1210.0 Gas Piping Installation.1210.1 Piping Underground. Underground gas piping
California Plumbing Code (Title 24, Part 5) · 2019 edition · updated 2026-09-10 · California
Italicized text is a California amendment to the model code, as printed in the official publication.
shall be installed with sufficient clearance from any other underground structure to avoid contact therewith, to allow maintenance, and to protect against damage from proximity to other structures. In addition, underground plastic piping shall be installed with sufficient clearance or shall be insulated from sources of heat to prevent the heat from impairing the serviceability of the pipe. [NFPA 54:7.1.1]
1210.1.1 Cover Requirements. Underground piping systems shall be installed with a minimum of 12 inches (305 mm) of cover. The minimum cover shall be increased to 18 inches (457 mm) if external damage to
(1) A pipe-to-soil voltage of −0.85 volts or more
negative is produced, with reference to a saturated copper-copper sulfate half cell. (2) A pipe-to-soil voltage of −0.78 volts or more
negative is produced, with reference to a satu
(2) A pipe-to-soil voltage of −0.78 volts or more
negative is produced, with reference to a saturated KCl calomel half cell. (3) A pipe-to-soil voltage of −0.80 volts or more
negative is produced, with reference to a silver
(3) A pipe-to-soil voltage of −0.80 volts or more
negative is produced, with reference to a silversilver chloride half cell. (4) Compliance with a method described in Appen dix D of Title 49 of the code of Federal Regu
(4) Compliance with a method described in Appen dix D of Title 49 of the code of Federal Regulations, Part 192. [NFPA 54:7.1.3.3] 1210.1.3.4 Sacrificial Anodes. Sacrificial anodes shall be tested in accordance with the following: (1) Upon installation of the cathodic protection sys tem, except where prohibited by climatic con
Upon installation of the cathodic protection sys tem, except where prohibited by climatic con
228 2019 CALIFORNIA PLUMBING CODE
FUEL GAS PIPING
ditions, in which case the testing shall be performed not later than 180 days after the installation of the system. (2) 12 to 18 months after the initial test. (3) Upon successful verification testing in accor dance with Section 1210.1.3.4(1) and Section
(3) Upon successful verification testing in accor dance with Section 1210.1.3.4(1) and Section 1210.1.3.4(2), periodic follow-up testing shall be performed at intervals not to exceed 36 months. [NFPA 54:7.1.3.4] 1210.1.3.5 System Failing Tests. Systems failing a test shall be repaired not more than 180 days after the date of the failed testing. The testing schedule shall be restarted as required in Section 1210.1.3.4(1) and Section 1210.1.3.4(2), and the results shall comply with Section 1210.1.3.3. [NFPA 54:7.1.3.5] 1210.1.3.6 Impressed Current Cathodic Pro- tection. Impressed current cathodic protection systems shall be inspected and tested in accordance with the following schedule: (1) The impressed current rectifier voltage output
shall be checked at intervals not exceeding two
(1) The impressed current rectifier voltage output
shall be checked at intervals not exceeding two months. (2) The pipe-to-soil voltage shall be tested at least
annually. [NFPA 54:7.1.3.6]
where the conduit terminates in the building, the space between the conduit and the gas piping shall be sealed to prevent the possible entrance of a gas leakage. Where the end sealing is of a type that retains the full pressure of the pipe, the conduit shall be designed for the same pressure as the pipe. The conduit shall extend at least 4 inches (102 mm) outside the building, be vented outdoors above finished ground level, and be installed to prevent the entrance of water and insects. [NFPA 54:7.1.6.1] 1210.1.6.2 Conduit with Both Ends Terminat-ing Indoors. Where the conduit originates and terminates within the same building, the conduit shall originate and terminate in an accessible portion of the building and shall not be sealed. [NFPA 54:7.1.6.2] 1210.1.7 Plastic Piping. Plastic piping shall be installed outdoors, underground only. Exceptions : (1) Plastic piping shall be permitted to terminate above ground where an anodeless riser is used.
(1) Plastic piping shall be permitted to terminate above ground where an anodeless riser is used. (2) Plastic piping shall be permitted to terminate with a
wall head adapter aboveground in buildings, includ
Plastic piping shall be permitted to terminate with a
wall head adapter aboveground in buildings, including basements, where the plastic piping is inserted in a piping material permitted for use in buildings.
[NFPA 54:7.1.7.1] 1210.1.7.1 Connections Between Metallic andPlastic Piping. Connections made between metallic and plastic piping shall be made with fittings conforming to one of the following: (1) ASTM D2513, Category I transition fittings (2) ASTM F1973 (3) ASTM F2509 [NFPA 54:7.1.7.2] 1210.1.7.2 Tracer. An electrically continuous corrosion-resistant tracer shall be buried with the plastic pipe to facilitate locating. The tracer shall be one of the following: (1) A product specifically designed for that pur pose.
(2) The pipe-to-soil voltage shall be tested at least
annually. [NFPA 54:7.1.3.6] 1210.1.3.7 Documentation. Documentation of the results of the two most recent tests shall be retained. [NFPA 54:7.1.3.7] 1210.1.3.8 Dissimilar Metals. Where dissimilar metals are joined underground, an insulating coupling or fitting shall be used. [NFPA 54:7.1.3.8] 1210.1.3.9 Steel Risers. Steel risers, other than anodeless risers, connected to plastic piping shall be cathodically protected by means of a welded anode.
umentation of the results of the two most recent tests shall be retained. [NFPA 54:7.1.3.7] 1210.1.3.8 Dissimilar Metals. Where dissimilar metals are joined underground, an insulating coupling or fitting shall be used. [NFPA 54:7.1.3.8] 1210.1.3.9 Steel Risers. Steel risers, other than anodeless risers, connected to plastic piping shall be cathodically protected by means of a welded anode.
[NFPA 54:7.1.3.9] 1210.1.4 Protection Against Freezing. Where the formation of hydrates or ice is known to occur, the piping shall be protected against freezing. [NFPA 54:7.1.4] 1210.1.5 Piping through Foundation Wall. Underground piping, where installed through the outer foundation or basement wall of a building shall be encased in a protective sleeve or protected by an approved device or method. The space between the gas piping and the sleeve and between the sleeve and the wall shall be sealed to prevent entry of gas and water. [NFPA 54:7.1.5] Where gas piping is installed underground beneath buildings, 1210.1.6 Piping Underground Beneath Buildings. the piping shall be either of the following: (1) Encased in an approved conduit designed to withstand
the imposed loads and installed in accordance with Sec
(1) A product specifically designed for that pur pose. (2) Insulated copper conductor not less than 14
AWG.
(1) Encased in an approved conduit designed to withstand
the imposed loads and installed in accordance with Section 1210.1.6.1 or Section 1210.1.6.2. (2) A piping or encasement system listed for installation
beneath buildings. [NFPA 54:7.1.6]
beneath buildings. [NFPA 54:7.1.6]
1210.1.6.1 Conduit with One End Terminat- ing Outdoors. The conduit shall extend into an accessible portion of the building and, at the point
(2) Insulated copper conductor not less than 14
AWG. Where tracer wire is used, access shall be provided from aboveground, or one end of the tracer wire or tape shall be brought aboveground at a building wall or riser. [NFPA 54:7.1.7.3 – 7.1.7.3.2]
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — California Plumbing Code (Title 24, Part 5)
- Chapter 1 — GENERAL CODE PROVISIONS
- Chapter 2 — DEFINITIONS
- Chapter 3 — GENERAL REGULATIONS
- Chapter 4 — PLUMBING FIXTURES AND FIXTURE FITTINGS
- Chapter 5 — WATER HEATERS
- Chapter 6 — WATER SUPPLY AND DISTRIBUTION
- Chapter 7 — SANITARY DRAINAGE
- Chapter 8 — INDIRECT WASTES
- Chapter 9 — VENTS
- Chapter 10 — TRAPS AND INTERCEPTORS
- Chapter 11 — STORM DRAINAGE
▸Chapter 12 — FUEL GAS PIPING
Overview- 1201.0 General.1201.1 Applicability. The regulations of this c…
- 1202.0 Coverage of Piping System.1202.1 General. Coverage of p…
- 1202.2 Piping System Requirements. Requirements for
- 1202.3 Applications. This code shall not apply to the followin…
- 1203.2 Excavation. Excavations required for the installation o…
- 1203.3 Type of Inspections. The Authority Having Jurisdiction …
- 1203.4 Inspection Waived. In cases where the work
- 1204.2 Gas Supplier. A copy of the certificate of such final
- 1204.3 Unlawful. It shall be unlawful for a serving gas suppli…
- 1205.2 Outlets. It shall be unlawful to turn on or connect gas
- 1206.2 Notice. Where such disconnection has been made, a
- 1206.3 Capped Outlets. It shall be unlawful to remove or
- 1208.0 Gas Piping System Design, Materials, and
- 1208.2 Provision for Location of Point of Delivery. The locati…
- 1208.3 Interconnections Between Gas Piping Sys-tems. Where two…
- 1208.4 Sizing of Gas Piping Systems. Gas piping systems shall …
- 1208.5 Maximum Design Operating Pressure. The
- 1208.6 Acceptable Piping Materials and JoiningMethods. Materia…
- 1208.7 Gas Meters. Gas meters shall be selected for the
- 1208.8 Gas Pressure Regulators. A line pressure regulator or g…
- 1208.9 Overpressure Protection Devices. Where the
- 1208.10 Pressure Limitation Requirements. Where
- 1208.11 Backpressure Protection. Protective devices
- 1208.12 Low-Pressure Protection. A protective device
- 1208.13 Shutoff Valves. Shutoff valves shall be approved
- 1208.14 Expansion and Flexibility. Piping systems shall
- 1210.0 Gas Piping Installation.1210.1 Piping Underground. Unde…
- 1210.2 Installation of Piping. Piping installed aboveground sh…
- 1210.3 Concealed Piping in Buildings. Gas piping in
- 1210.4 Piping in Vertical Chases. Where gas piping
- 1210.6 Drips and Sediment Traps. For other than dry gas
- 1210.7 Outlets. Outlets shall be located and installed in
- 1210.5 Gas Pipe Turns. Changes in direction of gas pipe
- 1210.10 Prohibited Devices. No device shall be placed
- 1210.11 Systems Containing Gas-Air Mixtures Out-side the Flamm…
- 1210.12 Systems Containing Flammable Gas-AirMixtures. Systems …
- 1210.8 Branch Pipe Connection. Where a branch outlet
- 1210.9 Manual Gas Shutoff Valves. An accessible gas
- 1211.2 Bonding of CSST Gas Piping. CSST gas piping
- 1211.3 Prohibited Use. Gas piping shall not be used as a
- 1211.4 Lightning Protection System. Where a lightning
- 1211.5 Electrical Circuits. Electrical circuits shall not util…
- 1211.6 Electrical Connections. All electrical connections
- 1211.7 Earthquake-Actuated Gas Shutoff Valves. Earth-
- 1212.2 Suspended Low-Intensity Infrared TubeHeaters. Suspended…
- 1212.3 Use of Nonmetallic Gas Hose Connectors. Listed gas hose…
- 1212.1 Connecting Appliances and Equipment.
- 1212.4 Injection (Bunsen) Burners. Injection (Bunsen)
- 1212.5 Connection of Portable and Mobile Industrial
- 1212.5 Connection of Portable and Mobile Industrial
- 1212.9 Sediment Trap. Where a sediment trap is not incorporate…
- 1212.6 Appliance Shutoff Valves and Connections.
- 1212.7 Quick-Disconnect Devices. Quick-disconnect
- 1212.8 Gas Convenience Outlets. Appliances shall be
- 1212.10 Installation of Piping. Piping shall be installed in
- 1212.11 Liquefied Petroleum Gas Facilities and Pip-
- 1213.0 Pressure Testing, Inspection, and Purging.1213.1 Piping…
- 1213.2 Test Preparation. Test preparation shall comply
- 1213.3 Test Pressure. This inspection shall include an air,
- 1213.4 Detection of Leaks and Defects. The piping system shall…
- 1213.5 Piping System Leak Test. Leak checks using fuel
- 1213.6 Purging Requirements. The purging of piping
- 1215.2 Tables for Sizing Gas Piping Systems. Table
- 1215.3 Sizing Equations. The inside diameter of smoothwall pip…
- 1214.2 Volume. The hourly volume of gas required at each
- 1214.3 Gas Appliances. Where the gas appliances to be
- 1214.4 Size of Piping Outlets. The size of the supply piping o…
- 1215.0 Required Gas Piping Size.1215.1 Pipe Sizing Methods. Wh…
- 1215.5 Engineering Methods. For conditions other than
- 1215.6 Variable Gas Pressure. Where the supply gas
- 1215.4 Sizing of Piping Sections. To determine the size
- Chapter 13 — HEALTH CARE FACILITIES AND MEDICAL GAS AND MEDICA…
- Chapter 14 — FIRESTOP PROTECTION
- Chapter 15 — ALTERNATE WATER SOURCES FOR NONPOTABLE APPLICATIONS
- Chapter 16 — NONPOTABLE RAINWATER CATCHMENT SYSTEMS
- Chapter 17 — REFERENCED STANDARDS
- Appendix A — RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYS…
- Appendix B — EXPLANATORY NOTES ON COMBINATION WASTE AND VENT S…
- Appendix C — ALTERNATE PLUMBING SYSTEMS
- Appendix D — SIZING STORM WATER DRAINAGE SYSTEMS
- Appendix E — MANUFACTURED/MOBILE HOME PARKS AND RECREATIONAL V…
- Appendix F — FIREFIGHTER BREATHING AIR REPLENISHMENT SYSTEMS
- Appendix G — SIZING OF VENTING SYSTEMS
- Appendix H — PRIVATE SEWAGE DISPOSAL SYSTEMS
- Appendix I — INSTALLATION STANDARD FOR PEX TUBING SYSTEMS FOR …
- Appendix J — COMBINATION OF INDOOR AND OUTDOOR COMBUSTION AND …
- Appendix K — POTABLE RAINWATER CATCHMENT SYSTEMS
- Appendix L — SUSTAINABLE PRACTICES
- Appendix M — PEAK WATER DEMAND CALCULATOR