15085. NOTICE OF COMPLETION
CEQA Statute and Guidelines (2025 consolidated text) · 2026 edition · updated 2026-10-05 · California
(a) As soon as the draft EIR is completed, a notice of completion must be filed with the Office of Planning and Research in a printed hard copy or in electronic form on a diskette or by electronic mail transmission.
(b) The notice of completion shall include:
(1) A brief description of the project,
(2) The proposed location of the project (either by street address and cross street, for a project in an urbanized area, or by attaching a specific map, preferably a copy of a U.S.G.S. 15’ or 7-1/2’ topographical map identified by quadrangle name).
(3) An address where copies of the draft EIR are available, and
(4) The review period during which comments will be received on the draft EIR.
(c) A sample form for the notice of completion is included in Appendix L
(d) Where the EIR will be reviewed through the state review process handled by the State Clearinghouse, the notice of completion cover form required by the State Clearinghouse will serve as the notice of completion (see Appendix C).
(e) Public agencies are encouraged to make copies of notices of completion filed pursuant to this section available in electronic format on the Internet.
223
Association of Environmental Professionals 2025
CEQA Guidelines
Note: Authority cited: Section 21083, Public Resources Code. Reference: Section 21161, Public Resources Code.
Get a plain-English answer with a citation back to this text.
Ask AI about this code