all selected options
for each piece of lighting equipment, including but not limited to lamps, ballasts, drivers, and lighting controls.
2019 CALIFORNIA MECHANICAL CODE 393
APPENDIX E any other purpose or distributed to any other persons or parti es.
(2) Operation and maintenance manuals for each
piece of lighting equipment and lighting controls
(2) Operation and maintenance manuals for each
piece of lighting equipment and lighting controls with routine maintenance clearly identified including, as a minimum, a recommended relamping or cleaning program and a schedule for inspecting and recalibrating all lighting controls. (3) A complete narrative of how each lighting con trol system is intended to operate including rec
(5) A complete narrative of how each system is
intended to operate, including suggested set
(5) A complete narrative of how each system is
intended to operate, including suggested setpoints. [ASHRAE 90.1:6.7.2.2] E 503.6.5.3 System Balancing. Construction documents shall require that HVAC systems be balanced in accordance with generally accepted engineering standards. Construction documents shall require that a written balance report be provided to the building owner or the designated representative of the building owner for HVAC systems serving zones with a total conditioned area exceeding 5000 square feet (464.52 m 2 ). [ASHRAE 90.1:6.7.2.3.1]
s shall require that HVAC systems be balanced in accordance with generally accepted engineering standards. Construction documents shall require that a written balance report be provided to the building owner or the designated representative of the building owner for HVAC systems serving zones with a total conditioned area exceeding 5000 square feet (464.52 m 2 ). [ASHRAE 90.1:6.7.2.3.1]
(3) A complete narrative of how each lighting con trol system is intended to operate including recommended settings. [ASHRAE 90.1:9.7.2.2] Materials and equipment shall be labeled in a manner E 503.6.4 Labeling of Material and Equipment. that will allow for determination of their compliance with the applicable provisions of this appendix. [ASHRAE 90.1:4.2.3] E 503.6.5 Completion Requirements. Section E 503.6.5.1 through Section E 503.6.5.4.1 are mandatory provisions and are necessary to comply with this appendix. [ASHRAE 90.1:6.7.2]
E 503.6.5.1 Drawings. Construction documents shall require that, within 90 days after the date of system acceptance, record drawings of the actual installation be provided to the building owner or the designated representative of the building owner. Record drawings shall include, as a minimum, the location and performance data on each piece of equipment, general configuration of duct and pipe distribution system including sizes, and the terminal air or water design flow rates. [ASHRAE 90.1:6.7.2.1] E 503.6.5.2 Manuals. Construction documents shall require that an operating manual and a maintenance manual be provided to the building owner or the designated representative of the building owner within 90 days after the date of system acceptance. These manuals shall be in accordance with industryaccepted standards and shall include, at a minimum, the following: (1) Submittal data stating equipment size and
selected options for each piece of equipment
E 503.6.5.3.1 Air System Balancing. Air systems shall be balanced in a manner to first minimize throttling losses. Then, for fans with fan system power greater than 1 hp (0.7 kW), fan speed shall be adjusted to meet design flow conditions. [ASHRAE 90.1:6.7.2.3.2] ing.E 503.6.5.3.2 Hydronic System Balanc- Hydronic systems shall be proportionately balanced in a manner to first minimize throttling losses; then the pump impeller shall be trimmed or pump speed shall be adjusted to meet design flow conditions. Exceptions: Impellers need not be trimmed nor pump speed adjusted. (1) For pumps with pump motors of 10 hp (7.5
kW) or less.
(1) For pumps with pump motors of 10 hp (7.5
kW) or less. (2) Where throttling results is not greater than
5 percent of the nameplate horsepower
(1) Submittal data stating equipment size and
selected options for each piece of equipment requiring maintenance. (2) Operation manuals and maintenance manuals
for each piece of equipment and system requir
(2) Operation manuals and maintenance manuals
for each piece of equipment and system requiring maintenance, except equipment not furnished as part of the project. Required routine maintenance actions shall be clearly identified. (3) Names and addresses of not less than one serv ice agency.
(2) Where throttling results is not greater than
5 percent of the nameplate horsepower draw, or 3 hp (2.2 kW), whichever is greater, above that required where the impeller was trimmed. [ASHRAE 90.1:6.7.2.3.3] E 503.6.5.4 System Commissioning. HVAC control systems shall be tested to ensure that control elements are calibrated, adjusted, and in proper working condition. For projects larger than 50 000 square feet (4645.15 m 2 ) conditioned area, except warehouses and semiheated spaces, detailed instructions for commissioning HVAC systems shall be provided by the designer in plans and specifications.
[ASHRAE 90.1:6.7.2.4]
(3) Names and addresses of not less than one serv ice agency. (4) HVAC controls system maintenance and cali bration information, including wiring diagrams,
HVAC controls system maintenance and cali bration information, including wiring diagrams, schematics, and control sequence descriptions. Desired or field-determined setpoints shall be permanently recorded on control drawings at control devices or, for digital control systems, in programming comments.
mission.E 503.6.5.4.1 Minimum Level of Com- Commissioning shall be performed for HVAC systems in accordance with Level 1, Basic Commissioning of the SMACNA HVAC Systems Commissioning Manual. (See Section E 801.0 for additional information on HVAC system commissioning) E 503.7 Minimum Equipment Efficiency Tables. The minimum efficiency requirements for equipment shall comply with Section E 503.7.1; duct insulation shall comply with Section E 503.7.2, and pipe insulation shall comply with Section E 503.7.3.
394 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
E 503.7.1 Minimum Efficiency Requirement Listed Equipment – Standard Rating and OperatingConditions. The minimum efficiency requirements for equipment shall comply with Table E 503.7.1(1) through Table E 503.7.1(16). E 503.7.2 Duct Insulation Tables. Duct insulation shall comply with Table E 503.7.2. E 503.7.3 Pipe Insulation Tables. Pipe insulation shall comply with Table E 503.7.3(1) through Table E 503.7.3(2). E 503.8 Alternative Compliance Path. HVAC systems serving heating, cooling, or ventilation needs of a computer room shall be in accordance with Section E 503.1, Section E 503.4, Section E 503.8.1 or Section E 503.8.2, Section E 503.8.3, Section E 502.7 through Section E 502.7.2, and Section E 503.7. [ASHRAE 90.1:6.6.1]
E 503.8.1 Computer Room (PUE1). The computer room PUE1 shall be not more than the values listed in Table E 503.8.1. Hourly simulation of the proposed design, for purposes of calculating PUE1, shall be in accordance with ASHRAE 90.1. Exception: The compliance path shall not be permitted for a proposed computer room design utilizing a combined heat and power system. [ASHRAE 90.1:6.6.1.1]
TABLE E 503.8.1 POWER USAGE EFFECTIVENESS (PUE) MAXIMUM
E 503.8.2 Computer Room (PUE0). The computer room PUE0 shall be not more than the values listed in Table E 503.8.1. The PUE0 shall be the highest value determined at outdoor cooling design temperatures, and shall be limited to systems utilizing electricity for an energy source. The PUE0 shall be calculated for the following conditions: (1) One hundred percent design IT equipment energy. (2) Fifty percent design IT equipment energy.
[ASHRAE 90.1:6.6.1.2]
(2) Fifty percent design IT equipment energy.
[ASHRAE 90.1:6.6.1.2] E 503.8.3 Documentation. Documentation on the following components shall be provided, including a breakdown of energy consumption or demand: (1) IT equipment (2) Power distribution losses external to the IT equip ment
(2)
ment (3) HVAC systems (4) Lighting [ASHRAE 90.1:6.6.1.3]
E 504.0 Solar Energy Systems.E 504.1 General. Solar energy systems shall be installed in accordance with the Uniform Solar Energy and Hydronics Code (USEHC).
[ASHRAE 90.1: TABLE 6.6.1]
| CLIMATE ZONE | * PUE |
|---|---|
2019 CALIFORNIA MECHANICAL CODE 395
APPENDIX E any other purpose or distributed to any other persons or parti es.
TABLE E 503.7.1(1) ELECTRICALLY OPERATED UNITARY AIR CONDITIONERS AND CONDENSING UNITS
MINIMUM EFFICIENCY REQUIREMENTS
[ASHRAE 90.1: TABLE 6.8.1-1]
| EQUIPMENT TYPE | SIZE CATEGORY | HEATING SECTION TYPE | SUBCATEGORY OR RATING CONDITION |
MINIMUM EFFICIENCY | TEST PROCEDURE1 |
|---|---|---|---|---|---|
cooled |
<65 000 Btu/h2 |
All |
AHRI 210/240 |
||
cooled |
<65 000 Btu/h2 |
All |
|||
cooled |
≤30 000 Btu/h2 |
All |
AHRI 210/240 |
||
cooled |
≤30 000 Btu/h2 |
All |
|||
velocity, air cooled |
<65 000 Btu/h2 | All |
Split system, three phase | 11.0 SEER |
AHRI 210/240 |
cooled |
≥65 000 Btu/h and <135 000 Btu/h |
(or none) |
Split system and single package |
12.9 IEER |
AHRI 340/360 |
cooled |
≥65 000 Btu/h and <135 000 Btu/h |
All other |
All other |
12.7 IEER |
12.7 IEER |
cooled |
≥135 000 Btu/h and <240 000 Btu/h |
(or none) |
(or none) |
12.4 IEER |
12.4 IEER |
cooled |
≥135 000 Btu/h and <240 000 Btu/h |
All other |
All other |
12.2 IEER |
12.2 IEER |
cooled |
≥240 000 Btu/h and <760 000 Btu/h |
(or none) |
(or none) |
11.6 IEER |
11.6 IEER |
cooled |
≥240 000 Btu/h and <760 000 Btu/h |
All other |
All other |
11.4 IEER |
11.4 IEER |
cooled |
≥760 000 Btu/h |
(or none) |
(or none) |
11.2 IEER |
11.2 IEER |
cooled |
≥760 000 Btu/h |
All other |
All other |
11.0 IEER |
11.0 IEER |
water cooled |
<65 000 Btu/h | All |
Split system and single package |
12.3 IEER |
AHRI 210/240 |
water cooled |
≥65 000 Btu/h and <135 000 Btu/h |
(or none) |
(or none) |
13.9 IEER |
AHRI 340/360 |
water cooled |
≥65 000 Btu/h and <135 000 Btu/h |
All other |
All other |
13.7 IEER |
13.7 IEER |
water cooled |
≥135 000 Btu/h and <240 000 Btu/h |
(or none) |
(or none) |
13.9 IEER |
13.9 IEER |
water cooled |
≥135 000 Btu/h and <240 000 Btu/h |
All other |
All other |
13.7 IEER |
13.7 IEER |
water cooled |
≥240 000 Btu/h and <760 000 Btu/h |
(or none) |
(or none) |
13.6 IEER |
13.6 IEER |
water cooled |
≥240 000 Btu/h and <760 000 Btu/h |
All other |
All other |
13.4 IEER |
13.4 IEER |
water cooled |
≥760 000 Btu/h | (or none) |
(or none) |
13.5 IEER |
13.5 IEER |
water cooled |
≥760 000 Btu/h | All other | All other | 13.3 IEER |
13.3 IEER |
396 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
TABLE E 503.7.1(1) (continued) ELECTRICALLY OPERATED UNITARY AIR CONDITIONERS AND CONDENSING UNITS
MINIMUM EFFICIENCY REQUIREMENTS
[ASHRAE 90.1: TABLE 6.8.1-1]
| EQUIPMENT TYPE | SIZE CATEGORY | HEATING SECTION TYPE | SUBCATEGORY OR RATING CONDITION |
MINIMUM EFFICIENCY | TEST PROCEDURE1 |
|---|---|---|---|---|---|
evaporatively cooled |
<65 000 Btu/h2 | All |
Split system and single package |
12.3 IEER |
AHRI 210/240 |
evaporatively cooled |
≥65 000 Btu/h and <135 000 Btu/h |
(or none) |
(or none) |
12.3 IEER |
AHRI 340/360 |
evaporatively cooled |
≥65 000 Btu/h and <135 000 Btu/h |
All other |
All other |
12.1 IEER |
12.1 IEER |
evaporatively cooled |
≥135 000 Btu/h and <240 000 Btu/h |
(or none) |
(or none) |
12.2 IERR |
12.2 IERR |
evaporatively cooled |
≥135 000 Btu/h and <240 000 Btu/h |
All other |
All other |
12.0 IEER |
12.0 IEER |
evaporatively cooled |
≥240 000 Btu/h and <760 000 Btu/h |
(or none) |
(or none) |
12.1 IEER |
12.1 IEER |
evaporatively cooled |
≥240 000 Btu/h and <760 000 Btu/h |
All other |
All other |
11.9 IEER |
11.9 IEER |
evaporatively cooled |
≥760 000 Btu/h |
(or none) |
(or none) |
11.9 IEER |
11.9 IEER |
evaporatively cooled |
≥760 000 Btu/h |
All other |
All other |
11.7 IEER |
11.7 IEER |
cooled |
≥135 000 Btu/h |
– |
– |
11.8 IEER |
AHRI 365 |
water cooled |
≥135 000 Btu/h |
– |
– |
14.0 IEER |
AHRI 365 |
evaporatively cooled |
≥135 000 Btu/h |
– |
– | 14.0 IEER |
AHRI 365 |
1
1 ASHRAE 90.1 contains a complete specification of the referenced test procedure, including the referenced year version of the test procedure. 2 Single-phase, air-cooled air conditioners less than 65 000 Btu/h (19 kW) are regulated by the U.S. Department of Energy Code of Federal Regulations 10 CFR 430. SEER values for single-phase products are set by the U.S. Department of Energy.
2019 CALIFORNIA MECHANICAL CODE 397
APPENDIX E any other purpose or distributed to any other persons or parti es.
TABLE E 503.7.1(2) ELECTRICALLY OPERATED UNITARY AND APPLIED HEAT PUMPS
MINIMUM EFFICIENCY REQUIREMENTS
[ASHRAE 90.1: TABLE 6.8.1-2]
| EQUIPMENT TYPE | SIZE CATEGORY | HEATING SECTION TYPE | SUBCATEGORY OR RATING CONDITION |
MINIMUM EFFICIENCY | TEST PROCEDURE1 |
|---|---|---|---|---|---|
mode) |
<65 000 Btu/h2 | All | AHRI 210/240 | ||
mode) |
<65 000 Btu/h2 | All | |||
cooled (cooling mode) |
≤30 000 Btu/h2 |
All |
Split system, three phase |
12.0 SEER |
AHRI 210/240 |
cooled (cooling mode) |
≤30 000 Btu/h2 |
All |
Single package, three phase |
12.0 SEER |
12.0 SEER |
velocity, air cooled |
<65 000 Btu/h2 | All |
Split System, three phase | 11.0 SEER |
AHRI 210/240 |
mode) |
≥65 000 Btu/h and <135 000 Btu/h |
none) |
Split system and single package |
12.2 IEER |
AHRI 340/360 |
mode) |
≥65 000 Btu/h and <135 000 Btu/h |
12.0 IEER |
12.0 IEER |
||
mode) |
≥135 000 Btu/h and <240 000 Btu/h |
none) |
none) |
11.6 IEER |
11.6 IEER |
mode) |
≥135 000 Btu/h and <240 000 Btu/h |
11.4 IEER |
11.4 IEER |
||
mode) |
≥240 000 Btu/h |
none) |
none) |
10.6 IEER |
10.6 IEER |
mode) |
≥240 000 Btu/h |
10.4 IEER |
10.4 IEER |
||
loop (cooling mode) |
All |
86°F entering water |
ISO 13256-1 |
||
loop (cooling mode) |
<65 000 Btu/h |
<65 000 Btu/h |
<65 000 Btu/h |
||
loop (cooling mode) |
<135 000 Btu/h |
<135 000 Btu/h |
<135 000 Btu/h |
||
water (cooling mode) |
|||||
loop (cooling mode) |
|||||
loop (cooling mode) |
|||||
groundwater (cooling mode) |
<135 000 Btu/h |
All |
59°F entering water |
16.3 EER |
ISO 13256-2 |
ground loop (cooling mode) |
<135 000 Btu/h | All | 77°F entering water |
12.1 EER |
ISO 13256-2 |
mode) |
<65 000 Btu/h2 (cooling capacity) |
– | AHRI 210/240 | ||
mode) |
<65 000 Btu/h2 (cooling capacity) |
– | |||
cooled (heating mode) |
≤30 000 Btu/h2 (cooling capacity) |
– |
AHRI 210/240 |
||
cooled (heating mode) |
≤30 000 Btu/h2 (cooling capacity) |
– |
|||
velocity, air cooled (heating mode) |
<65 000 Btu/h2 | – | Split system, three phase | 6.8 HSPF | AHRI 210/240 |
398 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
TABLE E 503.7.1(2) (continued) ELECTRICALLY OPERATED UNITARY AND APPLIED HEAT PUMPS
MINIMUM EFFICIENCY REQUIREMENTS
[ASHRAE 90.1: TABLE 6.8.1-2]
| EQUIPMENT TYPE | SIZE CATEGORY | HEATING SECTION TYPE | SUBCATEGORY OR RATING CONDITION |
MINIMUM EFFICIENCY | TEST PROCEDURE1 |
|---|---|---|---|---|---|
mode) |
<135 000 Btu/h (cooling capacity) |
– |
AHRI 340/360 |
||
mode) |
<135 000 Btu/h (cooling capacity) |
– |
|||
mode) |
≥135 000 Btu/hc (cooling capacity) |
≥135 000 Btu/hc (cooling capacity) |
|||
mode) |
≥135 000 Btu/hc (cooling capacity) |
≥135 000 Btu/hc (cooling capacity) |
|||
loop (heating mode) |
(cooling capacity) |
||||
water (heating mode) |
(cooling capacity) |
||||
loop (heating mode) |
(cooling capacity) |
||||
loop (heating mode) |
(cooling capacity) |
||||
groundwater (heating mode) |
(cooling capacity) |
– |
50°F entering water |
3.1 COPH |
ISO 13256-2 |
ground loop (heating mode) |
(cooling capacity) |
– |
32°F entering fluid |
2.5 COPH | ISO 13256-2 |
1
1 ASHRAE 90.1 contains a complete specification of the referenced test procedure, including the referenced year version of the test procedure. 2 Single-phase, air-cooled heat pumps less than 65 000 Btu/h (19 kW) are regulated by the U.S. Department of Energy Code of Federal Regulations 10 CFR 430. SEER and HSPF values for single-phase products are set by the U.S. Department of Energy.
2019 CALIFORNIA MECHANICAL CODE 399
APPENDIX E any other purpose or distributed to any other persons or parti es.
TABLE E 503.7.1(3) WATER-CHILLING PACKAGES – MINIMUM EFFICIENCY REQUIREMENTS 1, 2, 5
[ASHRAE 90.1: TABLE 6.8.1-3]
| EQUIPMENT TYPE | SIZE CATEGORY | UNITS | PATH A | PATH B | TEST PROCEDURE3 |
|---|---|---|---|---|---|
| <150 tons |
EER (Btu/Wh) |
AHRI 550/590 | |||
| <150 tons |
EER (Btu/Wh) |
||||
| ≥150 tons | ≥150 tons | ||||
| ≥150 tons | ≥150 tons | ||||
electrically operated |
All capacities |
EER (Btu/Wh) |
rated with matching condensers and comply with air-cooled chiller efficiency requirements |
rated with matching condensers and comply with air-cooled chiller efficiency requirements |
AHRI 550/590 |
ated positive displacement |
<75 tons |
kW/ton | AHRI 550/590 | ||
ated positive displacement |
<75 tons |
kW/ton | |||
ated positive displacement |
<150 tons |
<150 tons |
|||
ated positive displacement |
<150 tons |
<150 tons |
|||
ated positive displacement |
<300 tons |
<300 tons |
|||
ated positive displacement |
<300 tons |
<300 tons |
|||
ated positive displacement |
<600 tons |
<600 tons |
|||
ated positive displacement |
<600 tons |
<600 tons |
|||
ated positive displacement |
≥600 tons |
≥600 tons |
|||
ated positive displacement |
≥600 tons |
≥600 tons |
|||
ated centrifugal |
<150 tons |
kW/ton |
AHRI 550/590 |
||
ated centrifugal |
<150 tons |
kW/ton |
|||
ated centrifugal |
<300 tons |
<300 tons |
|||
ated centrifugal |
<300 tons |
<300 tons |
|||
ated centrifugal |
<400 tons |
<400 tons |
|||
ated centrifugal |
<400 tons |
<400 tons |
|||
ated centrifugal |
<600 tons |
<600 tons |
|||
ated centrifugal |
<600 tons |
<600 tons |
|||
ated centrifugal |
≥600 tons |
≥600 tons |
|||
ated centrifugal |
≥600 tons |
≥600 tons |
|||
effect |
NA4 |
||||
effect |
All capacities |
COP (W/W) |
≥0.700_ FL_ |
NA4 |
AHRI 560 |
rect fired |
All capacities |
COP (W/W) |
NA4 |
AHRI 560 |
|
rect fired |
All capacities |
COP (W/W) |
| EQUIPMENT TYPE | SIZE CATEGORY | UNITS | PATH A | PATH B | TEST PROCEDURE3 |
|---|---|---|---|---|---|
fired |
All capacities |
COP (W/W) |
NA4 | AHRI 560 | |
fired |
All capacities |
COP (W/W) |
1
1 The requirements for centrifugal chillers shall be adjusted for nonstandard rating conditions per Section E 503.4.1 and are only applicable for the range of conditions listed there. The requirements for air-cooled, water-cooled positive displacement and absorption chillers are at standard rating conditions defined in the reference test procedure. 2 Both the full-load and IPLV.IP requirements must be met or exceeded to comply with this appendix. When there is a Path B, compliance can be with either Path A or Path B for any application. 3 ASHRAE 90.1 contains a complete specification of the referenced test procedure, including the referenced year version of the test procedure. 4 NA means the requirements are not applicable for Path B, and only Path A can be used for compliance. 5 FL is the full-load performance requirements, and IPLV.IP is for the part-load performance requirements.
400 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
TABLE E 503.7.1(4) ELECTRICALLY OPERATED PACKAGED TERMINAL AIR CONDITIONERS, PACKAGED TERMINAL HEAT PUMPS, SINGLE-PACKAGE VERTICAL AIR CONDITIONERS, SINGLE-PACKAGE VERTICAL HEAT PUMPS, ROOM AIR CONDITIONERS,
AND ROOM AIR CONDITIONER HEAT PUMPS – MINIMUM EFFICIENCY REQUIREMENTS
[ASHRAE 90.1: TABLE 6.8.1-4]
| EQUIPMENT TYPE | SIZE CATEGORY (INPUT) | SUBCATEGORY OR RATING CONDITION |
MINIMUM EFFICIENCY | TEST PROCEDURE1 |
|---|---|---|---|---|
| PTAC (cooling mode) standard size |
All capacities |
95°F db outdoor air |
(before 1/1/2015) |
AHRI 310/ 380 |
| PTAC (cooling mode) standard size |
All capacities |
95°F db outdoor air |
(as of 1/1/2015) |
(as of 1/1/2015) |
nonstandard size1 |
||||
standard size |
14.0 – (0.300 × Cap/1000) 3 |
|||
nonstandard size2 |
All capacities |
95°F db outdoor air |
10.8 – (0.213 × Cap/1000) 3 EER |
AHRI 310/ 380 |
standard size |
All capacities |
– |
3.7 – (0.052 × Cap/1000) 3 COPH |
AHRI 310/ 380 |
nonstandard size2 |
||||
SPVAC (cooling mode) |
95°F db/75°F wb outdoor air | AHRI 390 | ||
SPVAC (cooling mode) |
<135 000 Btu/h |
<135 000 Btu/h |
||
SPVAC (cooling mode) |
<240 000 Btu/h |
<240 000 Btu/h |
||
| SPVHP (cooling mode) | 95°F db/75°F wb outdoor air | AHRI 390 | ||
| SPVHP (cooling mode) | <135 000 Btu/h |
<135 000 Btu/h |
||
| SPVHP (cooling mode) | <240 000 Btu/h |
<240 000 Btu/h |
||
| SPVHP (heating mode) | 47°F db/43°F wb outdoor air | AHRI 390 | ||
| SPVHP (heating mode) | <135 000 Btu/h |
<135 000 Btu/h |
||
| SPVHP (heating mode) | <240 000 Btu/h |
<240 000 Btu/h |
||
| Room air conditioners with louvered sides |
– | AHAM RAC-1 | ||
| Room air conditioners with louvered sides |
<8000 Btu/h |
<8000 Btu/h |
||
| Room air conditioners with louvered sides |
<14 000 Btu/h |
<14 000 Btu/h |
||
| Room air conditioners with louvered sides |
<20 000 Btu/h |
<20 000 Btu/h |
||
| Room air conditioners with louvered sides |
||||
nonweatherized space constrained |
95°F db/75°F wb outdoor air | AHRI 390 | ||
nonweatherized space constrained |
≤36 000 Btu/h |
≤36 000 Btu/h |
||
nonweatherized space constrained |
95°F db/75°F wb outdoor air | AHRI 390 | ||
nonweatherized space constrained |
≤36 000 Btu/h |
≤36 000 Btu/h |
||
nonweatherized space constrained |
47°F db/43°F wb outdoor air | AHRI 390 | ||
nonweatherized space constrained |
≤36 000 Btu/h |
≤36 000 Btu/h |
2019 CALIFORNIA MECHANICAL CODE 401
APPENDIX E any other purpose or distributed to any other persons or parti es.
TABLE E 503.7.1(4) (continued) ELECTRICALLY OPERATED PACKAGED TERMINAL AIR CONDITIONERS, PACKAGED TERMINAL HEAT PUMPS, SINGLE-PACKAGE VERTICAL AIR CONDITIONERS, SINGLE-PACKAGE VERTICAL HEAT PUMPS, ROOM AIR CONDITIONERS,
AND ROOM AIR CONDITIONER HEAT PUMPS – MINIMUM EFFICIENCY REQUIREMENTS
[ASHRAE 90.1: TABLE 6.8.1-4]
| EQUIPMENT TYPE | SIZE CATEGORY (INPUT) | SUBCATEGORY OR RATING CONDITION |
MINIMUM EFFICIENCY | TEST PROCEDURE1 |
|---|---|---|---|---|
| Room air conditioners without louvered sides |
AHAM RAC-1 |
|||
| Room air conditioners without louvered sides |
<20 000 Btu/h |
|||
| Room air conditioners without louvered sides |
||||
heat pumps with lou- vered sides |
– |
AHAM RAC-1 |
||
heat pumps with lou- vered sides |
||||
heat pumps without louvered sides |
– |
AHAM RAC-1 |
||
heat pumps without louvered sides |
||||
casement only |
||||
casement slider |
1
1 ASHRAE 90.1 contains a complete specification of the referenced test procedure, including the referenced year version of the test procedure. 2 Nonstandard size units must be factory labeled as follows: “MANUFACTURED FOR NONSTANDARD SIZE APPLICATIONS ONLY; NOT TO BE INSTALLED IN NEW STANDARD PROJECTS.” Nonstandard size efficiencies apply only to units being installed in existing sleeves having an external wall opening of less than 16 inch (406 mm) high or less than 42 inch (1067 mm) wide and having a cross-sectional area less than 670 square inches (0.432 m 2 ). 3 “Cap” means the rated cooling capacity of the product in Btu/h (kW). If the unit’s capacity is less than 7000 Btu/h (2.05 kW), use 7000 Btu/h (2.05 kW) in the calculation. Where the unit’s capacity is more than 15 000 Btu/h (4.4 kW), use 15 000 Btu/h (4.4 kW) in the calculation.
TABLE E 503.7.1(5) WARM-AIR FURNACES AND COMBINATION WARM-AIR FURNACES/AIR-CONDITIONING UNITS,
WARM-AIR DUCT FURNACES, AND UNIT HEATERS – MINIMUM EFFICIENCY REQUIREMENTS
[ASHRAE 90.1: TABLE 6.8.1-5]
| EQUIPMENT TYPE | SIZE CATEGORY (INPUT) |
SUBCATEGORY OR RATING CONDITION |
MINIMUM EFFICIENCY |
TEST PROCEDURE1 |
|---|---|---|---|---|
| <225 000 Btu/h |
Maximum capacity3 | 80%Et 2, 4 |
Efficiency, CSA Z21.47 |
|
| <225 000 Btu/h |
Maximum capacity3 |
80%Et 2, 4 |
tion, UL 727 |
|
1 ASHRAE 90.1 contains a complete specification of the referenced test procedure, including the referenced year version of the test procedure. 2 Combination units not covered by the U.S. Department of Energy Code of Federal Regulations 10 CFR 430 [three-phase power or cooling capacity greater than or equal to 65 000 Btu/h (19 kW)] may comply with either rating. 3 Compliance of multiple firing rate units shall be at the maximum firing rate. 4 Et = thermal efficiency. Units must also include an interrupted or intermittent ignition device (IID), have jacket losses not exceeding 0.75 percent of the input rating, and have either power venting or a flue damper. A vent damper is an acceptable alternative to a flue damper for those furnaces where combustion air is drawn from the conditioned space. 5 Ec = combustion efficiency (100 percent less flue losses). See test procedure for detailed discussion. 6 As of August 8, 2008, according to the Energy Policy Act of 2005, units must also include an interrupted or intermittent ignition device (IID) and have either power venting or an automatic flue damper.
402 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
TABLE E 503.7.1(6) GAS- AND OIL-FIRED BOILERS – MINIMUM EFFICIENCY REQUIREMENTS 2, 3
[ASHRAE 90.1: TABLE 6.8.1-6]
| EQUIPMENT TYPE1 | SUBCATEGORY OR RATING CONDITION |
SIZE CATEGORY (INPUT) |
MINIMUM EFFICIENCY | EFFICIENCY AS OF 3/2/2020 |
TEST PROCEDURE |
|---|---|---|---|---|---|
| Gas fired | |||||
| Gas fired | ≤2 500 000 Btu/h4 |
10 CFR Part 431 |
|||
| Gas fired | |||||
| Oil fired5 |
|||||
| Oil fired5 |
≤2 500 000 Btu/h4 |
10 CFR Part 431 |
|||
| Oil fired5 |
|||||
Gas fired— all, except natural draft |
≤2 500 000 Btu/h4 |
10 CFR Part 430 |
|||
Gas fired— all, except natural draft |
|||||
| Gas fired— natural draft |
≤2 500 000 Btu/h4 |
||||
| Gas fired— natural draft |
|||||
| Oil fired5 |
|||||
| Oil fired5 |
≤2 500 000 Btu/h4 |
10 CFR Part 431 |
|||
| Oil fired5 |
1
1 These requirements apply to boilers with rated input of 8 000 000 Btu/h (2343 kW) or less that are not packaged boilers and to all packaged boilers. Minimum efficiency requirements for boilers cover all capacities of packaged boilers. 2 Ec = combustion efficiency (100 percent less flue losses). See reference document for detailed information. 3 Et = thermal efficiency. See reference document for detailed information. 4 Maximum capacity—minimum and maximum ratings as provided for and allowed by the unit’s controls. 5 Includes oil-fired (residual). 6 Boilers shall not be equipped with a constant burning pilot light. 7 A boiler not equipped with a tankless domestic water-heating coil shall be equipped with an automatic means for adjusting the temperature of the water such that an incremental change in inferred heat load produces a corresponding incremental change in the temperature of the water supplied.
rols. 5 Includes oil-fired (residual). 6 Boilers shall not be equipped with a constant burning pilot light. 7 A boiler not equipped with a tankless domestic water-heating coil shall be equipped with an automatic means for adjusting the temperature of the water such that an incremental change in inferred heat load produces a corresponding incremental change in the temperature of the water supplied.
2019 CALIFORNIA MECHANICAL CODE 403
APPENDIX E any other purpose or distributed to any other persons or parti es.
TABLE E 503.7.1(7) PERFORMANCE REQUIREMENTS FOR HEAT REJECTION EQUIPMENT
MINIMUM EFFICIENCY REQUIREMENTS
[ASHRAE 90.1: TABLE 6.8.1-7]
| EQUIPMENT TYPE | TOTAL SYSTEM HEAT- REJECTION CAPACITY AT RATED CONDITIONS |
SUBCATEGORY OR RATING CONDITION8 |
PERFORMANCE REQUIRED1,2,3,6,7 |
TEST PROCEDURE4,5 |
|---|---|---|---|---|
circuit cooling towers |
All |
85°F leaving water 75°F entering wb |
≥40.2 gpm/hp |
CTI STD-201 RS |
cooling towers |
All |
85°F leaving water 75°F entering wb |
≥20.0 gpm/hp |
CTI STD-201 RS |
circuit cooling towers |
All |
90°F leaving water 75°F entering wb |
≥16.1 gpm/hp |
CTI STD-201 RS |
cooling towers |
All | 90°F leaving water 75°F entering wb |
≥7.0 gpm/hp | CTI STD-201 RS |
rative condensers |
All | 165°F entering gas temperature 105°F condensing temperature 75°F entering wb |
≥157 000 Btu/h·hp | CTI ATC-106 |
rative condensers |
All | 140°F entering gas temperature 96.3°F condensing temperature 75°F entering wb |
≥134 000 Btu/h·hp | CTI ATC-106 |
condensers |
All | 165°F entering gas temperature 105°F condensing temperature 75°F entering wb |
≥135 000 Btu/h·hp | CTI ATC-106 |
condensers |
All | 140°F entering gas temperature 96.3°F condensing temperature 75°F entering wb |
≥110 000 Btu/h·hp | CTI ATC-106 |
| All |
190°F entering gas temperature 15°F subcooling 95°F entering db |
≥176 000 Btu/h·hp |
AHRI 460 |
1 For purposes of this table, open-circuit cooling tower performance is defined as the water flow rating of the tower at the thermal rating condition listed in
1 For purposes of this table, open-circuit cooling tower performance is defined as the water flow rating of the tower at the thermal rating condition listed in Table E 503.7.1(7) divided by the fan motor nameplate power. 2 For purposes of this table, closed-circuit cooling tower performance is defined as the process water flow rating of the tower at the thermal rating condition listed in Table E 503.7.1(7) divided by the sum of the fan motor nameplate power and the integral spray pump motor nameplate power. 3 For purposes of this table, air-cooled condenser performance is defined as the heat rejected from the refrigerant divided by the fan motor nameplate power. 4 ASHRAE 90.1 contains a complete specification of the referenced test procedure, including the referenced year version of the test procedure. 5 The efficiencies and test procedures for both open- and closed-circuit cooling towers are not applicable to hybrid cooling towers that contain a combination of separate wet and dry heat exchange sections. The certification requirements do not apply to field-erected cooling towers. 6 All cooling towers shall comply with the minimum efficiency listed in the table for that specific type of tower with the capacity effect of any project-specific accessories and/or options included in the capacity of the cooling tower. 7 For purposes of this table, evaporative condenser performance is defined as the heat rejected at the specified rating condition in the table, divided by the sum of the fan motor nameplate power and the integral spray pump nameplate power. 8 Requirements for evaporative condensers are listed with ammonia (R-717) and R-507A as test fluids in the table. Evaporative condensers intended for use with halocarbon refrigerants other than R-507A must meet the minimum efficiency requirements listed above with R-507A as the test fluid.
404 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
TABLE E 503.7.1(8) HEAT TRANSFER EQUIPMENT – MINIMUM EFFICIENCY REQUIREMENTS
[ASHRAE 90.1: TABLE 6.8.1-8]
| EQUIPMENT TYPE | SUBCATEGORY | MINIMUM EFFICIENCY1 | TEST PROCEDURE2 |
|---|---|---|---|
2 ASHRAE 90.1 contains a complete specification of the referenced test procedure, including the referenced year version of the test procedure.
TABLE E 503.7.1(9) ELECTRICALLY OPERATED VARIABLE-REFRIGERANT-FLOW AIR CONDITIONERS – MINIMUM EFFICIENCY REQUIREMENTS
[ASHRAE 90.1: TABLE 6.8.1-9]
| EQUIPMENT TYPE | SIZE CATEGORY | HEATING SECTION TYPE |
SUBCATEGORY OR RATING CONDITION |
MINIMUM EFFICIENCY | TEST PROCEDURE |
|---|---|---|---|---|---|
air cooled |
AHRI 1230 | ||||
air cooled |
≥65 000 Btu/h and <135 000 Btu/h |
Electric resistance (or none) |
VRF multisplit system | 13.1 IEER (before 1/1/2017) 15.5 IEER (as of 1/1/2017) |
13.1 IEER (before 1/1/2017) 15.5 IEER (as of 1/1/2017) |
air cooled |
≥135 000 Btu/h and <240 000 Btu/h |
Electric resistance (or none) |
VRF multisplit system | 12.9 IEER (before 1/1/2017) 14.9 IEER (as of 1/1/2017) |
12.9 IEER (before 1/1/2017) 14.9 IEER (as of 1/1/2017) |
air cooled |
≥240 000 Btu/h |
Electric resistance (or none) |
VRF multisplit system | 11.6 IEER (before 1/1/2017) 13.9 IEER (as of 1/1/2017) |
11.6 IEER (before 1/1/2017) 13.9 IEER (as of 1/1/2017) |
2019 CALIFORNIA MECHANICAL CODE 405
APPENDIX E any other purpose or distributed to any other persons or parti es.
TABLE E 503.7.1(10) ELECTRICALLY OPERATED VARIABLE-REFRIGERANT-FLOW AND APPLIED
HEAT PUMPS – MINIMUM EFFICIENCY REQUIREMENTS
[ASHRAE 90.1: TABLE 6.8.1-10]
| EQUIPMENT TYPE | SIZE CATEGORY | HEATING SECTION TYPE |
SUBCATEGORY OR RATING CONDITION |
MINIMUM EFFICIENCY | TEST PROCEDURE |
|---|---|---|---|---|---|
(cooling mode) |
VRF multisplit system | AHRI 1230 | |||
(cooling mode) |
≥65 000 Btu/h and <135 000 Btu/h |
Electric resist- ance (or none) |
Electric resist- ance (or none) |
12.9 IEER (before 1/1/2017) 14.6 IEER (as of 1/1/2017) |
12.9 IEER (before 1/1/2017) 14.6 IEER (as of 1/1/2017) |
(cooling mode) |
≥65 000 Btu/h and <135 000 Btu/h |
Electric resist- ance (or none) |
VRF multisplit system with heat recovery |
12.7 IEER (before 1/1/2017) 14.4 IEER (as of 1/1/2017) |
12.7 IEER (before 1/1/2017) 14.4 IEER (as of 1/1/2017) |
(cooling mode) |
≥135 000 Btu/h and <240 000 Btu/h |
≥135 000 Btu/h and <240 000 Btu/h |
VRF multisplit system | 12.3 IEER (before 1/1/2017) 13.9 IEER (as of 1/1/2017) |
12.3 IEER (before 1/1/2017) 13.9 IEER (as of 1/1/2017) |
(cooling mode) |
≥135 000 Btu/h and <240 000 Btu/h |
≥135 000 Btu/h and <240 000 Btu/h |
VRF multisplit system with heat recovery |
12.1 IEER (before 1/1/2017) 13.7 IEER (as of 1/1/2017) |
12.1 IEER (before 1/1/2017) 13.7 IEER (as of 1/1/2017) |
(cooling mode) |
≥240 000 Btu/h | ≥240 000 Btu/h | VRF multisplit system | 11.0 IEER (before 1/1/2017) 12.7 IEER (as of 1/1/2017) |
11.0 IEER (before 1/1/2017) 12.7 IEER (as of 1/1/2017) |
(cooling mode) |
≥240 000 Btu/h | ≥240 000 Btu/h | VRF multisplit system with heat recovery |
10.8 IEER (before 1/1/2017) 12.5 IEER (as of 1/1/2017) |
10.8 IEER (before 1/1/2017) 12.5 IEER (as of 1/1/2017) |
source (cooling mode) |
<65 000 Btu/h | All | entering water |
16.0 IEER (as of 1/1/2018) |
AHRI 1230 |
source (cooling mode) |
<65 000 Btu/h | All | recovery 86°F entering water |
15.8 IEER (as of 1/1/2018) |
15.8 IEER (as of 1/1/2018) |
source (cooling mode) |
≥65 000 Btu/h and <135 000 Btu/h |
≥65 000 Btu/h and <135 000 Btu/h |
entering water |
16.0 IEER (as of 1/1/2018) |
16.0 IEER (as of 1/1/2018) |
source (cooling mode) |
≥65 000 Btu/h and <135 000 Btu/h |
≥65 000 Btu/h and <135 000 Btu/h |
recovery 86°F entering water |
15.8 IEER (as of 1/1/2018) |
15.8 IEER (as of 1/1/2018) |
source (cooling mode) |
≥135 000 Btu/h and <240 000 Btu/h |
≥135 000 Btu/h and <240 000 Btu/h |
entering water |
14.0 IEER (as of 1/1/2018) |
14.0 IEER (as of 1/1/2018) |
source (cooling mode) |
≥135 000 Btu/h and <240 000 Btu/h |
≥135 000 Btu/h and <240 000 Btu/h |
recovery 86°F entering water |
13.8 IEER (as of 1/1/2018) |
13.8 IEER (as of 1/1/2018) |
source (cooling mode) |
≥240 000 Btu/h | ≥240 000 Btu/h | VRF multisplit system 86°F entering water |
(before 1/1/2018) 12.0 IEER (as of 1/1/2018) |
(before 1/1/2018) 12.0 IEER (as of 1/1/2018) |
source (cooling mode) |
≥240 000 Btu/h | ≥240 000 Btu/h | VRF multisplit system with heat recovery 86°F entering water |
(before 1/1/2018) 11.8 IEER (as of 1/1/2018) |
(before 1/1/2018) 11.8 IEER (as of 1/1/2018) |
406 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
TABLE E 503.7.1(10) (continued) ELECTRICALLY OPERATED VARIABLE-REFRIGERANT-FLOW AND APPLIED
HEAT PUMPS – MINIMUM EFFICIENCY REQUIREMENTS
[ASHRAE 90.1: TABLE 6.8.1-10]
| EQUIPMENT TYPE | SIZE CATEGORY | HEATING SECTION TYPE |
SUBCATEGORY OR RATING CONDITION |
MINIMUM EFFICIENCY | TEST PROCEDURE |
|---|---|---|---|---|---|
ter source (cooling mode) |
<135 000 Btu/h | All | recovery 59°F entering water |
16.2 EER |
AHRI 1230 |
ter source (cooling mode) |
<135 000 Btu/h | All | recovery 59°F entering water |
16.0 EER |
16.0 EER |
ter source (cooling mode) |
≥135 000 Btu/h | ≥135 000 Btu/h | recovery 59°F entering water |
13.8 EER |
13.8 EER |
ter source (cooling mode) |
≥135 000 Btu/h | ≥135 000 Btu/h | recovery 59°F entering water |
13.6 EER |
13.6 EER |
source (cooling mode) |
<135 000 Btu/h | All |
entering water |
13.4 EER |
AHRI 1230 |
source (cooling mode) |
<135 000 Btu/h | All |
recovery 77°F entering water |
13.2 EER |
13.2 EER |
source (cooling mode) |
≥135 000 Btu/h |
≥135 000 Btu/h |
entering water |
11.0 EER |
11.0 EER |
source (cooling mode) |
≥135 000 Btu/h |
≥135 000 Btu/h |
recovery 77°F entering water |
10.8 EER |
10.8 EER |
(heating mode) |
(cooling capacity) |
AHRI 1230 | |||
(heating mode) |
≥65 000 Btu/h and <135 000 Btu/h |
— | db/43°F wb outdoor air |
||
(heating mode) |
≥65 000 Btu/h and <135 000 Btu/h |
— | |||
(heating mode) |
≥135 000 Btu/h (cooling capacity) |
— | db/43°F wb outdoor air |
||
(heating mode) |
≥135 000 Btu/h (cooling capacity) |
— | |||
source (heating mode) |
<65 000 Btu/h (cooling capacity) |
— | VRF multisplit system 68°F entering water |
(before 1/1/2018) 4.3 COPH (as of 1/1/2018) |
AHRI 1230 |
source (heating mode) |
<135 000 Btu/h (cooling capacity) |
— | VRF multisplit system 68°F entering water |
(before 1/1/2018) 4.3 COPH (as of 1/1/2018) |
(before 1/1/2018) 4.3 COPH (as of 1/1/2018) |
source (heating mode) |
<240 000 Btu/h (cooling capacity) |
— |
VRF multisplit system 68°F entering water |
(before 1/1/2018) 4.0 COPH (as of 1/1/2018) |
(before 1/1/2018) 4.0 COPH (as of 1/1/2018) |
source (heating mode) |
(cooling capacity) |
68°F entering water |
|||
ter source (heating mode) |
(cooling capacity) |
— |
entering water |
3.6 COPH |
AHRI 1230 |
ter source (heating mode) |
(cooling capacity) |
entering water |
|||
source (heating mode) |
(cooling capacity) |
— |
entering water |
3.1 COPH |
AHRI 1230 |
source (heating mode) |
(cooling capacity) |
entering water |
2019 CALIFORNIA MECHANICAL CODE 407
APPENDIX E any other purpose or distributed to any other persons or parti es.
TABLE E 503.7.1(11) AIR CONDITIONERS AND CONDENSING UNITS SERVING COMPUTER ROOMS
MINIMUM EFFICIENCY REQUIREMENTS
[ASHRAE 90.1: TABLE 6.8.1-11]
| EQUIPMENT TYPE |
NET SENSIBLE COOLING CAPACITY |
STANDARD MODEL | MINIMUM NET SENSIBLE COPc | TEST PROCEDURE | ||
|---|---|---|---|---|---|---|
| EQUIPMENT TYPE |
NET SENSIBLE COOLING CAPACITY |
STANDARD MODEL |
RETURN AIR DRY-BULB TEMPERATURE/ DEW-POINT TEMPERATURE |
RETURN AIR DRY-BULB TEMPERATURE/ DEW-POINT TEMPERATURE |
RETURN AIR DRY-BULB TEMPERATURE/ DEW-POINT TEMPERATURE |
RETURN AIR DRY-BULB TEMPERATURE/ DEW-POINT TEMPERATURE |
| EQUIPMENT TYPE |
NET SENSIBLE COOLING CAPACITY |
STANDARD MODEL |
CLASS 1 | CLASS 2 | CLASS 3 | CLASS 3 |
| EQUIPMENT TYPE |
NET SENSIBLE COOLING CAPACITY |
STANDARD MODEL |
75°F/52°F | 85°F/52°F |
95°F/52°F | 95°F/52°F |
| <65 000 Btu/h | AHRI 1360 | |||||
| <65 000 Btu/h | ||||||
| <65 000 Btu/h | ||||||
| <65 000 Btu/h | ||||||
| ≥65 000 Btu/h and <240 000 Btu/h |
||||||
| ≥65 000 Btu/h and <240 000 Btu/h |
||||||
| ≥65 000 Btu/h and <240 000 Btu/h |
||||||
| ≥65 000 Btu/h and <240 000 Btu/h |
||||||
| ≥240 000 Btu/h | ||||||
| ≥240 000 Btu/h | ||||||
| ≥240 000 Btu/h | ||||||
| ≥240 000 Btu/h | ||||||
| <65 000 Btu/h | AHRI 1360 | |||||
| <65 000 Btu/h | ||||||
| <65 000 Btu/h | ||||||
| <65 000 Btu/h | ||||||
| ≥65 000 Btu/h and <240 000 Btu/h |
||||||
| ≥65 000 Btu/h and <240 000 Btu/h |
||||||
| ≥65 000 Btu/h and <240 000 Btu/h |
||||||
| ≥65 000 Btu/h and <240 000 Btu/h |
||||||
| ≥240 000 Btu/h | ||||||
| ≥240 000 Btu/h | ||||||
| ≥240 000 Btu/h | ||||||
| ≥240 000 Btu/h | ||||||
fluid economizer |
<65 000 Btu/h | AHRI 1360 | ||||
fluid economizer |
<65 000 Btu/h | |||||
fluid economizer |
<65 000 Btu/h | |||||
fluid economizer |
<65 000 Btu/h | |||||
fluid economizer |
≥65 000 Btu/h and <240 000 Btu/h |
|||||
fluid economizer |
≥65 000 Btu/h and <240 000 Btu/h |
|||||
fluid economizer |
≥65 000 Btu/h and <240 000 Btu/h |
|||||
fluid economizer |
≥65 000 Btu/h and <240 000 Btu/h |
|||||
fluid economizer |
≥240 000 Btu/h | |||||
fluid economizer |
≥240 000 Btu/h | |||||
fluid economizer |
≥240 000 Btu/h | |||||
fluid economizer |
≥240 000 Btu/h |
408 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
TABLE E 503.7.1(11) (continued) AIR CONDITIONERS AND CONDENSING UNITS SERVING COMPUTER ROOMS
MINIMUM EFFICIENCY REQUIREMENTS
| [ASHRAE 90.1: TABLE | 6.8.1-11] | |||||
|---|---|---|---|---|---|---|
| EQUIPMENT TYPE |
NET SENSIBLE COOLING CAPACITY |
STANDARD MODEL |
MINIMUM NET SENSIBLE COPc | MINIMUM NET SENSIBLE COPc | MINIMUM NET SENSIBLE COPc | TEST PROCEDURE |
| EQUIPMENT TYPE |
NET SENSIBLE COOLING CAPACITY |
STANDARD MODEL |
RETURN AIR DRY-BULB TEMPERATURE/ DEW-POINT TEMPERATURE |
RETURN AIR DRY-BULB TEMPERATURE/ DEW-POINT TEMPERATURE |
RETURN AIR DRY-BULB TEMPERATURE/ DEW-POINT TEMPERATURE |
RETURN AIR DRY-BULB TEMPERATURE/ DEW-POINT TEMPERATURE |
| EQUIPMENT TYPE |
NET SENSIBLE COOLING CAPACITY |
STANDARD MODEL |
CLASS 1 | CLASS 2 | CLASS 3 | CLASS 3 |
| EQUIPMENT TYPE |
NET SENSIBLE COOLING CAPACITY |
STANDARD MODEL |
75°F/52°F | 85°F/52°F |
95°F/52°F | 95°F/52°F |
| <65 000 Btu/h | AHRI 1360 | |||||
| <65 000 Btu/h | ||||||
| <65 000 Btu/h | ||||||
| <65 000 Btu/h | ||||||
| ≥65 000 Btu/h and <240 000 Btu/h |
||||||
| ≥65 000 Btu/h and <240 000 Btu/h |
||||||
| ≥65 000 Btu/h and <240 000 Btu/h |
||||||
| ≥65 000 Btu/h and <240 000 Btu/h |
||||||
| ≥240 000 Btu/h | ||||||
| ≥240 000 Btu/h | ||||||
| ≥240 000 Btu/h | ||||||
| ≥240 000 Btu/h | ||||||
fluid economizer |
<65 000 Btu/h | AHRI 1360 | ||||
fluid economizer |
<65 000 Btu/h | |||||
fluid economizer |
<65 000 Btu/h | |||||
fluid economizer |
<65 000 Btu/h | |||||
fluid economizer |
≥65 000 Btu/h and <240 000 Btu/h |
|||||
fluid economizer |
≥65 000 Btu/h and <240 000 Btu/h |
|||||
fluid economizer |
≥65 000 Btu/h and <240 000 Btu/h |
|||||
fluid economizer |
≥65 000 Btu/h and <240 000 Btu/h |
|||||
fluid economizer |
≥240 000 Btu/h |
|||||
fluid economizer |
≥240 000 Btu/h |
|||||
fluid economizer |
≥240 000 Btu/h |
|||||
fluid economizer |
≥240 000 Btu/h |
TABLE E 503.7.1(12) COMMERCIAL REFRIGERATOR AND FREEZERS – MINIMUM EFFICIENCY REQUIREMENTS
[ASHRAE 90.1: TABLE 6.8.1-12]
[ASHRAE 90.1: TABLE 6.8.1-12]
| EQUIPMENT TYPE | APPLICATION | * ENERGY USE LIMITS, KWH/DAY |
TEST PROCEDURE |
|---|---|---|---|
- V = the chiller or frozen compartment volume (ft 3 ) as defined in Association of Home Appliance Manufacturers.
2019 CALIFORNIA MECHANICAL CODE 409
APPENDIX E any other purpose or distributed to any other persons or parti es.
TABLE E 503.7.1(13) COMMERCIAL REFRIGERATION – MINIMUM EFFICIENCY REQUIREMENTS
[ASHRAE 90.1: TABLE 6.8.1-13]
| EQUIPMENT TYPE | ENERGY USE LIMITS2,3 KWH/DAY |
TEST PROCEDURE |
|||
|---|---|---|---|---|---|
| EQUIPMENT CLASS1 |
FAMILY CODE |
OPERATING MODE |
RATING TEMPERATURE |
RATING TEMPERATURE |
RATING TEMPERATURE |
| EQUIPMENT TYPE | ENERGY USE LIMITS2,3 KWH/DAY |
TEST PROCEDURE |
|||
|---|---|---|---|---|---|
1 Equipment class designations consist of a combination [in sequential order separated by periods (AAA).(BB).(C)] of the following: (a) (AAA)—An equipment family code (VOP = vertical open, SVO = semivertical open, HZO = horizontal open, VCT = vertical transparent doors,
VCS = vertical solid doors, HCT = horizontal transparent doors, HCS = horizontal solid doors, and SOC = service over counter).
(a) (AAA)—An equipment family code (VOP = vertical open, SVO = semivertical open, HZO = horizontal open, VCT = vertical transparent doors,
VCS = vertical solid doors, HCT = horizontal transparent doors, HCS = horizontal solid doors, and SOC = service over counter). (b) (BB)—An operating mode code (RC = remote condensing and SC = self contained). (c) (C)—A rating temperature code (M = medium temperature [38°F], L = low temperature [0°F], or I = ice cream temperature [15°F]). For example,
“VOP.RC.M” refers to the “vertical open, remote condensing, medium temperature” equipment class.
(c)
“VOP.RC.M” refers to the “vertical open, remote condensing, medium temperature” equipment class. 2 V is the volume of the case (ft) as measured in accordance with AHRI 1200. 3 TDA is the total display area of the case (ft) as measured in accordance with AHRI 1200.
410 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
TABLE E 503.7.1(14) VAPOR COMPRESSION BASED INDOOR POOL DEHUMIDIFIERS – MINIMUM EFFICIENCY REQUIREMENTS
| [ASHRAE 90.1: TABLE 6.8.1-14] | |||
|---|---|---|---|
| EQUIPMENT TYPE |
SUBCATEGORY OR RATING CONDITION | MINIMUM EFFICIENCY |
TEST PROCEDURE |
| ~~Single package indoor* ~~ (with or without economizer) |
Rating Conditions: A, B, or C | AHRI 910 | |
(with or without economizer) |
(with or without economizer) |
||
(with or without economizer) |
(with or without economizer) |
||
(with or without economizer) |
(with or without economizer) |
TABLE E 503.7.1(15) ELECTRICALLY OPERATED DX-DOAS UNITS, SINGLE-PACKAGE AND REMOTE CONDENSER,
WITHOUT ENERGY RECOVERY – MINIMUM EFFICIENCY REQUIREMENTS
| [ASHRAE 90.1: TABLE 6.8.1-15] | |||
|---|---|---|---|
| EQUIPMENT TYPE |
SUBCATEGORY OR CONDITION |
MINIMUM EFFICIENCY |
TEST PROCEDURE |
(dehumidification mode) |
|||
(dehumidification mode) |
|||
(dehumidification mode) |
|||
(dehumidification mode) |
|||
(heating mode) |
|||
(dehumidification mode) |
AHRI 920 | ||
(dehumidification mode) |
|||
(dehumidification mode) |
|||
(heating mode) |
AHRI 920 | ||
(heating mode) |
|||
(heating mode) |
TABLE E 503.7.1(16) ELECTRICALLY OPERATED DX-DOAS UNITS, SINGLE PACKAGE AND REMOTE CONDENSER,
WITH ENERGY RECOVERY – MINIMUM EFFICIENCY REQUIREMENTS
| [ASHRAE 90.1: TABLE 6.8.1-16] | |||
|---|---|---|---|
| EQUIPMENT TYPE |
SUBCATEGORY OR RATING CONDITION |
MINIMUM EFFICIENCY |
TEST PROCEDURE |
(dehumidification mode) |
|||
(dehumidification mode) |
|||
(dehumidification mode) |
|||
(dehumidification mode) |
|||
(heating mode) |
|||
(dehumidification mode) |
AHRI 920 | ||
(dehumidification mode) |
|||
(dehumidification mode) |
|||
(heating mode) |
AHRI 920 | ||
(heating mode) |
|||
(heating mode) |
2019 CALIFORNIA MECHANICAL CODE 411
APPENDIX E any other purpose or distributed to any other persons or parti es.
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE
| TABLE E 503.7.2 MINIMUM DUCT INSULATION R-VALUE1 [ASHRAE 90.1:TABLE 6.8.2] | |||
|---|---|---|---|
| CLIMATE ZONE | DUCT LOCATION | DUCT LOCATION | DUCT LOCATION |
| CLIMATE ZONE | EXTERIOR2 | UNCONDITIONED SPACE AND BURIED DUCTS |
INDIRECTLY CONDITIONED SPACE3, 4 |
| SUPPLY AND RETURN DUCTS FOR HEATING AND COOLING |
|||
SUPPLY AND RETURN DUCTS FOR HEATING ONLY |
|||
SUPPLY AND RETURN DUCTS FOR COOLING ONLY |
|||
thicknesses do not consider water vapor transmission and possible surface condensation. Where portions of the building envelope are used as a plenum enclosure, building envelope insulation shall be as required by the most restrictive condition of Section E 503.4.7.1 or ASHRAE 90.1, depending on whether the plenum is located in the roof, wall, or floor. Insulation resistance measured on a horizontal plane in accordance with ASTM C518 at a mean temperature of 75°F (24°C) at the installed thickness. 2. Includes attics above insulated ceilings, parking garages and crawl spaces. 3. Includes return air plenums, with or without exposed roofs above. 4. Return ducts in this duct location do not require insulation.
TABLE E 503.7.3(1) MINIMUM PIPE INSULATION THICKNESS FOR HEATING AND HOT WATER SYSTEMS 1, 2, 3, 4, 5
(STEAM, STEAM CONDENSATE, HOT WATER HEATING, AND DOMESTIC WATER SYSTEMS)
[ASHRAE 90.1: TABLE 6.8.3-1]
| FLUID OPERATING TEM- PERATURE RANGE (F°) AND USAGE |
INSULATION CONDUCTIVITY | NOMINAL PIPE SIZE OR TUBE SIZE (inches) | |||||
|---|---|---|---|---|---|---|---|
| FLUID OPERATING TEM- PERATURE RANGE (F°) AND USAGE |
CONDUCTIVITY Btu•inch/(h•ft2•°F) |
MEAN RATING TEMPERATURE °F |
<1 | 1 to <11/2 | 11/2 to <4 | 4 to <8 | ≥8 |
| INSULATION THICKNESS (inches) |
|||||||
1 For insulation outside the stated conductivity range, the minimum thickness ( T ) shall be determined as follows: T = r {(1 + t / r ) K / k - 1} Where:
T = minimum insulation thickness (inches).
Where:
T = minimum insulation thickness (inches). r = actual outside radius of pipe (inches). t = insulation thickness listed in this table for applicable fluid temperature and pipe size. K = conductivity of alternate material at mean rating temperature indicated for the applicable fluid temperature [Btu•in/(h•ft 2 •°F)] [W/(m•K)]. k = the upper value of the conductivity range listed in this table for the applicable fluid temperature. 2 These thicknesses shall be based on energy efficiency considerations only.Additional insulation shall be permitted to required relative to safety issues/surface temperature. 3 Piping 11⁄2 inches (40 mm) or less and located in partitions within conditioned spaces, reduction of insulation thickness by 1 inch (25.4 mm) shall be permitted before thickness adjustment required in footnote 1, but not a thickness less than 1 inch (25.4 mm). 4 For direct-buried heating and hot water system piping, reduction of insulation thickness by 11⁄2 inch (40 mm) shall be permitted before thicknessadjustment required in footnote 1, but not a thickness less than 1 inch (25.4 mm). 5 Table E 503.7.3(1) is based on steel pipe. Non-metallic pipes, less than schedule 80 thickness shall use the table values. For other non-metallic pipeshaving a thermal resistance more than that of steel pipe, reduced insulation thicknesses shall be permitted where documentation is provided showing that the pipe with the proposed insulation has less heat transfer per foot (mm) than a steel pipe of the same size with the insulation thickness shown in Table E 503.7.3(1).
412 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
TABLE E 503.7.3(2) MINIMUM PIPE INSULATION THICKNESS FOR COOLING SYSTEMS (CHILLED WATER, BRINE, AND REFRIGERANT) 1,2,3,4
[ASHRAE 90.1:TABLE 6.8.3-2]
| INSULATION CONDUCTIVITY | NOMINAL PIPE SIZE OR TUBE SIZE (inches) | ||||||
|---|---|---|---|---|---|---|---|
| FLUID OPERATING TEMPERATURE RANGE (°F) AND USAGE |
CONDUCTIVITY Btu•inch/(h•f2•°F) |
MEAN RATING TEMPERATURE °F |
<1 | 1 to <11/2 | 11/2 to <4 | 4 to <8 | >8 |
| INSULATION THICKNESS(inches) |
INSULATION THICKNESS(inches) |
INSULATION THICKNESS(inches) |
INSULATION THICKNESS(inches) |
INSULATION THICKNESS(inches) |
|||
Notes: 1 For insulation outside the stated conductivity range, the minimum thickness ( T ) shall be determined as follows: T = r {(1 + t/r ) K/k - 1} Where: T = minimum insulation thickness (inches). r = actual outside radius of pipe (inches). t = insulation thickness listed in this table for applicable fluid temperature and pipe size. K = conductivity of alternate material at mean rating temperature indicated for the applicable fluid temperature [Btu • inch/(h • ft 2 • °F)] [W/(m•K)]. k = the upper value of the conductivity range listed in this table for the applicable fluid temperature. 2 These thicknesses shall be based on energy efficiency considerations only. Issues such as water, vapor permeability, or surface condensation require vapor retarders or additional insulation. 3 Insulation shall not be required for direct-buried cooling system piping. 4 Table E 503.7.3(2) is based on steel pipe. Non-metallic pipes less than schedule 80 thickness shall use the table values. For other non-metallic pipes having thermal resistance more than that of steel pipe, reduced insulation thicknesses shall be permitted where documentation is provided showing that the pipe with the proposed insulation has less heat transfer per foot (mm) than a steel pipe of the same size with the insulation thickness shown in Table E 503.7.3(2).
E 505.1 Applicability.E 505.0 Geothermal Systems. Geothermal systems that use the earth or body of water as a heat source or sink for heating or cooling shall be in accordance with Section E 505.1.1 through Section E 509.2.
E 505.1.1 Design, Installation, and Testing. Geothermal systems shall be designed by a registered design professional. The geothermal system design, installation, and testing shall be in accordance with CSA C448. E 505.1.2 Heat Pump Approval. Water source heat pumps used in conjunction with geothermal heat exchangers shall be listed and labeled for use in such systems and shall be designed for the minimum and maximum design water temperature. E 505.2 Ground Source Heat Pump-Loop Systems. Ground source heat pump ground-loop piping and tubing material for water-based systems shall comply with the standards cited in this appendix. E 505.3 Material Rating. Piping shall be rated for the operating temperature and pressure of the ground source heat pump-loop system. Fittings shall be rated for the temperature and pressure applications and recommended by the manufacturer for installation with the piping material installed. Where used underground, materials shall be approved for burial. E 505.4 Used Materials. The installation of used pipe, fittings, valves, and other materials shall not be permitted. Ground source heat pump ground-loop pipe and tubing shall E 505.5 Piping and Tubing Materials Standards. comply with the standards listed in Table E 505.5.
TABLE E 505.5 PLASTIC GROUND SOURCE LOOPPIPING
| MATERIAL | STANDARD |
|---|---|
| Chlorinated polyvinyl chloride (CPVC) |
ASTM D2846; ASTM F441; ASTM F442 |
| Cross-linked polyethylene (PEX) |
ASTM F876; ASTM F877; CSA B137.5; NSF 358-3 |
| Polyethylene/aluminum/poly- ethylene (PE-AL-PE) pressure pipe |
ASTM F1282; CSA B137.9 |
| High Density Polyethylene (HDPE) |
ASTM D2737; ASTM D3035; ASTM F714; AWWAC901; CSA B137.1; CSAC448; NSF 358-1 |
| Polypropylene (PP) |
ASTM F2389; CSA B137.11; NSF 358-2 |
| Polyvinyl chloride (PVC) |
ASTM D1785; ASTM D2241 |
| Polyethylene Raised Tempera- ture (PE-RT) |
ASTM F2623; ASTM F2769 |
2019 CALIFORNIA MECHANICAL CODE 413
APPENDIX E any other purpose or distributed to any other persons or parti es.
E 505.6 Fittings. Fittings for ground source heat pump systems shall be approved for installation with the piping materials to be installed, and shall comply with the standards listed in Table E 505.6.
TABLE E 505.6 GROUND SOURCE LOOP PIPE FITTINGS
E 506.6 Thermoplastic Welded Joints. Joint surfaces for thermoplastic welded joints shall be cleaned by an approved procedure. Joints shall be welded in accordance with the manufacturer’s installation instructions. E 506.7 CPVC Plastic Pipe. Joints between CPVC plastic piping and fittings shall comply with Section E 506.7.1 and Section E 506.7.2.
E 506.7.1 Threaded Joints. Threads shall comply with ASME B1.20.1. Schedule 80 or heavier plastic pipe shall be threaded with dies specifically designed for plastic pipe. Thread lubricant, pipe-joint compound or tape shall be applied on the male threads only and shall be approved for application on the piping material. E 506.7.2 Solvent Cement. Solvent cement joints for CPVC pipe and fittings shall be clean from dirt and moisture. Solvent cements in accordance with ASTM F493, requiring the use of a primer, shall be orange in color. The primer shall be colored and be in accordance with ASTM F656. Listed solvent cement in accordance with ASTM F493 that does not require the use of primers, yellow or red in color shall be permitted for pipe and fittings manufactured in accordance with ASTM D2846, 1 ⁄2 of an inch (15 mm) through 2 inches (50 mm) in diameter. Tubing.E 506.8 Cross-Linked Polyethylene (PEX) Plastic Compression or plastic to metal transition joints between cross-linked polyethylene plastic tubing and fittings shall comply with Section E 506.8.1 and Section E 506.8.2. Mechanical joints shall comply with Section E 506.5.
manufactured in accordance with ASTM D2846, 1 ⁄2 of an inch (15 mm) through 2 inches (50 mm) in diameter. Tubing.E 506.8 Cross-Linked Polyethylene (PEX) Plastic Compression or plastic to metal transition joints between cross-linked polyethylene plastic tubing and fittings shall comply with Section E 506.8.1 and Section E 506.8.2. Mechanical joints shall comply with Section E 506.5.
| MATERIAL | STANDARD |
|---|---|
| Chlorinated polyvinyl chloride (CPVC) |
ASTM F438; ASTM F439; ASTM F1970; CSA B137.6 |
| Cross-linked polyethylene (PEX) |
ASTM F877; ASTM F1807; ASTM F1960; ASTMF2080; ASTM F2159; ASTM F2434; CSAB137.5; NSF 358-3 |
ethylene (PE-AL-PE) |
CSAB137.9 |
| High Density Polyethylene (HDPE) |
ASTM F1055; CSA B137.1; CSA C448; NSF 358-1 |
| Polypropylene (PP) | NSF 358-2 |
| Polyvinyl chloride (PVC) | ASTM D2467; ASTM F1970; CSA B137.2; CSA B137.3 |
| Polyethylene Raised Tempera- ture(PE-RT) |
ASTM F2159; ASTM F2769; CSA B137.1 |
E 506.1 Approval.E 506.0 Joints and Connections. Joints and connections shall be of an approved type. Joints and connections shall be tight for the pressure of the ground source-loop system. Joints and fittings used underground shall be approved for buried applications. E 506.2 Joints Between Various Materials. Joints between various piping materials shall be made with approved transition fittings. E 506.3 Preparation of Pipe Ends. Pipe shall be cut square, reamed, and free of burrs and obstructions. Pipe ends shall have full-bore openings and shall not be undercut. CPVC, PE, and PVC pipe shall be chamfered. E 506.4 Joint Preparation and Installation. Where required by Section E 506.5 through Section E 506.12.2, the preparation and installation of mechanical and thermoplasticwelded joints shall be in accordance with Section E 506.4 and Section E 506.5. E 506.5 Mechanical Joints. Mechanical joints shall be installed in accordance with the manufacturer’s installation instructions.
E 506.8.1 Compression-Type Fittings. Where compression-type fittings include inserts and ferrules or orings, the fittings shall be installed with the inserts and ferrules or o-rings. E 506.8.2 Plastic-to-Metal Connections. Soldering on the metal portion of the system shall be performed not less than 18 inches (457 mm) from a plastic-to-metal adapter in the same water line. E 506.9 Polyethylene Plastic Pipe and Tubing. Joints between polyethylene plastic piping shall comply with Section E 506.9.1 through Section E 506.9.3.
alled with the inserts and ferrules or o-rings. E 506.8.2 Plastic-to-Metal Connections. Soldering on the metal portion of the system shall be performed not less than 18 inches (457 mm) from a plastic-to-metal adapter in the same water line. E 506.9 Polyethylene Plastic Pipe and Tubing. Joints between polyethylene plastic piping shall comply with Section E 506.9.1 through Section E 506.9.3.
E 506.9.1 Heat-Fusion Joints. Joints shall be of the socket-fusion, saddle-fusion, or butt-fusion type and joined in accordance with ASTM D2657. Joint surfaces shall be clean and free of moisture. Joint surfaces shall be heated to melt temperatures and joined. The joint shall be undisturbed until cool. Fittings shall be manufactured in accordance with ASTM D2683 or ASTM D3261. E 506.9.2 Electrofusion Joints. Joints shall be of the electrofusion type. Joint surfaces shall be clean and free of moisture, and scoured to expose virgin resin. Joint surfaces shall be heated to melt temperatures for the period of time specified by the manufacturer. The joint shall be undisturbed until cool. Fittings shall be manufactured in accordance with ASTM F1055. E 506.9.3 Stab-Type Insert Fittings. Joint surfaces shall be clean and free of moisture. Pipe ends shall be
414 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
chamfered and inserted into the fittings to full depth. Fittings shall be manufactured in accordance with ASTM F1924. E 506.10 Polypropylene (PP) Plastic. Joints between PP plastic pipe and fittings shall comply with Section E 506.10.1 and Section E 506.10.2.
E 506.10.1 Heat-Fusion Joints. Heat-fusion joints for polypropylene (PP) pipe and tubing joints shall be installed with socket-type heat-fused polypropylene fittings, electrofusion polypropylene fittings, or by butt fusion. Joint surfaces shall be clean and free from moisture. The joint shall be undisturbed until cool. Joints shall be made in accordance with ASTM F2389. E 506.10.2 Mechanical and Compression SleeveJoints. Mechanical and compression sleeve joints shall be installed in accordance with the manufacturer’s installation instructions. Plastic Tubing.E 506.11 Raised Temperature Polyethylene (PE-RT) Joints between raised temperature polyethylene tubing and fittings shall comply with Section E 506.11.1 and Section E 506.11.2. Mechanical joints shall comply with Section E 506.5.
E 506.11.1 Compression-Type Fittings. Where compression-type fittings include inserts and ferrules or o-rings, the fittings shall be installed without omitting the inserts and ferrules or o-rings. E 506.11.2 PE-RT-to-Metal Connections. Solder joints in a metal pipe shall not occur within 18 inches (457 mm) of a transition from such metal pipe to PE-RT pipe. E 506.12 PVC Plastic Pipe. Joints between PVC plastic pipe and fittings shall comply with Section E 506.12.1 and Section E 506.12.2.
r o-rings, the fittings shall be installed without omitting the inserts and ferrules or o-rings. E 506.11.2 PE-RT-to-Metal Connections. Solder joints in a metal pipe shall not occur within 18 inches (457 mm) of a transition from such metal pipe to PE-RT pipe. E 506.12 PVC Plastic Pipe. Joints between PVC plastic pipe and fittings shall comply with Section E 506.12.1 and Section E 506.12.2.
E 506.12.1 Solvent Cement Joints. Solvent cement joints for PVC pipe and fittings shall be clean from dirt and moisture. Purple primer in accordance with ASTM F656 shall be applied until the surface of the pipe and fitting is softened. Solvent cement in accordance with ASTM D2564 shall be applied to joint surfaces. E 506.12.2 Threaded Joints. Threads shall comply with ASME B1.20.1. Schedule 80 or heavier plastic pipe shall be threaded with dies specifically designed for plastic pipe. Thread lubricant, pipe-joint compound or tape shall be applied on the male threads only and shall be approved for application on the piping material.
E 507.3 Central Systems. Shutoff valves shall be installed on the building supply and return of a central utility system. E 507.4 Pressure Vessels. Shutoff valves shall be installed on the connection to a pressure vessel. E 507.5 Pressure-Reducing Valves. Shutoff valves shall be installed on both sides of a pressure-reducing valve. E 507.6 Equipment and Appliances. Shutoff valves shall be installed on connections to mechanical equipment and appliances. This requirement does not apply to components of a ground source loop system such as pumps, air separators, metering devices, and similar equipment. E 507.7 Expansion Tanks. Shutoff valves shall be installed at connections to nondiaphragm-type expansion tanks. E 507.8 Reduced Pressure. A pressure relief valve shall be installed on the low-pressure side of a hydronic piping system that has been reduced in pressure. The relief valve shall be set at the maximum pressure of the system design.
ators, metering devices, and similar equipment. E 507.7 Expansion Tanks. Shutoff valves shall be installed at connections to nondiaphragm-type expansion tanks. E 507.8 Reduced Pressure. A pressure relief valve shall be installed on the low-pressure side of a hydronic piping system that has been reduced in pressure. The relief valve shall be set at the maximum pressure of the system design.
E 508.0 Installation.E 508.1 General. Piping, valves, fittings, and connections shall be installed in accordance with the manufacturer’s installation instructions. E 508.2 Protection of Potable Water. Where ground source heat pump ground loop systems have a connection to a potable water supply, the potable water system shall be protected. E 508.3 Pipe Penetrations. Openings for pipe penetrations in walls, floors, and ceilings shall be larger than the penetrating pipe. Openings through concrete or masonry building elements shall be sleeved. The annular space surrounding pipe penetrations shall be protected in accordance with the building code. E 508.4 Clearance from Combustibles. A pipe in a ground source heat pump piping system, having an exterior surface temperature exceeding 250°F (121°C), shall have a clearance of not less than 1 inch (25.4 mm) from combustible materials. E 508.5 Contact with Building Material. A ground source heat pump ground-loop piping system shall not be in direct contact with building materials that cause the piping or fitting material to degrade or corrode, or that interferes with the operation of the system. E 508.6 Strains and Stresses. Piping shall be installed so as to prevent detrimental strains and stresses in the pipe. Provisions shall be made to protect piping from damage resulting from expansion, contraction, and structural settlement. Piping shall be installed so as to avoid structural stresses or strains within building components. E 508.7 Flood Hazard. Piping located in a flood hazard area shall be capable of resisting hydrostatic and hydrodynamic loads and stresses, including the effects of buoyancy, during the occurrence of flooding to the design flood elevation. E 508.8 Pipe Support. Pipe shall be supported in accordance with Section 313.1.
E 507.1 Where Required.E 507.0 Valves. Shutoff valves shall be installed in ground source-loop piping systems in the locations indicated in Section E 507.2 through Section E 507.8. E 507.2 Heat Exchangers. Shutoff valves shall be installed on the supply and return side of a heat exchanger, except where the heat exchanger is integral with a boiler or is a component of a manufacturer’s boiler and heat exchanger packaged unit, and is capable of being isolated from the hydronic system by the supply and return valves.
2019 CALIFORNIA MECHANICAL CODE 415
APPENDIX E any other purpose or distributed to any other persons or parti es.
E 508.9 Velocities. Ground source heat pump ground-loop systems shall be designed so that the flow velocities do not exceed the maximum flow velocity recommended by the pipe and fittings manufacturer. Flow velocities shall be controlled to reduce the possibility of water hammer. E 508.10 Labeling and Marking. Ground source heat pump ground-loop system piping shall be marked with tape, metal tags, or other methods where it enters a building. The marking shall indicate the following words: “GROUND SOURCE HEAT PUMP-LOOP SYSTEM.” The marking shall indicate antifreeze used in the system by name and concentration. E 508.11 Chemical Compatibility. Antifreeze and other materials used in the system shall be chemically compatible with the pipe, tubing, fittings, and mechanical systems. E 508.12 Transfer Fluid. The transfer fluid shall be compatible with the makeup water supplied to the system.
E 509.0 Testing. E 509.1 Ground Source Heat Pump Loop System Testing. Before connection header trenches are backfilled, the assembled loop system shall be pressure tested with water at 100 psi (689 kPa) for 15 minutes with no observed leaks. Flow and pressure loss testing shall be performed, and the actual flow rates and pressure drops shall be compared to the calculated design values. Where actual flow rate or pressure drop values differ from calculated design values by more than 10 percent, the cause shall be identified and corrective action taken. E 509.2 Pressurizing During Installation. Ground source heat pump ground loop piping to be embedded in concrete shall be pressure tested prior to pouring concrete. During pouring, the pipe shall be maintained at the proposed operating pressure.
E 601.1 Scope.E 601.0 Indoor Environment. The provisions of this section shall establish the means of reducing the quantity of air contaminants that are odorous, irritating, or harmful to the comfort and wellbeing of a building’s installers, occupants, and neighbors.
E 602.1 Requirements.E 602.0 Fireplaces. A direct-vent sealed-combustion gas or sealed wood-burning fireplace, or a sealed wood stove shall be installed. The fireplace shall comply with Section E 602.1.1 and Section E 602.1.2. E 602.1.1 Masonry or Factory-Built Fireplace. Masonry and factory-built fireplaces located in conditioned spaces shall be in accordance with Section E 602.1.1.1 through Section E 602.1.1.3. E 602.1.1.1 Opening Cover. Closeable metal or glass doors covering the entire opening of the firebox shall be installed. E 602.1.1.2 Combustion Air Intake. A combustion air intake to draw air from the outside of the building directly into the firebox, which is an area of
not less than 6 square inches (0.004 m 2 ) and is equipped with a readily accessible, operable, and tight-fitting damper or combustion-air control device.
E 602.1.1.3 Accessible Damper Control. The flue damper shall have a readily accessible control. Exception: Where a gas log, log lighter, or decorative gas appliance is installed in a fireplace, the flue damper shall be blocked open where required by this code or the manufacturer’s installation instructions. E 602.1.2 Prohibited. Continuous burning pilot lights and the use of indoor air for cooling a firebox jacket, where the indoor air is vented to the outside of the building, are prohibited.
E 603.0 Pollutant Control. E 603.1 Indoor Air Quality During Construction. Indoor air quality of a building shall be maintained in accordance with Section E 603.1.1 through Section E 603.1.3.
E 603.1.1 Temporary Ventilation During Con-struction. Temporary ventilation during construction shall be provided in accordance with the following: (1) Ventilation during construction shall be achieved
through openings in the building shell using fans to
(1) Ventilation during construction shall be achieved
through openings in the building shell using fans to produce not less than three air changes per hour. (2) During dust-producing operations, the supply and
return HVAC system openings shall be protected
(2) During dust-producing operations, the supply and
return HVAC system openings shall be protected from dust in accordance with Section E 603.1.3. (3) Where the building is occupied during demolition
or construction, ventilation shall be provided in
(3) Where the building is occupied during demolition
or construction, ventilation shall be provided in accordance with the Control Measures of the SMACNA IAQ Guidelines for Occupied Buildings Under Construction. (4) The permanent HVAC system shall not be used dur ing construction to condition and ventilate the build
(4) The permanent HVAC system shall not be used dur ing construction to condition and ventilate the building within the required temperature range for material and equipment installation. Where required, a supplemental HVAC system shall be used during construction, return air shall be equipped with filters with a minimum efficiency reporting value (MERV) of 8, in accordance with ASHRAE 52.2, or an average efficiency of 30 percent in accordance with ASHRAE 52.2. Before occupancy, filters shall be replaced with filters having a MERV 13 rating in accordance with Section E 603.3. Exception: Embedded hydronics system shall be permitted to be used to condition the building during construction. E 603.1.2 Indoor Air Quality After Construction. After construction ends and interior finishes are installed, flush-out the building to reduce contaminant concentrations by supplying a total outdoor air volume of 14 000 cubic feet per square foot (ft 3 /ft 2 ) (4267.2 m 3 /m 2 ) of occupiable building area. An internal temperature of not less than 60°F (16°C) and relative humidity not higher than 60 percent shall be maintained during the flush-out
416 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
process. Occupancy shall begin on condition of 3500 ft 3 /ft 2 (1066.8 m 3 /m 2 ) of building area, with the remaining 10 500 ft 3 /ft 2 (3200.4 m 3 /m 2 ) being accomplished as soon as possible. Exception: Other means of reducing the contaminant concentration levels shall be permitted where approved by the Authority Having Jurisdiction. E 603.1.3 Covering of Duct Openings and Pro- tection of Mechanical Equipment During Con-struction. At the time of rough installation, or during storage on the construction site and until final startup of the heating and cooling equipment, duct and other related air distribution component openings shall be covered with tape, plastic, sheet metal, or other methods acceptable to the enforcing agency to reduce the amount of dust or debris that collects in the system. E 603.2 Isolation of Pollutant Sources. Rooms where activities produce hazardous fumes or chemicals, including commercial kitchens, garages, janitorial or laundry rooms, and copy or printing rooms, shall be exhausted and isolated from adjacent spaces in accordance with this code. E 603.3 Filters. In mechanically ventilated buildings, particle filters, or air-cleaning devices shall be provided to clean outdoor and return air prior to its delivery to occupied spaces. The particle or air cleaner shall have a MERV of 13. Exception: A filter or air cleaning device with a lower MERV value shall be permitted provided it is the highest value commercially available for the specific equipment that is installed. E 603.4 Ozone Depletion and Global WarmingReductions. Installations of HVAC and refrigeration shall not contain CFCs and shall be in accordance with this code.
E 604.0 Indoor Moisture Control.E 604.1 Rainwater Control. Roof drainage systems shall discharge to a place of disposal in accordance with the plumbing code. Storm water shall be directed away from the building.
E 605.0 Indoor Air Quality for Low-Rise Residential.E 605.1 General. Rooms or occupied spaces within singlefamily homes and multifamily structures of three stories or less above grade shall be designed to have ventilation (outdoor) air for occupants in accordance with Section E 605.1.1 through Section E 605.1.3.2, or the applicable local code.
E 605.1.1 Natural Ventilation. Naturally ventilated spaces shall be permanently open to and within 20 feet (6096 mm) of operable wall or roof openings to the outdoors, the openable area of which is not less than 5 percent of the conditioned floor area of the naturally ventilated space. Where openings are covered with louvers or otherwise obstructed, openable area shall be based on the free unobstructed area through the opening.
Naturally ventilated spaces shall be permanently open to and within 20 feet (6096 mm) of operable wall or roof openings to the outdoors, the openable area of which is not less than 5 percent of the conditioned floor area of the naturally ventilated space. Where openings are covered with louvers or otherwise obstructed, openable area shall be based on the free unobstructed area through the opening.
E 605.1.1.1 Access to Operable Openings. The means to open required operable openings shall be readily accessible to building occupants where the space is occupied. E 605.1.2 Mechanical Ventilation. Each space that is not naturally ventilated in accordance with Section E 605.1.1 shall be ventilated with a mechanical system capable of providing an outdoor air rate not less than 15 ft 3 /min (0.007 m 3 /s) per person times the expected number of occupants. Mechanical ventilation shall comply with this code. E 605.1.3 Dwelling-Unit Ventilation. A Mechanical exhaust system, supply system, or combination thereof shall be installed to operate for each dwelling unit to provide continuous dwelling-unit ventilation with outdoor air rate not less than the rate specified in Section E 605.1.3.1. [ASHRAE 62.2:4.1] E 605.1.3.1 Total Ventilation Rate. The total required ventilation rate ( Qtot ) shall be as specified in Table E 605.1.3.1 or, alternatively, calculated in accordance with Equation E 605.1.3.1.
| TABLE E 605.1.3.1 VENTILATION AIR REQUIREMENTS, (cubic foot per minute) [ASHRAE 62.2:TABLE 4.1a] | |||||
|---|---|---|---|---|---|
| FLOOR AREA(ft2) |
BEDROOMS | BEDROOMS | BEDROOMS | BEDROOMS | BEDROOMS |
| FLOOR AREA(ft2) |
1 |
2 |
3 |
4 |
5 |
2019 CALIFORNIA MECHANICAL CODE 417
APPENDIX E any other purpose or distributed to any other persons or parti es.
(Equation E 605.1.3.1) Qtot = 0.03 Afloor + 7.5( Nbr + 1)
Where: Qtot = total required ventilation rate, cubic feet per minute (ft 3 /min) Afloor = dwelling unit square foot (ft 2 ) Nbr = number of bedrooms; not to be less than one
For SI units: 1 cubic foot per minute = 0.00047 m 3 /s, 1 square foot = 0.0929 m 2
Exceptions: Dwelling-unit mechanical ventilation systems shall not be required where the Authority Having Jurisdiction determines that window operation is a locally permissible method of providing ventilation and provided one or more of the following conditions is met: (1) The building has no mechanical cooling and is
located in zone 1 or 2.
(1) The building has no mechanical cooling and is
located in zone 1 or 2. (2) The building is thermally conditioned for
human occupancy for less than 876 hours per
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
(2) The building is thermally conditioned for
human occupancy for less than 876 hours per year. [ASHRAE 62.2:4.1.1] E 605.1.3.2 Effective Annual Average Infiltra-tion Rate (Qinf). Effective Annual Average Infiltration Rate ( Qinf ) shall be calculated using Equation E 605.1.3.2:
Qinf = may be not greater than 2 / 3 × Qtot (see ASHRAE 62.2 for exceptions for existing buildings)
[Equation E 605.1.3.2] Qinf (cfm) = ( NL x wsf x Afloor ) / (7.3)*
Where: NL = normalized leakage wsf = weather and shielding factor from ASHRAE
62.2.
wsf = weather and shielding factor from ASHRAE
62.2. Afloor = floor area of residence, ft 2 (m 2 )
- Replace 7.3 with 1.44 for metric units. [ASHRAE 62.2:4.1.2(e)] E 605.1.3.3 Required Mechanical VentilationRate (Qfan). Required Mechanical Ventilation Rate ( Qfan ) shall be calculated using Equation E 605.1.3.3: Qfan = Qtot - ( Qinf × Aext ) [Equation E 605.1.3.3]
Where: Qfan = required mechanical ventilation rate, cfm (L/
s) Qtot = total required ventilation rate, cfm (L/s)
Aext = 1 for single-family detached homes, or the
ratio of exterior envelope surface area that is not attached to garages or other dwelling units to total envelope surface area for single-family attached homes. [ASHRAE 62.2:4.1.2(f)] E 605.1.3.4 Different Occupant Density. Table E 605.1.3.1 and Equation E 605.1.3.1 assume two persons in a studio or one-bedroom dwelling unit and an additional person for each additional bedroom. Where higher occupant densities are known, the rate shall be increased by 7.5 ft 3 /min (0.003 m 3 /s) for each additional person. Where approved by the Authority Having Jurisdiction, lower occupant densities shall be permitted to be used. [ASHRAE 62.2:4.1.3] E 605.1.4 System Type. The dwelling-unit mechanical ventilation system shall consist of one or more supply or exhaust fans and associated ducts and controls. Local exhaust fans shall be permitted to be part of a mechanical exhaust system. Where local exhaust fans are used to provide dwelling-unit ventilation, the local exhaust airflow shall be permitted to be credited towards the whole dwelling-unit ventilation airflow requirement. Outdoor air ducts connected to the return side of an air handler shall be permitted as supply ventilation where manufacturer’s requirements for return air temperature are met. See ASHRAE 62.2 for guidance on selection of methods. [ASHRAE 62.2:4.2] E 605.1.5 Airflow Measurement. The airflow required by this section shall be the quantity of outdoor ventilation air supply, indoor air, or both exhausted by the mechanical ventilation system as installed and shall be measured according to the ventilation equipment manufacturer’s instructions, or by using a flow hood, flow grid, or other airflow measuring device at the mechanical ventilation fan’s inlet terminals/grilles, outlet terminals/grilles, or in the connected ventilation ducts. Ventilation airflow of systems with multiple operating modes shall be tested in all modes designed to be in accordance with this section. [ASHRAE 62.2:4.3] E 605.1.6 Control and Operation. A readily accessible manual ON-OFF control, including but not limited to a fan switch or a dedicated branch-circuit overcurrent device, shall be provided. Controls shall include text or an icon indicating the system’s function. Exception: For multifamily dwelling units, the manual ON-OFF control shall not be required to be readily accessible. [ASHRAE 62.2:4.4] E 605.1.7 Variable Mechanical Ventilation. Dwelling-unit mechanical ventilation systems designed to provide variable ventilation shall comply with Section E 605.1.7.1 or Section E 605.1.7.2 or Section E 605.1.7.3. Section E 605.1.7.2 and Section E 605.1.7.3 also require compliance with ASHRAE 62.2 and require verification with supporting documentation from the manufacturer, designer, or specifier of the ventilation control system that
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
Qfan
s) Qtot = total required ventilation rate, cfm (L/s)
418 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
the system meets the requirements of these sections. Where the dwelling-unit ventilation rate varies based on occupancy, occupancy shall be determined by occupancy sensors or by an occupant-programmable schedule.
[ASHRAE 62.2:4.5]
containing a bathtub, shower, or tub/shower combination. The ventilation rate shall be not less than 50 ft 3 /min (0.02 m 3 /s) for intermittent operation and 20 ft 3 /min (0.009 m 3 /s) for continuous operation. Fans shall comply with the Energy Star Program. E 605.3 Filters. Heating and air conditioning filters shall have a MERV rating of 6 or higher. The air distribution system shall be designed for the pressure drop across the filter.
E 606.0 Indoor Air Quality for Other than Low-Rise E 606.1 Minimum Indoor Air Quality.Residential Buildings. The building shall comply with this code and ASHRAE 62.1 for ventilation air supply.
E 607.0 Environmental Comfort.E 607.1 Thermal Comfort Controls. The mechanical systems and controls of building shall be designed to provide and maintain indoor comfort conditions in accordance with ASHRAE 55. E 607.2 Heating and Air-Conditioning System Design. Heating and air-conditioning systems shall be sized, designed, and have their equipment selected in accordance with the following: (1) Heat loss and heat gain are established in accordance
with ACCA Manual J, ASHRAE handbooks, or other
ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE
ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE ASHRAE
An annual schedule of ventilation complies E 605.1.7.2.1 Annual Average Schedule. with this section when the annual average relative exposure during occupied periods is not more than unity as calculated in accordance with ASHRAE 62.2. [ASHRAE 62.2:4.5.2.1] E 605.1.7.2.2 Block Scheduling. The schedule of ventilation complies with this section when it is broken into blocks of time and each block individually has an average relative exposure during occupied periods that is not more than unity as calculated in ASHRAE 62.2.
tive exposure during occupied periods is not more than unity as calculated in accordance with ASHRAE 62.2. [ASHRAE 62.2:4.5.2.1] E 605.1.7.2.2 Block Scheduling. The schedule of ventilation complies with this section when it is broken into blocks of time and each block individually has an average relative exposure during occupied periods that is not more than unity as calculated in ASHRAE 62.2.
[ASHRAE 62.2:4.5.2.2] E 605.1.7.3 Real-Time Control. A real-time ventilation controller complies with this section when it is designed to adjust the ventilation system based on real-time input to the ventilation calculations so that the average relative exposure during occupied periods is not more than unity as calculated in ASHRAE 62.2. The averaging period shall be not less than one day but not more than one year and shall be based on simple, recursive or running average, but not extrapolation. [ASHRAE 62.2:4.5.3] E 605.1.8 Equivalent Ventilation. A dwelling-unit ventilation system shall be designed and operated in such a way as to provide the same or lower annual exposure as would be provided in accordance with Section E 605.1.3. The calculations shall be based on a single zone with a constant contaminant emission rate. The manufacturer, specifier, or designer of the equivalent ventilation system shall certify that the system is in accordance with this intent and provide supporting documentation.
[ASHRAE 62.2:4.6] E 605.2 Bathroom Exhaust Fans. Except where a whole house energy recovery system is used, a mechanical exhaust fan vented to the outdoors shall be provided in each room
E 605.1.7.1 Short-Term Average Ventilation. To comply with this section, a variable ventilation system shall be installed to provide an average dwelling-unit ventilation rate over any three-hour period that is greater than or equal to Qfan as determined in accordance with Section E 605.1.3.3.
[ASHRAE 62.2:4.5.1] E 605.1.7.2 Scheduled Ventilation. This section shall only be allowed to be used where one or more fixed patterns of designed ventilation are known at the time compliance to Section E 605.0 is being determined. Such patterns include those both clock-driven and driven by typical meteorological data. Compliance with this section shall be in accordance with either Section E 605.1.7.2.1 or Section E 605.1.7.2.2.
[ASHRAE 62.2:4.5.2]
E 608.1 General.E 608.0 Low VOC Solvent Cement and Primer. Primers and solvent cements used to join plastic pipe, and fittings shall be in accordance with Section E 608.1.1 and Section E 608.1.2.
E 608.1.1 Solvent Cement. Solvent cement, including one-step solvent cement, shall have a volatile organic compound (VOC) content of less than or equal to 65 ounces per gallon (oz/gal) (487 g/L) for CPVC cement, 68 oz/gal (509 g/L) for PVC cement, and 43 oz/gal (322 g/L) for ABS cement, as determined by the South Coast Air Quality Management District’s Laboratory Methods of Analysis for Enforcement Samples, Method 316A. E 608.1.2 Primer. Primer shall have a volatile organic compound (VOC) content of less than or equal to 73 oz/gal (546 g/L), as determined by the South Coast Air Quality Management District’s Laboratory Methods of Analysis for Enforcement Samples, Method 316A.
E 701.0 Installer Qualifications.E 701.1 Scope. The provisions of this section address minimum qualifications of installers of mechanical systems covered within the scope of this appendix.
(1) Heat loss and heat gain are established in accordance
with ACCA Manual J, ASHRAE handbooks, or other equivalent methods. (2) Duct systems shall be sized in accordance with ACCA
Manual D, ASHRAE handbooks, or other equivalent
(2) Duct systems shall be sized in accordance with ACCA
Manual D, ASHRAE handbooks, or other equivalent methods. (3) Heating and cooling equipment in accordance with
ACCA Manual S or other equivalent methods.
ACCA Manual S or other equivalent methods.
2019 CALIFORNIA MECHANICAL CODE 419
APPENDIX E any other purpose or distributed to any other persons or parti es.
E 702.1 General.E 702.0 Qualifications. Where permits are required, the Authority Having Jurisdiction shall have the authority to require contractors, installers, or service technicians to demonstrate competency. Where determined by the Authority Having Jurisdiction, the contractor, installer, or service technician shall be licensed to perform such work.
Part I
E 801.0 Heating, Ventilation, and Air Conditioning E 801.1 Applicability.Systems Commissioning. The provisions of this section apply to the commissioning of commercial and institutional HVAC systems.
ect requirements shall be completed at the design phase of the building project, and updated as necessary during the design and construction phases. The basis of design document shall cover not less than the following systems: (1) Heating, ventilation, air conditioning (HVAC) systems
and controls
E 802.1 Commissioning Requirements.E 802.0 Commissioning. HVAC commissioning shall be included in the design and construction processes of the project to verify that the HVAC systems and components meet the owner’s project requirements and in accordance with this appendix. Commissioning shall be performed in accordance with this appendix by personnel trained and certified in commissioning by a nationally recognized organization. Commissioning requirements shall include the following: (1) Owner’s project requirements (2) Basis of design (3) Commissioning measures shown in the construction doc uments
e owner’s project requirements and in accordance with this appendix. Commissioning shall be performed in accordance with this appendix by personnel trained and certified in commissioning by a nationally recognized organization. Commissioning requirements shall include the following: (1) Owner’s project requirements (2) Basis of design (3) Commissioning measures shown in the construction doc uments
(1) Heating, ventilation, air conditioning (HVAC) systems
and controls (2) Water heating systems (3) Renewable energy systems E 802.4 Commissioning Plan. A commissioning plan shall be completed to document the approach to how the project will be commissioned, and shall be started during the design phase of the building project. The commissioning plan shall include not less than the following: (1) General project information (2) Commissioning goals (3) Systems to be commissioned. Plans to test systems and
components shall include not less than the following:
Systems to be commissioned. Plans to test systems and
components shall include not less than the following: (a) A detailed explanation of the original design intent. (b) Equipment and systems to be tested, including the
extent of tests.
(b) Equipment and systems to be tested, including the
extent of tests. (c) Functions to be tested. (d) Conditions under which the test shall be performed. (e) Measurable criteria for acceptable performance. (4) Commissioning team information. (5) Commissioning process activities, schedules, and
responsibilities. Plans for the completion of commis
(3)
uments (4) Commissioning plan (5) Functional performance (6) Testing (7) Post construction documentation and training (8) Commissioning report
HVAC systems and components covered by this appendix as well as process equipment and controls, and renewable energy systems shall be included in the scope of the commissioning requirements. E 802.2 Owner’s Project Requirements (OPR). The performance goals and requirements of the HVAC system shall be documented before the design phase of the project begins. This documentation shall include not less than the following: (1) Environmental and sustainability goals (2) Energy efficiency goals (3) Indoor environmental quality requirements (4) Equipment and systems performance goals (5) Building occupant and O&M personnel expectations E 802.3 Basis of Design (BOD). A written explanation of how the design of the HVAC system meets the owner’s proj
(5) Commissioning process activities, schedules, and
responsibilities. Plans for the completion of commissioning requirements listed in Section E 802.5 through Section E 802.7 shall be included. E 802.5 Functional Performance Testing. Functional performance tests shall demonstrate the correct installation and operation of each component, system, and system-to-system interface in accordance with the approved plans and specifications. Functional performance testing reports shall contain information addressing each of the building components tested, the testing methods utilized, and readings and adjustments made. ing.E 802.6 Post Construction Documentation and Train- A system manual and systems operations training are required.
E 802.6.1 Systems Manual. Documentation of the operational aspects of the HVAC system shall be completed within the systems manual and delivered to the building owner and facilities operator. The systems manual shall include not less than the following: (1) Site information, including facility description, his tory, and current requirements.
(1) Site information, including facility description, his tory, and current requirements. (2) Site contact information. (3) Basic O&M, including general site operating proce dures, basic troubleshooting, recommended mainte
(3) Basic O&M, including general site operating proce dures, basic troubleshooting, recommended maintenance requirements, and site events log. (4) Major systems. (5) Site equipment inventory and maintenance notes.
420 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
(6) Equipment/system warranty documentation and
information.
(6) Equipment/system warranty documentation and
information. (7) “As-Built” design drawings. (8) Other resources and documentation. E 802.6.2 Systems Operations Training. The training of the appropriate maintenance staff for each equipment type or system shall include not less than the following: (1) System/Equipment overview (what it is, what it
does, and what other systems or equipment it inter
(1) System/Equipment overview (what it is, what it
does, and what other systems or equipment it interfaces with). (2) Review of the information in the systems manual. (3) Review of the record drawings on the system/equip ment.
E 803.2.1.2 Responsible Person. The responsible person shall be the contractor or registered design professional of record. A certificate of acceptance shall be signed by a responsible person to take responsibility for the scope of work specified by the certificate of acceptance document. The responsible person shall perform the field testing and verification work, and where this is the case, the responsible person shall complete and sign both the field technician’s signature block and the responsible person’s signature block on the certificate of acceptance form. The responsible person assumes responsibility for the acceptance testing work performed by the field technician agent or employee. E 803.2.1.3 Certificate of Acceptance. The certificate of acceptance shall be submitted to the Authority Having Jurisdiction in order to receive the final certificate of occupancy. The Authority Having Jurisdiction shall not release a final certificate of occupancy unless the submitted certificate of acceptance demonstrates that the specified systems and equipment have been shown to be performing in accordance with the applicable acceptance requirements. The Authority Having Jurisdiction has the authority to require the field technician and responsible person to demonstrate competence, to its satisfaction. Certificate of acceptance forms are located in Section E 806.0.
(3) Review of the record drawings on the system/equip ment. E 802.7 Commissioning Report. A complete report of commissioning process activities undertaken through the design, construction, and post-construction phases of the building project shall be completed and provided to the owner.
Part II
E 803.1 General.E 803.0 Commissioning Acceptance. Part II of this appendix provides a means of verifying the commissioning requirements of Section E 802.1. The activities specified in Part II of this appendix includes three aspects, as described as follows: (1) Visual inspection of the equipment and installation. (2) Review of the certification requirements. (3) Functional tests of the systems and controls. E 803.2 Construction Documents. Details of commissioning acceptance requirements shall be incorporated into the construction documents, including information that describes the details of the functional tests to be performed. This information shall be permitted to be integrated into the specifications for testing and air balancing, energy management and control system, equipment startup procedures or commissioning. It is possible that the work will be performed by a combination of the test and balance (TAB) contractor, mechanical/electrical contractor, and the energy management control system (EMCS) contractor, so applicable roles and responsibilities shall be clearly called out.
E 803.2.1 Roles and Responsibilities. The roles and responsibilities of the persons involved in commissioning acceptance are included in Section E 803.2.1.1 through Section E 803.2.1.3.
E 804.1 General.E 804.0 Commissioning Tests. Functional tests shall be performed on new equipment and systems installed in either new construction or retrofit applications in accordance with this section. The appropriate certificate of acceptance form along with each specific test shall be completed and submitted to the Authority Having Jurisdiction before a final occupancy permit can be granted. E 804.2 Tests. Functional testing shall be performed on the devices and systems listed in this section. The functional test results are documented using the applicable certificate of acceptance forms shown in parenthesis and located in Section E 806.0. The functional tests shall be performed in accordance with Section E 805.0 using the following forms: (1) Minimum ventilation controls for constant and variable
air volume systems (Form MECH-2A).
(1) Minimum ventilation controls for constant and variable
air volume systems (Form MECH-2A). (2) Zone temperature and scheduling controls for constant
volume, single-zone, unitary air conditioner and heat
(3) Duct leakage on a subset of small single-zone systems
depending on the ductwork location (Form MECH-4A). (4) Air economizer controls for economizers that are not fac tory installed and tested (Form MECH-5A).
E 803.2.1.1 Field Technician. The field technician shall be responsible for performing and documenting the results of the acceptance procedures on the certificate of acceptance forms. The field technician shall sign the certificate of acceptance to certify that the information he provides on the certificate of acceptance is true and correct.
(2) Zone temperature and scheduling controls for constant
volume, single-zone, unitary air conditioner and heat pump systems (Form MECH-3A). (3) Duct leakage on a subset of small single-zone systems
depending on the ductwork location (Form MECH-4A).
(4) Air economizer controls for economizers that are not fac tory installed and tested (Form MECH-5A). (5) Demand-controlled ventilation control systems (Form
MECH-6A).
(5) Demand-controlled ventilation control systems (Form
MECH-6A). (6) Supply fan variable flow controls (Form MECH-7A).
2019 CALIFORNIA MECHANICAL CODE 421
APPENDIX E any other purpose or distributed to any other persons or parti es.
(7) Valve leakage for hydronic variable flow systems and
isolation valves on chillers and boilers in plants with
(7) Valve leakage for hydronic variable flow systems and
isolation valves on chillers and boilers in plants with more than one chiller or boiler being served by the same primary pumps through a common header (Form MECH-8A). (8) Supply water temperature reset control strategies pro grammed into the building automation system for water
(8) Supply water temperature reset control strategies pro grammed into the building automation system for water systems (e.g., chilled, hot, or condenser water) (Form MECH-9A). (9) Hydronic variable flow controls on a water system where
the pumps are controlled by variable frequency drives
(9) Hydronic variable flow controls on a water system where
the pumps are controlled by variable frequency drives (e.g., chilled and hot water systems; water-loop heat pump systems) (Form MECH-10A). (10)Automatic demand shed control (Form MECH-11A). (11) Fault detection and diagnostic for DX units (Form
MECH-12A).
the field technician and sign the certificate of acceptance to certify compliance with the acceptance requirements. The responsible person shall be permitted to perform the field technician’s responsibilities, and shall then sign the field technician declaration on the certificate of acceptance to certify that the information on the form is true and correct. E 804.3.4 Certificate of Occupancy. The Authority Having Jurisdiction shall not issue the final certificate of occupancy until required certificates of acceptance are submitted. Copies of completed, signed certificates of acceptance are required to be posted, or made available with the permit(s), and shall be made available to the Authority Having Jurisdiction.
(11) Fault detection and diagnostic for DX units (Form
MECH-12A). (12)Automatic fault detection and diagnostic systems
(AFDD) (Form MECH-13A).
(12)Automatic fault detection and diagnostic systems
(AFDD) (Form MECH-13A). (13)Distributed energy storage DEC/DX AC systems (Form
MECH-14A).
(13)Distributed energy storage DEC/DX AC systems (Form
MECH-14A). (14)Thermal energy storage (TES) systems (Form MECH 15A).
(14)Thermal energy storage (TES) systems (Form MECH 15A). E 804.3 Acceptance Process. The functional testing process shall comply with Section E 804.3.1 through Section E 804.3.4.
E 804.3.1 Plan Review. The installing contractor, registered design professional of record, owner’s agent, or the person responsible for certification of the acceptance testing on the certificate of acceptance (responsible person) shall review the plans and specifications to ensure that they are in accordance with the acceptance requirements. This is typically done prior to signing a certificate of compliance. E 804.3.2 Construction Inspection. The installing contractor, registered design professional of record, owner’s agent, or the person responsible for certification of the acceptance testing on the certificate of acceptance (responsible person) shall perform a construction inspection prior to testing to ensure that the equipment that is installed is capable of complying with the requirements of this appendix and is calibrated. The installation of associated systems and equipment necessary for proper system operation is required to be completed prior to the testing. E 804.3.3 Acceptance Testing. One or more field technicians shall perform the acceptance testing; identify performance deficiencies; ensure that they are corrected; and where necessary, repeat the acceptance procedures until the specified systems and equipment are performing in accordance with the acceptance requirements. The field technician who performs the testing shall sign the certificate of acceptance to certify the information has been provided to document the results of the acceptance procedures is true and correct.
E 805.0 HVAC System Tests. E 805.1 Variable Air Volume Systems (Form MECH-2A). This test ensures that adequate outdoor air ventilation is provided through the variable air volume air handling unit at two representative operating conditions. The test consists of measuring outdoor air values at maximum flow and at or near minimum flow. The test verifies that the minimum volume of outdoor air is introduced to the air handling unit where the system is in occupied mode at these two conditions of supply airflow. This test shall be performed in conjunction with supply fan variable flow controls test procedures to reduce the overall system testing time as both tests use the same two conditions of airflow for their measurements.
E 805.1.1 Test Procedure. The procedure for performing a functional test for variable air volume systems shall be in accordance with Section E 805.1.1.1 and Section E 805.1.1.2.
E 805.1.1.1 Construction Inspection. Prior to functional testing, verify and document that the system controlling outside airflow is calibrated either in the field or factory. E 805.1.1.2 Functional Testing. The functional testing shall be in accordance with the following steps: Step 1: Where the system has an outdoor air economizer, force the economizer high limit to disable economizer control (e.g., for a fixed drybulb high limit, lower the setpoint below the current outdoor air temperature). Step 2: Adjust supply airflow to either the sum of the minimum zone airflows or 30 percent of the total design airflow. Verify and document the following: (1) Measured outside airflow reading is within 10
has an outdoor air economizer, force the economizer high limit to disable economizer control (e.g., for a fixed drybulb high limit, lower the setpoint below the current outdoor air temperature). Step 2: Adjust supply airflow to either the sum of the minimum zone airflows or 30 percent of the total design airflow. Verify and document the following: (1) Measured outside airflow reading is within 10
percent of the total ventilation air called for in
The responsible person shall review the test results from the acceptance requirement procedures provided by
(1) Measured outside airflow reading is within 10
percent of the total ventilation air called for in the certificate of compliance. (2) OSA controls stabilize within 5 minutes. Step 3: Adjust supply airflow to achieve design airflow. Verify and document the following: (1) Measured outside airflow reading is within 10
percent of the total ventilation air called for in
Measured outside airflow reading is within 10
percent of the total ventilation air called for in the certificate of compliance.
422 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
(2) OSA controls stabilize within 5 minutes. Step 4: Restore system to “as-found” operating conditions. E 805.1.2 Acceptance Criteria. System controlling outdoor air flow shall be calibrated in the field or at the factory.
(2) Thermostat shall be in accordance with temper ature adjustment and dead band requirements. (3) Occupied, unoccupied, and holiday schedules
shall be programmed per the facility’s schedule.
E 805.3.1.1 Construction Inspection. Prior to functional testing, verify and document the following: (1) Thermostat is located within the space-condi tioning zone that is served by the HVAC sys
Measured outdoor airflow reading shall be within 10 percent of the total value found on the certificate of compliance under the following conditions: (1) Minimum system airflow. (2) Thirty percent of total design flow design supply air flow.
(1) Thermostat is located within the space-condi tioning zone that is served by the HVAC system. (2) Thermostat shall be in accordance with temper ature adjustment and dead band requirements.
(2) Thirty percent of total design flow design supply air flow. The purpose of this test is to ensure that adequate outdoor air E 805.2 Constant Volume Systems (Form MECH-2A). ventilation is provided through the constant volume air handling unit to the spaces served under operating conditions. The intent of this test is to verify that the minimum volume of outdoor air is introduced to the air handling unit during typical space occupancy.
E 805.2.1 Test Procedure. The procedure for performing a functional test for constant air volume systems shall be in accordance with Section E 805.2.1.1 and Section E 805.2.1.2.
E 805.2.1.1 Construction Inspection. Prior to functional testing, verify and document the following: (1) Minimum position is marked on the outside air
damper.
(1) Minimum position is marked on the outside air
damper. (2) The system has means of maintaining the min imum outdoor air damper position.
(3) Occupied, unoccupied, and holiday schedules
shall be programmed per the facility’s schedule. (4) Preoccupancy purge is programmed. E 805.3.1.2 Functional Testing. The functional testing shall be in accordance with the following steps: Step 1: Disable economizer and demand control ventilation systems (where applicable). Step 2: Simulate a heating demand during the occupied condition. Verify and document the following: (1) Supply fan operates continually. (2) The unit provides heating. (3) No cooling is provided by the unit. (4) Outside air damper is at minimum position. Step 3: Simulate operation in the dead band during occupied condition. Verify and document the following: (1) Supply fan operates continually. (2) Neither heating nor cooling is provided by the
unit.
(2) Neither heating nor cooling is provided by the
unit. (3) Outside air damper is at minimum position. Step 4: Simulate cooling demand during occupied condition. Lock out economizer (where applicable). Verify and document the following: (1) Supply fan operates continually. (2) The unit provides cooling. (3) No heating is provided by the unit. (4) Outside air damper is at minimum position. Step 5: Simulate operation in the dead band during unoccupied mode. Verify and document the following: (1) Supply fan is off. (2) Outside air damper is fully closed. (3) Neither heating nor cooling is provided by the
unit.
(2) The system has means of maintaining the min imum outdoor air damper position. E 805.2.1.2 Functional Testing. Where the system has an outdoor air economizer, force the economizer to the minimum position and stop outside air damper modulation (e.g., for a fixed drybulb high limit, lower the setpoint below the current outdoor air temperature). E 805.2.2 Acceptance Criteria. The system has a means of maintaining the minimum outdoor air damper position. The minimum damper position is marked on the outdoor air damper. The measured outside airflow reading shall be within 10 percent of the total ventilation air called for in the certificate of compliance. E 805.3 Constant Volume, Single-Zone, Unitary Air (Form MECH-3A).Conditioner and Heat Pumps Systems Acceptance The purpose of this test is to verify the individual components of a constant volume, single-zone, unitary air conditioner and heat pump system function correctly; including: thermostat installation and programming, supply fan, heating, cooling, and damper operation.
E 805.3.1 Test Procedure. The procedure for performing a functional test for constant volume, singlezone, unitary air conditioner and heat pump systems shall be in accordance with Section E 805.3.1.1 and Section E 805.3.1.2.
(3) Neither heating nor cooling is provided by the
unit. Step 6: Simulate heating demand during unoccupied conditions. Verify and document the following: (1) Supply fan is on (either continuously or cycling). (2) Heating is provided by the unit. (3) No cooling is provided by the unit. (4) Outside air damper is either closed or at mini mum position.
mum position.
2019 CALIFORNIA MECHANICAL CODE 423
APPENDIX E any other purpose or distributed to any other persons or parti es.
Step 7: Simulate cooling demand during unoccupied condition. Lock out economizer (where applicable). Verify and document the following: (1) Supply fan is on (either continuously or
cycling).
(1) Supply fan is on (either continuously or
cycling). (2) Cooling is provided by the unit. (3) No heating is provided by the unit. (4) Outside air damper is either closed or at mini mum position.
E 805.4.1.1 Construction Inspection. Prior to functional testing, verify and document the following: (1) Duct connections shall comply with the require ments of this appendix and this code.
(4) Outside air damper is either closed or at mini mum position. Step 8: Simulate manual override during unoccupied condition. Verify and document the following: (1) System operates in “occupied” mode. (2) System reverts to “unoccupied” mode where
manual override time period expires.
(5) Insulation R-Values shall comply with the min imum requirements of this appendix. E 805.4.1.2 Functional Testing. Perform duct leakage test in accordance with Section E 503.4.7.2.1. E 805.4.2 Acceptance Criteria. Flexible ducts are not compressed or constricted. Duct connections shall comply with the requirements of this appendix and this code (new ducts only). Joints and seams are properly sealed in accordance with the requirements of this appendix and this code (new ducts only). Duct R-values shall comply with the minimum requirements of this appendix (new ducts only). Insulation is protected from damage and suitable for outdoor usage where applicable (new ducts only). The leakage shall not exceed the rate in accordance with Section E 503.4.7.2. E 805.5 Air Economizer Controls Acceptance (FormMECH-5A). The purpose of functionally testing an air economizer cycle is to verify that an HVAC system uses outdoor air to satisfy space cooling loads where outdoor air conditions are acceptable. There are two types of economizer controls; stand-alone packages and DDC controls. The stand-alone packages are commonly associated with small unitary rooftop HVAC equipment, and DDC controls are typically associated with built-up or large packaged air handling systems. Test procedures for both economizer control types are provided.
(1) Duct connections shall comply with the require ments of this appendix and this code. (2) Flexible ducts are not compressed. (3) Ducts are fully accessible for testing. (4) Joints and seams are properly sealed in accor dance with the requirements of this appendix.
(4) Joints and seams are properly sealed in accor dance with the requirements of this appendix. (5) Insulation R-Values shall comply with the min imum requirements of this appendix.
(2) System reverts to “unoccupied” mode where
manual override time period expires. Step 9: Restore economizer and demand control ventilation systems (where applicable), and remove system overrides initiated during the test. E 805.3.2 Acceptance Criteria. Thermostat is located within the space-conditioning zone that is served by the respective HVAC system. The thermostat shall comply with temperature adjustment and dead band requirements. Occupied, unoccupied, and holiday schedules shall be programmed per the facility’s schedule. Preoccupancy purge is programmed in accordance with the requirements. The purpose of this test is to verify duct work associated with E 805.4 Air Distribution Systems (Form MECH-4A). non-exempt constant volume, single-zone, HVAC units (e.g., air conditioners, heat pumps, and furnaces) meet the material, installation, and insulation R-values and leakage requirements outlined in this appendix. This test is required for single-zone units serving less than 5000 square feet (464.52 m 2 ) of floor area where 25 percent or more of the duct surface area is in one of the following spaces: (1) Outdoors. (2) In a space directly under a roof where the U-factor of the
roof is greater than the U-factor of the ceiling.
(2) In a space directly under a roof where the U-factor of the
roof is greater than the U-factor of the ceiling. (3) In a space directly under a roof with fixed vents or open ings to the outside or unconditioned spaces.
(3)
ings to the outside or unconditioned spaces. (4) In an unconditioned crawlspace. (5) In other unconditioned spaces.
This test applies to both new duct systems and to existing duct systems being extended or the space conditioning system is altered by the installation or replacement of space conditioning equipment, including: replacement of the air handler; outdoor condensing unit of a split system air conditioner or heat pump; cooling or heating coil; or the furnace heat exchanger. Existing duct systems do not have to be tested where they are insulated or sealed with asbestos.
For units with economizers that are factory installed and certified operational by the manufacturer to economizer quality control requirements, the in-field economizer functional tests do not have to be conducted. A copy of the manufacturer’s certificate shall be attached to the Form MECH-5A. However, the construction inspection, including compliance with high-temperature lockout temperature setpoint, shall be completed regardless of whether the economizer is field or factory installed.
(1) Economizer lockout setpoint is in accordance
with this appendix. (2) Economizer lockout control sensor is located to
prevent false readings.
E 805.4.1 Test Procedure. The procedure for performing a functional test for air distribution systems shall be in accordance with Section E 805.4.1.1 and Section E 805.4.1.2.
E 805.5.1 Test Procedure. The procedure for performing a functional test for air economizer controls shall comply with Section E 805.5.1.1 and Section E 805.5.1.2. E 805.5.1.1 Construction Inspection. Prior to functional testing, verify and document the following: (1) Economizer lockout setpoint is in accordance
with this appendix.
prevent false readings.
424 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
(3) System is designed to provide up to 100 percent
outside air without over-pressurizing the build
(3) System is designed to provide up to 100 percent
outside air without over-pressurizing the building. (4) For systems with DDC controls lockout sen sor(s) are either factory calibrated or field cali
(5) The outdoor air damper is 100 percent open before
mechanical cooling is enabled and for units 75 000
(4) For systems with DDC controls lockout sen sor(s) are either factory calibrated or field calibrated. (5) For systems with non-DDC controls, manufac turer’s startup and testing procedures are
(5) For systems with non-DDC controls, manufac turer’s startup and testing procedures are applied. E 805.5.1.2 Functional Testing. The functional testing shall be in accordance with the following steps: Step 1: Disable demand control ventilation systems (where applicable). Step 2: Enable the economizer, and simulate a cooling demand large enough to drive the economizer fully open. Verify and document the following: (1) Economizer damper is 100 percent opened and
return air damper is 100 percent closed.
(5) The outdoor air damper is 100 percent open before
mechanical cooling is enabled and for units 75 000 Btu/h (22 kw) and larger remains at 100 percent open while mechanical cooling is enabled (economizer integration where used for compliance). (6) Where the economizer is disabled, the outdoor air
damper closes to a minimum position; the return
(1) Economizer damper is 100 percent opened and
return air damper is 100 percent closed. (2) Where applicable, verify that the economizer
remains 100 percent open where the cooling
(2) Where applicable, verify that the economizer
remains 100 percent open where the cooling demand can no longer be met by the economizer alone. (3) Applicable fans and dampers operate as
intended to maintain building pressure.
(6) Where the economizer is disabled, the outdoor air
damper closes to a minimum position; the return damper modulates 100 percent open, and mechanical cooling remains enabled. Acceptance (Form MECH-6A).E 805.6 Demand-Controlled Ventilation Systems The purpose of this test is to verify that systems required to employ demand-controlled ventilation shall be permitted to vary outside ventilation flow rates based on maintaining interior carbon dioxide (CO2) concentration setpoints. Demand-controlled ventilation refers to an HVAC system’s ability to reduce outdoor air ventilation flow below design values where the space served is at less than design occupancy. Carbon dioxide is a good indicator of occupancy load and is the basis used for modulating ventilation flow rates.
(3) Applicable fans and dampers operate as
intended to maintain building pressure. (4) The unit heating is disabled. Step 3: Disable the economizer and simulate a cooling demand. Verify and document the following: (1) Economizer damper shall close to its minimum
position.
E 805.6.1 Test Procedure. The procedure for performing a functional test for demand-control ventilation (DVC) systems shall be in accordance with Section E 805.6.1.1 and Section E 805.6.1.2. E 805.6.1.1 Construction Inspection. Prior to functional testing, verify and document the following: (1) Carbon dioxide control sensor is factory cali brated or field-calibrated in accordance with
(1) Economizer damper shall close to its minimum
position. (2) Applicable fans and dampers shall operate as
intended to maintain building pressure.
(1) Carbon dioxide control sensor is factory cali brated or field-calibrated in accordance with this appendix. (2) The sensor is located in the high-density space
between 3 feet (914 mm) and 6 feet (1829 mm)
(2) The sensor is located in the high-density space
between 3 feet (914 mm) and 6 feet (1829 mm) above the floor or at the anticipated level of the occupants’ heads. (3) DCV control setpoint is at or below the carbon
dioxide concentration permitted by this appen
(2) Applicable fans and dampers shall operate as
intended to maintain building pressure. (3) The unit heating is disabled. Step 4: Simulate a heating demand, and set the economizer so that it is capable of operating (e.g., actual outdoor air conditions are below lockout setpoint). Verify the economizer is at minimum position. Step 5: Restore demand control ventilation systems (where applicable) and remove system overrides initiated during the test. E 805.5.2 Acceptance Criteria. Air economizer controls acceptance criteria shall be as follows: (1) Where the economizer is factory installed and certi fied, a valid factory certificate is required for accept
(1) Where the economizer is factory installed and certi fied, a valid factory certificate is required for acceptance. No additional equipment tests are necessary. (2) Air economizer lockout setpoint is in accordance
with this appendix. Outside sensor location accu
(3) DCV control setpoint is at or below the carbon
dioxide concentration permitted by this appendix. E 805.6.1.2 Functional Testing. The functional testing shall be in accordance with the following steps: Step 1: Disable economizer controls. Step 2: Simulate a signal at or slightly above the carbon dioxide concentration setpoint required by this appendix. Verify and document the following: (1) For single zone units, outdoor air damper mod ulates open to satisfy the total ventilation air
(2) Air economizer lockout setpoint is in accordance
with this appendix. Outside sensor location accurately reads true outdoor air temperature and is not affected by exhaust air or other heat sources. (3) Sensors are located to achieve the desired control. (4) During economizer mode, the outdoor air damper
shall modulate open to a maximum position and
(1) For single zone units, outdoor air damper mod ulates open to satisfy the total ventilation air called for in the certificate of compliance. (2) For multiple zone units, either outdoor air
damper or zone damper modulate open to sat
ulates to the design minimum value.
During economizer mode, the outdoor air damper
shall modulate open to a maximum position and return air damper to 100 percent closed.
(2) For multiple zone units, either outdoor air
damper or zone damper modulate open to satisfy the zone ventilation requirements. Step 3: Simulate signal well below the carbon dioxide setpoint. Verify and document the following: (1) For single zone units, outdoor air damper mod ulates to the design minimum value.
2019 CALIFORNIA MECHANICAL CODE 425
APPENDIX E any other purpose or distributed to any other persons or parti es.
(2) For multiple zone units, either outdoor air
damper or zone damper modulate to satisfy the
E 805.7.1.1 Construction Inspection. Prior to functional testing, verify and document the following: (1) Supply fan controls modulate to increase capac ity.
(2) For multiple zone units, either outdoor air
damper or zone damper modulate to satisfy the reduced zone ventilation requirements. Step 4: Restore economizer controls and remove system overrides initiated during the test. Step 5: With controls restored, apply carbon dioxide calibration gas at a concentration slightly above the setpoint to the sensor. Verify that the outdoor air damper modulates open to satisfy the total ventilation air called for in the certificate of compliance. E 805.6.2 Acceptance Criteria. Demand-controlled ventilation systems acceptance criteria shall be as follows: (1) Each carbon dioxide sensor is factory calibrated
(with calibration certificate) or field calibrated.
(1) Supply fan controls modulate to increase capac ity. (2) Supply fan maintains discharge static pressure
within plus or minus 10 percent of the current
(2) Supply fan maintains discharge static pressure
within plus or minus 10 percent of the current operating set point. (3) Supply fan controls stabilize within a 5 minute
period.
(1) Each carbon dioxide sensor is factory calibrated
(with calibration certificate) or field calibrated. (2) Each carbon dioxide sensor is wired correctly to the
controls to ensure proper control of the outdoor air
(2) Each carbon dioxide sensor is wired correctly to the
controls to ensure proper control of the outdoor air damper. (3) Each carbon dioxide sensor is located correctly
within the space 1 foot (305 mm) to 6 feet (1829
(3) Supply fan controls stabilize within a 5 minute
period. E 805.7.1.2 Functional Testing. The functional testing shall be in accordance with the following steps: Step 1: Simulate demand for design airflow. Verify and document the following: (1) Supply fan controls modulate to increase capac ity.
(1) Supply fan controls modulate to increase capac ity. (2) Supply fan maintains discharge static pressure
within plus or minus 10 percent of the current
(3) Each carbon dioxide sensor is located correctly
within the space 1 foot (305 mm) to 6 feet (1829 mm) above the floor. (4) Interior carbon dioxide concentration setpoint is not
more than 600 parts per million (ppm) plus outdoor
(2) Supply fan maintains discharge static pressure
within plus or minus 10 percent of the current operating set point. (3) Supply fan controls stabilize within a 5 minute
period.
(4) Interior carbon dioxide concentration setpoint is not
more than 600 parts per million (ppm) plus outdoor air carbon dioxide value where dynamically measured or not more than 1000 ppm where no OSA sensor is provided. (5) A minimum OSA setting is provided where the sys tem is in occupied mode in accordance with this
(3) Supply fan controls stabilize within a 5 minute
period. Step 2: Simulate demand for minimum airflow. Verify and document the following: (1) Supply fan controls modulate to decrease
capacity.
(5) A minimum OSA setting is provided where the sys tem is in occupied mode in accordance with this appendix regardless of space carbon dioxide readings. (6) A maximum OSA damper position for DCV control
shall be established in accordance with this appen
(1) Supply fan controls modulate to decrease
capacity. (2) Current operating setpoint has decreased (for
systems with DDC to the zone level).
(2) Current operating setpoint has decreased (for
systems with DDC to the zone level). (3) Supply fan maintains discharge static pressure
within plus or minus 10 percent of the current
(6) A maximum OSA damper position for DCV control
shall be established in accordance with this appendix, regardless of space carbon dioxide readings. (7) The outdoor air damper shall modulate open where
the carbon dioxide concentration within the space
(3) Supply fan maintains discharge static pressure
within plus or minus 10 percent of the current operating setpoint. (4) Supply fan controls stabilize within a 5 minute
period.
(7) The outdoor air damper shall modulate open where
the carbon dioxide concentration within the space exceeds setpoint. (8) The outdoor air damper modulates closed (toward
minimum position) where the carbon dioxide con
(4) Supply fan controls stabilize within a 5 minute
period. Step 3: Restore system to correct operating conditions. E 805.7.2 Acceptance Criteria. Supply fan variable flow controls acceptance criteria shall be as follows: (1) Static pressure sensor(s) is factory calibrated (with
calibration certificate) or field calibrated.
(1) Static pressure sensor(s) is factory calibrated (with
calibration certificate) or field calibrated. (2) For systems without DDC controls to the zone level,
the pressure sensor setpoint is less than one-third of
(8) The outdoor air damper modulates closed (toward
minimum position) where the carbon dioxide concentration within the space is below setpoint. MECH-7A).E 805.7 Supply Fan Variable Flow Controls (Form The purpose of this test is to ensure that the supply fan in a variable air volume application modulates to meet system airflow demand. In most applications, the individual VAV boxes serving each space will modulate the amount of air delivered to the space based on heating and cooling requirements. As a result, the total supply airflow provided by the central air handling unit shall vary to maintain sufficient airflow through each VAV box. Airflow shall be controlled using a variable frequency drive (VFD) to modulate supply fan speed and vary system airflow. The most common strategy for controlling the VFD is to measure and maintain static pressure within the duct.
(2) For systems without DDC controls to the zone level,
the pressure sensor setpoint is less than one-third of the supply fan design static pressure. (3) For systems with DDC controls with VAV boxes
reporting to the central control panel, the pressure
(3) For systems with DDC controls with VAV boxes
reporting to the central control panel, the pressure setpoint is reset by zone demand (box damper position or a trim and respond algorithm). At full flow: (1) Supply fan maintains discharge static pressure
within plus or minus 10 percent of the current oper
E 805.7.1 Test Procedure. The procedure for performing a functional test for supply fan variable controls shall be in accordance with Section E 805.7.1.1 and Section E 805.7.1.2.
(1) Supply fan maintains discharge static pressure
within plus or minus 10 percent of the current operating control static pressure setpoint. (2) Supply fan controls stabilizes within a 5 minute
period.
(2) Supply fan controls stabilizes within a 5 minute
period. (3) At minimum flow (not less than 30 percent of total
design flow).
(3) At minimum flow (not less than 30 percent of total
design flow). (4) Supply fan controls modulate to decrease capacity.
426 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
(5) Current operating setpoint has decreased (for sys tems with DDC to the zone level).
(5) Current operating setpoint has decreased (for sys tems with DDC to the zone level). (6) Supply fan maintains discharge static pressure
within plus or minus 10 percent of the current oper
ditions. The chilled water supply temperature shall be permitted to be raised as the cooling load decreases, and heating hot water supply temperature shall be permitted to be lowered as the heating load decreases.
This requirement applies to chilled and hot water systems that are not designed for variable flow, and that have a design capacity greater than or equal to 500 000 Btu/h (147 kW).
(6) Supply fan maintains discharge static pressure
within plus or minus 10 percent of the current operating setpoint. E 805.8 Valve Leakage (Form MECH-8A). The purpose of this test is to ensure that control valves serving variable flow systems are designed to withstand the pump pressure over the full range of operation. Valves with insufficient actuators will lift under certain conditions causing water to leak through and loss of control. This test applies to the variable flow systems, chilled and hot-water variable flow systems, chiller isolation valves, boiler isolation valves, and watercooled air conditioner and hydronic heat pump systems.
E 805.8.1 Test Procedure. The procedure for performing a functional test for valve leakage shall be in accordance with Section E 805.8.1.1 and Section E 805.8.1.2. E 805.8.1.1 Construction Inspection. Prior to functional testing, verify and document the valve and piping arrangements were installed in accordance with the design drawings. E 805.8.1.2 Functional Testing. The functional testing shall be in accordance with the following steps: Step 1: For each pump serving the distribution system, dead head the pumps using the discharge isolation valves at the pumps. Document the following: (1) Record the differential pressure across the
pumps.
E 805.9.1 Test Procedure. The procedure for performing a functional test for supply water temperature reset controls shall be in accordance with Section E 805.9.1.1 and Section E 805.9.1.2. E 805.9.1.1 Construction Inspection. Prior to functional testing, verify and document the supply water temperature sensors shall be either factory or field calibrated. E 805.9.1.2 Functional Testing. The functional testing shall be in accordance with the following steps: Step 1: Change reset control variable to its maximum value. Verify and document the following: (1) Chilled or hot water temperature setpoint is
reset to appropriate value.
(1) Chilled or hot water temperature setpoint is
reset to appropriate value. (2) Actual supply temperature changes to meet set point.
(2) Actual supply temperature changes to meet set point. (3) Verify that supply temperature is within 2 per cent of the control setpoint.
(1) Record the differential pressure across the
pumps. (2) Verify that this is within 5 percent of the sub mittal data for the pump.
(2) Actual supply temperature changes to meet set point. (3) Verify that supply temperature is within 2 per cent of the control setpoint.
(2) Verify that this is within 5 percent of the sub mittal data for the pump. Step 2: Reopen the pump discharge isolation valves. Automatically close valves on the systems being tested. Where three-way valves are present, close off the bypass line. Verify and document the following: (1) The valves automatically close. (2) Record the pressure differential across the
pump.
(3) Verify that supply temperature is within 2 per cent of the control setpoint. Step 2: Change reset control variable to its minimum value. Verify and document the following: (1) Chilled or hot water temperature setpoint is
reset to appropriate value.
(1) Chilled or hot water temperature setpoint is
reset to appropriate value. (2) Actual supply temperature changes to meet set point.
(2) Record the pressure differential across the
pump. (3) Verify that the pressure differential is within 5
percent of the reading from Step 1 for the pump
(3) Verify that supply temperature is within 2 per cent of the control setpoint. Step 3: Restore reset control variable to automatic control. Verify and document the following: (1) Chilled or hot water temperature setpoint is
reset to appropriate value.
(1) Chilled or hot water temperature setpoint is
reset to appropriate value. (2) Actual supply temperature changes to meet set point.
(2) Actual supply temperature changes to meet set point. (3) Verify that supply temperature is within 2 per cent of the control setpoint.
(3) Verify that the pressure differential is within 5
percent of the reading from Step 1 for the pump that is operating during the valve test. Step 3: Restore system to correct operating conditions. E 805.8.2 Acceptance Criteria. System has no flow where coils are closed and the pump is turned on. E 805.9 Supply Water Temperature Reset Controls (Form MECH-9A). The purpose of this test is to ensure that both the chilled water and hot water supply temperatures are automatically reset based on either building loads or outdoor air temperature, as indicated in the control sequences. Many HVAC systems are served by central chilled and heating hot water plants. The supply water operating temperatures shall meet peak loads where the system is operating at design conditions. As the loads vary, the supply water temperatures shall be permitted to be adjusted to satisfy the new operating con
(3) Verify that supply temperature is within 2 per cent of the control setpoint. E 805.9.2 Acceptance Criteria. The supply water temperature sensors are either factory calibrated (with calibration certificates) or field-calibrated. Sensor performance shall comply with the specifications. The supply water reset is operational. E 805.10 Hydronic System Variable Flow Controls (Form MECH-10A). The purpose of this test is to ensure that hydronic variable flow chilled water and water-loop heat pump systems with circulating pumps larger than 5 hp (3.7 kW) vary system flow rate by modulating pump speed using a variable frequency drive (VFD) or equivalent. As the loads within the building fluctuate, control valves modulate the amount of water passing through each coil and add or remove
2019 CALIFORNIA MECHANICAL CODE 427
APPENDIX E any other purpose or distributed to any other persons or parti es.
the desired amount of energy from the air stream to satisfy the load. In the case of water-loop heat pumps, each two-way control valve associated with a heat pump will be closed where that unit is not operating. As each control valve modulates, the pump variable frequency drive (VFD) responds accordingly to meet system water flow requirements. This is not required on heating hot water systems with variable flow designs or for condensing water serving water cooled chillers.
E 805.10.1 Test Procedure. The procedure for performing a functional test for hydronic system variable flow controls shall be in accordance with Section E 805.10.1.1 and Section E 805.10.1.2. E 805.10.1.1 Construction Inspection. Prior to functional testing, verify and document the pressure sensors are either factory or field calibrated. E 805.10.1.2 Functional Testing. The functional testing shall comply with the following steps: Step 1: Open control valves to increase water flow to not less than 90 percent design flow. Verify and document the following: (1) Pump speed increases. (2) System pressure is either within plus or minus
5 percent of current operating setpoint, or the
EMCS interface enables activation of the central demand shed controls. E 805.11.1.2 Functional Testing. The functional testing shall comply with the following steps: Step 1: Engage the global demand shed system. Verify and document the following: (1) That the cooling setpoint in noncritical spaces
increases by the proper amount.
(1) That the cooling setpoint in noncritical spaces
increases by the proper amount. (2) That the cooling setpoint in critical spaces do
not change.
(2) That the cooling setpoint in critical spaces do
not change. Step 2: Disengage the global demand shed system. Verify and document the following: (1) That the cooling setpoint in noncritical spaces
return to their original values.
(1) That the cooling setpoint in noncritical spaces
return to their original values. (2) That the cooling setpoint in critical spaces do
not change.
(2) System pressure is either within plus or minus
5 percent of current operating setpoint, or the pressure is below the setpoint, and the pumps are operating at 100 percent speed. (3) System operation shall stabilize within 5 min utes after test procedures are initiated.
(3) System operation shall stabilize within 5 min utes after test procedures are initiated. Step 2: Modulate control valves to reduce water flow to 50 percent of the design flow or less, but not lower than the pump minimum flow. Verify and document the following: (1) Pump speed decrease. (2) Current operating setpoint has decreased (for
systems with DDC to the zone level).
(2) Current operating setpoint has decreased (for
systems with DDC to the zone level). (3) Current operating setpoint has not increased
(for all other systems).
(2) That the cooling setpoint in critical spaces do
not change. E 805.11.2 Acceptance Criteria. The control system changes the setpoints of noncritical zones on activation of a single central hardware or software point then restores the initial setpoints where the point is released. E 805.12 Fault Detection and Diagnostics (FDD) for MECH-12A).Packaged Direct-Expansion (DX) Units (Form The purpose of this test is to verify proper fault detection and reporting for automated fault detection and diagnostics systems for packaged units. Automated FDD systems ensure proper equipment operation by identifying and diagnosing common equipment problems such as improper refrigerant charge, low airflow, or faulty economizer operation. Qualifying FDD systems receive a compliance credit where using the performance approach. A system that does not meet the eligibility requirements shall be permitted to be installed, but no compliance credit will be given.
(3) Current operating setpoint has not increased
(for all other systems). (4) System pressure is within 5 percent of current
operating setpoint.
(4) System pressure is within 5 percent of current
operating setpoint. (5) System operation stabilizes within 5 minutes
after test procedures are initiated.
E 805.12.1 Test Procedure. The procedure for performing a functional test for fault detection and diagnostics (FDD) for packaged direct-expansion (DX) units shall be in accordance with Section E 805.12.1.1 and Section E 805.12.1.2.
E 805.12.1.1 Construction Inspection. Prior to functional testing, verify and document that the FDD hardware is installed on equipment by the manufacturer, and that equipment make and model include factory-installed FDD hardware that match the information indicated on copies of the manufacturer’s cut sheets and on the plans and specifications.
(5) System operation stabilizes within 5 minutes
after test procedures are initiated. E 805.10.2 Acceptance Criteria. The differential pressure sensor is either factory calibrated (with calibration certificates) or field calibrated. The pressure sensor shall be located at or near the most remote HX or control valve. The setpoint system controls shall stabilize. MECH-11A).E 805.11 Automatic Demand Shed Control (Form The purpose of this test is to ensure that the central demand shed sequences have been properly programmed into the DDC system.
E 805.11.1 Test Procedure. The procedure for performing a functional test for automatic demand shed controls shall be in accordance with Section E 805.11.1.1 and Section E 805.11.1.2.
This procedure applies to fault detection and diagnostics (FDD) system for direct-expansion packaged units containing the following features: (1) The unit shall include a factory-installed econ omizer and shall limit the economizer deadband
(1) The unit shall include a factory-installed econ omizer and shall limit the economizer deadband to not more than 2°F (-17°C). (2) The unit shall include direct-drive actuators on
outside air and return air dampers.
E 805.11.1.1 Construction Inspection. Prior to functional testing, verify and document that the
(2) The unit shall include direct-drive actuators on
outside air and return air dampers. (3) The unit shall include an integrated economizer
with either differential drybulb or differential
The unit shall include an integrated economizer
with either differential drybulb or differential enthalpy control.
428 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
(4) The unit shall include a low temperature lock out on the compressor to prevent coil freeze-up
(4) The unit shall include a low temperature lock out on the compressor to prevent coil freeze-up or comfort problems. (5) Outside air and return air dampers shall have
maximum leakage rates in accordance to this
(5) Outside air and return air dampers shall have
maximum leakage rates in accordance to this appendix. (6) The unit shall have an adjustable expansion
control device such as a thermostatic expansion
(6) The unit shall have an adjustable expansion
control device such as a thermostatic expansion valve (TXV). (7) To improve the ability to troubleshoot charge
and compressor operation, a high-pressure
(7) To improve the ability to troubleshoot charge
and compressor operation, a high-pressure refrigerant port will be located on the liquid line. A low-pressure refrigerant port will be located on the suction line. (8) The following sensors shall be permanently
installed to monitor system operation, and the
E 805.12.2 Acceptance Criteria. The system is able to detect a low airflow condition and report the fault. The system is able to detect where refrigerant charge is low or high and the fault is reported. E 805.13 Automatic Fault Detection Diagnostics nal Units (Form MECH-13A).(FDD) for Air Handling Units (AHU) and Zone Termi- The purpose of this test is to verify that the system detects common faults in air handling units and terminal units. FDD systems for air handling units and zone terminal units require DDC controls to the zone level. Successful completion of this test provides a compliance credit where using the performance approach. An FDD system that does not pass this test shall be permitted to be installed, but no compliance credit will be given.
The following sensors shall be permanently
installed to monitor system operation, and the controller shall have the capability of displaying the value of each parameter: (a) Refrigerant suction pressure (b) Refrigerant suction temperature (c) Liquid line pressure (d) Liquid line temperature (e) Outside air temperature (f) Outside air relative humidity (g) Return air temperature (h) Return air relative humidity (i) Supply air temperature (j) Supply air relative humidity The controller will provide system status by indicating the following conditions: (1) Compressor enabled (2) Economizer enabled (3) Free cooling available (4) Mixed air low limit cycle active (5) Heating enabled
rature (e) Outside air temperature (f) Outside air relative humidity (g) Return air temperature (h) Return air relative humidity (i) Supply air temperature (j) Supply air relative humidity The controller will provide system status by indicating the following conditions: (1) Compressor enabled (2) Economizer enabled (3) Free cooling available (4) Mixed air low limit cycle active (5) Heating enabled
E 805.13.1 Test Procedure. The procedure for performing a functional test for automatic fault detection diagnostics (FDD) for Air Handling Units and Zone Terminal Units shall be in accordance with Section E 805.13.1.1. E 805.13.1.1 Functional Testing. The functional testing shall be in accordance with Section E 805.13.1.1.1 and Section E 805.13.1.1.2. E 805.13.1.1.1 Functional Testing for AirHandling Units. The functional testing of AHU with FDD controls shall be in accordance with the following steps: Step 1: Sensor drift/failure: (1) Disconnect outside air temperature sensor
from unit controller.
(1) From the control system workstation, com mand the mixing box dampers to full open (100 percent outdoor air). (2) Disconnect power to the actuator and ver ify that a fault is reported at the control
(2) Disconnect power to the actuator and ver ify that a fault is reported at the control workstation. (3) Reconnect power to the actuator and com mand the mixing box dampers to full open.
(1) Disconnect outside air temperature sensor
from unit controller. (2) Verify that the FDD system reports a fault. (3) Connect OAT sensor to the unit controller. (4) Verify that FDD indicates normal system
operation.
(4) Verify that FDD indicates normal system
operation. Step 2: Damper/actuator fault: (1) From the control system workstation, com mand the mixing box dampers to full open
The unit controller shall have the capability to manually initiate each operating mode so that the operation of compressors, economizers, fans, and heating system can be independently tested and verified. E 805.12.1.2 Functional Testing. The functional testing shall be in accordance with the following steps: Step 1: Test low airflow condition by replacing the
existing filter with a dirty filter or appropri
(3) Reconnect power to the actuator and com mand the mixing box dampers to full open. (4) Verify that the control system does not
report a fault.
Step 1: Test low airflow condition by replacing the
existing filter with a dirty filter or appropriate obstruction. Step 2: Verify that the fault detection and diagnostics
system reports the fault.
(4) Verify that the control system does not
report a fault. (5) From the control system workstation, com mand the mixing box dampers to a full
Step 2: Verify that the fault detection and diagnostics
system reports the fault. Step 3: Verify that the system is able to verify the
correct refrigerant charge.
(5) From the control system workstation, com mand the mixing box dampers to a fullclosed position (0 percent outdoor air). (6) Disconnect power to the actuator and ver ify that a fault is reported at the control
Step 3: Verify that the system is able to verify the
correct refrigerant charge. Step 4: Calibrate outside air, return air, and supply
air temperature sensors.
(6) Disconnect power to the actuator and ver ify that a fault is reported at the control workstation. (7) Reconnect power to the actuator and com mand the dampers closed.
(7) Reconnect power to the actuator and com mand the dampers closed. (8) Verify that the control system does not
report a fault during normal operation.
Verify that the control system does not
report a fault during normal operation.
air temperature sensors.
2019 CALIFORNIA MECHANICAL CODE 429
APPENDIX E any other purpose or distributed to any other persons or parti es.
Step 3: Valve/actuator fault: (1) From the control system workstation, com mand the heating and cooling coil valves
(1) From the control system workstation, com mand the heating and cooling coil valves to full open or closed, then disconnect power to the actuator and verify that a fault is reported at the control workstation. Step 4: Inappropriate simultaneous heating, mechanical cooling, and economizing or all functions: (1) From the control system workstation, over ride the heating coil valve and verify that a
(d) Reconnect the actuator and restore to
normal operation. Step 3: Valve/actuator fault (for systems with hydronic reheat): (1) Command the reheat coil valve to full
open.
(d) Reconnect the actuator and restore to
normal operation.
(1) Command the reheat coil valve to full
open. (2) Disconnect power to the actuator. Set the
heating setpoint temperature to be lower
(1) From the control system workstation, over ride the heating coil valve and verify that a fault is reported at the control workstation. (2) From the control system workstation, over ride the cooling coil valve and verify that a
(2) From the control system workstation, over ride the cooling coil valve and verify that a fault is reported at the control workstation. (3) From the control system workstation, over ride the mixing box dampers and verify
(2) Disconnect power to the actuator. Set the
heating setpoint temperature to be lower than the current space temperature, to command the valve closed. Verify that the fault is reported at the control workstation. (3) Reconnect the actuator and restore normal
operation.
(1) Set the integral coefficient of the box con troller to a value 50 times the current value. (2) The damper cycles continuously and air flow is unstable. Verify that the control sys
(3) From the control system workstation, over ride the mixing box dampers and verify that a fault is reported at the control workstation. Zone Terminal Units.E 805.13.1.1.2 Functional Testing for The functional testing of one of each type of terminal unit (VAV box) in the project not less than 5 percent of the terminal boxes shall be in accordance with the following steps: Step 1: Sensor drift/failure: (1) Disconnect the tubing to the differential
pressure sensor of the VAV box.
(3) Reconnect the actuator and restore normal
operation. Step 4: Feedback loop tuning fault (unstable airflow): (1) Set the integral coefficient of the box con troller to a value 50 times the current value.
(2) The damper cycles continuously and air flow is unstable. Verify that the control system detects and reports the fault. (3) Reset the integral coefficient of the con troller to the original value to restore nor
(1) Disconnect the tubing to the differential
pressure sensor of the VAV box. (2) Verify that control system detects and
reports the fault.
(3) Reset the integral coefficient of the con troller to the original value to restore normal operation. Step 5: Disconnected inlet duct: (1) From the control system workstation, com mand the damper to full closed; then dis
(2) Verify that control system detects and
reports the fault. (3) Reconnect the sensor and verify proper
sensor operation.
(3) Reconnect the sensor and verify proper
sensor operation. (4) Verify that the control system does not
report a fault.
(1) From the control system workstation, com mand the damper to full closed; then disconnect power to the actuator, and verify that a fault is reported at the control workstation. E 805.13.2 Acceptance Criteria. The system is able to detect common faults with air-handling units, such as a sensor failure, a failed damper, an actuator, or an improper operating mode.
(4)
report a fault. Step 2: Damper/actuator fault: (1) Damper stuck open.
(a) Command the damper to full open
(room temperature above setpoint).
(a) Command the damper to full open
(room temperature above setpoint). (b) Disconnect the actuator to the damper. (c) Adjust the cooling setpoint so that the
room temperature is below the cooling
(c) Adjust the cooling setpoint so that the
room temperature is below the cooling setpoint to command the damper to the minimum position. Verify that the control system reports a fault. (d) Reconnect the actuator and restore to
normal operation.
(d)
normal operation. (2) Damper stuck closed.
(a) Set the damper to the minimum posi tion.
(a) Set the damper to the minimum posi tion. (b) Disconnect the actuator to the damper. (c) Set the cooling setpoint below the
room temperature to simulate a call for
Set the cooling setpoint below the
room temperature to simulate a call for cooling. Verify that the control system reports a fault.
The system is able to detect and report common faults with zone terminal units, such as a failed damper, an actuator, or a control tuning issue. (Form MECH-14A).E 805.14 Distributed Energy Storage DX AC System The purpose of this test is to verify the proper operation of distributed energy storage DX systems. Distributed energy systems (DES) reduce peak demand by operating during off-peak hours and storing cooling, usually in the form of ice. During peak cooling hours the ice is melted to avoid compressor operation. The system typically consists of a water tank containing refrigerant coils that cool the water and convert it to ice. As with a standard direction expansion (DX) air conditioner, the refrigerant is compressed in a compressor and then cooled in an air-cooled condenser. The liquid refrigerant then is directed through the coils in the water tank to make ice or to air handler coils to cool the building. This applies to constant or variable volume, direct expansion (DX) systems with distributed energy storage (DES/DXAC).
E 805.14.1 Test Procedure. The procedure for performing a functional test for distributed energy storage DX AC systems shall be in accordance with Section E 805.14.1.1 through Section E 805.14.1.3.
430 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
E 805.14.1.1 Construction Inspection. Prior to functional testing, verify and document the following: (1) The water tank is filled to the proper level. (2) The water tank is sitting on a foundation with
adequate structural strength.
(5) Verify that the system operates in direct mode (with
compressor running) during the morning shoulder
(2) The water tank is sitting on a foundation with
adequate structural strength. (3) The water tank is insulated and the top cover is
in place.
(3) The water tank is insulated and the top cover is
in place. (4) The DES/DXAC is installed correctly (e.g.,
refrigerant piping, etc.).
(4) The DES/DXAC is installed correctly (e.g.,
refrigerant piping, etc.). (5) Verify that the correct model number is installed
and configured.
(5) Verify that the correct model number is installed
and configured. E 805.14.1.2 Functional Testing. The functional testing shall be in accordance with the following steps: Step 1: Simulate cooling load during daytime period (e.g., by setting time schedule to include actual time and placing thermostat cooling setpoint below actual temperature). Verify and document the following: (1) Supply fan operates continually. (2) Where the DES/DXAC has cooling capacity,
DES/DXAC shall run to meet the cooling
(2) Where the DES/DXAC has cooling capacity,
DES/DXAC shall run to meet the cooling demand (in ice melt mode). (3) Where the DES/DXAC has no ice and there is
a call for cooling, the DES/DXAC shall run in
(5) Verify that the system operates in direct mode (with
compressor running) during the morning shoulder time period. E 805.15 Thermal Energy Storage (TES) System(Form MECH-15A). The purpose of this test is to verify the proper operation of thermal energy storage (TES) systems. TES systems reduce energy consumption during peak demand periods by shifting energy consumption to nighttime. Operation of the thermal energy storage compressor during the night produces cooling energy which is stored in the form of cooled fluid or ice in tanks. During peak cooling hours the thermal storage is used for cooling to prevent the need for chiller operation. This section is limited to the following types of TES systems: (1) Chilled water storage (2) Ice-on-coil (3) Ice harvester (4) Brine (5) Ice-slurry (6) Eutectic salt (7) Clathrate hydrate slurry (CHS)
(3) Where the DES/DXAC has no ice and there is
a call for cooling, the DES/DXAC shall run in direct cooling mode. Step 2: Simulate no cooling load during daytime condition. Verify and document the following: (1) Supply fan operates in accordance with the
facility thermostat or control system.
(1) Supply fan operates in accordance with the
facility thermostat or control system. (2) The DES/DXAC and the condensing unit do
not run.
E 805.15.1 Test Procedure. The procedure for performing a functional test for thermal energy storage (TES) system shall be in accordance with Section E 805.15.1.1 and Section E 805.15.1.2. E 805.15.1.1 Construction Inspection. Prior to functional testing, verify and document the following for the chiller and storage tank: (1) Chiller:
(a) Brand and Model (b) Type (centrifugal, reciprocating, other) (c) Capacity (tons) (SIZE) (d) Starting efficiency (kW/ton) at beginning
of ice production (COMP - kW/TON
(2) The DES/DXAC and the condensing unit do
not run. Step 3: Simulate no cooling load during morning shoulder time period. Verify and document the following: (1) The DES/DXAC is idle. Step 4: Simulate a cooling load during morning shoulder time period. Verify and document the following: (1) The DES/DXAC runs in direct cooling mode. E 805.14.1.3 Calibrating Controls. Set the proper time and date in accordance with the manufacturer’s instructions for approved installers. E 805.14.2 Acceptance Criteria. Distributed energy storage DXAC system acceptance criteria shall be as follows: (1) Verify night time ice making operation. (2) Verify that tank discharges during on-peak cooling
periods.
(d) Starting efficiency (kW/ton) at beginning
of ice production (COMP - kW/TON START) (e) Ending efficiency (kW/ton) at end of ice
production (COMP - kW/TON/END)
(e) Ending efficiency (kW/ton) at end of ice
production (COMP - kW/TON/END) (f) Capacity reduction (percent/°F) (PER – COMP - REDUCT/F) (g) Verify that the efficiency of the chiller
meets or exceeds the requirements of Sec
(g) Verify that the efficiency of the chiller
meets or exceeds the requirements of Section E 501.0. (2) Storage Tank:
(2) Verify that tank discharges during on-peak cooling
periods. (3) Verify that the compressor does not run and the tank
does not discharge where there is no cooling demand
(a) Storage type (TES-TYPE) (b) Number of tanks (SIZE) (c) Storage capacity per tank (ton-hours)
(SIZE)
(3) Verify that the compressor does not run and the tank
does not discharge where there is no cooling demand during on-peak periods. (4) Verify that the system does not operate during a
morning shoulder period where there is no cooling
(c) Storage capacity per tank (ton-hours)
(SIZE) (d) Storage rate (tons) (COOL – STORE RATE)
Verify that the system does not operate during a
morning shoulder period where there is no cooling demand.
(d) Storage rate (tons) (COOL – STORE RATE) (e) Discharge rate (tons) (COOL – SUPPLY RATE)
(e) Discharge rate (tons) (COOL – SUPPLY RATE) (f) Auxiliary power (watts) (PUMPS + AUX kW)
2019 CALIFORNIA MECHANICAL CODE 431
APPENDIX E any other purpose or distributed to any other persons or parti es.
(g) Tank area (CTANK – LOSS - COEFF) (h) Tank insulation (R-Value) (CTANK –
LOSS – COEFF)
(h)
LOSS – COEFF) (3) TES System:
(a) The TES system is one of the above eligi ble systems.
(a) The TES system is one of the above eligi ble systems. (b) Initial charge rate of the storage tanks
(tons).
(b) Initial charge rate of the storage tanks
(tons). (c) Final charge rate of the storage tank (tons). (d) Initial discharge rate of the storage tanks
(tons).
(d) Initial discharge rate of the storage tanks
(tons). (e) Final discharge rate of the storage tank
(tons).
(e) Final discharge rate of the storage tank
(tons). (f) Charge test time (hrs). (g) Discharge test time (hrs). (h) Tank storage capacity after charge (ton hrs).
(h) Tank storage capacity after charge (ton hrs). (i) Tank storage capacity after discharge (tonhrs). (j) Tank standby storage losses (UA). (k) Initial chiller efficiency (kW/ton) during
charging.
perature setpoint lower than the ambient temperature. Verify that the TES system starts discharging. This shall be checked by observing tank inlet and outlet temperatures and system flow, or directly by reading an inventory meter where the system has one. Where the system has no charge, verify that the system will still attempt to meet the load through storage. Step 4: Force the time to be between noon and 6:00 p.m., and simulate a cooling load by lowering the indoor air temperature setpoint below the ambient temperature. Verify that the tank starts discharging and the compressor is off. Step 5: Force the time to be between 9:00 a.m. to noon, and simulate a cooling load by lowering the indoor air temperature setpoint below the ambient temperature. Verify that the tank does not discharge and the cooling load is met by the compressor. Step 6: Force the time to be between 9:00 p.m. and 9:00 a.m. and simulate a full tank charge. This can be done in a couple of ways: (1) By changing the inventory sensor limit that
indicates tank capacity to the energy manage
(1) By changing the inventory sensor limit that
indicates tank capacity to the energy management system so that it indicates a full tank. (2) By resetting the coolant temperature that indi cates a full charge to a higher temperature than
(k) Initial chiller efficiency (kW/ton) during
charging. (l) Final chiller efficiency (kW/ton) during charging. E 805.15.1.2 Functional Testing. The functional testing shall be in accordance with the following steps: Step 1: Verify that the TES system and the chilled water plant is controlled and monitored by an energy management system (EMS). Step 2: Force the time to be between 9:00 p.m. and 9:00 a.m., and simulate a partial or no charge of the tank. Simulate no cooling load by setting the indoor temperature setpoint(s) higher than the ambient temperature.
(1) Verify that the system is able to charge the storage
tank during off-peak periods where there is no cooling load. (2) Verify that tank discharges during on-peak cooling
periods.
Where the tank is full or nearly full of ice, it shall be permitted to adjust the control settings for this test. In some cases, the control system will not permit the chiller to start the ice-making process unless a portion of the ice has been melted. The controls designer shall be permitted to use an inventory meter (a 4-20 mA sensor that indicates water level) to determine whether or not ice-making can commence (e.g., not allow ice-making unless the inventory meter signal is less than 17 mA). Where this is the case, this limit can be reset to 20 mA during testing to allow ice making to occur.
(2) By resetting the coolant temperature that indi cates a full charge to a higher temperature than the current tank leaving temperature. Verify that the tank charging is stopped. Step 7: Force the time to be between noon and 6:00 p.m. and simulate no cooling load by setting the indoor temperature setpoint above the ambient temperature. Verify that the tank does not discharge and the compressor is off. E 805.15.2 Acceptance Criteria. Thermal energy storage (TES) system acceptance criteria shall be as follows: (1) Verify that the system is able to charge the storage
tank during off-peak periods where there is no cool
Verify that the system operates in direct mode (with
compressor running) during the morning shoulder time period.
(2) Verify that tank discharges during on-peak cooling
periods. (3) Verify that the compressor does not run and the tank
does not discharge where there is no cooling demand
(3) Verify that the compressor does not run and the tank
does not discharge where there is no cooling demand during on-peak periods. (4) Verify that the system does not operate during a
morning shoulder period where there is no cooling
Verify that the TES system starts charging (storing energy). This shall be checked by verifying flow and inlet and outlet temperatures of the storage tank, or directly by reading an inventory meter where the system has one. Step 3: Force the time to be between 6:00 p.m. and 9:00 p.m., and simulate a partial charge on the tank. Simulate a cooling load by setting the indoor tem
(4) Verify that the system does not operate during a
morning shoulder period where there is no cooling demand. (5) Verify that the system operates in direct mode (with
compressor running) during the morning shoulder
E 806.0 Certificate of Acceptance Forms.E 806.1 General. This section includes the certificate of acceptance forms referenced in Section E 804.0 and Section E 805.0.
432 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
| CERTIFICATE OF ACCEPTANCE | MECH-2A | |
|---|---|---|
| Outdoor Air Acceptance must demonstrate compliance. |
(Page 1 of 3) |
FIELD TECHNICIAN’S DECLARATION STATEMENT - I certify under penalty of perjury the information provided on this form is true and correct.
I am the person who performed the acceptance requirements verification reported on this Certificate of Acceptance (Field Technician).
I certify that the construction/installation identified on this form complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Section E 801.0 through Section E 806.0.
I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been
completed and is posted or made available with the building permit(s) issued for the building.
FIELD TECHNICIAN’S DECLARATION STATEMENT
| Field Technician’s Name: | Field Technician’s Signature: | |
|---|---|---|
RESPONSIBLE PERSON’S DECLARATION STATEMENT - I certify under penalty of perjury that I am the Field Technician, or the Field Technician is acting on my behalf as my
employee or my agent and I have reviewed the information provided on this form.
I am a licensed contractor or registered design professional who is eligible per the requirements of the Authority Having Jurisdiction to take responsibility for the scope of work specified on this document and attest to the declarations in this statement (responsible person).
I certify that the information provided on this form substantiates that the construction/installation identified on this form complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Section E 801.0 through Section E 806.0.
I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been completed and is posted or made available with the permit(s) issued for the building.
I will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the
RESPONSIBLE PERSON’S DECLARATION STATEMENT
| building permit(s) issued for the building, and made available to the enforcement agency understand that a signed copy of this Certificate of Acceptance is required to be included wit provides to the building owner at occupancy. Company Name: | for all applicable inspections. I th the documentation the builder Phone: | ||
|---|---|---|---|
2019 CALIFORNIA MECHANICAL CODE 433
APPENDIX E any other purpose or distributed to any other persons or parti es.
| CERTIFICATE OF ACCEPTANCE MECH-2A | |
|---|---|
| Outdoor Air Acceptance (Page 2 of 3) |
|
through Section E 805.2.2
Construction Inspection
1. Instrumentation to perform test includes, but not limited to:
a. Watch.
b. Calibrated means to measure airflow.
2. Check one of the following:
Variable Air Volume (VAV) - Check as appropriate:
| a. Sensor used to control outdoor air flow must have calibration certificate or b Calibration certificate (attach calibration certification). Field calibration (attach results). Constant Air Volume (CAV) - Check as appropriate: System is designed to provide a fixed minimum OSA when the unit is on. Outdoor Air Acceptance | be field calibrated | d. |
|---|---|---|
flow achieved (minutes). |
||
434 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
CERTIFICATE OF ACCEPTANCE MECH-2A
Outdoor Air Acceptance Project Name/Address: (Page 3 of 3)
System Name or Identification/Tag: System Location or Area Served:
C. PASS/FAIL Evaluation (check one):
C. PASS/FAIL Evaluation (check one):
PASS: All Construction Inspection responses are complete and Testing Calculations & Results responses are positive
(Y – yes).
FAIL: Any Construction Inspection responses are incomplete OR there is one or more negative (N – no) responses
(Y – yes).
FAIL: Any Construction Inspection responses are incomplete OR there is one or more negative (N – no) responses
in Testing Calculations & Results section. Provide explanation below. Use and attach additional pages if necessary.
2019 CALIFORNIA MECHANICAL CODE 435
APPENDIX E any other purpose or distributed to any other persons or parti es.
| CERTIFICATE OF ACCEPTANCE | MECH-3A | |
|---|---|---|
| Constant Volume Single Zone Unitary Air Conditioner and Heat Pump Systems must demonstrate compliance. |
Constant Volume Single Zone Unitary Air Conditioner and Heat Pump Systems must demonstrate compliance. |
(Page 1 of 3) |
FIELD TECHNICIAN’S DECLARATION STATEMENT - I certify under penalty of perjury the information provided on this form is true and correct.
I am the person who performed the acceptance requirements verification reported on this Certificate of Acceptance (Field Technician).
I certify that the construction/installation identified on this form complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Section E 801.0 through Section E 806.0.
I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been
FIELD TECHNICIAN’S DECLARATION STATEMENT
| completed and is posted or mad Company Name: Field Technician’s Name: | de available with the buildin | ng permit(s) issued for the buildi Field Technician’s Signature: |
|---|---|---|
RESPONSIBLE PERSON’S DECLARATION STATEMENT - I certify under penalty of perjury that I am the Field Technician, or the Field Technician is acting on my behalf as my
employee or my agent and I have reviewed the information provided on this form.
I am a licensed contractor or registered design professional who is eligible per the requirements of the Authority Having Jurisdiction to take responsibility for the scope of work specified on this document and attest to the declarations in this statement (responsible person).
I certify that the information provided on this form substantiates that the construction/installation identified on this form complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Section E 801.0 through Section E 806.0.
I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been completed and is posted or made available with the permit(s) issued for the building.
I will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the
RESPONSIBLE PERSON’S DECLARATION STATEMENT
| building permit(s) issued for the building, and made available to the enforcement agency understand that a signed copy of this Certificate of Acceptance is required to be included wit provides to the building owner at occupancy. Company Name: | for all applicable inspections. I th the documentation the builder Phone: | ||
|---|---|---|---|
436 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
CERTIFICATE OF ACCEPTANCE MECH-3A
Constant Volume Single Zone Unitary Air Conditioner and Heat Pump Systems (Page 2 of 3)
Project Name/Address:
System Name or Identification/Tag: System Location or Area Served:
Verify the individual components of a constant volume, single-zone, unitary air conditioner and heat pump system func-
Intent:
tion correctly, including: thermostat installation and programming, supply fan, heating, cooling, and damper operation.
Construction Inspection
1. Instrumentation to perform test includes, but not limited to:
a. None required
2. Installation
Thermostat is located within the space-conditioning zone that is served by the HVAC system.
3. Programming (check all of the following):
Thermostat meets the temperature adjustment and dead band requirements.
Occupied, unoccupied, and holiday schedules have been programmed per the facility’s schedule.
Preoccupancy purge has been programmed to meet the requirements of Section E 805.3 through Section E 805.3.2.
A. Functional Testing Requirements. Operating Modes
Cooling load during unoccupied condition
Cooling load during occupied condition
Manual override
No-load during unoccupied condition
Heating load during unoccupied condition
No-load during occupied condition
Heating load during occupied condition
B
F
G
E
Step 1: Check and verify the following for each simulation mode required. A
C
D
a. Supply fan operates continually.
b. Supply fan turns off.
c. Supply fan cycles on and off.
d. System reverts to “occupied” mode to satisfy any condition.
e. System turns off when manual override time period expires.
f. Gas-fired furnace, heat pump, or electric heater stages on.
g. Neither heating or cooling is provided by the unit.
h. No heating is provided by the unit.
i. No cooling is provided by the unit.
j. Compressor stages on.
j.
k. Outside air damper is open to minimum position.
l. Outside air damper closes completely.
l. Outside air damper closes completely.
m. System returned to initial operating conditions after all tests have been completed: Y/N
B. Testing Results
Indicate if Passed (P), Failed (F), or N/A (X), fill in appropriate letter.
A B C D E F G
2019 CALIFORNIA MECHANICAL CODE 437
APPENDIX E any other purpose or distributed to any other persons or parti es.
CERTIFICATE OF ACCEPTANCE MECH-3A
Constant Volume Single Zone Unitary Air Conditioner and Heat Pump Systems (Page 3 of 3)
Project Name/Address:
System Name or Identification/Tag: System Location or Area Served:
C. PASS/FAIL Evaluation. (check one):
PASS: All Construction Inspection responses are complete and Testing Results responses are “Pass” (P).
FAIL: Any Construction Inspection responses are incomplete OR there is one or more “Fail” (F) responses in
Testing Results section. Provide explanation below. Use and attach additional pages if necessary.
438 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
| CERTIFICATE OF ACCEPTANCE | MECH-4A | |
|---|---|---|
| Air Distribution Systems Acceptance must demonstrate compliance. |
(Page 1 of 3) |
FIELD TECHNICIAN’S DECLARATION STATEMENT - I certify under penalty of perjury the information provided on this form is true and correct.
I am the person who performed the acceptance requirements verification reported on this Certificate of Acceptance (Field Technician).
I certify that the construction/installation identified on this form complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Section E 801.0 through Section E 806.0.
I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been
completed and is posted or made available with the building permit(s) issued for the building.
FIELD TECHNICIAN’S DECLARATION STATEMENT
Company Name:
RESPONSIBLE PERSON’S DECLARATION STATEMENT - I certify under penalty of perjury that I am the Field Technician, or the Field Technician is acting on my behalf as my
employee or my agent and I have reviewed the information provided on this form.
I am a licensed contractor or registered design professional who is eligible per the requirements of the Authority Having Jurisdiction to take responsibility for the scope of work specified on this document and attest to the declarations in this statement (responsible person).
I certify that the information provided on this form substantiates that the construction/installation identified on this form complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Section E 801.0 through Section E 806.0.
I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been completed and is posted or made available with the permit(s) issued for the building.
I will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the
RESPONSIBLE PERSON’S DECLARATION STATEMENT
| building permit(s) issued for the building, and made available to the enforcement agency understand that a signed copy of this Certificate of Acceptance is required to be included wit provides to the building owner at occupancy. Company Name: | for all applicable inspections. I th the documentation the builder Phone: | ||
|---|---|---|---|
2019 CALIFORNIA MECHANICAL CODE 439
APPENDIX E any other purpose or distributed to any other persons or parti es.
| CERTIFICATE OF ACCEPTANCE MECH-4A | |
|---|---|
| Air Distribution Systems Acceptance (Page 2 of 3) |
|
existing single zone ductwork must be less than 15% leakage or other compliance path per Section E 805.4 through Section E 805.4.2.
Construction Inspection
- Scope of test – New Buildings – this test required on New Buildings only if all check boxes 1(a) through 1(c) are checked.
Existing Buildings – this test required if 1(a) through 1(d) are checked.
checked.
Existing Buildings – this test required if 1(a) through 1(d) are checked. Ductwork conforms to the following (note if any of these are not checked, then this test is not required): 1(a) Connected to a constant volume, single zone air conditioners, heat pumps, or furnaces. 1(b) Serves less than 5000 square feet of floor area. 1(c) Has more than 25% duct surface area located in one or more of the following spaces.
- Outdoors.
- A space directly under a roof where the U-factor of the roof is greater than U-factor of the ceiling.
- A space directly under a roof with fixed vents or openings to the outside or unconditioned spaces.
- An unconditioned crawlspace.
- Other unconditioned spaces.
1(d) A duct is extended or any of the following replaced: air handler, outdoor condensing unit of a split system, cooling or heating coil, or the furnace heat exchanger. 2. Instrumentation to perform test includes:
a. Duct Pressure Test.
- Instrumentation to perform test includes:
a. Duct Pressure Test.
3. Material and Installation. Complying new duct systems shall have a checked box for all of the following categories (a)
through (g):
a. Choice of drawbands. (check one of the following)
Stainless steel worm-drive hose clamps.
Stainless steel worm-drive hose clamps.
UV-resistant nylon duct ties.
b. Flexible ducts are not constricted in any way.
c. Duct leakage tests performed before access to ductwork and connections are blocked.
d. Joints and seams are not sealed with cloth back rubber adhesive tape unless used in combination with mastic
and drawbands.
d. Joints and seams are not sealed with cloth back rubber adhesive tape unless used in combination with mastic
and drawbands.
e. Duct R-values are verified R-8 per Section E 805.4 through Section E 805.4.2.
f. Ductwork located outdoors has insulation that is protected from damage and suitable for outdoor service.
g. A sticker has been affixed to the exterior surface of the air handler access door per Section E 805.4 through
Section E 805.4.2.
Section E 805.4.2.
For SI units: 1 square foot = 0.0929 m 2
440 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
| CERTIFICATE OF ACCEPTANCE MECH-4A | |
|---|---|
| Air Distribution Systems Acceptance (Page 3 of 3) |
|
2019 CALIFORNIA MECHANICAL CODE 441
APPENDIX E any other purpose or distributed to any other persons or parti es.
| <br>CERTIFICATE OF ACCEPTANCE | MECH-5A | |
|---|---|---|
| Air Economizer Controls Acceptance must demonstrate compliance. |
(Page 1 of 3) |
FIELD TECHNICIAN’S DECLARATION STATEMENT - I certify under penalty of perjury the information provided on this form is true and correct.
I am the person who performed the acceptance requirements verification reported on this Certificate of Acceptance (Field Technician).
I certify that the construction/installation identified on this form complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Section E 801.0 through Section E 806.0.
I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been
FIELD TECHNICIAN’S DECLARATION STATEMENT
| completed and is posted or mad Company Name: Field Technician’s Name: | de available with the buildin | ng permit(s) issued for the buildi Field Technician’s Signature: |
|---|---|---|
RESPONSIBLE PERSON’S DECLARATION STATEMENT - I certify under penalty of perjury that I am the Field Technician, or the Field Technician is acting on my behalf as my
employee or my agent and I have reviewed the information provided on this form.
I am a licensed contractor or registered design professional who is eligible per the requirements of the Authority Having Jurisdiction to take responsibility for the scope of work specified on this document and attest to the declarations in this statement (responsible person).
I certify that the information provided on this form substantiates that the construction/installation identified on this form complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Section E 801.0 through Section E 806.0.
I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been completed and is posted or made available with the permit(s) issued for the building.
I will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the
RESPONSIBLE PERSON’S DECLARATION STATEMENT
| building permit(s) issued for the building, and made available to the enforcement agency understand that a signed copy of this Certificate of Acceptance is required to be included wit provides to the building owner at occupancy. Company Name: | for all applicable inspections. I th the documentation the builder Phone: | ||
|---|---|---|---|
442 2019 CALIFORNIA MECHANICAL CODE
APPENDIX E
| CERTIFICATE OF ACCEPTANCE MECH-5A | |
|---|---|
| Air Economizer Controls Acceptance (Page 2 of 3) |
|
Construction Inspection
1. Instrumentation to perform test includes, but not limited to:
a. Handheld temperature probes calibration.
Date: (must be within last year).
b. Multimeter capable of measuring ohms and milliamps.
2. Test method (check one of the following):
Economizer comes from HVAC system manufacturer installed by and has been factory calibrated and tested.
Attach documentation and complete certification statement. No functional testing required.
Economizer field installed and field tested or factory installed and field tested.
3. Installation (check all of the following first level boxes).
Economizer lockout setpoint complies with Section E 805.5 through Section E 805.5.2.
Economizer lockout control sensor is located to prevent false readings.
System is designed to provide up to 100% outside air without over-pressurizing the building.
For systems with DDC controls lockout sensor(s) are either factory calibrated or field calibrated.
For systems with non-DDC controls, manufacturer’s startup and testing procedures have been applied.
A. Functional Testing.
Step 1: Disable demand control ventilation systems (if applicable).
Step 2: Enable the economizer and simulate a cooling demand large enough to drive the economizer fully open
(check and verify the following).
Economizer damper modulates 100% open.
Return air damper modulates 100% closed.
<u>the economizer alone.</u>
~~<u></u>~~ ~~<u>All applicable fans and dampers operate as intended to maintain building pressure.</u>~~
~~<u></u>~~ ~~<u>The unit heating is disabled.</u>~~
**~~<u>Step 3: Simulate a cooling load and disable the economizer (check and verify the following).</u>~~**
~~<u></u>~~ ~~<u>Economizer damper closes to its minimum position.</u>~~
~~<u></u>~~ ~~<u>All applicable fans and dampers operate as intended to maintain building pressure.</u>~~
~~<u></u>~~ ~~<u>The unit heating is disabled.</u>~~
**~~<u>Step 4: Simulate a heating demand and enable the economizer (check and verify the following).</u>~~**
~~<u></u>~~ ~~<u>Economizer damper closes to its minimum position.</u>~~
**~~<u><mark>Step 5: System returned to initial operating conditions.</mark></u>~~** **~~<u><mark>Y/N</mark></u>~~**
**~~<u>B. Testing Results.</u>~~** **~~<u><mark>PASS / FAIL</mark></u>~~**
~~<u><mark>Step 1: Simulate cooling load and enable the economizer (all check boxes are complete).</mark></u>~~
~~<u><mark>Step 2: Simulate cooling load and disable the economizer (all check boxes are complete).</mark></u>~~
~~<u><mark>Step 3: Simulate heating demand and enable the economizer (all check boxes are complete).</mark></u>~~
**<mark>2019 CALIFORNIA MECHANICAL CODE</mark>** **<mark>443</mark>**
**<mark>APPENDIX E</mark>** <mark>any</mark> <mark>other</mark> <mark>purpose</mark> <mark>or</mark> <mark>distributed</mark> <mark>to</mark> <mark>any</mark> <mark>other</mark> <mark>persons</mark> <mark>or</mark> <mark>parti</mark> es.
|CERTIFICATE OF ACCEPTANCE|MECH-5A|
|---|---|
|~~**C.**~~<br>~~PASS/FAIL Evaluation (check one):~~<br>~~~~<br>~~PASS: All~~~~**Construction Inspection** responses are complete and~~~~**Testing Results** responses are “Pass.”~~<br><br>~~FAIL: Any~~~~**Construction Inspection** responses are incomplete~~~~_OR_ there is one or more “Fail” responses in~~~~**Testing**~~<br>**Results** section. Provide explanation below. Use and attach additional pages if necessary.<br>**Air Economizer Controls Acceptance**<br>**(Page 3 of 3)**<br>~~Project Name/Address:~~<br>~~System Name or Identification/Tag:~~<br>~~System Location or Area Served:~~|~~**C.**~~<br>~~PASS/FAIL Evaluation (check one):~~<br>~~~~<br>~~PASS: All~~~~**Construction Inspection** responses are complete and~~~~**Testing Results** responses are “Pass.”~~<br><br>~~FAIL: Any~~~~**Construction Inspection** responses are incomplete~~~~_OR_ there is one or more “Fail” responses in~~~~**Testing**~~<br>**Results** section. Provide explanation below. Use and attach additional pages if necessary.<br>**Air Economizer Controls Acceptance**<br>**(Page 3 of 3)**<br>~~Project Name/Address:~~<br>~~System Name or Identification/Tag:~~<br>~~System Location or Area Served:~~|
**<mark>444</mark>** **<mark>2019 CALIFORNIA MECHANICAL CODE</mark>**
**<mark>APPENDIX E</mark>**
|CERTIFICATE OF ACCEPTANCE|Col2|MECH-6A|
|---|---|---|
|**Demand Control Ventilation Systems Acceptance**<br>~~Project Name/Address:~~<br>~~System Name or Identification/Tag:~~<br>~~Enforcement Agency:~~<br>~~_Note: Submit one Certificate of Acceptance for each system that_~~<br>_must demonstrate compliance._|~~System Location or Area Served:~~<br>~~Permit Number:~~<br>~~Enforcement Agency Use: Checked by/Date~~|**(Page 1 of 3)**|
**FIELD TECHNICIAN’S DECLARATION STATEMENT** - I certify under penalty of perjury the information provided on this form is true and correct.
- I am the person who performed the acceptance requirements verification reported on this Certificate of Acceptance (Field
Technician).
- I certify that the construction/installation identified on this form complies with the acceptance requirements indicated in
the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements
and procedures specified in Section E 801.0 through Section E 806.0.
- I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been
**FIELD TECHNICIAN’S DECLARATION STATEMENT**
|completed and is posted or mad Company Name: Field Technician’s Name:|de available with the buildin|ng permit(s) issued for the buildi Field Technician’s Signature:|
|---|---|---|
|||<br>|
||||
**RESPONSIBLE PERSON’S DECLARATION STATEMENT** - I certify under penalty of perjury that I am the Field Technician, or the Field Technician is acting on my behalf as my
employee or my agent and I have reviewed the information provided on this form.
- I am a licensed contractor or registered design professional who is eligible per the requirements of the Authority Having
Jurisdiction to take responsibility for the scope of work specified on this document and attest to the declarations in this statement (responsible person).
- I certify that the information provided on this form substantiates that the construction/installation identified on this form
complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and
conforms to the applicable acceptance requirements and procedures specified in Section E 801.0 through Section E 806.0.
- I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been
completed and is posted or made available with the permit(s) issued for the building.
- I will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the
building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I
understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder
**RESPONSIBLE PERSON’S DECLARATION STATEMENT**
|provides to the building owner Company Name: Responsible Person’s Name:|r at occupancy.|P Responsible Person’s Signature:|
|---|---|---|
|<br>||<br>|
||||
**<mark>2019 CALIFORNIA MECHANICAL CODE</mark>** **<mark>445</mark>**
**<mark>APPENDIX E</mark>** <mark>any</mark> <mark>other</mark> <mark>purpose</mark> <mark>or</mark> <mark>distributed</mark> <mark>to</mark> <mark>any</mark> <mark>other</mark> <mark>persons</mark> <mark>or</mark> <mark>parti</mark> es.
|CERTIFICATE OF ACCEPTANCE MECH-6A|Col2|
|---|---|
|**Demand Control Ventilation Systems Acceptance**<br>**(Page 2 of 3)**<br>|**Demand Control Ventilation Systems Acceptance**<br>**(Page 2 of 3)**<br>|
|~~Project Name/Address:~~<br> <br>|~~Project Name/Address:~~<br> <br>|
|~~System Name or Identification/Tag:~~<br>|~~System Location or Area Served:~~<br>|
**Intent:**
_<u>maintaining interior carbon dioxide (CO2) concentration setpoints.</u>_
**~~<u>Construction Inspection</u>~~**
~~1.~~ ~~Instrumentation to perform test includes, but not limited to:~~
<u>a.</u> <u>Calibrated handheld CO2 analyzer.</u>
b. Manufacturer’s calibration kit.
c. Calibrated CO2/air mixtures.
2. Installation.
The sensor is located in the high density space between 3 feet and 6 feet above the floor or at the anticipated level
of the occupants heads.
3. Documentation of all carbon dioxide control sensors includes (check one of the following):
a. Calibration method.
Factory-calibration certificate (certificate must be attached).
Field calibrated.
b. Sensor accuracy.
<u></u> <u>Certified by manufacturer to be no more than +/- 75 ppm calibration certificate must be attached.</u>
e the floor or at the anticipated level
of the occupants heads.
3. Documentation of all carbon dioxide control sensors includes (check one of the following):
a. Calibration method.
Factory-calibration certificate (certificate must be attached).
Field calibrated.
b. Sensor accuracy.
<u></u> <u>Certified by manufacturer to be no more than +/- 75 ppm calibration certificate must be attached.</u>
**~~<u><mark>A. Functional Testing.</mark></u>~~** **~~<u><mark>Results</mark></u>~~**
~~<u><mark>a.</mark></u>~~ ~~<u><mark>Disable economizer controls.</mark></u>~~
~~<u><mark>b.</mark></u>~~ ~~<u><mark>Outside air CO</mark></u>~~ ~~<u>2</u>~~ ~~<u><mark>concentration (select one of the following).</mark></u>~~
~~<u></u>~~ ~~<u>Measured dynamically using CO</u>~~ <u>2</u> ~~<u>sensor.</u>~~ ~~<u>ppm</u>~~
~~<u>c.</u>~~ ~~<u>Interior CO</u>~~ <u>2</u> ~~<u>concentration setpoint (Outside CO</u>~~ <u>2</u> ~~<u>concentration + 600 ppm).</u>~~ ~~<u>ppm</u>~~
**~~Step 1: Simulate a signal at or slightly above the CO2 setpoint or follow manufacturers recommended testing proce-~~**
**<u>dures.</u>**
~~~~ ~~For single zone units, outdoor air damper modulates opens to satisfy the total ventilation air called for in the certificate~~
<u>of compliance.</u>
~~~~ ~~For multiple zone units, either outdoor air damper or zone damper modulate open to satisfy the zone ventilation~~
<u>requirements.</u>
**~~<u>Step 2: Simulate signal well below the CO2</u>~~** **~~<u>setpoint or follow manufacturers recommended procedures.</u>~~**
~~<u><mark></mark></u>~~ ~~<u><mark>For single zone units, outdoor air damper modulates to the design minimum value.</mark></u>~~
~~<mark></mark>~~ ~~<mark>For multiple zone units, either outdoor air damper or zone damper modulate to satisfy the reduced zone ventilation</mark>~~
<u>requirements.</u>
**~~<u>Step 3: System returned to initial operating conditions.</u>~~** **~~<u>Y/N</u>~~**
**~~<u>B. Testing Results.</u>~~** **~~<u>PASS / FAIL</u>~~**
~~<u>Step 1: Simulate a high CO2 load (check box complete).</u>~~
~~<u>Step 2: Simulate a low CO2 load (check box complete).</u>~~
~~For SI units: 1 inch = 25.4 mm~~
**<mark>446</mark>** **<mark>2019 CALIFORNIA MECHANICAL CODE</mark>**
**<mark>APPENDIX E</mark>**
|CERTIFICATE OF ACCEPTANCE|MECH-6A|
|---|---|
|~~**C.**~~<br>~~PASS/FAIL Evaluation (check one):~~<br>~~~~<br>~~PASS: All~~~~**Construction Inspection** responses are complete and~~~~**Testing Results** responses are “Pass.”~~<br><br>~~FAIL: Any~~~~**Construction Inspection** responses are incomplete~~~~_OR_ there is one or more “Fail” responses in~~~~**Testing**~~<br>**Results** section. Provide explanation below. Use and attach additional pages if necessary.<br>**Demand Control Ventilation Systems Acceptance**<br>**(Page 3 of 3)**<br>~~Project Name/Address:~~<br>~~System Name or Identification/Tag:~~<br>~~System Location or Area Served:~~|~~**C.**~~<br>~~PASS/FAIL Evaluation (check one):~~<br>~~~~<br>~~PASS: All~~~~**Construction Inspection** responses are complete and~~~~**Testing Results** responses are “Pass.”~~<br><br>~~FAIL: Any~~~~**Construction Inspection** responses are incomplete~~~~_OR_ there is one or more “Fail” responses in~~~~**Testing**~~<br>**Results** section. Provide explanation below. Use and attach additional pages if necessary.<br>**Demand Control Ventilation Systems Acceptance**<br>**(Page 3 of 3)**<br>~~Project Name/Address:~~<br>~~System Name or Identification/Tag:~~<br>~~System Location or Area Served:~~|
**<mark>2019 CALIFORNIA MECHANICAL CODE</mark>** **<mark>447</mark>**
**<mark>APPENDIX E</mark>** <mark>any</mark> <mark>other</mark> <mark>purpose</mark> <mark>or</mark> <mark>distributed</mark> <mark>to</mark> <mark>any</mark> <mark>other</mark> <mark>persons</mark> <mark>or</mark> <mark>parti</mark> es.
|CERTIFICATE OF ACCEPTANCE|Col2|MECH-7A|
|---|---|---|
|**Supply Fan VFD Acceptance**<br>~~Project Name/Address:~~<br>~~System Name or Identification/Tag:~~<br>~~Enforcement Agency:~~<br>~~_Note: Submit one Certificate of Acceptance for each system that_~~<br>_must demonstrate compliance._|~~System Location or Area Served:~~<br>~~Permit Number:~~<br>~~Enforcement Agency Use: Checked by/Date~~|**(Page 1 of 2)**|
**FIELD TECHNICIAN’S DECLARATION STATEMENT** - I certify under penalty of perjury the information provided on this form is true and correct.
- I am the person who performed the acceptance requirements verification reported on this Certificate of Acceptance (Field
Technician).
- I certify that the construction/installation identified on this form complies with the acceptance requirements indicated in
the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements
and procedures specified in Section E 801.0 through Section E 806.0.
- I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been
**FIELD TECHNICIAN’S DECLARATION STATEMENT**
|completed and is posted or mad Company Name: Field Technician’s Name:|de available with the buildin|ng permit(s) issued for the buildi Field Technician’s Signature:|
|---|---|---|
|||<br>|
||||
**RESPONSIBLE PERSON’S DECLARATION STATEMENT** - I certify under penalty of perjury that I am the Field Technician, or the Field Technician is acting on my behalf as my
employee or my agent and I have reviewed the information provided on this form.
- I am a licensed contractor or registered design professional who is eligible per the requirements of the Authority Having
Jurisdiction to take responsibility for the scope of work specified on this document and attest to the declarations in this statement (responsible person).
- I certify that the information provided on this form substantiates that the construction/installation identified on this form
complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and
conforms to the applicable acceptance requirements and procedures specified in Section E 801.0 through Section E 806.0.
- I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been
completed and is posted or made available with the permit(s) issued for the building.
- I will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the building
**RESPONSIBLE PERSON’S DECLARATION STATEMENT**
|permit(s) issued for the building, and made available to the enforcement agency for all appl that a signed copy of this Certificate of Acceptance is required to be included with the docum the building owner at occupancy. Company Name:|Col2|Col3|licable inspections. I understand mentation the builder provides to Phone:|
|---|---|---|---|
|~~Company Name:~~<br> <br>|~~Company Name:~~<br> <br>|~~Company Name:~~<br> <br>|~~Phone:~~<br>|
|~~Responsible Person’s Name:~~<br><br>|~~Responsible Person’s Name:~~<br><br>|~~Responsible Person’s Signature:~~<br>|~~Responsible Person’s Signature:~~<br>|
|~~License:~~|~~Date Signed:~~|~~Position With Company (Title):~~|~~Position With Company (Title):~~|
**<mark>448</mark>** **<mark>2019 CALIFORNIA MECHANICAL CODE</mark>**
**<mark>APPENDIX E</mark>**
|CERTIFICATE OF ACCEPTANCE MECH-7A|Col2|
|---|---|
|**Supply Fan VFD Acceptance**<br>**(Page 2 of 2)**<br>|**Supply Fan VFD Acceptance**<br>**(Page 2 of 2)**<br>|
|~~Project Name/Address:~~<br> <br>|~~Project Name/Address:~~<br> <br>|
|~~System Name or Identification/Tag:~~<br> <br>|~~System Location or Area Served:~~<br>|
**~~<u><mark>Construction Inspection</mark></u>~~**
~~1~~ ~~Instrumentation to perform test includes, but not limited to:~~
<u>a.</u> <u>Calibrated differential pressure gauge.</u>
2 Installation.
| Discharge static pressure sensors are either factory calibrated or field-calibrated. The static pressure location, setpoint, and reset control meets the requirements of Section E 805.7 t E 805.7.2. 3 Documentation of all discharge static pressure sensors including (check one of the following): Field-calibrated. Calibration complete, all pressure sensors within 10% of calibrated reference sensor. A. Functional Testing.|Col2|through Section Results|
|---|---|---|
|~~**A. Functional Testing.**~~<br>|~~**A. Functional Testing.**~~<br>|~~**Results**~~|
|~~**Step 1: Drive all VAV boxes to achieve design airflow.**~~<br> <br>|~~**Step 1: Drive all VAV boxes to achieve design airflow.**~~<br> <br>|~~**Step 1: Drive all VAV boxes to achieve design airflow.**~~<br> <br>|
|~~a. Supply fan controls modulate to increase capacity.~~<br>|~~a. Supply fan controls modulate to increase capacity.~~<br>|~~**Y / N**~~<br>|
|<br>~~b. Supply fan maintains discharge static pressure within +/-10% of the current operating setpoint.~~<br>|<br>~~b. Supply fan maintains discharge static pressure within +/-10% of the current operating setpoint.~~<br>|<br>~~**Y / N**~~<br>|
|<br>~~c. Supply fan controls stabilize within a 5 minute period.~~<br>|<br>~~c. Supply fan controls stabilize within a 5 minute period.~~<br>|<br>~~**Y / N**~~|
|~~**Step 2: Drive all VAV boxes to minimum flow.**~~<br> <br>|~~**Step 2: Drive all VAV boxes to minimum flow.**~~<br> <br>|~~**Step 2: Drive all VAV boxes to minimum flow.**~~<br> <br>|
|~~a. Supply fan controls modulate to decrease capacity.~~<br>|~~a. Supply fan controls modulate to decrease capacity.~~<br>|~~**Y / N**~~<br>|
|<br>~~b. Current operating setpoint has decreased (for systems with DDC to the zone level).~~<br>|<br>~~b. Current operating setpoint has decreased (for systems with DDC to the zone level).~~<br>|<br>~~**Y / N**~~<br>|
|<br>~~c. Supply fan maintains discharge static pressure within +/-10% of the current operating setpoint.~~<br>|<br>~~c. Supply fan maintains discharge static pressure within +/-10% of the current operating setpoint.~~<br>|<br>~~**Y / N**~~<br>|
|<br>~~d. Supply fan controls stabilize within a 5 minute period.~~<br> <br>|<br>~~d. Supply fan controls stabilize within a 5 minute period.~~<br> <br>|<br>~~**Y / N**~~<br>|
|~~**Step 3: System returned to initial operating conditions.**~~<br>|~~**Y / N**~~<br>|~~**Y / N**~~<br>|
~~<u><mark>Step 1: Drive all VAV boxes to achieve design airflow.</mark></u>~~
~~<u><mark>Step 2: Drive all VAV boxes to minimum flow.</mark></u>~~
**~~<u><mark>C. PASS / FAIL Evaluation (check one):</mark></u>~~**
~~<u><mark></mark></u>~~
~~<u><mark></mark></u>~~ ~~<u><mark>PASS: All Construction Inspection responses are complete and all Testing Results responses are “Pass.”</mark></u>~~
<u></u> <sup>~~<mark>FAIL: Any Construction Inspection responses are incomplete</mark>~~</sup> <sup>_~~<mark>OR</mark>~~_</sup> <sup>~~<mark>there is one or more “Fail” responses in Testing</mark>~~</sup>
<u>Results section. Provide explanation below. Use and attach additional pages if necessary.</u>
<sup>~~<mark>FAIL: Any Construction Inspection responses are incomplete</mark>~~</sup> <sup>_~~<mark>OR</mark>~~_</sup>
<u>Results section. Provide explanation below. Use and attach additional pages if necessary.</u>
**<mark>2019 CALIFORNIA MECHANICAL CODE</mark>** **<mark>449</mark>**
**<mark>APPENDIX E</mark>** <mark>any</mark> <mark>other</mark> <mark>purpose</mark> <mark>or</mark> <mark>distributed</mark> <mark>to</mark> <mark>any</mark> <mark>other</mark> <mark>persons</mark> <mark>or</mark> <mark>parti</mark> es.
|CERTIFICATE OF ACCEPTANCE|Col2|MECH-8A|
|---|---|---|
|**Valve Leakage Test**<br>~~Project Name/Address:~~<br>~~System Name or Identification/Tag:~~<br>~~Enforcement Agency:~~<br>~~_Note: Submit one Certificate of Acceptance for each system that_~~<br>_must demonstrate compliance._|~~System Location or Area Served:~~<br>~~Permit Number:~~<br>~~Enforcement Agency Use: Checked by/Date~~|**(Page 1 of 2)**|
**FIELD TECHNICIAN’S DECLARATION STATEMENT** - I certify under penalty of perjury the information provided on this form is true and correct.
- I am the person who performed the acceptance requirements verification reported on this Certificate of Acceptance (Field
Technician).
- I certify that the construction/installation identified on this form complies with the acceptance requirements indicated in
the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements
and procedures specified in Section E 801.0 through Section E 806.0.
- I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been
**FIELD TECHNICIAN’S DECLARATION STATEMENT**
|completed and is posted or mad Company Name: Field Technician’s Name:|de available with the buildin|ng permit(s) issued for the buildi Field Technician’s Signature:|
|---|---|---|
|||<br>|
||||
**RESPONSIBLE PERSON’S DECLARATION STATEMENT** - I certify under penalty of perjury that I am the Field Technician, or the Field Technician is acting on my behalf as my
employee or my agent and I have reviewed the information provided on this form.
- I am a licensed contractor or registered design professional who is eligible per the requirements of the Authority Having
Jurisdiction to take responsibility for the scope of work specified on this document and attest to the declarations in this statement (responsible person).
- I certify that the information provided on this form substantiates that the construction/installation identified on this form
complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and
conforms to the applicable acceptance requirements and procedures specified in Section E 801.0 through Section E 806.0.
- I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been
completed and is posted or made available with the permit(s) issued for the building.
- I will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the
**RESPONSIBLE PERSON’S DECLARATION STATEMENT**
|building permit(s) issued for the building, and made available to the enforcement agency understand that a signed copy of this Certificate of Acceptance is required to be included wit provides to the building owner at occupancy. Company Name:|Col2|Col3|for all applicable inspections. I th the documentation the builder Phone:|
|---|---|---|---|
|~~Company Name:~~<br> <br>|~~Company Name:~~<br> <br>|~~Company Name:~~<br> <br>|~~Phone:~~<br>|
|~~Responsible Person’s Name:~~<br><br>|~~Responsible Person’s Name:~~<br><br>|~~Responsible Person’s Signature:~~<br>|~~Responsible Person’s Signature:~~<br>|
|~~License:~~|~~Date Signed:~~|~~Position With Company (Title):~~|~~Position With Company (Title):~~|
**<mark>450</mark>** **<mark>2019 CALIFORNIA MECHANICAL CODE</mark>**
**<mark>APPENDIX E</mark>**
|CERTIFICATE OF ACCEPTANCE MECH-8A|Col2|
|---|---|
|**Valve Leakage Test**<br>**(Page 2 of 2)**<br>|**Valve Leakage Test**<br>**(Page 2 of 2)**<br>|
|~~Project Name/Address:~~<br> <br>|~~Project Name/Address:~~<br> <br>|
|~~System Name or Identification/Tag:~~<br> <br>|~~System Location or Area Served:~~<br>|
|A. Functional Testing. Pump Tag (Id) of operation. Intent: Construction Inspection 1 Instrumentation to perform test includes, but not limited to: a. Calibrated differential pressure gauge. b. Pump curve submittals showing the shutoff head. 2 Installation. Valve and piping arrangements were installed per the design drawings.|Col2|Results|
|---|---|---|
|~~**A. Functional Testing.**~~<br>~~**Pump Tag (Id)**~~<br>||~~**Results**~~|
|~~**Step 1: Determine pump dead head pressure.**~~<br> <br>|~~**Step 1: Determine pump dead head pressure.**~~<br> <br>|~~**Step 1: Determine pump dead head pressure.**~~<br> <br>|
|~~a. Close pump discharge isolation valve.~~<br> <br> <br>|~~a. Close pump discharge isolation valve.~~<br> <br> <br>|~~**Y / N**~~|
|<br>~~b. Measure and record the differential pump pressure.~~<br>|~~Feet Water~~<br>Column =<br> <br>||
|~~c. Record the shutoff head from the submittal.~~<br>|<br>~~Feet Water~~<br>Column =<br>||
|<br> <br>|<br> <br>|<br>|
|<br>~~e. Open pump discharge isolation valve.~~<br> <br>|<br>~~e. Open pump discharge isolation valve.~~<br> <br>|<br>~~**Y / N**~~<br>|
|<br> <br>~~**Step 2: Automatically close all valves on the systems being tested. If three-way valves are present, close off the bypass**~~<br>**line(s).**<br> <br>|<br> <br>~~**Step 2: Automatically close all valves on the systems being tested. If three-way valves are present, close off the bypass**~~<br>**line(s).**<br> <br>|<br> <br>~~**Step 2: Automatically close all valves on the systems being tested. If three-way valves are present, close off the bypass**~~<br>**line(s).**<br> <br>|
|<br> <br> <br>|<br> <br> <br>||
|<br>~~b. Measure and record the differential pump pressure in feet of water column.~~<br>|~~Feet Water~~<br>Column =<br>|<br>|
|<br> <br> <br>|<br> <br> <br>|<br>|
|<br>~~**Step 3: System returned to initial operating conditions.**~~<br>|<br> <br>~~**Y / N**~~<br>|<br> <br>~~**Y / N**~~<br>|
~~<u><mark>Step 1: Pressure measurement is within 5% of submittal data for all pumps.</mark></u>~~ ~~<u><mark></mark></u>~~ ~~<u><mark></mark></u>~~
~~<u><mark>Step 2: Pressure measurements are within 5%.</mark></u>~~ ~~<u><mark></mark></u>~~ ~~<u><mark></mark></u>~~
**~~<u>C. PASS / FAIL Evaluation (check one):</u>~~**
~~<u></u>~~ <sup>~~<u>PASS: All</u>~~</sup> <sup>**~~<u>Construction Inspection</u>~~**</sup> <sup>~~<u>responses are complete and all</u>~~</sup> <sup>**~~<u>Testing Results</u>~~**</sup> <sup>~~<u>responses are “Pass.”</u>~~</sup>
<u></u> <sup>~~FAIL: Any~~</sup> <sup>**~~Construction Inspection~~**</sup> <sup>~~responses are incomplete~~</sup> <sup>_~~OR~~_</sup> <sup>~~there is one or more “Fail” responses in~~</sup> <sup>**~~Testing~~**</sup>
**<u>Results</u>** <u>section. Provide explanation below. Use and attach additional pages if necessary.</u>
<sup>~~FAIL: Any~~</sup> <sup>**~~Construction Inspection~~**</sup> <sup>~~responses are incomplete~~</sup> <sup>_~~OR~~_</sup>
**<u>Results</u>** <u>section. Provide explanation below. Use and attach additional pages if necessary.</u>
~~For SI units: 1 inch water column = 0.249 kPa~~
**<mark>2019 CALIFORNIA MECHANICAL CODE</mark>** **<mark>451</mark>**
**<mark>APPENDIX E</mark>** <mark>any</mark> <mark>other</mark> <mark>purpose</mark> <mark>or</mark> <mark>distributed</mark> <mark>to</mark> <mark>any</mark> <mark>other</mark> <mark>persons</mark> <mark>or</mark> <mark>parti</mark> es.
|CERTIFICATE OF ACCEPTANCE|Col2|MECH-9A|
|---|---|---|
|**Supply Water Temperature Reset Controls Acceptance**<br>~~Project Name/Address:~~<br>~~System Name or Identification/Tag:~~<br>~~Enforcement Agency:~~<br>~~_Note: Submit one Certificate of Acceptance for each system that_~~<br>_must demonstrate compliance._|~~System Location or Area Served:~~<br>~~Permit Number:~~<br>~~Enforcement Agency Use: Checked by/Date~~|**(Page 1 of 2)**|
**FIELD TECHNICIAN’S DECLARATION STATEMENT** - I certify under penalty of perjury the information provided on this form is true and correct.
- I am the person who performed the acceptance requirements verification reported on this Certificate of Acceptance (Field
Technician).
- I certify that the construction/installation identified on this form complies with the acceptance requirements indicated in
the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements
and procedures specified in Section E 801.0 through Section E 806.0.
- I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been
**FIELD TECHNICIAN’S DECLARATION STATEMENT**
|completed and is posted or mad Company Name: Field Technician’s Name:|de available with the buildin|ng permit(s) issued for the buildi Field Technician’s Signature:|
|---|---|---|
|||<br>|
||||
**RESPONSIBLE PERSON’S DECLARATION STATEMENT** - I certify under penalty of perjury that I am the Field Technician, or the Field Technician is acting on my behalf as my
employee or my agent and I have reviewed the information provided on this form.
- I am a licensed contractor or registered design professional who is eligible per the requirements of the Authority Having
Jurisdiction to take responsibility for the scope of work specified on this document and attest to the declarations in this statement (responsible person).
- I certify that the information provided on this form substantiates that the construction/installation identified on this form
complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and
conforms to the applicable acceptance requirements and procedures specified in Section E 801.0 through Section E 806.0.
- I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been
completed and is posted or made available with the permit(s) issued for the building.
- I will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the
**RESPONSIBLE PERSON’S DECLARATION STATEMENT**
|building permit(s) issued for the building, and made available to the enforcement agency understand that a signed copy of this Certificate of Acceptance is required to be included wit provides to the building owner at occupancy. Company Name:|Col2|Col3|for all applicable inspections. I th the documentation the builder Phone:|
|---|---|---|---|
|~~Company Name:~~<br> <br>|~~Company Name:~~<br> <br>|~~Company Name:~~<br> <br>|~~Phone:~~<br>|
|~~Responsible Person’s Name:~~<br><br>|~~Responsible Person’s Name:~~<br><br>|~~Responsible Person’s Signature:~~<br>|~~Responsible Person’s Signature:~~<br>|
|~~License:~~|~~Date Signed:~~|~~Position With Company (Title):~~|~~Position With Company (Title):~~|
**<mark>452</mark>** **<mark>2019 CALIFORNIA MECHANICAL CODE</mark>**
**<mark>APPENDIX E</mark>**
|CERTIFICATE OF ACCEPTANCE MECH-9A|Col2|
|---|---|
|**Supply Water Temperature Reset Controls Acceptance**<br>**(Page 2 of 2)**<br>|**Supply Water Temperature Reset Controls Acceptance**<br>**(Page 2 of 2)**<br>|
|~~Project Name/Address:~~<br> <br>|~~Project Name/Address:~~<br> <br>|
|~~System Name or Identification/Tag:~~<br> <br>|~~System Location or Area Served:~~<br>|
_<u>loads or outdoor air temperature, as indicated in the control sequences.</u>_
**~~<u><mark>Construction Inspection</mark></u>~~**
|1 Instrumentation to perform test includes, but not limited to: a. Calibrated reference temperature sensor or drywell bath. 2 Installation Supply water temperature sensors have been either factory or field calibrated. 3 Documentation of hydronic system supply temperature sensors including (check one of the following): Field-calibrated Calibration complete, hydronic system supply temperature sensors within 1% of calibrated reference sensor or drywell bath. A. Functional Testing.|Col2|
|---|---|
|~~**A. Functional Testing.**~~<br>|~~**A. Functional Testing.**~~<br>|
|~~**Step 1: Test maximum reset value.**~~<br> <br>|~~**Step 1: Test maximum reset value.**~~<br> <br>|
|~~a. Change reset control variable to its maximum value.~~<br>|~~**Y / N**~~<br>|
|<br>~~b. Verify that chilled or hot water temperature setpoint is reset to appropriate value.~~<br>|<br>~~**Y / N**~~<br>|
|<br>~~c. Verify that actual system temperature changes to within 2% of the new setpoint.~~<br>|<br>~~**Y / N**~~|
|<br> <br> <br> <br>|<br> <br> <br> <br>|
|<br> <br>|<br>|
|<br> <br>|<br> <br>|
|<br> <br>|<br>|
|<br> <br>~~**Step 3: Test maximum reset value.**~~<br> <br>|<br> <br>~~**Step 3: Test maximum reset value.**~~<br> <br>|
|<br>~~a. Restore reset control variable to automatic control.~~<br>|~~**Y / N**~~<br>|
|<br>~~b. Verify that chilled or hot water temperature setpoint is reset to appropriate value.~~<br>|<br>~~**Y / N**~~<br>|
|<br>~~c. Verify that actual supply temperature changes to meet setpoint.~~<br>|<br>~~**Y / N**~~<br>|
|<br>~~d. Verify that actual supply temperature changes to within 2% of the new setpoint.~~<br> <br>|<br>~~**Y / N**~~<br>|
~~<u><mark>System passes criteria in 1c, 2c, and 3d.</mark></u>~~ ~~<u><mark></mark></u>~~ ~~<u><mark></mark></u>~~
**~~<u>C. PASS / FAIL Evaluation (check one):</u>~~**
~~<u></u>~~ <sup>~~<u>PASS: All</u>~~</sup> <sup>**~~<u>Construction Inspection</u>~~**</sup> <sup>~~<u>responses are complete and all</u>~~</sup> <sup>**~~<u>Testing Results</u>~~**</sup> <sup>~~<u>responses are “Pass.”</u>~~</sup>
<u></u> <sup>~~FAIL: Any~~</sup> <sup>**~~Construction Inspection~~**</sup> <sup>~~responses are incomplete~~</sup> <sup>_~~OR~~_</sup> <sup>~~there is one or more “Fail” responses in~~</sup> <sup>**~~Testing~~**</sup>
**<u>Results</u>** <u>section. Provide explanation below. Use and attach additional pages if necessary.</u>
<sup>~~FAIL: Any~~</sup> <sup>**~~Construction Inspection~~**</sup> <sup>~~responses are incomplete~~</sup> <sup>_~~OR~~_</sup>
**<u>Results</u>** <u>section. Provide explanation below. Use and attach additional pages if necessary.</u>
**<mark>2019 CALIFORNIA MECHANICAL CODE</mark>** **<mark>453</mark>**
**<mark>APPENDIX E</mark>** <mark>any</mark> <mark>other</mark> <mark>purpose</mark> <mark>or</mark> <mark>distributed</mark> <mark>to</mark> <mark>any</mark> <mark>other</mark> <mark>persons</mark> <mark>or</mark> <mark>parti</mark> es.
|CERTIFICATE OF ACCEPTANCE|Col2|MECH-10A|
|---|---|---|
|**Hydronic System Variable Flow Control Acceptance**<br>~~Project Name/Address:~~<br>~~System Name or Identification/Tag:~~<br>~~Enforcement Agency:~~<br>~~_Note: Submit one Certificate of Acceptance for each system that_~~<br>_must demonstrate compliance._|~~System Location or Area Served:~~<br>~~Permit Number:~~<br>~~Enforcement Agency Use: Checked by/Date~~|**(Page 1 of 3)**|
**FIELD TECHNICIAN’S DECLARATION STATEMENT** - I certify under penalty of perjury the information provided on this form is true and correct.
- I am the person who performed the acceptance requirements verification reported on this Certificate of Acceptance (Field
Technician).
- I certify that the construction/installation identified on this form complies with the acceptance requirements indicated in
the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements
and procedures specified in Section E 801.0 through Section E 806.0.
- I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been
**FIELD TECHNICIAN’S DECLARATION STATEMENT**
|completed and is posted or mad Company Name: Field Technician’s Name:|de available with the buildin|ng permit(s) issued for the buildi Field Technician’s Signature:|
|---|---|---|
|||<br>|
||||
**RESPONSIBLE PERSON’S DECLARATION STATEMENT** - I certify under penalty of perjury that I am the Field Technician, or the Field Technician is acting on my behalf as my
employee or my agent and I have reviewed the information provided on this form.
- I am a licensed contractor or registered design professional who is eligible per the requirements of the Authority Having
Jurisdiction to take responsibility for the scope of work specified on this document and attest to the declarations in this statement (responsible person).
- I certify that the information provided on this form substantiates that the construction/installation identified on this form
complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and
conforms to the applicable acceptance requirements and procedures specified in Section E 801.0 through Section E 806.0.
- I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been
completed and is posted or made available with the permit(s) issued for the building.
- I will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the
**RESPONSIBLE PERSON’S DECLARATION STATEMENT**
|building permit(s) issued for the building, and made available to the enforcement agency understand that a signed copy of this Certificate of Acceptance is required to be included wit provides to the building owner at occupancy. Company Name:|Col2|Col3|for all applicable inspections. I th the documentation the builder Phone:|
|---|---|---|---|
|~~Company Name:~~<br> <br>|~~Company Name:~~<br> <br>|~~Company Name:~~<br> <br>|~~Phone:~~<br>|
|~~Responsible Person’s Name:~~<br><br>|~~Responsible Person’s Name:~~<br><br>|~~Responsible Person’s Signature:~~<br>|~~Responsible Person’s Signature:~~<br>|
|~~License:~~|~~Date Signed:~~|~~Position With Company (Title):~~|~~Position With Company (Title):~~|
**<mark>454</mark>** **<mark>2019 CALIFORNIA MECHANICAL CODE</mark>**
**<mark>APPENDIX E</mark>**
|CERTIFICATE OF ACCEPTANCE MECH-10A|Col2|
|---|---|
|**Hydronic System Variable Flow Control Acceptance**<br>**(Page 2 of 3)**<br>|**Hydronic System Variable Flow Control Acceptance**<br>**(Page 2 of 3)**<br>|
|~~Project Name/Address:~~<br> <br>|~~Project Name/Address:~~<br> <br>|
|~~System Name or Identification/Tag:~~<br> <br>|~~System Location or Area Served:~~<br>|
_<u>coil and add or remove the desired amount of energy from the air stream to satisfy the load.</u>_
**~~<u><mark>Construction Inspection</mark></u>~~**
~~<mark>1.</mark>~~ ~~<mark>Instrumentation to perform test includes, but not limited to:</mark>~~
a. Calibrated differential pressure gauge.
2. Installation
Pressure sensors are either factory calibrated or field-calibrated.
Pressure sensor location, setpoint, and reset control meets the requirements of Section E 805.8 through Section
E 805.8.2.
3. Documentation of all control pressure sensors including (check one of the following):
a. Factory-calibrated (proof required).
Factory-calibration certificate.
b. Field-calibrated.
<u></u> <u>Calibration complete, all pressure sensors within 10% of calibrated reference sensor.</u>
**~~<u><mark>A. Functional Testing.</mark></u>~~** **~~<u><mark>Results</mark></u>~~**
**~~<u><mark>Step 1: Design flow test.</mark></u>~~**
~~<u><mark>a.</mark></u>~~ ~~<u><mark>Open control valves to achieve a minimum of 90% of design flow.</mark></u>~~ **~~<u><mark>Y / N</mark></u>~~**
~~<u><mark>b.</mark></u>~~ ~~<u><mark>Verify that the pump speed increases.</mark></u>~~ **~~<u><mark>Y / N</mark></u>~~**
~~<u><mark>c.</mark></u>~~ ~~<u><mark>Are the pumps operating at 100% speed?</mark></u>~~ **~~<u><mark>Y / N</mark></u>~~**
~~<u><mark>d.</mark></u>~~ ~~<u><mark>Record the system pressure as measured at the control sensor.</mark></u>~~ ~~<u><mark>(Feet Water Column) =</mark></u>~~
~~<u>e.</u>~~ ~~<u>Record the system pressure setpoint.</u>~~ ~~<u>(Feet Water Column) =</u>~~
~~<u><mark>f.</mark></u>~~ ~~<u><mark>Is the pressure reading 1d within 5% of pressure setpoint 1e?</mark></u>~~ **~~<u><mark>Y / N</mark></u>~~**
~~<u><mark>g.</mark></u>~~ ~~<u><mark>Did the system operation stabilize within 5 minutes after completion of step 1a?</mark></u>~~ **~~<u><mark>Y / N</mark></u>~~**
**~~<u><mark>Step 2: Low flow test</mark></u>~~**
~~<u><mark>a.</mark></u>~~ ~~<u><mark>Close coil control valves to achieve a maximum of 50% of design flow.</mark></u>~~ **~~<u><mark>Y / N</mark></u>~~**
~~<u><mark>b.</mark></u>~~ ~~<u><mark>Verify that the current operating speed decreases (for systems with DDC to the zone level).</mark></u>~~ **~~<u><mark>Y / N</mark></u>~~**
~~<u><mark>c.</mark></u>~~ ~~<u><mark>Verify that the current operating speed has not increased (for all other systems that are not DDC).</mark></u>~~ **~~<u><mark>Y / N</mark></u>~~**
~~<u><mark>d.</mark></u>~~ ~~<u><mark>Record the system pressure as measured at the control sensor.</mark></u>~~ ~~<u><mark>(Feet Water Column) =</mark></u>~~
~~<u>e.</u>~~ ~~<u>Record the system pressure setpoint.</u>~~ ~~<u>(Feet Water Column) =</u>~~
~~<u><mark>f.</mark></u>~~ ~~<u><mark>Is the setpoint in 2e is less than the setpoint in 1d?</mark></u>~~ **~~<u><mark>Y / N</mark></u>~~**
~~<u><mark>g.</mark></u>~~ ~~<u><mark>Is the pressure reading 2d within 5% of pressure setpoint 2e?</mark></u>~~ **~~<u><mark>Y / N</mark></u>~~**
~~<u><mark>h.</mark></u>~~ ~~<u><mark>Did the system operation stabilize within 5 minutes after completion of step 2a?</mark></u>~~ **~~<u><mark>Y / N</mark></u>~~**
**~~<u><mark>Step 3: System returned to initial operating conditions.</mark></u>~~** **~~<u><mark>Y / N</mark></u>~~**
**~~<u><mark>B. Testing Results</mark></u>~~** **~~<u><mark>PASS / FAIL</mark></u>~~**
~~<u><mark>Step 1: Select pass if either 1c or 1f are true.</mark></u>~~ ~~<u><mark></mark></u>~~ ~~<u><mark></mark></u>~~
~~<u><mark>Step 2: Select pass if 2b, 2e, 2f and 2g are true.</mark></u>~~ ~~<u><mark></mark></u>~~ ~~<u><mark></mark></u>~~
~~For SI units: 1 inch water column = 0.249 kPa~~
**<mark>2019 CALIFORNIA MECHANICAL CODE</mark>** **<mark>455</mark>**
**<mark>APPENDIX E</mark>** <mark>any</mark> <mark>other</mark> <mark>purpose</mark> <mark>or</mark> <mark>distributed</mark> <mark>to</mark> <mark>any</mark> <mark>other</mark> <mark>persons</mark> <mark>or</mark> <mark>parti</mark> es.
|CERTIFICATE OF ACCEPTANCE MECH-10A|Col2|
|---|---|
|**Hydronic System Variable Flow Control Acceptance**<br>**(Page 3 of 3)**<br>|**Hydronic System Variable Flow Control Acceptance**<br>**(Page 3 of 3)**<br>|
|~~Project Name/Address:~~<br> <br>|~~Project Name/Address:~~<br> <br>|
|~~System Name or Identification/Tag:~~<br>|~~System Location or Area Served:~~|
~~<u><mark></mark></u>~~ ~~<u><mark>PASS: All</mark></u>~~ **~~<u><mark>Construction Inspection</mark></u>~~** ~~<u><mark>responses are complete and all</mark></u>~~ **~~<u><mark>Testing Results</mark></u>~~** ~~<u><mark>responses are “Pass.”</mark></u>~~
<u></u> <sup>~~<mark>FAIL: Any</mark>~~</sup> <sup>**~~<mark>Construction Inspection</mark>~~**</sup> <sup>~~<mark>responses are incomplete</mark>~~</sup> <sup>_~~<mark>OR</mark>~~_</sup> <sup>~~<mark>there is one or more “Fail” responses in</mark>~~</sup> <sup>**~~<mark>Testing</mark>~~**</sup>
**<u><mark>Results</mark></u>** <u><mark>section. Provide explanation below. Use and attach additional pages if necessary.</mark></u>
<sup>~~<mark>FAIL: Any</mark>~~</sup> <sup>**~~<mark>Construction Inspection</mark>~~**</sup> <sup>~~<mark>responses are incomplete</mark>~~</sup> <sup>_~~<mark>OR</mark>~~_</sup>
**<u><mark>Results</mark></u>** <u><mark>section. Provide explanation below. Use and attach additional pages if necessary.</mark></u>
**<mark>456</mark>** **<mark>2019 CALIFORNIA MECHANICAL CODE</mark>**
**<mark>APPENDIX E</mark>**
|CERTIFICATE OF ACCEPTANCE|Col2|MECH-11A|
|---|---|---|
|**Automatic Demand Shed Control Acceptance**<br>~~Project Name/Address:~~<br>~~System Name or Identification/Tag:~~<br>~~Enforcement Agency:~~<br>~~_Note: Submit one Certificate of Acceptance for each system that_~~<br>_must demonstrate compliance._|~~System Location or Area Served:~~<br>~~Permit Number:~~<br>~~Enforcement Agency Use: Checked by/Date~~|**(Page 1 of 2)**|
**FIELD TECHNICIAN’S DECLARATION STATEMENT** - I certify under penalty of perjury the information provided on this form is true and correct.
- I am the person who performed the acceptance requirements verification reported on this Certificate of Acceptance (Field
Technician).
- I certify that the construction/installation identified on this form complies with the acceptance requirements indicated in
the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements
and procedures specified in Section E 801.0 through Section E 806.0.
- I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been
**FIELD TECHNICIAN’S DECLARATION STATEMENT**
|completed and is posted or mad Company Name: Field Technician’s Name:|de available with the buildin|ng permit(s) issued for the buildi Field Technician’s Signature:|
|---|---|---|
|||<br>|
||||
**RESPONSIBLE PERSON’S DECLARATION STATEMENT** - I certify under penalty of perjury that I am the Field Technician, or the Field Technician is acting on my behalf as my
employee or my agent and I have reviewed the information provided on this form.
- I am a licensed contractor or registered design professional who is eligible per the requirements of the Authority Having
Jurisdiction to take responsibility for the scope of work specified on this document and attest to the declarations in this statement (responsible person).
- I certify that the information provided on this form substantiates that the construction/installation identified on this form
complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and
conforms to the applicable acceptance requirements and procedures specified in Section E 801.0 through Section E 806.0.
- I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been
completed and is posted or made available with the permit(s) issued for the building.
- I will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the
**RESPONSIBLE PERSON’S DECLARATION STATEMENT**
|building permit(s) issued for the building, and made available to the enforcement agency understand that a signed copy of this Certificate of Acceptance is required to be included wit provides to the building owner at occupancy. Company Name:|Col2|Col3|for all applicable inspections. I th the documentation the builder Phone:|
|---|---|---|---|
|~~Company Name:~~<br> <br>|~~Company Name:~~<br> <br>|~~Company Name:~~<br> <br>|~~Phone:~~<br>|
|~~Responsible Person’s Name:~~<br><br>|~~Responsible Person’s Name:~~<br><br>|~~Responsible Person’s Signature:~~<br>|~~Responsible Person’s Signature:~~<br>|
|~~License:~~|~~Date Signed:~~|~~Position With Company (Title):~~|~~Position With Company (Title):~~|
**<mark>2019 CALIFORNIA MECHANICAL CODE</mark>** **<mark>457</mark>**
**<mark>APPENDIX E</mark>** <mark>any</mark> <mark>other</mark> <mark>purpose</mark> <mark>or</mark> <mark>distributed</mark> <mark>to</mark> <mark>any</mark> <mark>other</mark> <mark>persons</mark> <mark>or</mark> <mark>parti</mark> es.
|CERTIFICATE OF ACCEPTANCE MECH-11A|Col2|
|---|---|
|**Automatic Demand Shed Control Acceptance**<br>**(Page 2 of 2)**<br>|**Automatic Demand Shed Control Acceptance**<br>**(Page 2 of 2)**<br>|
|~~Project Name/Address:~~<br> <br>|~~Project Name/Address:~~<br> <br>|
|~~System Name or Identification/Tag:~~<br> <br>|~~System Location or Area Served:~~<br>|
|Ensure that the central demand shed sequences have been properly programmed into the DDC system. Intent: Construction Inspection 1. Instrumentation to perform test includes, but not limited to: a. None. 2. Installation. The EMCS front end interface enables activation of the central demand shed controls. A. Functional Testing. Pump Tag (Id)|Col2|.|
|---|---|---|
|~~**A. Functional Testing.**~~<br>~~**Pump Tag (Id)**~~<br>|~~**A. Functional Testing.**~~<br>~~**Pump Tag (Id)**~~<br>||
|~~**Step 1: Engage the demand shed controls.**~~<br><br>|~~**Step 1: Engage the demand shed controls.**~~<br><br>||
|<br><br> <br><br> <br>|<br><br> <br><br> <br>|<br>|
|<br>~~b.~~<br>~~Verify that the current operating temperature setpoint in a sample of noncritical spaces increases by~~<br>the proper amount.<br><br>|<br>~~b.~~<br>~~Verify that the current operating temperature setpoint in a sample of noncritical spaces increases by~~<br>the proper amount.<br><br>|<br>~~**Y / N**~~<br>|
|<br><br> <br>|<br><br> <br>||
|<br>~~**Step 2: Disengage the demand shed controls.**~~<br><br>|<br>~~**Step 2: Disengage the demand shed controls.**~~<br><br>|<br>|
|<br><br> <br><br> <br>|<br><br> <br><br> <br>|<br>|
|<br>~~b.~~<br>~~Verify that the current operating temperature setpoint in the sample of noncritical spaces returns to~~<br>their original value.<br><br> <br>|<br>~~b.~~<br>~~Verify that the current operating temperature setpoint in the sample of noncritical spaces returns to~~<br>their original value.<br><br> <br>|<br>~~**Y / N**~~<br>|
|<br>~~c.~~<br>~~Verify that the current operating temperature setpoint in the sample of critical spaces does not~~<br>change.<br> <br> <br>|<br>~~c.~~<br>~~Verify that the current operating temperature setpoint in the sample of critical spaces does not~~<br>change.<br> <br> <br>|~~**Y / N**~~<br> <br>|
|<br>||<br>|
|<br> <br>|<br>|<br> <br>|
|<br> <br>|<br>|<br> <br>|
|<br> <br>|~~~~|<br>~~~~|
~~<u><mark></mark></u>~~ ~~<u><mark>PASS: All</mark></u>~~ **~~<u><mark>Construction Inspection</mark></u>~~** ~~<u><mark>responses are complete and all</mark></u>~~ **~~<u><mark>Testing Results</mark></u>~~** ~~<u><mark>responses are “Pass.”</mark></u>~~
~~<u><mark></mark></u>~~
~~<mark>FAIL: Any</mark>~~ **~~<mark>Construction Inspection</mark>~~** ~~<mark>responses are incomplete</mark>~~ _~~<mark>OR</mark>~~_ ~~<mark>there is one or more “Fail” responses in</mark>~~ **~~<mark>Testing</mark>~~**
<u></u> **<u><mark>Results</mark></u>** <u><mark>section. Provide explanation below. Use and attach additional pages if necessary.</mark></u>
**<mark>458</mark>** **<mark>2019 CALIFORNIA MECHANICAL CODE</mark>**
**<mark>APPENDIX E</mark>**
|CERTIFICATE OF ACCEPTANCE|MECH-12A|
|---|---|
|**Fault Detection and Diagnostics (FDD) for Packaged Direct-Expansion Units**<br>~~Project Name/Address:~~<br>~~System Name or Identification/Tag:~~<br>~~System Location or Area Served:~~<br>~~Enforcement Agency:~~<br>~~Permit Number:~~<br>~~_Note: Submit one Certificate of Acceptance for each system that_~~<br>_must demonstrate compliance._<br>~~Enforcement Agency Use: Checked by/Date~~|**(Page 1 of 3)**|
**FIELD TECHNICIAN’S DECLARATION STATEMENT** - I certify under penalty of perjury the information provided on this form is true and correct.
- I am the person who performed the acceptance requirements verification reported on this Certificate of Acceptance (Field
Technician).
- I certify that the construction/installation identified on this form complies with the acceptance requirements indicated in
the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements
and procedures specified in Section E 801.0 through Section E 806.0.
- I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been
**FIELD TECHNICIAN’S DECLARATION STATEMENT**
|completed and is posted or mad Company Name: Field Technician’s Name:|de available with the buildin|ng permit(s) issued for the buildi Field Technician’s Signature:|
|---|---|---|
|||<br>|
||||
**RESPONSIBLE PERSON’S DECLARATION STATEMENT** - I certify under penalty of perjury that I am the Field Technician, or the Field Technician is acting on my behalf as my
employee or my agent and I have reviewed the information provided on this form.
- I am a licensed contractor or registered design professional who is eligible per the requirements of the Authority Having
Jurisdiction to take responsibility for the scope of work specified on this document and attest to the declarations in this statement (responsible person).
- I certify that the information provided on this form substantiates that the construction/installation identified on this form
complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and
conforms to the applicable acceptance requirements and procedures specified in Section E 801.0 through Section E 806.0.
- I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been
completed and is posted or made available with the permit(s) issued for the building.
- I will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the
**RESPONSIBLE PERSON’S DECLARATION STATEMENT**
|building permit(s) issued for the building, and made available to the enforcement agency understand that a signed copy of this Certificate of Acceptance is required to be included wit provides to the building owner at occupancy. Company Name:|Col2|Col3|for all applicable inspections. I th the documentation the builder Phone:|
|---|---|---|---|
|~~Company Name:~~<br> <br>|~~Company Name:~~<br> <br>|~~Company Name:~~<br> <br>|~~Phone:~~<br>|
|~~Responsible Person’s Name:~~<br><br>|~~Responsible Person’s Name:~~<br><br>|~~Responsible Person’s Signature:~~<br>|~~Responsible Person’s Signature:~~<br>|
|~~License:~~|~~Date Signed:~~|~~Position With Company (Title):~~|~~Position With Company (Title):~~|
**<mark>2019 CALIFORNIA MECHANICAL CODE</mark>** **<mark>459</mark>**
**<mark>APPENDIX E</mark>** <mark>any</mark> <mark>other</mark> <mark>purpose</mark> <mark>or</mark> <mark>distributed</mark> <mark>to</mark> <mark>any</mark> <mark>other</mark> <mark>persons</mark> <mark>or</mark> <mark>parti</mark> es.
**CERTIFICATE OF ACCEPTANCE** **MECH-12A**
**Fault Detection and Diagnostics (FDD) for Packaged Direct-Expansion Units** **(Page 2 of 3)**
~~<u>Project Name/Address:</u>~~
~~<u>System Name or Identification/Tag:</u>~~ ~~<u>System Location or Area Served:</u>~~
_~~The purpose of this test is to verify proper fault detection and reporting for automated fault detection and~~_
**<u>Intent:</u>**
_<u>diagnostics systems for packaged units.</u>_
**~~<u><mark>Construction Inspection</mark></u>~~**
~~<mark>1.</mark>~~ ~~<mark>Instrumentation to perform test includes, but not limited to:</mark>~~
a. List of instrumentation may be needed or included.
2. Installation.
Verify that FDD hardware is installed on equipment by the manufacturer and that equipment make and model
include factory-installed FDD hardware that matches the information indicated on copies of the manufacturer’s cut
<u>sheets and on the plans and specifications.</u>
**~~<u>A. Eligibility Criteria Results.</u>~~** **~~<u>Results</u>~~**
~~a.~~ ~~A fault detection and diagnostics (FDD) system for direct-expansion packaged units shall contain the following~~
<u>features to be eligible for credit in the performance calculation method:</u>
~~b.~~ ~~The unit shall include a factory-installed economizer and shall limit the economizer deadband to no~~ **~~Y / N~~**
<u><mark>more than 2°F.</mark></u>
~~<u><mark>c.</mark></u>~~ ~~<u><mark>The unit shall include direct-drive actuators on outside air and return air dampers.</mark></u>~~
**~~Y / N~~**
<u><mark>more than 2°F.</mark></u>
~~<u><mark>c.</mark></u>~~ ~~<u><mark>The unit shall include direct-drive actuators on outside air and return air dampers.</mark></u>~~ **~~<u><mark>Y / N</mark></u>~~**
~~<mark>d.</mark>~~ ~~<mark>The unit shall include an integrated economizer with either differential dry-bulb or differential</mark>~~ **~~<mark>Y / N</mark>~~**
<u>enthalpy control.</u>
~~e.~~ ~~The unit shall include a low temperature lockout on the compressor to prevent coil freeze-up or~~ **~~Y / N~~**
<u>enthalpy control.</u>
~~e.~~ ~~The unit shall include a low temperature lockout on the compressor to prevent coil freeze-up or~~
<u>comfort problems.</u>
~~f.~~
<u>comfort problems.</u>
~~f.~~ ~~Outside air and return air dampers shall have maximum leakage rates conforming to Section E 805.12~~
<u>through Section E 805.12.2.</u>
~~g.~~ ~~The unit shall have an adjustable expansion control device such as a thermostatic expansion valve~~
<u>through Section E 805.12.2.</u>
~~g.~~ ~~The unit shall have an adjustable expansion control device such as a thermostatic expansion valve~~
<u>(TXV).</u>
~~h.~~
<u>(TXV).</u>
~~h.~~ ~~To improve the ability to troubleshoot charge and compressor operation, a high-pressure refrigerant~~
<u>port will be located on the liquid line. A low-pressure refrigerant port will be located on the suction line.</u>
~~<u>i.</u>~~ ~~<u>The following sensors should be permanently installed to monitor system operation and the controller</u>~~
**~~<u><mark>Y / N</mark></u>~~**
**~~<mark>Y / N</mark>~~**
**~~Y / N~~**
**~~Y / N~~**
**~~Y / N~~**
**~~Y / N~~**
**~~<u><mark>Y / N</mark></u>~~**
<u>port will be located on the liquid line. A low-pressure refrigerant port will be located on the suction line.</u>
~~<u>i.</u>~~ ~~<u>The following sensors should be permanently installed to monitor system operation and the controller</u>~~ **~~<u><mark>Y / N</mark></u>~~**
~~<u>should have the capability of displaying the value of each parameter:</u>~~
<u>Refrigerant suction pressure</u> <u>Supply air relative humidity</u> <u>Return air temp</u> <u>Supply air relative</u>
Refrigerant suction temp Outside air relative humidity Supply air temp humidity
<u></u> <u>Liquid line pressure</u> <u></u> <u>Return air relative humidity</u> <u></u> <u>Outside air temp</u>
~~j.~~ ~~The controller will provide system status by indicating the following conditions:~~ **~~<u>Y / N</u>~~**
Compressor enabled Economizer enabled Free cooling available
<u></u> <u>Heating enabled</u> <u></u> <u>Mixed air low limit cycle active</u>
~~k.~~ ~~The unit controller shall have the capability to manually initiate each operating mode so that the operation~~
**~~<u>Y / N</u>~~**
<u>of compressors, economizers, fans, and heating system can be independently tested and verified.</u>
**~~<u>Y / N</u>~~**
~~For SI units: °C = (°F-32)/1.8~~
**~~<u>Y / N</u>~~**
**<mark>460</mark>** **<mark>2019 CALIFORNIA MECHANICAL CODE</mark>**
**<mark>APPENDIX E</mark>**
**CERTIFICATE OF ACCEPTANCE** **MECH-12A**
**Fault Detection and Diagnostics (FDD) for Packaged Direct-Expansion Units** **(Page 3 of 3)**
~~<u>Project Name/Address:</u>~~
~~<u>System Name or Identification/Tag:</u>~~ ~~<u>System Location or Area Served:</u>~~
**~~<u><mark>B. Functional Testing.</mark></u>~~** **~~<u><mark>Results</mark></u>~~**
**~~<u><mark>Step 1: Low airflow test.</mark></u>~~**
~~<u><mark>a.</mark></u>~~ ~~<u><mark>Test low airflow condition by replacing the existing filter with a dirty filter or appropriate obstruction.</mark></u>~~
~~<u><mark>b.</mark></u>~~ ~~<u><mark>Verify that the fault detection and diagnostics system reports the fault.</mark></u>~~ **~~<u><mark>Y / N</mark></u>~~**
~~<u><mark>c.</mark></u>~~ ~~<u><mark>Verify that the system is able to verify the correct refrigerant charge.</mark></u>~~ **~~<u><mark>Y / N</mark></u>~~**
~~<mark>d.</mark>~~ ~~<mark>Verify that you are able to calibrate the following:</mark>~~ **~~<u><mark>Y / N</mark></u>~~**
<u></u> <u><mark>Outside Air Temperature Sensor.</mark></u> <u></u> <u><mark>Return Air Temperature Sensors.</mark></u> <u></u> <u><mark>Supply Air Tempera</mark></u> ~~<u><mark>ture Sensors.</mark></u>~~
**~~<u><mark>Y / N</mark></u>~~**
**~~<u><mark>Y / N</mark></u>~~**
~~<mark>Verify that you are able to calibrate the following:</mark>~~ **~~<u><mark>Y / N</mark></u>~~**
<u></u> <u><mark>Outside Air Temperature Sensor.</mark></u> <u></u> <u><mark>Return Air Temperature Sensors.</mark></u> <u></u> <u><mark>Supply Air Tempera</mark></u> ~~<u><mark>ture Sensors.</mark></u>~~
**~~<u><mark>C. Testing Results</mark></u>~~** **~~<u><mark>PASS / FAIL</mark></u>~~**
~~<u><mark>Test passes if all answers are yes under</mark></u>~~ **~~<u><mark>Eligibility Criteria</mark></u>~~** ~~<u><mark>and</mark></u>~~ **~~<u><mark>Functional Testing</mark></u>~~** ~~<u><mark>.</mark></u>~~ ~~<u><mark></mark></u>~~ ~~<u><mark></mark></u>~~
~~<u><mark></mark></u>~~ ~~<u><mark>PASS: All</mark></u>~~ **~~<u><mark>Construction Inspection</mark></u>~~** ~~<u><mark>responses are complete and all</mark></u>~~ **~~<u><mark>Testing Results</mark></u>~~** ~~<u><mark>responses are “Pass.”</mark></u>~~
~~<u><mark></mark></u>~~
~~<mark>FAIL: Any</mark>~~ **~~<mark>Construction Inspection</mark>~~** ~~<mark>responses are incomplete</mark>~~ _~~<mark>OR</mark>~~_ ~~<mark>there is one or more “Fail” responses in</mark>~~ **~~<mark>Testing</mark>~~**
<u></u> **<u><mark>Results</mark></u>** <u><mark>section. Provide explanation below. Use and attach additional pages if necessary.</mark></u>
**<mark>2019 CALIFORNIA MECHANICAL CODE</mark>** **<mark>461</mark>**
**<mark>APPENDIX E</mark>** <mark>any</mark> <mark>other</mark> <mark>purpose</mark> <mark>or</mark> <mark>distributed</mark> <mark>to</mark> <mark>any</mark> <mark>other</mark> <mark>persons</mark> <mark>or</mark> <mark>parti</mark> es.
|CERTIFICATE OF ACCEPTANCE MECH-13A|Col2|
|---|---|
|**Automatic Fault Detection and Diagnostics (FDD) for Packaged Direct-Expansion Units and Zone**<br>**(Page 1 of 4)**<br>**Terminal Units Acceptance**<br>|**Automatic Fault Detection and Diagnostics (FDD) for Packaged Direct-Expansion Units and Zone**<br>**(Page 1 of 4)**<br>**Terminal Units Acceptance**<br>|
|~~Project Name/Address:~~<br> <br>|~~Project Name/Address:~~<br> <br>|
|||
|<br>|<br>|
**FIELD TECHNICIAN’S DECLARATION STATEMENT** - I certify under penalty of perjury the information provided on this form is true and correct.
- I am the person who performed the acceptance requirements verification reported on this Certificate of Acceptance (Field
Technician).
- I certify that the construction/installation identified on this form complies with the acceptance requirements indicated in
the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements
and procedures specified in Section E 801.0 through Section E 806.0.
- I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been
<u>completed and is posted or made available with the building permit(s) issued for the building.</u>
**FIELD TECHNICIAN’S DECLARATION STATEMENT**
~~Company Name:~~
|Col1|Col2|Col3|
|---|---|---|
||||
**RESPONSIBLE PERSON’S DECLARATION STATEMENT** - I certify under penalty of perjury that I am the Field Technician, or the Field Technician is acting on my behalf as my
employee or my agent and I have reviewed the information provided on this form.
- I am a licensed contractor or registered design professional who is eligible per the requirements of the Authority Having
Jurisdiction to take responsibility for the scope of work specified on this document and attest to the declarations in this statement (responsible person).
- I certify that the information provided on this form substantiates that the construction/installation identified on this form
complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and
conforms to the applicable acceptance requirements and procedures specified in Section E 801.0 through Section E 806.0.
- I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been
completed and is posted or made available with the permit(s) issued for the building.
- I will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the
building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I
understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder
**RESPONSIBLE PERSON’S DECLARATION STATEMENT**
|provides to the building owner Company Name: Responsible Person’s Name:|r at occupancy.|P Responsible Person’s Signature:|
|---|---|---|
|<br>||<br>|
||||
**<mark>462</mark>** **<mark>2019 CALIFORNIA MECHANICAL CODE</mark>**
**<mark>APPENDIX E</mark>**
**CERTIFICATE OF ACCEPTANCE** **MECH-13A**
**Automatic Fault Detection and Diagnostics (FDD) for Packaged Direct-Expansion Units and Zone** **(Page 2 of 4)**
**Terminal Units Acceptance**
~~<u>Project Name/Address:</u>~~
~~<u>System Name or Identification/Tag:</u>~~ ~~<u>System Location or Area Served:</u>~~
**~~<u><mark>Intent:</mark></u>~~** _~~<u><mark>Verify that the system detects common faults in air handling units and zone terminal units.</mark></u>~~_
**~~<u><mark>Construction Inspection</mark></u>~~**
~~<mark>1.</mark>~~ ~~<mark>Instrumentation to perform test includes, but not limited to:</mark>~~
a. No instrumentation is required – changes are implemented at the building automation system control station.
|2. Installation. a. The functional testing verifies proper installation of the controls for FDD for air handling units and z units. No additional installation checks are required. A. Eligibility Criteria Results.|zone terminal Results|
|---|---|
|~~**A. Eligibility Criteria Results.**~~<br>|~~**Results**~~|
|<br> <br>~~**Testing of each AHU with FDD controls shall include the following tests:**~~|<br> <br>~~**Testing of each AHU with FDD controls shall include the following tests:**~~|
|<br><br> <br> <br>|<br><br> <br> <br>|
|<br><br> <br> <br>|<br>|
|<br> <br> <br> <br>|<br> <br>|
|<br> <br> <br> <br> <br>|<br> <br>|
|<br> <br> <br> <br>|<br>|
|<br> <br> <br> <br><br> <br><br>|<br> <br> <br> <br><br> <br><br>|
|<br>~~a.~~<br>~~From the control system workstation, command the mixing box dampers to full open (100% outdoor~~<br>air).<br><br>|~~**Y / N**~~<br>|
|<br><br>|<br>|
|<br><br> <br><br>|<br> <br>|
|<br><br> <br><br> <br>|<br> <br>|
|<br>~~e.~~<br>~~From the control system workstation, command the mixing box dampers to a full-closed position~~<br>(0% outdoor air).<br><br>|<br>~~**Y / N**~~<br>|
|<br><br> <br><br>|<br>|
|<br><br> <br><br>|<br> <br>|
|<br><br> <br>|<br>|
|<br> <br> <br><br> <br> <br>|<br> <br> <br><br> <br> <br>|
|<br>~~a.~~<br>~~From the control system workstation, command the heating and cooling coil valves to full open or~~<br>closed, then disconnect power to the actuator and verify that a fault is reported at the control workstation.<br>|~~**Y / N**~~|
|<br><br> <br> <br>|<br><br> <br> <br>|
|<br>~~a.~~<br>~~From the control system workstation, override the heating coil valve and verify that a fault is~~<br>reported at the control workstation.<br><br> <br>|~~**Y / N**~~<br>|
|<br>~~b.~~<br>~~From the control system workstation, override the cooling coil valve and verify that a fault is~~<br>reported at the control workstation.<br><br> <br>|~~**Y / N**~~<br>|
|<br>~~c.~~<br>~~From the control system workstation, override the mixing box dampers and verify that a fault is~~<br>reported at the control workstation.|~~**Y / N**~~|
**<mark>2019 CALIFORNIA MECHANICAL CODE</mark>** **<mark>463</mark>**
**<mark>APPENDIX E</mark>** <mark>any</mark> <mark>other</mark> <mark>purpose</mark> <mark>or</mark> <mark>distributed</mark> <mark>to</mark> <mark>any</mark> <mark>other</mark> <mark>persons</mark> <mark>or</mark> <mark>parti</mark> es.
**CERTIFICATE OF ACCEPTANCE** **MECH-13A**
**Automatic Fault Detection and Diagnostics (FDD) for Packaged Direct-Expansion Units and Zone** **(Page 3 of 4)**
**Terminal Units Acceptance**
~~<u>Project Name/Address:</u>~~
~~<u>System Name or Identification/Tag:</u>~~ ~~<u>System Location or Area Served:</u>~~
|B. Functional Testing for Zone Terminal Units.|Results|
|---|---|
|<br> <br>~~**Testing shall be performed on one of each type of terminal unit (VAV box) in the project. A**~~<br>**minimum of 5% of results the terminal boxes shall be tested.**|<br> <br>~~**Testing shall be performed on one of each type of terminal unit (VAV box) in the project. A**~~<br>**minimum of 5% of results the terminal boxes shall be tested.**|
|<br><br> <br> <br>|<br><br> <br> <br>|
|<br><br> <br> <br>|<br>|
|<br> <br> <br> <br>|<br> <br>|
|<br> <br> <br> <br> <br>|<br> <br>|
|<br> <br> <br> <br>|<br>|
|<br> <br> <br> <br>|<br> <br> <br> <br>|
|<br> <br><br> <br>|<br> <br><br> <br>|
|<br><br> <br><br>|<br>|
|<br><br> <br><br> <br>|<br> <br>|
|<br>~~c.~~<br>~~Adjust the cooling setpoint so that the room temperature is below the cooling setpoint to command~~<br>the damper to the minimum position. Verify that the control system reports a fault.<br><br>|<br>~~**Y / N**~~<br>|
|<br><br> <br>||
|<br> <br> <br><br> <br>|<br> <br> <br><br> <br>|
|<br><br> <br><br>|<br>|
|<br><br> <br><br> <br>|<br> <br>|
|<br>~~c.~~<br>~~Set the cooling setpoint below the room temperature to simulate a call for cooling. Verify that the~~<br>control system reports a fault.<br><br>|<br>~~**Y / N**~~<br>|
|<br>~~d.~~<br>~~Reconnect the actuator and restore to normal operation.~~<br>|~~**Y / N**~~|
|<br> <br> <br><br> <br>|<br> <br> <br><br> <br>|
|<br><br> <br><br>|<br>|
|<br>~~b.~~<br>~~Disconnect power to the actuator. Set the heating setpoint temperature to be lower than the current~~<br>space temperature, to command the valve closed. Verify that the fault is reported at the control work-<br>station.<br><br>|<br>~~**Y / N**~~<br>|
|~~c.~~<br>~~Reconnect the actuator and restore normal operation.~~<br>|~~**Y / N**~~|
|<br><br> <br> <br>|<br><br> <br> <br>|
|<br>~~a.~~<br>~~Set the integral coefficient of the box controller to a value 50 times the current value. Lower the~~<br>space cooling setpoint to simulate a call for cooling.<br><br> <br>|~~**Y / N**~~<br>|
|<br>~~b.~~<br>~~The damper cycles continuously and airflow is unstable. Verify that the control system detects and~~<br>reports the fault.<br><br>|~~**Y / N**~~<br>|
|<br><br> <br>||
|<br> <br>~~**Step 5: Disconnected inlet duct.**~~<br><br> <br>|<br> <br>~~**Step 5: Disconnected inlet duct.**~~<br><br> <br>|
|<br>~~a.~~<br>~~From the control system workstation, command the damper to full closed, then disconnect power to~~<br>the actuator and verify that a fault is reported at the control workstation.|~~**Y / N**~~|
**<mark>464</mark>** **<mark>2019 CALIFORNIA MECHANICAL CODE</mark>**
**<mark>APPENDIX E</mark>**
**CERTIFICATE OF ACCEPTANCE** **MECH-13A**
**Automatic Fault Detection and Diagnostics (FDD) for Packaged Direct-Expansion Units and Zone** **(Page 4 of 4)**
**Terminal Units Acceptance**
~~<u>Project Name/Address:</u>~~
~~<u>System Name or Identification/Tag:</u>~~ ~~<u>System Location or Area Served:</u>~~
**~~<u><mark>C. Testing Results</mark></u>~~** **~~<u><mark>PASS / FAIL</mark></u>~~**
~~<u><mark>Test passes if all answers are yes under</mark></u>~~ **~~<u><mark>Functional Testing Sections</mark></u>~~** ~~<u><mark>.</mark></u>~~ ~~<u><mark></mark></u>~~ ~~<u><mark></mark></u>~~
**~~<u><mark>D. PASS / FAIL Evaluation (check one):</mark></u>~~**
~~<u><mark></mark></u>~~ ~~<u><mark>PASS: All</mark></u>~~ **~~<u><mark>Construction Inspection</mark></u>~~** ~~<u><mark>responses are complete and all</mark></u>~~ **~~<u><mark>Testing Results</mark></u>~~** ~~<u><mark>responses are “Pass.”</mark></u>~~
~~<u><mark></mark></u>~~
~~<mark>FAIL: Any</mark>~~ **~~<mark>Construction Inspection</mark>~~** ~~<mark>responses are incomplete</mark>~~ _~~<mark>OR</mark>~~_ ~~<mark>there is one or more “Fail” responses in</mark>~~ **~~<mark>Testing</mark>~~**
<u></u> **<u><mark>Results</mark></u>** <u><mark>section. Provide explanation below. Use and attach additional pages if necessary.</mark></u>
**<mark>2019 CALIFORNIA MECHANICAL CODE</mark>** **<mark>465</mark>**
**<mark>APPENDIX E</mark>** <mark>any</mark> <mark>other</mark> <mark>purpose</mark> <mark>or</mark> <mark>distributed</mark> <mark>to</mark> <mark>any</mark> <mark>other</mark> <mark>persons</mark> <mark>or</mark> <mark>parti</mark> es.
|CERTIFICATE OF ACCEPTANCE|Col2|MECH-14A|
|---|---|---|
|**Distributed Energy Storage DX AC Systems Acceptance**<br>~~Project Name/Address:~~<br>~~System Name or Identification/Tag:~~<br>~~Enforcement Agency:~~<br>~~_Note: Submit one Certificate of Acceptance for each system that_~~<br>_must demonstrate compliance._|~~System Location or Area Served:~~<br>~~Permit Number:~~<br>~~Enforcement Agency Use: Checked by/Date~~|**(Page 1 of 3)**|
**FIELD TECHNICIAN’S DECLARATION STATEMENT** - I certify under penalty of perjury the information provided on this form is true and correct.
- I am the person who performed the acceptance requirements verification reported on this Certificate of Acceptance (Field
Technician).
- I certify that the construction/installation identified on this form complies with the acceptance requirements indicated in
the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements
and procedures specified in Section E 801.0 through Section E 806.0.
- I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been
**FIELD TECHNICIAN’S DECLARATION STATEMENT**
|completed and is posted or mad Company Name: Field Technician’s Name:|de available with the buildin|ng permit(s) issued for the buildi Field Technician’s Signature:|
|---|---|---|
|||<br>|
||||
**RESPONSIBLE PERSON’S DECLARATION STATEMENT** - I certify under penalty of perjury that I am the Field Technician, or the Field Technician is acting on my behalf as my
employee or my agent and I have reviewed the information provided on this form.
- I am a licensed contractor or registered design professional who is eligible per the requirements of the Authority Having
Jurisdiction to take responsibility for the scope of work specified on this document and attest to the declarations in this statement (responsible person).
- I certify that the information provided on this form substantiates that the construction/installation identified on this form
complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and
conforms to the applicable acceptance requirements and procedures specified in Section E 801.0 through Section E 806.0.
- I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been
completed and is posted or made available with the permit(s) issued for the building.
- I will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the
**RESPONSIBLE PERSON’S DECLARATION STATEMENT**
|building permit(s) issued for the building, and made available to the enforcement agency understand that a signed copy of this Certificate of Acceptance is required to be included wit provides to the building owner at occupancy. Company Name:|Col2|Col3|for all applicable inspections. I th the documentation the builder Phone:|
|---|---|---|---|
|~~Company Name:~~<br> <br>|~~Company Name:~~<br> <br>|~~Company Name:~~<br> <br>|~~Phone:~~<br>|
|~~Responsible Person’s Name:~~<br><br>|~~Responsible Person’s Name:~~<br><br>|~~Responsible Person’s Signature:~~<br>|~~Responsible Person’s Signature:~~<br>|
|~~License:~~|~~Date Signed:~~|~~Position With Company (Title):~~|~~Position With Company (Title):~~|
**<mark>466</mark>** **<mark>2019 CALIFORNIA MECHANICAL CODE</mark>**
**<mark>APPENDIX E</mark>**
|CERTIFICATE OF ACCEPTANCE MECH-14A|Col2|
|---|---|
|**Distributed Energy Storage DX AC Systems Acceptance**<br>**(Page 2 of 3)**<br>|**Distributed Energy Storage DX AC Systems Acceptance**<br>**(Page 2 of 3)**<br>|
|~~Project Name/Address:~~<br> <br>|~~Project Name/Address:~~<br> <br>|
|||
|<br> <br>|<br>|
**~~<u><mark>Construction Inspection</mark></u>~~**
~~<mark>1.</mark>~~ ~~<mark>Instrumentation to perform test includes, but not limited to:</mark>~~
|a. No special instrumentation is required to perform these tests. 2. Installation. Prior to Performance Testing, verify and document the following: The water tank is filled to the proper level. The water tank is sitting on a foundation with adequate structural strength. The water tank is insulated and the top cover is in place. The DES/DXAC is installed correctly (refrigerant piping, etc.). Verify that the correct model number is installed and configured. A. Functional Testing|Results|
|---|---|
|<br> <br>~~**A. Functional Testing**~~|<br> <br>~~**Results**~~|
|~~**Step 1: Simulate no cooling load during a nighttime period by setting system time to between 9:00 p.m. and 6:00 a.m.**~~<br>**Raise the space temperature setpoint above the current space temperature. Verify and document the**<br>**following:**<br><br> <br> <br> <br>|~~**Step 1: Simulate no cooling load during a nighttime period by setting system time to between 9:00 p.m. and 6:00 a.m.**~~<br>**Raise the space temperature setpoint above the current space temperature. Verify and document the**<br>**following:**<br><br> <br> <br> <br>|
|<br><br>|<br>|
|<br><br> <br> <br> <br>|<br> <br>|
|<br> <br>~~**Step 2:**~~<br>~~**Simulate cooling load during daytime period (e.g., by setting time schedule to include actual time and placing**~~<br>**thermostat cooling set-point below actual temperature). Verify and document the following:**<br><br> <br>|<br> <br>~~**Step 2:**~~<br>~~**Simulate cooling load during daytime period (e.g., by setting time schedule to include actual time and placing**~~<br>**thermostat cooling set-point below actual temperature). Verify and document the following:**<br><br> <br>|
|<br><br> <br>|<br>|
|<br>~~b.~~<br>~~If the DES/DXAC has cooling capacity, DES/DXAC runs to meet the cooling demand (in ice melt~~<br>mode).<br><br> <br>|<br>~~**Y / N / N/A**~~<br>|
|~~c.~~<br>~~If the DES/DXAC has no ice and there is a call for cooling, the DES/DXAC runs in direct cooling~~<br>mode.<br>|~~**Y / N / N/A**~~|
|<br><br> <br>|<br><br> <br>|
|<br><br> <br><br>||
|<br>~~b.~~<br>~~The DES/DXAC and the condensing unit do not run.~~<br>|<br>|
|~~**Step 4: Simulate no cooling load during morning shoulder time period. Verify and document the following:**~~<br><br> <br>|~~**Step 4: Simulate no cooling load during morning shoulder time period. Verify and document the following:**~~<br><br> <br>|
|~~a.~~<br>~~The DES/DXAC is idle (the condensing unit and the refrigerant pumps remain off).~~<br>|<br>|
~~<mark>a.</mark>~~ ~~<mark>Verify that you are able to set the proper time and date, as per manufacturer’s installation manual for</mark>~~ **~~<mark>Y / N</mark>~~**
<u>approved installers.</u>
**~~<mark>Y / N</mark>~~**
**~~<u><mark>C. Testing Results.</mark></u>~~** **~~<u><mark>PASS / FAIL</mark></u>~~**
~~<u><mark>Test passes if all answers are yes under</mark></u>~~ **~~<u><mark>Functional Testing</mark></u>~~** ~~<u><mark>and</mark></u>~~ **~~<u><mark>Calibrating Controls</mark></u>~~** ~~<u><mark>.</mark></u>~~ ~~<u></u>~~ ~~<u></u>~~
~~For SI units: 1 metric ton = 1000 kg, 1000 British thermal units per hour = 0.293 kW~~
**<mark>2019 CALIFORNIA MECHANICAL CODE</mark>** **<mark>467</mark>**
**<mark>APPENDIX E</mark>** <mark>any</mark> <mark>other</mark> <mark>purpose</mark> <mark>or</mark> <mark>distributed</mark> <mark>to</mark> <mark>any</mark> <mark>other</mark> <mark>persons</mark> <mark>or</mark> <mark>parti</mark> es.
|CERTIFICATE OF ACCEPTANCE MECH-14A|Col2|
|---|---|
|**Distributed Energy Storage DX AC Systems Acceptance**<br>**(Page 3 of 3)**<br>|**Distributed Energy Storage DX AC Systems Acceptance**<br>**(Page 3 of 3)**<br>|
|~~Project Name/Address:~~<br> <br>|~~Project Name/Address:~~<br> <br>|
|||
|<br>|<br>|
~~<mark>FAIL: Any</mark>~~ **~~<mark>Construction Inspection</mark>~~** ~~<mark>responses are incomplete</mark>~~ _~~<mark>OR</mark>~~_ ~~<mark>there is one or more “Fail” responses in</mark>~~ **~~<mark>Testing</mark>~~**
<u></u> **<u><mark>Results</mark></u>** <u><mark>section. Provide explanation below. Use and attach additional pages if necessary.</mark></u>
**<mark>468</mark>** **<mark>2019 CALIFORNIA MECHANICAL CODE</mark>**
**<mark>APPENDIX E</mark>**
|CERTIFICATE OF ACCEPTANCE|Col2|MECH-15A|
|---|---|---|
|**Thermal Energy Storage (TES) System Acceptance**<br>~~Project Name/Address:~~<br>~~System Name or Identification/Tag:~~<br>~~Enforcement Agency:~~<br>~~_Note: Submit one Certificate of Acceptance for each system that_~~<br>_must demonstrate compliance._|~~System Location or Area Served:~~<br>~~Permit Number:~~<br>~~Enforcement Agency Use: Checked by/Date~~|**(Page 1 of 3)**|
**FIELD TECHNICIAN’S DECLARATION STATEMENT** - I certify under penalty of perjury the information provided on this form is true and correct.
- I am the person who performed the acceptance requirements verification reported on this Certificate of Acceptance (Field
Technician).
- I certify that the construction/installation identified on this form complies with the acceptance requirements indicated in
the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements
and procedures specified in Section E 801.0 through Section E 806.0.
- I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been
**FIELD TECHNICIAN’S DECLARATION STATEMENT**
|completed and is posted or mad Company Name: Field Technician’s Name:|de available with the buildin|ng permit(s) issued for the buildi Field Technician’s Signature:|
|---|---|---|
|||<br>|
||||
**RESPONSIBLE PERSON’S DECLARATION STATEMENT** - I certify under penalty of perjury that I am the Field Technician, or the Field Technician is acting on my behalf as my
employee or my agent and I have reviewed the information provided on this form.
- I am a licensed contractor or registered design professional who is eligible per the requirements of the Authority Having
Jurisdiction to take responsibility for the scope of work specified on this document and attest to the declarations in this statement (responsible person).
- I certify that the information provided on this form substantiates that the construction/installation identified on this form
complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and
conforms to the applicable acceptance requirements and procedures specified in Section E 801.0 through Section E 806.0.
- I have confirmed that the Installation Certificate(s) for the construction/installation identified on this form has been
completed and is posted or made available with the permit(s) issued for the building.
- I will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the
**RESPONSIBLE PERSON’S DECLARATION STATEMENT**
|building permit(s) issued for the building, and made available to the enforcement agency understand that a signed copy of this Certificate of Acceptance is required to be included wit provides to the building owner at occupancy. Company Name:|Col2|Col3|for all applicable inspections. I th the documentation the builder Phone:|
|---|---|---|---|
|~~Company Name:~~<br> <br>|~~Company Name:~~<br> <br>|~~Company Name:~~<br> <br>|~~Phone:~~<br>|
|~~Responsible Person’s Name:~~<br><br>|~~Responsible Person’s Name:~~<br><br>|~~Responsible Person’s Signature:~~<br>|~~Responsible Person’s Signature:~~<br>|
|~~License:~~|~~Date Signed:~~|~~Position With Company (Title):~~|~~Position With Company (Title):~~|
**<mark>2019 CALIFORNIA MECHANICAL CODE</mark>** **<mark>469</mark>**
**<mark>APPENDIX E</mark>** <mark>any</mark> <mark>other</mark> <mark>purpose</mark> <mark>or</mark> <mark>distributed</mark> <mark>to</mark> <mark>any</mark> <mark>other</mark> <mark>persons</mark> <mark>or</mark> <mark>parti</mark> es.
|CERTIFICATE OF ACCEPTANCE|Col2|MECH-15A|
|---|---|---|
|**Thermal Energy Storage (TES) System Acceptance**<br>~~Project Name/Address:~~<br>~~System Name or Identification/Tag:~~<br>~~System Location or Area Served:~~<br>~~_Verify proper operation of distributed energy storage DX systems._~~<br>~~**Intent:**~~<br>~~**Construction Inspection**~~<br>~~1.~~<br>~~Instrumentation to perform test includes, but not limited to:~~<br>a.<br>No special instrumentation is required for the acceptance tests.<br>|**Thermal Energy Storage (TES) System Acceptance**<br>~~Project Name/Address:~~<br>~~System Name or Identification/Tag:~~<br>~~System Location or Area Served:~~<br>~~_Verify proper operation of distributed energy storage DX systems._~~<br>~~**Intent:**~~<br>~~**Construction Inspection**~~<br>~~1.~~<br>~~Instrumentation to perform test includes, but not limited to:~~<br>a.<br>No special instrumentation is required for the acceptance tests.<br>|**(Page 2 of 3)**|
|Verify proper operation of distributed energy storage DX systems. Intent: Construction Inspection 1. Instrumentation to perform test includes, but not limited to: a. No special instrumentation is required for the acceptance tests. A. Certificate of Compliance Information|Col2|Col3|Col4|Col5|Col6|
|---|---|---|---|---|---|
|~~**A. Certificate of Compliance Information**~~<br>|~~**A. Certificate of Compliance Information**~~<br>|~~**A. Certificate of Compliance Information**~~<br>|~~**A. Certificate of Compliance Information**~~<br>|~~**A. Certificate of Compliance Information**~~<br>|~~**A. Certificate of Compliance Information**~~<br>|
|<br><br><br>~~_The following Certificate of Compliance information for both the chiller and the storage tank shall be provided on the plans_~~<br>_to document the key TES System parameters and allow plan check comparison to the inputs used in the DOE-2 simulation._<br>_DOE-2 keywords are shown in ALL CAPITALS in parentheses._|<br><br><br>~~_The following Certificate of Compliance information for both the chiller and the storage tank shall be provided on the plans_~~<br>_to document the key TES System parameters and allow plan check comparison to the inputs used in the DOE-2 simulation._<br>_DOE-2 keywords are shown in ALL CAPITALS in parentheses._|<br><br><br>~~_The following Certificate of Compliance information for both the chiller and the storage tank shall be provided on the plans_~~<br>_to document the key TES System parameters and allow plan check comparison to the inputs used in the DOE-2 simulation._<br>_DOE-2 keywords are shown in ALL CAPITALS in parentheses._|<br><br><br>~~_The following Certificate of Compliance information for both the chiller and the storage tank shall be provided on the plans_~~<br>_to document the key TES System parameters and allow plan check comparison to the inputs used in the DOE-2 simulation._<br>_DOE-2 keywords are shown in ALL CAPITALS in parentheses._|<br><br><br>~~_The following Certificate of Compliance information for both the chiller and the storage tank shall be provided on the plans_~~<br>_to document the key TES System parameters and allow plan check comparison to the inputs used in the DOE-2 simulation._<br>_DOE-2 keywords are shown in ALL CAPITALS in parentheses._|<br><br><br>~~_The following Certificate of Compliance information for both the chiller and the storage tank shall be provided on the plans_~~<br>_to document the key TES System parameters and allow plan check comparison to the inputs used in the DOE-2 simulation._<br>_DOE-2 keywords are shown in ALL CAPITALS in parentheses._|
||<br> <br>|||||
||<br> <br> <br>|||||
||<br>~~Capacity (tons):~~<br>(Size)<br> <br>|||||
||~~Starting Efficiency (kW/ton):~~<br>(at beginning of ice production)<br>(COMP-kW/TON-START)<br> <br>|||||
||~~Ending Efficiency (kW/ton):~~<br>(at end of ice production)<br>(COMP-kW/TON-END)<br> <br>|||||
||~~Capacity Reduction (% / F):~~<br>(PER-COMP-REDUCT/F)<br> <br>|<br>||||
|~~b.~~<br>~~Storage~~<br>Tank<br>|~~Storage Type (Check):~~<br>(TES-TYPE)|~~Chilled Water~~<br>Storage<br>|~~Ice-on-Coil~~<br>|~~Ice-on-Coil~~<br>|~~CHS~~|
|~~b.~~<br>~~Storage~~<br>Tank<br>||~~Ice Harvester~~<br>|~~Ice Harvester~~<br>|~~Brine~~<br>|~~Brine~~<br>|
|~~b.~~<br>~~Storage~~<br>Tank<br>||<br>~~Ice-Slurry~~|<br>~~Ice-Slurry~~|~~Eutectic Salt~~|~~Eutectic Salt~~|
|~~b.~~<br>~~Storage~~<br>Tank<br>|<br>|||||
|~~b.~~<br>~~Storage~~<br>Tank<br>|<br> <br> <br>|||||
|~~b.~~<br>~~Storage~~<br>Tank<br>|<br>~~Storage Rate (tons):~~<br>(COOL-STORE-RATE)<br> <br>|||||
|~~b.~~<br>~~Storage~~<br>Tank<br>|~~Discharge Rate (tons):~~<br>(COOL-SUPPLY-RATE)<br> <br>|||||
|~~b.~~<br>~~Storage~~<br>Tank<br>|~~Auxiliary Power (watts):~~<br>(PUMP+AUX-kW)<br> <br>|||||
|~~b.~~<br>~~Storage~~<br>Tank<br>|~~Tank Area (square feet):~~<br>(CTANK-LOSS-COEFF)<br> <br>|||||
|~~b.~~<br>~~Storage~~<br>Tank<br>|~~Tank Insulation (R-Value):~~<br>(CTANK-LOSS-COEFF)<br>|||||
**<mark>470</mark>** **<mark>2019 CALIFORNIA MECHANICAL CODE</mark>**
**<mark>APPENDIX E</mark>**
**CERTIFICATE OF ACCEPTANCE** **MECH-15A**
|Thermal Energy Storage (TES) System Acceptance Project Name/Address: System Name or Identification/Tag: System Location or Area Served: B. Functional Testing|(Page 3 of 3) Results|
|---|---|
|~~**B. Functional Testing**~~<br>|~~**Results**~~|
|<br><br> <br><br> <br> <br>|<br><br> <br><br> <br> <br>|
|<br>~~a.~~<br>~~In the TES System Design Verification part, the installing contractor shall certify the~~<br>following information, which verifies proper installation of the TES System consistent<br>with system design expectations:<br><br>The TES system is one of the above<br>eligible systems<br><br>Initial charge rate of the storage<br>tanks (tons)<br><br>Final charge rate of the storage tank<br>(tons)<br><br>Tank standby storage losses (UA)<br><br>Initial discharge rate of the storage<br>tanks (tons)<br><br>Final discharge rate of the storage<br>tank (tons)<br><br>Charge test time (hours)<br><br>Initial chiller efficiency (kW/ton)<br>during charging<br><br>Discharge test time (hours)<br><br>Tank storage capacity after charge<br>(ton-hours)<br><br>Tank storage capacity after<br>discharge (ton-hours)<br><br>Final chiller efficiency (kW/ton)<br>during charging<br>~~**Y / N**~~<br>|~~**Y / N**~~|
|<br> <br> <br> <br><br> <br><br>|<br> <br> <br> <br><br> <br><br>|
|<br>~~a.~~<br>~~The TES system and the chilled water plant is controlled and monitored by an EMS.~~<br><br> <br>|~~~~<br>~~Pass~~<br><br>|
|<br>~~a.~~<br>~~The TES system and the chilled water plant is controlled and monitored by an EMS.~~<br><br> <br>|~~~~<br>~~Fail~~<br><br>|
|~~b.~~<br>~~Force the time between 9:00 p.m. and 9:00 a.m. and simulate a partial or no charge of the tank and~~<br>simulate no cooling load by setting the indoor temperature setpoint higher than the ambient tempera-<br>ture. Verify that the TES system starts charging (storing energy).<br><br> <br>|~~~~<br>~~Pass~~<br><br>|
|~~b.~~<br>~~Force the time between 9:00 p.m. and 9:00 a.m. and simulate a partial or no charge of the tank and~~<br>simulate no cooling load by setting the indoor temperature setpoint higher than the ambient tempera-<br>ture. Verify that the TES system starts charging (storing energy).<br><br> <br>|~~~~<br>~~Fail~~<br><br>|
|<br>~~c.~~<br>~~Force the time to be between 6:00 p.m. and 9:00 p.m. and simulate a partial charge on the tank and~~<br>simulate a cooling load by setting the indoor temperature set point lower than the ambient tempera-<br>ture. Verify that the TES system starts discharging.<br><br> <br>|~~~~<br>~~Pass~~<br><br>|
|<br>~~c.~~<br>~~Force the time to be between 6:00 p.m. and 9:00 p.m. and simulate a partial charge on the tank and~~<br>simulate a cooling load by setting the indoor temperature set point lower than the ambient tempera-<br>ture. Verify that the TES system starts discharging.<br><br> <br>|~~~~<br>~~Fail~~<br><br>|
|<br>~~d.~~<br>~~Force the time to be between noon and 6:00 p.m. and simulate a cooling load by lowering the indoor~~<br>air temperature set point below the ambient temperature. Verify that the tank starts discharging and<br>the compressor is off. For systems designed to meet partial loads the system should be run until the<br>TES storage is fully depleted. The number of hours of operation must meet or exceed the designed<br>operational hours for the system.<br><br> <br>|<br>Pass<br><br>|
|<br>~~d.~~<br>~~Force the time to be between noon and 6:00 p.m. and simulate a cooling load by lowering the indoor~~<br>air temperature set point below the ambient temperature. Verify that the tank starts discharging and<br>the compressor is off. For systems designed to meet partial loads the system should be run until the<br>TES storage is fully depleted. The number of hours of operation must meet or exceed the designed<br>operational hours for the system.<br><br> <br>|<br>Fail<br><br>|
|<br>~~e.~~<br>~~Force the time to be between 9:00 a.m. to noon, and simulate a cooling load by lowering the indoor~~<br>air temperature set point below the ambient temperature. Verify that the tank does not discharge and<br>the cooling load is met by the compressor only.<br><br> <br>|~~~~<br>~~Pass~~<br><br>|
|<br>~~e.~~<br>~~Force the time to be between 9:00 a.m. to noon, and simulate a cooling load by lowering the indoor~~<br>air temperature set point below the ambient temperature. Verify that the tank does not discharge and<br>the cooling load is met by the compressor only.<br><br> <br>|~~~~<br>~~Fail~~<br><br>|
|<br>~~f.~~<br>~~Force the time to be between 9:00 p.m. and 9:00 a.m. and simulate a full tank charge by changing the~~<br>output of the sensor to the EMS. Verify that the tank charging is stopped.<br><br> <br>|~~~~<br>~~Pass~~<br><br>|
|<br>~~f.~~<br>~~Force the time to be between 9:00 p.m. and 9:00 a.m. and simulate a full tank charge by changing the~~<br>output of the sensor to the EMS. Verify that the tank charging is stopped.<br><br> <br>|~~~~<br>~~Fail~~<br><br>|
|~~g.~~<br>~~Force the time to be between noon and 6:00 p.m. and simulate no cooling load by setting the indoor~~<br>temperature set point above the ambient temperature. Verify that the tank does not discharge and the<br>compressor is off.<br><br>|~~~~<br>~~Pass~~<br><br>|
|~~g.~~<br>~~Force the time to be between noon and 6:00 p.m. and simulate no cooling load by setting the indoor~~<br>temperature set point above the ambient temperature. Verify that the tank does not discharge and the<br>compressor is off.<br><br>|~~~~<br>~~Fail~~|
~~<u><mark></mark></u>~~ ~~<u><mark>PASS: All</mark></u>~~ **~~<u><mark>Construction Inspection</mark></u>~~** ~~<u><mark>responses are complete and all</mark></u>~~ **~~<u><mark>Testing Results</mark></u>~~** ~~<u><mark>responses are “Pass.”</mark></u>~~
~~<u><mark></mark></u>~~
~~<mark>FAIL: Any</mark>~~ **~~<mark>Construction Inspection</mark>~~** ~~<mark>responses are incomplete</mark>~~ _~~<mark>OR</mark>~~_ ~~<mark>there is one or more “Fail” responses in</mark>~~ **~~<mark>Testing</mark>~~**
<u></u> **<u><mark>Results</mark></u>** <u><mark>section. Provide explanation below. Use and attach additional pages if necessary.</mark></u>
~~For SI units: 1 metric ton = 1000 kg, 1000 British thermal units per hour = 0.293 kW~~
**<mark>2019 CALIFORNIA MECHANICAL CODE</mark>** **<mark>471</mark>**
<mark>any</mark> <mark>other</mark> <mark>purpose</mark> <mark>or</mark> <mark>distributed</mark> <mark>to</mark> <mark>any</mark> <mark>other</mark> <mark>persons</mark> <mark>or</mark> <mark>parti</mark> es.
**<mark>472</mark>** **<mark>2019 CALIFORNIA MECHANICAL CODE</mark>**
**CALIFORNIA MECHANICAL CODE – MATRIX ADOPTION TABLE**
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — California Mechanical Code (Title 24, Part 4)
- Chapter 1 — GENERAL CODE PROVISIONS
- Chapter 2 — DEFINITIONS
- Chapter 3 — GENERAL REGULATIONS
- Chapter 4 — VENTILATION AIR
- Chapter 5 — EXHAUST SYSTEMS
- Chapter 6 — DUCT SYSTEMS
- Chapter 7 — COMBUSTION AIR
- Chapter 8 — CHIMNEYS AND VENTS
- Chapter 9 — INSTALLATION OF SPECIFIC APPLIANCES
- Chapter 10 — BOILERS AND PRESSURE VESSELS
- Chapter 11 — REFRIGERATION
- Chapter 12 — HYDRONICS
- Chapter 13 — FUEL GAS PIPING
- Chapter 14 — PROCESS PIPING
- Chapter 15 — SOLAR ENERGY SYSTEMS
- Chapter 16 — STATIONARY POWER PLANTS
- Chapter 17 — REFERENCED STANDARDS
- Appendix A — RESIDENTIAL PLAN EXAMINER REVIEW FORM FOR HVAC SY…
- Appendix B — PROCEDURES TO BE FOLLOWED TO PLACE GAS EQUIPMENT …
- Appendix C — INSTALLATION AND TESTING OF OIL (LIQUID) FUEL-FIR…
- Appendix D — FUEL SUPPLY: MANUFACTURED/MOBILE HOME PARKS AND R…
- Appendix E — SUSTAINABLE PRACTICES
- Appendix F — SIZING OF VENTING SYSTEMS AND OUTDOOR COMBUSTION …
- Appendix G — EXAMPLE CALCULATION OF OUTDOOR AIR RATE