Skip to content

Earlier editions: 20222019

Chapter 7 — SANITARY DRAINAGE

719.1 Locations — 2025 California Plumbing Code

California Plumbing Code (Title 24, Part 5) · 2025 edition · updated 2026-09-25 · California

CBSC: official editions, supplements and errata

Italicized text is a California amendment to the model code, as printed in the official publication.

Cite as: 2025 California Plumbing Code (Title 24, Part 5) § 719.1 · Effective January 1, 2026 · Official source: Building Standards Commission

Cleanouts shall be placed inside the building near the connection between the building drain and the building sewer or installed outside the building at the lower end of the building drain and extended to grade.

Additional building sewer cleanouts shall be installed at intervals not to exceed 100 feet (30 480 mm) in straight runs and for each aggregate horizontal change in direction exceeding 135 degrees (2.36 rad).

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — California Plumbing Code (Title 24, Part 5)

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.