15222. PREPARATION OF JOINT DOCUMENTS
CEQA Statute and Guidelines (2025 consolidated text) · 2026 edition · updated 2026-10-05 · California
If a Lead Agency finds that an EIS or Finding of No Significant Impact for a project would not be prepared by the federal agency by the time when the Lead Agency will need to consider an EIR or Negative Declaration, the Lead Agency should try to prepare a combined EIR-EIS or Negative Declaration-Finding of No Significant Impact. To avoid the need for the federal agency to prepare a separate document for the same project, the Lead Agency must involve the federal agency in the preparation of the joint document. The Lead Agency may also enter into a Memorandum of Understanding with the federal agency to ensure that both federal and state requirements are met.
300
CEQA Guidelines
Association of Environmental Professionals 2025
This involvement is necessary because federal law generally prohibits a federal agency from using an EIR prepared by a state agency unless the federal agency was involved in the preparation of the document.
Note: Authority cited: Section 21083, Public Resources Code; Reference: Sections 21083.5 and 21083.7, Public Resources Code; Section 102 (2)(D) of NEPA, 43 U.S.C.A. 4322 (2)(D) ; 40 C.F.R. Part 1506.2.
Get a plain-English answer with a citation back to this text.
Ask AI about this code