Management is provided a window after the systemic revisions and prior to the quarterly reports run date to determine if additional base points should be lowered. Utilize the following guidelines:

Consider revising if there is a large discrepancy between the median and the calculated base point.

Lower base points if identified issues prevented employees from achieving the set rate.

The Mid-Quarter/Quarterly Efficiency Report is available on Control-D. The Control -D Report Name is "MID-QTR/QTRLY EFFICIENCY" ; the Control-D Job Name is MEPMQE.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Internal Revenue Manual Part 3. Submission Processing

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.