Chapter 13 — HEALTH CARE FACILITIES AND MEDICAL GAS AND MEDICAL VACUUM SYSTEMS
1309.10 Inspection of Brazed Joints. After brazing, the
California Plumbing Code (Title 24, Part 5) · 2019 edition · updated 2026-09-10 · California
Italicized text is a California amendment to the model code, as printed in the official publication.
outside of all joints shall be cleaned by washing with water and a wire brush to remove any residue and allow clear visual inspection of the joint. [NFPA 99:5.1.10.4.7.1]
1309.10.1 Where Flux is Used. Where flux has been used, the wash water shall be hot. [NFPA 99:5.1.10.4.7.2] 1309.10.2 Visually Inspected. Each brazed joint shall be visually inspected after cleaning the outside surfaces.
[NFPA 99:5.1.10.4.7.3] 1309.10.3 Prohibited Brazed Joints. Joints exhibiting the following conditions shall not be permitted: (1) Flux or flux residue (when flux or flux-coated BAg
series rods are used with dissimilar metals).
« «
«
(1) Each joint in the final connection between the new
work and the existing system shall be leak-tested with the gas of system designation at the normal operating pressure by means of a leak detectant that is safe for use with oxygen and does not contain ammonia. [NFPA 99:5.1.12.3.9.2] (2) Vacuum joints shall be tested using an ultrasonic
leak detector or other means that will allow detection
(1) Flux or flux residue (when flux or flux-coated BAg
series rods are used with dissimilar metals). (2) Base metal melting or erosion. (3) Unmelted filler metal. (4) Failure of the filler metal to be clearly visible all the
way around the joint at the interface between the
(2) Vacuum joints shall be tested using an ultrasonic
leak detector or other means that will allow detection of leaks in an active vacuum system. [NFPA 99:5.1.12.3.9.3] (3) For pressure gases, immediately after the final
brazed connection is made and leak-tested, an outlet
(4) Failure of the filler metal to be clearly visible all the
way around the joint at the interface between the socket and the tube. (5) Cracks in the tube or component. (6) Cracks in the braze filler metal. (7) Failure of the joint to hold the test pressure under the
installer-performed initial pressure test (see Section
(3) For pressure gases, immediately after the final
brazed connection is made and leak-tested, an outlet in the new piping and an outlet in the existing piping that are immediately downstream from the point or area of intrusion shall be purged in accordance with the applicable requirements of Section 1309.8.9(4). [NFPA 99:5.1.12.3.9.4] (4) In order to remove any traces of particulate matter
deposited in the pipelines as a result of construction,
(4) In order to remove any traces of particulate matter
deposited in the pipelines as a result of construction, a heavy, intermittent purging of the pipeline shall be done. [NFPA 99:5.1.12.3.6] (5) Before the new work is used for patient care, positive
pressure gases shall be tested for operational pressure
(5) Before the new work is used for patient care, positive
pressure gases shall be tested for operational pressure and gas concentration in accordance with Section 1318.14 and Section 1318.15. [NFPA 99:5.1.12.3.9.5] (6) Permanent records of these tests shall be maintained
in accordance with NFPA 99. [NFPA 99:5.12.3.9.6]
(7) Failure of the joint to hold the test pressure under the
installer-performed initial pressure test (see Section 1318.5, Section 1318.6 or Section 1318.7) and standing pressure test (see Section 1318.9, Section 1318.10 or Section 1318.13). [NFPA 99:5.1.10.4.7.4] 1309.10.4 Defective Brazed Joints. Brazed joints that are identified as defective under the conditions of Section 1309.10.3(2) or Section 1309.10.3(5) shall be replaced. Brazed joints that are identified as defective under the conditions of Section 1309.10.3(1), 1309.10.3(3), 1309.10.3(4), 1309.10.3(6) or 1309.10.3(7) shall be permitted to be repaired, except that no joint shall be reheated more than once before being replaced. [NFPA 99:5.1.10.4.7.5, 5.1.10.4.7.6]
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — California Plumbing Code (Title 24, Part 5)
- Chapter 1 — GENERAL CODE PROVISIONS
- Chapter 2 — DEFINITIONS
- Chapter 3 — GENERAL REGULATIONS
- Chapter 4 — PLUMBING FIXTURES AND FIXTURE FITTINGS
- Chapter 5 — WATER HEATERS
- Chapter 6 — WATER SUPPLY AND DISTRIBUTION
- Chapter 7 — SANITARY DRAINAGE
- Chapter 8 — INDIRECT WASTES
- Chapter 9 — VENTS
- Chapter 10 — TRAPS AND INTERCEPTORS
- Chapter 11 — STORM DRAINAGE
- Chapter 12 — FUEL GAS PIPING
▸Chapter 13 — HEALTH CARE FACILITIES AND MEDICAL GAS AND MEDICA…
Overview- 1301.0 General.1301.1 Applicability. This chapter applies to t…
- 1301.2 Where Not Applicable. This chapter does not apply
- 1301.3 Conflict of Requirements. The requirements of
- 1301.4 Terms. Where the terms medical gas or medical support g…
- 1301.5 Where Required. Construction and equipment
- 1301.6 Existing Systems. Only the altered, renovated, or
- 1302.2 Patient Care Spaces. The governing body of the
- 1302.3 Anesthesia. It shall be the responsibility of the gover…
- 1302.4 Wet Procedure Locations. It shall be the responsibility…
- 1303.2 Psychiatric Patient Rooms. Piping and drain
- 1303.3 Locations for Ice Storage. Ice makers or ice storage co…
- 1303.4 Sterilizers and Bedpan Steamers. Sterilizers
- 1303.5 Aspirators. Provisions for aspirators or other watersup…
- 1303.6 Drains. Drains shall be installed on dryers, aftercoole…
- 1303.7 Clinical Sinks. Clinical sinks shall be installed in
- 1303.8 Water Supply for Hospitals. Hospitals shall be
- 1304.0 Medical Gas and Medical Vacuum Piping Sys-
- 1304.2 Manufacturer’s Instructions. The installation of
- 1304.3 Category 2 Piped Medical Gas and MedicalVacuum. Categor…
- 1304.4 Category 3 Piped Medical Gas and MedicalVacuum. Categor…
- 1304.5 Certification of Systems. Certification of medical gas …
- 1304.6 Construction Documents. Before a medical gas
- 1305.2 Minimum Flow Rates. Medical gas and vacuum
- 1305.3 Minimum Station Outlets and Inlets. Station
- 1306.0 Qualifications of Installers.1306.1 General. The instal…
- 1306.2 Brazing. Brazing shall be performed by individuals
- 1306.3 Health Care Organization Personnel. Health
- 1307.2 Examination. Brazers shall be qualified by visual
- 1307.3 Brazing Procedure Specification. The brazing
- 1307.4 Documentation. The brazing procedure qualification reco…
- 1307.5 Procedures. Brazing procedures qualified by a technical…
- 1307.7 Qualifications. Performance qualifications of brazers s…
- 1307.6 Conditions of Acceptance. An employer shall be
- 1308.2 Cleaning. Tubes, valves, fittings, station outlets, and
- 1308.3 Delivery. Each length of tube shall be delivered
- 1308.4 Tubes for Medical Gas Systems. Tubes shall be
- 1308.5 Tubes for Medical Vacuum Systems. Piping for
- 1309.2 Changes in Direction. Positive pressure patient
- 1308.6 Category 3 Systems. Category 3 systems shall
- 1309.3 Medical Vacuum Systems. Vacuum systems shall
- 1309.4 Brazed Joints and Fittings. Fittings shall be
- 1309.5 Tube Ends. Tube ends shall be cut square using a
- 1309.6 Cleaning Procedures. The interior surfaces of
- 1309.7 Brazing Dissimilar Metals. Flux shall only be
- 1309.8 Nitrogen Purge. When brazing, joints shall be continuou…
- 1309.9 Assembling and Heating Brazed Joints. Tube
- 1309.10 Inspection of Brazed Joints. After brazing, the
- 1309.11 Memory Metal Fittings. Memory metal fittings
- 1309.12 Axially Swaged Fittings. Axially swaged, elastic strai…
- 1309.13 Threaded Fittings. Threaded fittings shall meet
- 1309.14 Dielectric Fittings. Dielectric fittings that comply
- 1309.15 Other Types of Fittings. Listed or approved
- 1309.16 Welded Joints. Welded joints for medical gas and
- 1310.2 Required Pipe Sizing. Piping systems shall be
- 1309.17 Welding for Stainless Tube. Stainless tube shall
- 1309.18 Prohibited Joints. The following joints shall be
- 1310.3 Pipe Protection. Piping shall be protected against
- 1310.4 Location of Piping. Piping risers shall be permitted to…
- 1310.5 Pipe Support. Piping shall be supported from the
- 1310.7 Connectors. Hose and flexible connectors, both
- 1310.6 Backfilling and Trenching. The installation procedure f…
- 1310.9 Changes in System Use. Where a positive-pressure medica…
- 1310.10 Breaching or Penetrating Medical Gas Pip-ing. Positive…
- 1310.11 Labeling, Identification and Operating Pres-sure. Colo…
- 1310.8 Prohibited System Interconnections. Two or
- 1311.0 Valves.1311.1 General. New or replacement valves shall …
- 1311.6 Zone Valves. All station outlets/inlets shall be suppli…
- 1311.7 In-Line Shutoff Valves. Optional in-line valves
- 1311.8 Emergency Shutoff Valves. Category 3 systems
- 1311.2 Source Valves. A shutoff valve shall be placed at
- 1311.3 Main Line Valve. A shutoff valve shall be provided
- 1311.4 Riser Valves. Each riser supplied from the main line
- 1311.5 Service Valves. Service valves shall be installed to
- 1311.9 Valves for Future Connections. Future connection valves…
- 1311.10 Identification of Shutoff Valves. Shutoff valves
- 1312.0 Central Supply Systems.1312.1 Permitted Locations for M…
- 1312.2 Materials. Materials used in central supply systems
- 1312.3 Pressure-Relief Valve Requirements. Central
- 1313.0 Medical Air Supply Systems.1313.1 Quality of Medical Ai…
- 1313.3 Category 2 Medical Air Supply Systems. Category 2 syste…
- 1313.2 Medical Air Compressors. Medical air compressors shall …
- 1313.4 Category 3 Systems. Category 3 dental air compressor su…
- 1313.5 Air Sources. Air sources for medical air compressors sh…
- 1313.6 Air Intakes. Compressor intake piping shall be permitte…
- 1314.2 Medical-Surgical Vacuum Sources. Medicalsurgical vacuum…
- 1313.7 Medical Air Receivers. Receivers for medical air
- 1314.3 Vacuum Pumps. Additional pumps shall automatically acti…
- 1314.4 Vacuum Receivers. Receivers for vacuum shall
- 1315.2 Pressure Relief Valves. All pressure relief valves
- 1314.5 Vacuum Source Exhausts. The medical-surgical
- 1315.3 Pressure and Vacuum Indicator Locations. Pressure/vacuu…
- 1316.2 Required Valves. Each station outlet shall consist
- 1316.3 Post Installation. After installation of the piping,
- 1316.4 Identification. Station outlets and inlets shall be
- 1317.0 Warning Systems.1317.1 Category 1. All master, area, an…
- 1317.2 Category 2 Systems. Warning systems associated
- 1317.3 Category 3 Systems. Category 3 warning systems
- 1318.3 Reports. The inspection and testing reports shall be
- 1318.4 Initial Piping Blowdown. Piping in medical gas
- 1318.5 Initial Pressure Tests – Medical Gas and Vac-uum System…
- 1317.4 Components. Functioning of alarm components
- 1318.2 Breached Systems. All systems that are breached
- 1318.6 Initial Pressure Test - Category 3 Copper PipingSystems…
- 1318.7 Initial Leak Test – Category 3 Plastic VacuumPiping Sys…
- 1318.8 Cross-Connection Tests – Medical Gas andVacuum Systems.…
- 1318.9 Standing Pressure Tests – for Positive Pres-sure Medica…
- 1318.10 Standing Pressure Tests – Medical VacuumPiping Systems…
- 1318.11 Standing Pressure Tests – for Category 3
- 1318.12 Medical Gas Piping System Purge Tests. The
- 1318.13 Category 3 Dental Air and Nitrogen Supply
- 1318.14 Operational Pressure Test. Operational pressure tests …
- 1318.15 Medical Gas Concentration Test. After purging
- 1319.2 Certification Tests. Certification tests, verified and
- 1319.3 Report Items. A report that includes the specific
- 1318.16 System Verification. Verification tests shall be
- Chapter 14 — FIRESTOP PROTECTION
- Chapter 15 — ALTERNATE WATER SOURCES FOR NONPOTABLE APPLICATIONS
- Chapter 16 — NONPOTABLE RAINWATER CATCHMENT SYSTEMS
- Chapter 17 — REFERENCED STANDARDS
- Appendix A — RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYS…
- Appendix B — EXPLANATORY NOTES ON COMBINATION WASTE AND VENT S…
- Appendix C — ALTERNATE PLUMBING SYSTEMS
- Appendix D — SIZING STORM WATER DRAINAGE SYSTEMS
- Appendix E — MANUFACTURED/MOBILE HOME PARKS AND RECREATIONAL V…
- Appendix F — FIREFIGHTER BREATHING AIR REPLENISHMENT SYSTEMS
- Appendix G — SIZING OF VENTING SYSTEMS
- Appendix H — PRIVATE SEWAGE DISPOSAL SYSTEMS
- Appendix I — INSTALLATION STANDARD FOR PEX TUBING SYSTEMS FOR …
- Appendix J — COMBINATION OF INDOOR AND OUTDOOR COMBUSTION AND …
- Appendix K — POTABLE RAINWATER CATCHMENT SYSTEMS
- Appendix L — SUSTAINABLE PRACTICES
- Appendix M — PEAK WATER DEMAND CALCULATOR