Skip to content

Earlier editions: 20222019

Chapter 13 — FUEL GAS PIPING

1310.1 Piping Underground. Underground gas piping shall

California Mechanical Code (Title 24, Part 4) · 2025 edition · updated 2026-09-10 · California

Italicized text is a California amendment to the model code, as printed in the official publication.

be installed with sufficient clearance from any other underground structure to avoid contact therewith, to allow maintenance, and to protect against damage from proximity to other structures. Underground plastic piping shall be installed with sufficient clearance or shall be insulated from any source of heat so as to prevent the heat from impairing the serviceability of the pipe. [NFPA 54:7.1.1.1, 7.1.1.2] 1310.1.1 Cover Requirements. Underground piping systems shall be installed with a minimum of 12 inches (305 mm) of cover. The minimum cover shall be increased to 18 inches (457 mm) if external damage to the pipe or tubing from external forces is likely to result. Where a minimum of 12 inches (305 mm) of cover cannot be provided, the piping shall be installed in conduit. [NFPA 54:7.1.2.1 – 7.1.2.1(B)]

1310.1.2 Trenches. The trench shall be graded so that the pipe has a firm, substantially continuous bearing on the bottom of the trench. [NFPA 54:7.1.2.2]

1310.1.2.1 Backfilling. Where flooding of the trench is done to consolidate the backfill, care shall be exer

cised to see that the pipe is not floated from its firm bearing on the trench bottom. [NFPA 54:7.1.2.3]

1310.1.3 Protection Against Corrosion. Steel pipe and steel tubing installed underground shall be installed in accordance with Section 1310.1.3.1 through Section 1310.1.3.9. [NFPA 54:7.1.3]

1310.1.3.1 Zinc Coating. Zinc coating (galvanizing) shall not be deemed adequate protection for underground gas piping. [NFPA 54:7.1.3.1] 1310.1.3.2 Underground Piping. Underground piping shall comply with one or more of the following unless approved technical justification is provided to demonstrate that protection is unnecessary:

(1) The piping shall be made of corrosion-resistant material that is suitable for the environment in

which it will be installed.

(2) Pipe shall have a factory-applied, electrically insulating coating. Fittings and joints between sections of coated pipe shall be coated in accordance with the coating manufacturer’s instructions.

(3) The piping shall have a cathodic protection system installed, and the system shall be maintained in accordance with Section 1310.1.3.3 or Section 1310.1.3.6. [NFPA 54:7.1.3.2] 1310.1.3.3 Cathodic Protection. Cathodic protection systems shall be monitored by testing and the results shall be documented. The test results shall demonstrate one of the following:

− (1) A pipe-to-soil voltage of 0.85 volts or more negative is produced, with reference to a saturated copper-copper sulfate half cell.

− (2) A pipe-to-soil voltage of 0.78 volts or more negative is produced, with reference to a saturated KCl calomel half cell.

− (3) A pipe-to-soil voltage of 0.80 volts or more negative is produced, with reference to a silversilver chloride half cell.

(4) Compliance with a method described in Appendix D of Title 49 of the Code of Federal Regulations, Part 192. [NFPA 54:7.1.3.3]

1310.1.3.4 Sacrificial Anodes. Sacrificial anodes shall be tested in accordance with the following:

(1) Upon installation of the cathodic protection system, except where prohibited by climatic conditions, in which case the testing shall be performed not later than 180 days after the installation of the system.

(2) 12 to 18 months after the initial test.

(3) Upon successful verification testing in accordance with Section 1310.1.3.4(1) and Section 1310.1.3.4(2), periodic follow-up testing shall be performed at intervals not to exceed 36 months. [NFPA 54:7.1.3.4]

1310.1.3.5 System Failing Tests. Systems failing a test shall be repaired not more than 180 days after

FUEL GAS PIPING

the date of the failed testing. The testing schedule shall be restarted as required in Section 1310.1.3.4(1) and Section 1310.1.3.4(2), and the results shall comply with Section 1310.1.3.3. [NFPA 54:7.1.3.5]

1310.1.3.6 Impressed Current Cathodic Pro- tection. Impressed current cathodic protection systems shall be inspected and tested in accordance with the following schedule:

(1) The impressed current rectifier voltage output shall be checked at intervals not exceeding two months.

(2) The pipe-to-soil voltage shall be tested at least annually. [NFPA 54:7.1.3.6]

1310.1.3.7 Documentation. Documentation of

the results of the two most recent tests shall be retained. [NFPA 54:7.1.3.7]

1310.1.3.8 Dissimilar Metals. Where dissimilar metals are joined underground, an insulating coupling or fitting shall be used. [NFPA 54:7.1.3.8]

1310.1.3.9 Steel Risers. Steel risers, other than anodeless risers, connected to plastic piping shall be cathodically protected by means of a welded anode.

[NFPA 54:7.1.3.9]

1310.1.4 Protection Against Freezing. Where the formation of hydrates or ice is known to occur, piping shall be protected against freezing. [NFPA 54:7.1.4]

1310.1.5 Piping Through Foundation Wall. Piping through a foundation wall shall comply with all of the following:

(1) Underground piping, where installed through the outer foundation or basement wall of a building, shall be encased in a protective sleeve or protected by an approved device or method.

(2) The spaces between the gas piping and the sleeve and between the sleeve and the wall shall be sealed to prevent entry of gas and water.

(3) Sealing materials shall be compatible with the piping and sleeve. [NFPA 54:7.1.5]

1310.1.6 Piping Underground Beneath Buildings. Where gas piping is installed underground beneath buildings, the piping shall be either of the following:

(1) Encased in an approved conduit designed to withstand the imposed loads and installed in accordance with Section 1310.1.6.1 or Section 1310.1.6.2.

(2) A piping/encasement system listed for installation beneath buildings. [NFPA 54:7.1.6]

1310.1.6.1 Conduit with One End Terminat- ing Outdoors. The conduit shall extend into an accessible portion of the building and, at the point where the conduit terminates in the building, the space between the conduit and the gas piping shall be sealed to prevent the possible entrance of any gas leakage. Where the end sealing is of a type that retains the full pressure of the pipe, the conduit shall

.1 Conduit with One End Terminat-** ing Outdoors. The conduit shall extend into an accessible portion of the building and, at the point where the conduit terminates in the building, the space between the conduit and the gas piping shall be sealed to prevent the possible entrance of any gas leakage. Where the end sealing is of a type that retains the full pressure of the pipe, the conduit shall

be designed for the same pressure as the pipe. The conduit shall extend at least 4 inches (102 mm) outside the building, be vented outdoors above finished ground level, and be installed so as to prevent the entrance of water and insects. [NFPA 54:7.1.6.1]

1310.1.6.2 Conduit with Both Ends Terminat- ing Indoors. Where the conduit originates and terminates within the same building, the conduit shall originate and terminate in an accessible portion of the building and shall not be sealed. [NFPA 54:7.1.6.2]

1310.1.7 Connections of Plastic Piping. Plastic piping shall be installed outdoors, underground only.

Exceptions:

(1) Plastic piping shall be permitted to terminate aboveground where an anodeless riser is used.

(2) Plastic piping shall be permitted to terminate with a wall head adapter aboveground in buildings, including basements, where the plastic piping is inserted in a piping material permitted for use in buildings.

[NFPA 54:7.1.7.1]

1310.1.7.1 Connections Between Metallic and Plastic Piping. Connections made between metallic and plastic piping shall be made with fittings conforming to one of the following:

(1) ASTM D2513 Category I transition fittings

(2) ASTM F1973

(3) ASTM F2509 [NFPA 54:7.1.7.2]

1310.1.7.2 Tracer Wire. An electrically continuous corrosion-resistant tracer shall be buried with the

plastic pipe to facilitate locating. The tracer shall be one of the following:

(1) A product specifically designed for that pur pose.

(2) Insulated copper conductor not less than 14 AWG.

Where tracer wire is used, access shall be provided from aboveground or one end of the tracer wire or tape shall be brought aboveground at a building wall or riser. [NFPA 54:7.1.7.3 – 7.1.7.3.2]

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — California Mechanical Code (Title 24, Part 4)
California Mechanical Code (Title 24, Part 4)
  1. Chapter 1 — GENERAL CODE PROVISIONS
  2. Chapter 2 — DEFINITIONS
  3. Chapter 3 — GENERAL REGULATIONS
  4. Chapter 4 — VENTILATION AIR
  5. Chapter 5 — EXHAUST SYSTEMS
  6. Chapter 6 — DUCT SYSTEMS
  7. Chapter 7 — COMBUSTION AIR
  8. Chapter 8 — CHIMNEYS AND VENTS
  9. Chapter 9 — INSTALLATION OF SPECIFIC APPLIANCES
  10. Chapter 10 — BOILERS AND PRESSURE VESSELS
  11. Chapter 11 — REFRIGERATION
  12. Chapter 12 — HYDRONICS
  13. Chapter 13 — FUEL GAS PIPING
    Overview
    1. 1301.1 Applicability. The regulations of this chapter shall
    2. 1302.1 General. Coverage of piping systems shall extend
    3. 1302.2 Piping System Requirements. Requirements for
    4. 1302.3 Applications. This chapter shall not apply to the
    5. 1303.1 Inspection Notification. Upon completion of the
    6. 1303.2 Excavation. Excavations required for the installation o…
    7. 1303.3 Type of Inspections. The Authority Having Jurisdiction …
    8. 1303.4 Inspection Waived. In cases where the work authorized b…
    9. 1304.1 Issuance. Whereupon final piping inspection, the
    10. 1304.2 Gas Supplier. A copy of the certificate of such final
    11. 1304.3 Unlawful. It shall be unlawful for a serving gas suppli…
    12. 1305.1 Authorized Personnel. It shall be unlawful for a
    13. 1305.2 Outlets. It shall be unlawful to turn on or connect gas
    14. 1306.1 Disconnection. The Authority Having Jurisdiction
    15. 1306.2 Notice. Where such disconnection has been made, a
    16. 1306.3 Capped Outlets. It shall be unlawful to remove or
    17. 1307.1 General. Where temporary use of gas is desired, and
    18. 1308.1 Installation of Piping System. Where required
    19. 1308.2 Interconnections Supplying Separate Users.
    20. 1308.3 Sizing of Gas Piping Systems. Gas piping systems shall …
    21. 1308.4 Acceptable Piping Materials and Joining
    22. 1308.5 Gas Meters. Gas meters shall be selected for the
    23. 1308.6 Gas Pressure Regulators. A line pressure regulator shal…
    24. 1308.7 Overpressure Protection. Where the serving gas
    25. 1308.8 Pressure Limitation Requirements. Where piping systems …
    26. 1308.9 Overpressure Protection Devices. Overpressure protectio…
    27. 1308.13 Expansion and Flexibility. Piping systems shall
    28. 1308.14 Pressure Regulator and Pressure Control
    29. 1308.10 Backpressure Protection. Protective devices
    30. 1308.11 Low-Pressure Protection. A protective device
    31. 1308.12 Shutoff Valves. Shutoff valves shall be selected in
    32. 1309.1 General. Where automatic excess flow valves are
    33. 1310.1 Piping Underground. Underground gas piping shall
    34. 1310.2 CSST Piping Systems. CSST piping systems shall
    35. 1310.3 Installation of Aboveground Piping. Piping
    36. 1310.4 Concealed Piping in Buildings. Gas piping in
    37. 1310.5 Piping in Vertical Chases. Where gas piping
    38. 1310.6 Maximum Operating Pressure in Buildings.
    39. 1310.7 Appliance Overpressure Protection. The maximum operatin…
    40. 1310.8 Gas Pipe Turns. Changes in direction of gas pipe
    41. 1310.9 Drips and Sediment Traps. For other than dry gas
    42. 1310.10 Outlets. Outlets shall be located and installed in
    43. 1310.11 Manual Gas Shutoff Valves. An accessible gas
    44. 1310.12 Prohibited Devices. Devices shall not be placed
    45. 1310.13 Systems Containing Gas-Air Mixtures Out-
    46. 1310.14 Systems Containing Flammable Gas-Air
    47. 1311.1 Pipe and Tubing Other than CSST. Each aboveground porti…
    48. 1311.2 Bonding of CSST Gas Piping. CSST gas piping
    49. 1311.3 Arc-Resistant Jacketed CSST. CSST listed with
    50. 1311.4 Prohibited Use. Gas piping shall not be used as a
    51. 1311.5 Lightning Protection System. Where a lightning
    52. 1311.6 Electrical Circuits. Electrical circuits shall not util…
    53. 1311.7 Electrical Connections. All electrical connections
    54. 1312.1 Connecting Appliances and Equipment.
    55. 1312.3 Use of Nonmetallic Gas Hose Connectors.
    56. 1312.4 Injection (Bunsen) Burners. Injection (Bunsen)
    57. 1312.5 Connection of Portable and Mobile Industrial
    58. 1312.2 Suspended Low-Intensity Infrared Tube
    59. 1312.6 Appliance Shutoff Valves and Connections.
    60. 1312.7 Quick-Disconnect Devices. Quick-disconnect
    61. 1312.8 Gas Convenience Outlets. Appliances shall be
    62. 1312.9 Sediment Trap. Where a sediment trap is not incorporate…
    63. 1312.10 Installation of Piping. Piping shall be installed in
    64. 1312.11 Liquefied Petroleum Gas (LP-Gas) Facilities
    65. 1313.1 Piping Installations. Prior to acceptance and initial o…
    66. 1313.2 Test Preparation. Test preparation shall comply
    67. 1313.3 Test Pressure. This inspection shall include an air,
    68. 1313.4 Detection of Leaks and Defects. The piping system shall…
    69. 1313.5 Piping System Leak Test. Leak checks using fuel
    70. 1313.6 Purging Requirements. The purging of piping
    71. 1314.1 General. The following regulations, shall comply
    72. 1314.2 Volume. The hourly volume of gas required at each
    73. 1314.3 Gas Appliances. Where the gas appliances to be
    74. 1314.4 Size of Piping Outlets. The size of the supply piping o…
    75. 1315.1 Pipe Sizing Methods. Where the pipe size is to be
    76. 1315.2 Sizing of Gas Piping Systems. Sizing of piping
    77. 1315.3 Sizing Equations. The inside diameter of smooth
    78. 1315.4 Sizing of Piping Sections. To determine the size
    79. 1315.5 Engineering Methods. For conditions other than
    80. 1315.6 Variable Gas Pressures. Where the supply gas
  14. Chapter 14 — PROCESS PIPING
  15. Chapter 15 — SOLAR ENERGY SYSTEMS
  16. Chapter 16 — STATIONARY POWER PLANTS
  17. Chapter 17 — GEOTHERMAL ENERGY SYSTEMS AND AMBIENT TEMPERATURE…
  18. Chapter 18 — REFERENCED STANDARDS
  19. Appendix A — RESIDENTIAL PLAN EXAMINER REVIEW FORM FOR HVAC SY…
  20. Appendix B — PROCEDURES TO BE FOLLOWED TO PLACE GAS EQUIPMENT …
  21. Appendix C — INSTALLATION AND TESTING OF OIL (LIQUID) FUEL-FIR…
  22. Appendix D — FUEL SUPPLY: MANUFACTURED/MOBILE HOME PARKS AND R…
  23. Appendix E — SUSTAINABLE PRACTICES
  24. Appendix F — SIZING OF VENTING SYSTEMS AND OUTDOOR COMBUSTION …
  25. Appendix G — EXAMPLE CALCULATION OF OUTDOOR AIR RATE
  26. Appendix H — PROFESSIONAL QUALIFICATIONS
  27. Appendix I — INDOOR HORTICULTURAL FACILITIES
  28. Appendix J — CLEAN AIR DELIVERY

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.