15328. SMALL HYDROELECTRIC PROJECTS AT EXISTING FACILITIES
CEQA Statute and Guidelines (2025 consolidated text) · 2026 edition · updated 2026-10-05 · California
Class 28 consists of the installation of hydroelectric generating facilities in connection with existing dams, canals, and pipelines where:
329
Association of Environmental Professionals 2025
CEQA Guidelines
(a) The capacity of the generating facilities is 5 megawatts or less;
(b) Operation of the generating facilities will not change the flow regime in the affected stream, canal, or pipeline including but not limited to:
(1) Rate and volume of flow;
(2) Temperature;
(3) Amounts of dissolved oxygen to a degree that could adversely affect aquatic life; and
(4) Timing of release.
(c) New power lines to connect the generating facilities to existing power lines will not exceed one mile in length if located on a new right of way and will not be located adjacent to a wild or scenic river;
(d) Repair or reconstruction of the diversion structure will not raise the normal maximum surface elevation of the impoundment;
(e) There will be no significant upstream or downstream passage of fish affected by the project;
(f) The discharge from the power house will not be located more than 300 feet from the toe of the diversion structure;
(g) The project will not cause violations of applicable state or federal water quality standards;
(h) The project will not entail any construction on or alteration of a site included in or eligible for inclusion in the National Register of Historic Places; and
(i) Construction will not occur in the vicinity of any endangered, rare, or threatened species.
Note: Authority cited: Section 21083, Public Resources Code; Reference: Section 21084, Public Resources Code.