Chapter 17 — GEOTHERMAL ENERGY SYSTEMS AND AMBIENT TEMPERATURE LOOPS
1711.3 Field Pressure Testing – Final — 2025 California Mechanical Code
California Mechanical Code (Title 24, Part 4) · 2025 edition · updated 2026-09-25 · California
CBSC: official editions, supplements and errata
Italicized text is a California amendment to the model code, as printed in the official publication.
Cite as: 2025 California Mechanical Code (Title 24, Part 4) § 1711.3 · Effective January 1, 2026 · Official source: Building Standards Commission
The ground-heat exchanger and building piping shall be cleaned, flushed, and, where required, shall be filled with the heat transfer fluid medium. The ground loop system shall be tested at the design flow rate(s) and differential pressure(s) recorded. Where the actual pressure change at design flow is more than +/- 10 percent of the design flow pressure drop, the cause shall be identified, and corrective action taken.