The minimum size of a building sewer shall be determined on the basis of the total number of fixture units drained by such sewer, in accordance with Table 717.1. No building sewer shall be smaller than the building drain.
For alternate methods of sizing building sewers, see Appendix C.
TABLE 717.1
MAXIMUM/MINIMUM FIXTURE UNIT LOADING
| ON BUILDING SEWER PIPING* | |||
|---|---|---|---|
SIZE OF PIPE (inches) |
SLOPE (inches per foot) |
SLOPE (inches per foot) |
SLOPE (inches per foot) |
SIZE OF PIPE (inches) |
1⁄16 | 1⁄8 | 1⁄4 |
6 and smaller |
(As specified in Table 703.2/ No minimum loading) |
(As specified in Table 703.2/ No minimum loading) |
(As specified in Table 703.2/ No minimum loading) |
8 |
1950/1500 | 2800/625 | 3900/275 |
10 |
3400/1600 | 4900/675 | 6800/300 |
12 |
5600/1700 | 8000/725 | 11 200/325 |
For SI units: 1 inch = 25 mm, 1 inch per foot = 83.3 mm/m
- See also Appendix H, Private Sewage Disposal Systems. For alternate methods of sizing drainage piping, see Appendix C.