Skip to content

Earlier editions: 20222019

Chapter 17 — GEOTHERMAL ENERGY SYSTEMS AND AMBIENT TEMPERATURE LOOPS

1707.16 Pressurizing During Installation — 2025 California Mechanical Code

California Mechanical Code (Title 24, Part 4) · 2025 edition · updated 2026-09-25 · California

CBSC: official editions, supplements and errata

Italicized text is a California amendment to the model code, as printed in the official publication.

Cite as: 2025 California Mechanical Code (Title 24, Part 4) § 1707.16 · Effective January 1, 2026 · Official source: Building Standards Commission

Ground source heat pump ground loop piping to be embedded in concrete shall be pressure tested prior to pouring concrete. During pouring, the pipe shall be maintained at the proposed operating pressure.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — California Mechanical Code (Title 24, Part 4)

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.