Skip to content

EMP - Total number of accountable employees measured in efficiency, met the learning curve (if measured in quality) and reported time and volume to the OFP.›Reminder:›Employee Performance Standards Report

Employee Performance Standards Report - Description

Internal Revenue Manual Part 3. Submission Processing · 2026-10-03 edition · updated 2026-10-04 · United States

The Employee Performance Standards Report displays:

Report Date - Date the report generated in MM/DD/YYYY format.

Site - Site the report generated for (Austin, Kansas City, or Ogden).

Period Covered - Quarter the standards apply to in MM/DD/YYYY - MM/DD/YYYY format.

Operation - Two-digit Operation Code and operation name.

Quality - Section for Quality Base Point and Standards information.

Previous Quality - Section for Previous Quality Base Point and Standards information.

Efficiency - Section for Efficiency Base Point and Standards information.

Previous Efficiency - Section for Previous Efficiency Base Point and Standards information.

Employee Signature - Section for employee acknowledgement of receipt.

The Quality Section displays:

Function - Parent Function(s) with quality base points relevant to the operation.

Base Point - Base point(s) relevant to each parent function.

Numerical Performance Standard (2) - Accuracy level of achievement required for a 2 rating (minimally successful) in quality for the OF Base Point.

Numerical Performance Standard (3) - Accuracy level of achievement required for a 3 rating (fully successful) in quality for the OF Base Point.

Numerical Performance Standard (4) - Accuracy level of achievement required to achieve a 4 rating (exceeds fully successful) in quality for the OF Base Point.

Numerical Performance Standard (5) - Accuracy level of achievement required for a 5 rating (outstanding) in quality for the OF Base Point.

The Previous Quality Section displays:

Base Point - Quality base point prior to any revision if the base point was revised.

Numerical Performance Standard - Accuracy level of achievement required for each rating if the OF Base Point was revised.

Revision Date: Latest revision date if the quality base point was revised.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Internal Revenue Manual Part 3. Submission Processing

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.