Skip to content

Article 4 — VARIANCES.

San Leandro Municipal Code · 2026-09 edition · updated 2026-09-27 · San Leandro

Administration Chapter 7-10

§ 7-9-400. ESTABLISHMENT OF GEOLOGIC HAZARD ZONES

§ 7-9-405. DESIGNATION OF THE Article 1

FLOODPLAIN Special Studies Zones ADMINISTRATOR. § 7-9-410. DUTIES AND § 7-10-100. SPECIAL STUDIES RESPONSIBILITIES OF ZONES ESTABLISHED. FLOODPLAIN § 7-10-105. AMENDMENT OF ADMINISTRATOR. MAP—PUBLIC HEARING.

Exceptions & meaning →

§ 7-10-110. NOTICE OF HEARING.

Article 5 § 7-10-115. BOUNDARIES OF Provisions for Flood Hazard Reduction SPECIAL STUDIES ZONES.

Exceptions & meaning →

§ 7-9-500. STANDARDS OF

CONSTRUCTION. Article 2

Exceptions & meaning →

§ 7-9-505. STANDARDS FOR Approval Procedure for New Real Estate

UTILITIES. Developments and Structures for Human

Exceptions & meaning →

§ 7-9-510. STANDARDS FOR Occupancy

SUBDIVISIONS. § 7-9-515. STANDARDS FOR § 7-10-200. GUIDELINES MANUFACTURED ESTABLISHED. HOMES. § 7-10-205. LIMITATIONS ON

Exceptions & meaning →

§ 7-9-520. STANDARDS FOR APPROVALS.

RECREATIONAL § 7-10-210. APPEALS—MANNER. VEHICLES. § 7-10-215. APPEALS—HEARING—NOTICE. § 7-9-525. FLOODWAYS. § 7-10-220. APPEALS—DETERMINATION.

Exceptions & meaning →

§ 7-9-530. COASTAL HIGH

HAZARD AREAS. Article 3

Exceptions & meaning →

§ 7-9-535. MUDSLIDE (i.e., Fees

MUDFLOW) PRONE AREAS. § 7-10-300. FEE FOR GEOLOGIC

Exceptions & meaning →

§ 7-9-540. FLOOD-RELATED EVALUATION.

EROSION-PRONE AREAS. § 7-10-305. FEE FOR BUILDING PERMIT.

Chapter 7-11 Article 2
DEVELOPMENT FEE FOR STREET Permit—Application
IMPROVEMENTS ON NEW
DEVELOPMENT PROJECTS § 7-12-200. PERMIT—WHEN
REQUIRED.
Article 1 § 7-12-205. PERMIT—WHEN NOT
General Provisions REQUIRED.

Exceptions & meaning →

§ 7-11-105. DEFINITIONS. TO INCLUDE.

§ 7-11-110. ESTABLISHMENT OF § 7-12-215. PERMIT FEE. APPLICATION—APPLICATION

Exceptions & meaning →

§ 7-11-115. TIME OF FEE PAYMENT. FORM.

§ 7-11-120. FEE SCHEDULE. § 7-12-220. PERMIT

Exceptions & meaning →

§ 7-11-125. CREDITS. APPLICATION—VICINITY

MAP. § 7-11-130. EXEMPTIONS. § 7-12-225. PERMIT § 7-11-135. INDIVIDUAL APPLICATION—SITE ADJUSTMENTS. MAP AND GRADING

Exceptions & meaning →

§ 7-11-140. APPLICATION OF FEES. PLAN.

§ 7-11-145. REVIEW. § 7-12-230. PERMIT

Exceptions & meaning →

§ 7-11-155. MASTER PLAN CONTROL AND

CONSTITUTES A SEDIMENTATION SPECIFIC PLAN. CONTROL, AND

Exceptions & meaning →

§ 7-11-160. ESTABLISHMENT OF DRAINAGE PLANS.

ZONES OF BENEFIT. § 7-12-235. PERMIT

Exceptions & meaning →

§ 7-11-165. ADOPTION OF A APPLICATION—POLLUTANT

CAPITAL CONTROL PLAN. IMPROVEMENT PLAN. § 7-12-240. PERMIT

Exceptions & meaning →

§ 7-11-170. ADOPTION OF APPLICATION—INITIAL

ADMINISTRATIVE STATEMENT(S) OF THE REGULATIONS. CIVIL ENGINEER(S) IN

Exceptions & meaning →

§ 7-11-175. ENFORCEMENT. CHARGE.

§ 7-11-180. OPERATIVE DATE OF § 7-12-245. PERMIT CHAPTER. APPLICATION—INITIAL STATEMENTS OF THE CIVIL ENGINEER(S) IN Chapter 7-12 CHARGE—RESPONSIBILITIES GRADING, EXCAVATIONS AND FILLS OF THE ENGINEER DEFINED. Article 1

Exceptions & meaning →

§ 7-12-250. PERMIT Definitions

APPLICATION—PROPOSED WORK SCHEDULE. § 7-12-100. DEFINITIONS.

§ 7-12-255. PERMIT § 7-12-305. PERMIT—CONDITIONS
APPLICATION—ITEMIZED UPON ISSUANCE.
ESTIMATE OF COST OF
WORK BY CIVIL Article 4
ENGINEER. Permit—Denial

Exceptions & meaning →

§ 7-12-260. PERMIT

APPLICATION—RELATED § 7-12-400. PERMIT—GROUNDS TO SPECIAL STUDIES FOR DENIAL—HAZARD. ZONES DESIGNATED BY § 7-12-405. PERMIT—GROUNDS STATE GEOLOGIST FOR (GEOLOGIC REPORT). DENIAL—DISINTERESTED

Exceptions & meaning →

§ 7-12-265. PERMIT CIVIL ENGINEER IN

APPLICATION—RELATED CHARGE. TO FLOOD HAZARD AREA. Article 5

Exceptions & meaning →

§ 7-12-270. PERMIT Permit—Completion—Time of Validity

APPLICATION—RELATED TO EXPANSIVE SOILS § 7-12-500. STATEMENT OF CONDITIONS. COMPLETION OF CIVIL

Exceptions & meaning →

§ 7-12-275. PERMIT ENGINEERS IN CHARGE

APPLICATION—SOILS (FINAL COMPLETION). REPORT, CONTENTS. § 7-12-505. STATEMENT OF

Exceptions & meaning →

§ 7-12-280. PERMIT COMPLETION OF CIVIL

APPLICATION—REFERRED ENGINEER(S) IN TO THE DIRECTOR OF CHARGE—PARTIAL DEVELOPMENT COMPLETION. SERVICES. § 7-12-510. STATEMENT OF

Exceptions & meaning →

§ 7-12-285. PERMIT COMPLETION OF CIVIL

APPLICATION—REFERRED ENGINEER(S) IN TO THE DIRECTOR OF CHARGE— DEVELOPMENT RESPONSIBILITY SERVICES—LANDSCAPE CHANGES HANDS. ADDENDUM TO THE § 7-12-515. STATEMENT OF GRADING COMPLETION OF CIVIL PLANS—REPORT— ENGINEER(S) IN CONTENTS. CHARGE— GROUNDS

Exceptions & meaning →

§ 7-12-290. PERMIT FOR DENIAL OF

APPLICATION—REFERRAL BUILDING PERMIT. TO OTHER PUBLIC § 7-12-520. STATEMENT OF AGENCIES AND PUBLIC COMPLETION OF THE UTILITIES. CIVIL ENGINEER(S) IN CHARGE— RELATED TO

Exceptions & meaning →

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — San Leandro Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.