EMP - Total number of accountable employees measured in efficiency, met the learning curve (if measured in quality) and reported time and volume to the OFP.›Reminder:
Mid-Quarter/Quarterly Quality Report - Description
Internal Revenue Manual Part 3. Submission Processing · 2026-10-03 edition · updated 2026-10-04 · United States
The Mid-Quarter/Quarterly Quality Report generates for each site. The quality data is listed in Operation and Function order for every measured OF at the applicable site. The report includes:
Period Covered, Site, and Run Date.
Operation and Function.
Calculated Base Point for the OF (if applicable).
Base Point for the applicable OF.
Get a plain-English answer with a citation back to this text.
Ask AI about this code