Chapter 13 — FUEL GAS PIPING

1313.5 Piping System Leak Test — 2025 California Mechanical Code

California Mechanical Code (Title 24, Part 4) · 2025 edition · updated 2026-09-25 · California

CBSC: official editions, supplements and errata

Italicized text is a California amendment to the model code, as printed in the official publication.

Cite as: 2025 California Mechanical Code (Title 24, Part 4) § 1313.5 · Effective January 1, 2026 · Official source: Building Standards Commission

Leak checks using fuel gas shall be permitted in piping systems that have been pressure-tested in accordance with Section 1313.0 through Section 1313.4.2. [NFPA 54:8.2.1] 1313.5.1 Turning Gas On. During the process of turning gas on into a system of new gas piping, the entire system shall be inspected to determine that there are no open fittings or ends and that all valves at unused outlets are closed and plugged or capped. [NFPA 54:8.2.2] 1313.5.2 Leak Check. Immediately after the gas is turned on into a new system or into a system that has been initially restored after an interruption of service, the piping system shall be checked for leakage. Where leakage is indicated, the gas supply shall be shut off until the necessary repairs have been made. [NFPA 54:8.2.3]

1313.5.3 Placing Appliances and Equipment in Operation. Appliances and equipment shall not be placed in operation until after the piping system has been checked for leakage in accordance with Section 1313.5.2, the piping system is purged in accordance with Section 1313.6, and connections to the appliance are checked for leakage. [NFPA 54:8.2.4]

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — California Mechanical Code (Title 24, Part 4)

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.