Skip to content

EMP - Total number of accountable employees measured in efficiency, met the learning curve (if measured in quality) and reported time and volume to the OFP.

Reminder:

Internal Revenue Manual Part 3. Submission Processing · 2026-10-03 edition · updated 2026-10-04 · United States

Base Points are input into MEPS by the MEPS Operation Advisor (generally the Operation Technical Advisor), the Operation Manager, or the Site MEPS Coordinator prior to 14 days before the beginning of the quarter they cover).

The above information repeats for each OFP within each operation at the site if there is history from the same quarter, prior year.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Internal Revenue Manual Part 3. Submission Processing

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.