CALGreen · California Green Building Standards Code (CALGreen)
Phased projects and tenant improvements (Section 303)
Section 303 limits required CALGreen measures at the shell and initial tenant improvement phases to only those applicable to newly constructed building components, with subsequent TIs scoped under Section 301.3.
Last reviewed: July 6, 2026
Overview
Section 303 of the California Green Building Standards Code (CALGreen) governs phased projects and tenant improvements by specifying which green‑building measures apply at each phase. For shell buildings and other work done to accommodate future tenants, only the measures that apply to the newly constructed building components and systems are required at the shell phase (see §303.1). The code also clarifies that the provisions apply to the initial tenant improvements and that subsequent tenant improvements follow the scoping rules for additions and alterations in Section 301.3 (§303.1.1) .
This distinction matters because many other mandatory provisions in Chapters 4 and 5 reference phased work — for example, commissioning thresholds and exceptions (tenant improvements under 10,000 sq ft), bicycle parking sizing for new shell buildings in phased projects, and material/soil handling rules for staged site work. These related requirements show how §303 interacts with Chapter 5 mandatory measures such as commissioning, bicycle parking (5.106.4.1.2.3), and construction/demolition or land‑clearing provisions for phased projects .
In this section
Code references
Grounded in the retrieved California Green Building Standards Code (CALGreen) — click a citation to read the verbatim passage:
CALGreen § 301.5 High relevance — show source text
301.5 Health Facilities. [OSHPD 1, 2 & 4] Health facilities under the jurisdiction of the Office of Statewide Health Planning and Development (OSHPD) are required to comply with the mandatory measures prescribed in Section 5.304, Outdoor Water Use. Compliance with Section 5.304, as adopted by the Building Standards Commission, is enforced by the local agency having jurisdiction. Evidence of local approval shall be submitted to OSHPD prior to issuance of plan approval or a building permit.
2025 CALIFORNIA GREEN BUILDING STANDARDS CODE 3-3
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
GREEN BUILDING
SECTION 302—MIXED OCCUPANCY BUILDINGS
302.1 Mixed occupancy buildings. In mixed occupancy buildings, each portion of a building shall comply with the specific green building measures applicable to each specific occupancy.
Exceptions:
- [HCD] Accessory structures and accessory occupancies serving residential buildings shall comply with Chapter 4 and Appendix A4, as applicable.
- [HCD] For the purposes of CALGreen, live/work units, complying with Section 508.5 of the California Building Code, shall not be considered mixed occupancies. Live/work units shall comply with Chapter 4 and Appendix A4, as applicable.
SECTION 303—PHASED PROJECTS
303.1 Phased projects. For shell buildings and others constructed for future tenant improvements, only those code measures relevant to the building components and systems considered to be new construction (or newly constructed) shall apply.
303.1.1 Initial tenant improvements. The provisions of this code shall apply only to the initial tenant improvements to a project. Subsequent tenant improvements shall comply with the scoping provisions in Section 301.3 nonresidential additions and alterations.
SECTION 304—VOLUNTARY TIERS
304.1 Purpose. Voluntary tiers are intended to further encourage building practices that improve public health, safety and general welfare by promoting the use of building concepts which minimize the building’s impact on the environment and promote a more sustainable design.
304.1.1 Tiers. The provisions of Divisions A4.6 and A5.6 outline means, in the form of voluntary tiers, for achieving enhanced construction levels by incorporating additional measures for residential and nonresidential new construction. Voluntary tiers may be adopted by local governments and, when adopted, enforced by local enforcing agencies. Buildings complying with tiers specified for each occupancy contain additional prerequisite and elective green building measures necessary to meet the threshold of each tier. See Section 101.7 of this code for procedures and requirements related to local amendments, additions or deletions, including changes to energy standards.
[BSC & HCD] Where there are practical difficulties involved in complying with the threshold levels of a tier, the enforcing agency may grant modifications for individual cases. The enforcing agency shall first find that a special individual reason makes the strict letter of the tier impractical and that modification is in conformance with the intent and purpose of the measure. The details of any action granting modification shall be recorded and entered in the files of the enforcing agency.
SECTION 305 [OSHPD 1]— CALGreen TIER 1 AND CALGreen TIER 2
305.1 CALGreen Tier 1 and CALGreen Tier 2 buildings contain voluntary green building measures necessary to meet the threshold of each level.
CALGreen § 5-26 High relevance — show source text
5-26 2025 CALIFORNIA GREEN BUILDING STANDARDS CODE
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
NONRESIDENTIAL MANDATORY MEASURES
dance with this section by trained personnel with experience on projects of comparable size and complexity. For I-occupancies that are not regulated by OSHPD or for I-occupancies and L-occupancies that are not regulated by the California Energy Code Section 100.0 Scope, all requirements in Sections 5.410.2 through 5.410.2.6 shall apply.
Note: For energy-related systems under the scope (Section 100) of the California Energy Code, including heating, ventilation, air conditioning (HVAC) systems and controls, indoor lighting systems and controls, as well as water heating systems and controls, refer to California Energy Code Section 120.8 for commissioning requirements.
Commissioning requirements shall include:
- Owner’s or owner representative’s project requirements.
- Basis of design.
- Commissioning measures shown in the construction documents.
- Commissioning plan.
- Functional performance testing.
- Documentation and training.
- Commissioning report.
Exceptions:
Unconditioned warehouses of any size.
Areas less than 10,000 square feet used for offices or other conditioned accessory spaces within unconditioned warehouses.
Tenant improvements less than 10,000 square feet as described in Section 303.1.1.
Open parking garages of any size, or open parking garage areas, of any size, within a structure.
Note: For the purposes of this section, unconditioned shall mean a building, area or room which does not provide heating and/or air conditioning.
Informational Note:
- Functional performance testing for heating, ventilation, air conditioning systems and lighting controls must be performed in compliance with the California Energy Code.
5.410.2.1 Owner’s or Owner representative’s Project Requirements (OPR). [N] The expectations and requirements of the building appropriate to its phase shall be documented before the design phase of the project begins. This documentation shall include the following:
- Environmental and sustainability goals.
- Building sustainable goals.
- Indoor environmental quality requirements.
- Project program, including facility functions and hours of operation, and need for after hours operation.
- Equipment and systems expectations.
- Building occupant and operation and maintenance (O&M) personnel expectations.
5.410.2.2 Basis of Design (BOD). [N] A written explanation of how the design of the building systems meets the OPR shall be completed at the design phase of the building project. The Basis of Design document shall cover the following systems:
Renewable energy systems.
Landscape irrigation systems.
Water reuse systems.
5.410.2.3 Commissioning plan. [N] Prior to permit issuance a commissioning plan shall be completed to document how the project will be commissioned. The commissioning plan shall include the following:
- General project information.
- Commissioning goals.
- Systems to be commissioned. Plans to test systems and components shall include: a. An explanation of the original design intent. b. Equipment and systems to be tested, including the extent of tests.
c. Functions to be tested.
d. Conditions under which the test shall be performed. e. Measurable criteria for acceptable performance. 4. Commissioning team information. 5. Commissioning process activities, schedules and responsibilities. Plans for the completion of commissioning shall be included.
CALGreen § 5.410.2.1 Medium relevance — show source text
Informational Note:
- Functional performance testing for heating, ventilation, air conditioning systems and lighting controls must be performed in compliance with the California Energy Code.
5.410.2.1 Owner’s or Owner representative’s Project Requirements (OPR). [N] The expectations and requirements of the building appropriate to its phase shall be documented before the design phase of the project begins. This documentation shall include the following:
- Environmental and sustainability goals.
- Building sustainable goals.
- Indoor environmental quality requirements.
- Project program, including facility functions and hours of operation, and need for after hours operation.
- Equipment and systems expectations.
- Building occupant and operation and maintenance (O&M) personnel expectations.
5.410.2.2 Basis of Design (BOD). [N] A written explanation of how the design of the building systems meets the OPR shall be completed at the design phase of the building project. The Basis of Design document shall cover the following systems:
Renewable energy systems.
Landscape irrigation systems.
Water reuse systems.
5.410.2.3 Commissioning plan. [N] Prior to permit issuance a commissioning plan shall be completed to document how the project will be commissioned. The commissioning plan shall include the following:
- General project information.
- Commissioning goals.
- Systems to be commissioned. Plans to test systems and components shall include: a. An explanation of the original design intent. b. Equipment and systems to be tested, including the extent of tests.
c. Functions to be tested.
d. Conditions under which the test shall be performed. e. Measurable criteria for acceptable performance. 4. Commissioning team information. 5. Commissioning process activities, schedules and responsibilities. Plans for the completion of commissioning shall be included.
5.410.2.4 Functional performance testing. [N] Functional performance tests shall demonstrate the correct installation and operation of each component, system and system- to-system interface in accordance with the approved plans and specifications.
2025 CALIFORNIA GREEN BUILDING STANDARDS CODE 5-27
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
NONRESIDENTIAL MANDATORY MEASURES
Functional performance testing reports shall contain information addressing each of the building components tested, the testing methods utilized, and include any readings and adjustments made.
5.410.2.5 Documentation and training. [N] A systems manual and systems operations training are required, including Occupational Safety and Health Act (OSHA) requirements in California Code of Regulations (CCR), Title 8, Section 5142, and other related regulations.
5.410.2.5.1 Systems manual. [N] Documentation of the operational aspects of the building shall be completed within the systems manual and delivered to the building owner or representative. The systems manual shall include the following:
Site information, including facility description, history and current requirements.
Site contact information.
Basic operations and maintenance, including general site operating procedures, basic troubleshooting, recommended maintenance requirements, site events log.
Major systems.
Site equipment inventory and maintenance notes.
A copy of verifications required by the enforcing agency or this code.
Other resources and documentation, if applicable.
CALGreen § 1-5 Medium relevance — show source text
102 Construction Documents
and Installation Verification . . . . . . . . . . . . . . . . . . . .1-5
103 Building Standards Commission. . . . . . . . . . . . . . . . . . .1-5 104 Department of Housing and Community Development. . . . . . . . . . . . . . . . . .1-6 105 Division of the State Architect . . . . . . . . . . . . . . . . . . . . .1-6
106 Office of Statewide Health Planning and Development . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-6
CHAPTER 2 DEFINITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3
201 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-3
202 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-3
CHAPTER 3 GREEN BUILDING . . . . . . . . . . . . . . . . . . . . . . . . 3-3
301 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-3
302 Mixed Occupancy Buildings . . . . . . . . . . . . . . . . . . . . . . .3-4 303 Phased Projects. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-4 304 Voluntary Tiers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-4 305 CALGreen Tier 1 and CALGreen Tier 2 . . . . . . . . . . . . . .3-4
306 Voluntary Measures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-4
CHAPTER 4 RESIDENTIAL MANDATORY MEASURES . . . . . . 4-3
4.1 Planning and Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-3 4.2 Energy Efficiency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-7 4.3 Water Efficiency and Conservation . . . . . . . . . . . . . . . . .4-9 4.4 Material Conservation and Resource Efficiency . . . . 4-11 4.5 Environmental Quality . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13
CHAPTER 5 NONRESIDENTIAL MANDATORY MEASURES . . 5-3
CALGreen § 5.106.4.1.2.1 Medium relevance — show source text
Calculations for bicycle parking requirements shall be rounded up to the nearest whole number.
5.106.4.1.2.1 For new buildings with tenant spaces, provide secure bicycle parking for 10 percent of the tenant-occupants, with a minimum of one bicycle parking facility.
5.106.4.1.2.2 For additions or alterations, provide secure bicycle parking for 10 percent of the tenant-occupants being added, with a minimum of one bicycle parking facility.
5.106.4.1.2.3 For new shell buildings in phased projects, provide secure bicycle parking for 10 percent of the anticipated tenant-occupants, with a minimum of one bicycle parking facility.
5.106.4.2 Bicycle parking. [DSA-SS] For public schools and community colleges, comply with Sections 5.106.4.2.1 and 5.106.4.2.2. 5.106.4.2.1 Student bicycle parking. Provide permanently anchored bicycle racks conveniently accessed with a minimum of four two-bike capacity racks per new building.
5-4 2025 CALIFORNIA GREEN BUILDING STANDARDS CODE
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
NONRESIDENTIAL MANDATORY MEASURES
5.106.4.2.2 Staff bicycle parking. Provide permanent, secure bicycle parking conveniently accessed with a minimum of two staff bicycle parking spaces per new building. Acceptable bicycle parking facilities shall be convenient from the street or staff parking area and shall meet one of the following:
- Covered, lockable enclosures with permanently anchored racks for bicycles;
- Lockable bicycle rooms with permanently anchored racks; or
- Lockable, permanently anchored bicycle lockers.
5.106.5 Electric vehicle (EV) charging.
5.106.5.1 Reserved.
5.106.5.2 Reserved.
5.106.5.3 Electric vehicle (EV) charging. [N] [BSC-CG] Construction to provide electric vehicle infrastructure and facilitate electric vehicle charging shall comply with Section 5.106.5.3.1 EV capable spaces, Section 5.106.5.3.2 Electric vehicle charging stations and associated Table 5.106.5.3.1, or Section 5.106.5.3.6 Electric vehicle charging stations (EVCS)—Power allocation method and associated Table 5.106.5.3.6, and shall be provided in accordance with regulations in the California Building Code and the California Electrical Code. Exceptions:
- On a case-by-case basis where the local enforcing agency has determined compliance with this section is not feasible based upon one of the following conditions: a. Where there is no local utility power supply. b. Where the local utility is unable to supply adequate power. c. Where there is evidence suitable to the local enforcement agency substantiating that additional local utility infrastructure design requirements, directly related to the implementation of Section 5.106.5.3, may adversely impact the construction cost of the project.
- Areas of parking facilities served by parking lifts, including but not limited to, automated mechanical-access open parking garages as defined in the California Building Code ; or parking facilities otherwise incapable of supporting electric vehicle charging. 5.106.5.3.1 EV capable spaces. [N] EV capable spaces shall be provided in accordance with Table 5.106.5.3.1 and the following requirements:
CALGreen § 5.106.3 Medium relevance — show source text
The NPDES permits require postconstruction runoff (post-project hydrology) to match the preconstruction runoff (pre-project hydrology) with the installation of postconstruction stormwater management measures. The NPDES permits emphasize runoff reduction through on-site stormwater use, interception, evapotranspiration and infiltration through nonstructural controls, such as Low Impact Development (LID) practices and conservation design measures. Stormwater volume that cannot be addressed using nonstructural practices is required to be captured in structural practices and be approved by the enforcing agency.
Refer to the current applicable permits on the State Water Resources Control Board website at: www.waterboards.ca.gov/constructionstormwater. Consideration to the stormwater runoff management measures should be given during the initial design process for appropriate integration into site development.
5.106.3 Reserved.
5.106.4 Bicycle parking. For buildings within the authority of California Building Standards Commission as specified in Section 103, comply with Section 5.106.4.1. For buildings within the authority of the Division of the State Architect pursuant to Section 105, comply with Section 5.106.4.2.
5.106.4.1 Bicycle parking. [BSC-CG] Comply with Sections 5.106.4.1.1 and 5.106.4.1.2; or meet the applicable local ordinance, whichever is stricter.
5.106.4.1.1 Short-term bicycle parking. If the new project or an addition or alteration is anticipated to generate visitors, provide permanently anchored bicycle racks within 200 feet of the visitors’ entrance, readily visible to passers-by, for 20 percent of the peak daily visitors, with a minimum of one two-bike capacity rack.
5.106.4.1.2 Long-term bicycle parking. Acceptable bicycle parking facility for Sections 5.106.4.1.2.1, 5.106.4.1.2.2 and 5.106.4.1.2.3 shall be conveniently located near the street and shall meet one of the following:
- Covered, lockable enclosures with permanently anchored racks for bicycles;
- Lockable bicycle rooms with permanently anchored racks; or
- Lockable, permanently anchored bicycle lockers.
Calculations for bicycle parking requirements shall be rounded up to the nearest whole number.
5.106.4.1.2.1 For new buildings with tenant spaces, provide secure bicycle parking for 10 percent of the tenant-occupants, with a minimum of one bicycle parking facility.
5.106.4.1.2.2 For additions or alterations, provide secure bicycle parking for 10 percent of the tenant-occupants being added, with a minimum of one bicycle parking facility.
5.106.4.1.2.3 For new shell buildings in phased projects, provide secure bicycle parking for 10 percent of the anticipated tenant-occupants, with a minimum of one bicycle parking facility.
5.106.4.2 Bicycle parking. [DSA-SS] For public schools and community colleges, comply with Sections 5.106.4.2.1 and 5.106.4.2.2. 5.106.4.2.1 Student bicycle parking. Provide permanently anchored bicycle racks conveniently accessed with a minimum of four two-bike capacity racks per new building.
5-4 2025 CALIFORNIA GREEN BUILDING STANDARDS CODE
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
NONRESIDENTIAL MANDATORY MEASURES
CALGreen § 3-4 Medium relevance — show source text
302 Mixed Occupancy Buildings . . . . . . . . . . . . . . . . . . . . . . .3-4 303 Phased Projects. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-4 304 Voluntary Tiers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-4 305 CALGreen Tier 1 and CALGreen Tier 2 . . . . . . . . . . . . . .3-4
306 Voluntary Measures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-4
CHAPTER 4 RESIDENTIAL MANDATORY MEASURES . . . . . . 4-3
4.1 Planning and Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-3 4.2 Energy Efficiency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-7 4.3 Water Efficiency and Conservation . . . . . . . . . . . . . . . . .4-9 4.4 Material Conservation and Resource Efficiency . . . . 4-11 4.5 Environmental Quality . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13
CHAPTER 5 NONRESIDENTIAL MANDATORY MEASURES . . 5-3
5.1 Planning and Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-3 5.2 Energy Efficiency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-15 5.3 Water Efficiency and Conservation . . . . . . . . . . . . . . . 5-19 5.4 Material Conservation and Resource Efficiency . . . . 5-23 5.5 Environmental Quality . . . . . . . . . . . . . . . . . . . . . . . . . . 5-31
CHAPTER 6 REFERENCED ORGANIZATIONS
AND STANDARDS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-3
601 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-3
CHAPTER 7 INSTALLER AND SPECIAL
INSPECTOR QUALIFICATIONS . . . . . . . . . . . . . . . . . . . . . . 7-3 701 General (Reserved) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-3 702 Qualifications. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-3
CALGreen § 5.408.2 Medium relevance — show source text
5.408.2 Universal waste. [A] Additions and alterations to a building or tenant space that meet the scoping provisions in Section 301.3 for nonresidential additions and alterations, shall require verification that Universal Waste items such as fluorescent lamps and ballast and mercury containing thermostats as well as other California prohibited Universal Waste materials are disposed of properly and are diverted from landfills. A list of prohibited Universal Waste materials shall be included in the construction documents.
Note: Refer to the Universal Waste Rule link at: https://dtsc.ca.gov/universalwaste/
5.408.3 Excavated soil and land clearing debris. 100 percent of trees, stumps, rocks and associated vegetation and soils resulting primarily from land clearing shall be reused or recycled. For a phased project, such material may be stockpiled on site until the storage site is developed.
Exception: Reuse, either on-site or off-site, of vegetation or soil contaminated by disease or pest infestation.
Notes:
- If contamination by disease or pest infestation is suspected, contact the County Agricultural Commissioner and follow its direction for recycling or disposal of the material. (www.cdfa.ca.gov/exec/ county/county_contacts.html)
- For a map of known pest and/or disease quarantine zones, consult with the California Department of Food and Agriculture. (www.cdfa.ca.gov)
SECTION 5.409—LIFE CYCLE ASSESSMENT
5.409.1 Scope.
[BSC-CG] Effective July 1, 2024, projects consisting of newly constructed building(s) with a combined floor area of 100,000 square feet or greater shall comply with either Section 5.409.2 or Section 5.409.3. Alteration(s) to existing building(s) where the combined altered floor area is 100,000 square feet or greater shall comply with either Section 5.105.2, 5.409.2, or 5.409.3. Addition(s) to existing building(s) where the total floor area combined with the existing building(s) is 100,000 square feet or greater shall comply with
5-24 2025 CALIFORNIA GREEN BUILDING STANDARDS CODE
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
NONRESIDENTIAL MANDATORY MEASURES
either Section 5.105.2, Section 5.409.2, or Section 5.409.3. Effective January 1, 2026, the combined floor area shall be 50,000 square feet or greater.
[DSA-SS] Projects consisting of newly constructed building(s) with a combined floor area of 50,000 square feet or greater shall comply with either Section 5.409.2 or Section 5.409.3. Alteration(s) to existing building(s) where the combined altered floor area is 50,000 square feet or greater shall comply with either Section 5.105.2, 5.409.2, or 5.409.3. Addition(s) to existing building(s) where the total floor area combined with the existing building(s) is 50,000 square feet or greater shall comply with either Section 5.105.2, Section 5.409.2, or Section 5.409.3.
**5.409.2 Whole building life cycle assessment.
CALGreen § 5.409.2 Medium relevance — show source text
2025 CALIFORNIA GREEN BUILDING STANDARDS CODE APPENDIX A5-29
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
APPENDIX A5 — NONRESIDENTIAL VOLUNTARY MEASURES
- Projects consisting of newly constructed building(s) with a combined floor area of less than 50,000 square feet shall comply with either Section 5.409.2 or Section 5.409.3 for Tier 1 compliance, and either Section A5.409.2.1 or A5.409.3 Tier 1 requirements for Tier 2 compliance.
- Alteration(s) to existing building(s) where the aggregate floor area is less than 50,000 square feet shall comply with either Section 5.105.2, Section 5.409.2, or Section 5.409.3 for Tier 1 compliance, and either Section A5.105.2.1, Section A5.409.2.1, or Section A5.409.3 Tier 1 requirements for Tier 2 compliance.
- Addition(s) to an existing building where the total floor area combined with the existing building(s) is less than 50,000 square feet shall comply with either Section 5.105.2, Section 5.409.2, or Section 5.409.3 for Tier 1 compliance, and either Section A5.105.2.1, Section A5.409.2.1, or Section A5.409.3 Tier 1 requirements for Tier 2 compliance. Exception: Combined addition(s) to existing building(s) of two times the area or more of the existing building(s) is not eligible to meet compliance with Section 5.105.2 or Section A5.105.2.
A5.409.2 Whole building life cycle assessment. Projects shall meet the minimum requirements of Section A5.409.2 for Tier 1 or Tier 2 compliance.
A5.409.2.1 Tier 1. Projects shall conduct a cradle-to-grave whole building life cycle assessment meeting the requirements of Section 5.409.2 and performed in accordance with ISO 14040 and 14044, excluding operating energy, demonstrating a minimum 15-percent reduction in global warming potential (GWP) as compared to a reference baseline building of similar size, function, complexity, type of construction, material specification, and location that meets the requirements of all parts of the California Building Standards Code currently in effect. Software used to conduct the whole building life cycle assessment, including reference baseline building, shall have a data set compliant with ISO 14044, and ISO 21930 or EN 15804, and the software shall conform to ISO 21931 and/or EN 15978. The software tools and data sets shall be the same for evaluation of both the baseline building and the proposed building.
Exception: For projects that include building reuse, the reference baseline building shall exclude the reused elements. The percent reduction in GWP shall be achieved through the design and construction of new project elements.
**A5.409.2.2 Tier 2.
CALGreen § 5.105.2 Medium relevance — show source text
Exception: Combined addition(s) to existing building(s) of two times the area or more of the existing building(s) is not eligible to meet compliance with Section 5.105.2 or Section A5.105.2.
A5.409.2 Whole building life cycle assessment. Projects shall meet the minimum requirements of Section A5.409.2 for Tier 1 or Tier 2 compliance.
A5.409.2.1 Tier 1. Projects shall conduct a cradle-to-grave whole building life cycle assessment meeting the requirements of Section 5.409.2 and performed in accordance with ISO 14040 and 14044, excluding operating energy, demonstrating a minimum 15-percent reduction in global warming potential (GWP) as compared to a reference baseline building of similar size, function, complexity, type of construction, material specification, and location that meets the requirements of all parts of the California Building Standards Code currently in effect. Software used to conduct the whole building life cycle assessment, including reference baseline building, shall have a data set compliant with ISO 14044, and ISO 21930 or EN 15804, and the software shall conform to ISO 21931 and/or EN 15978. The software tools and data sets shall be the same for evaluation of both the baseline building and the proposed building.
Exception: For projects that include building reuse, the reference baseline building shall exclude the reused elements. The percent reduction in GWP shall be achieved through the design and construction of new project elements.
A5.409.2.2 Tier 2. Projects shall conduct a cradle-to-grave whole building life cycle assessment meeting the requirements of Section 5.409.2 and performed in accordance with ISO 14040 and ISO 14044, excluding operating energy, demonstrating a minimum 20-percent reduction in GWP as compared to a reference baseline building of similar size, function, complexity, type of construction, material specification, and location that meets the requirements of all parts of the California Building Standards Code currently in effect. Software used to conduct the whole building life cycle assessment, including reference baseline building, shall have a data set compliant with ISO 14044, and ISO 21930 or EN 15804, and the software shall conform to ISO 21931 and/or EN 15978. The software tools and data sets shall be the same for evaluation of both the baseline building and the proposed building.
Exception: For projects that include building reuse, the reference baseline building shall not be of new construction and shall retain existing materials. The percent reduction in GWP shall be achieved through the design and construction of new project elements.
A5.409.2.3 Verification of compliance. A summary of the GWP analysis produced by the software and Worksheet WS-7 signed by the design professional of record shall be provided in the construction documents as documentation of compliance. A copy of the whole building life cycle assessment which includes the GWP analysis produced by the software, in addition to maintenance and training information, shall be included in the operation and maintenance manual and shall be provided to the owner at the close of construction. The enforcing agency may require inspection and inspection reports in accordance with Sections 702.2 and 703.1 during and at completion of construction to demonstrate substantial conformance. Inspection shall be performed by the design professional of record or third party acceptable to the enforcing agency.
A5.409.3 Product GWP compliance—prescriptive path. Each product that is permanently installed and listed in Table A5.409.3 shall have a Type III environmental product declaration (EPD), either product-specific or factory-specific.
CALGreen § 5.410 Medium relevance — show source text
SECTION 5.410—BUILDING MAINTENANCE AND OPERATION
5.410.1 Recycling by occupants. Provide readily accessible areas that serve the entire building and are identified for the depositing, storage and collection of non-hazardous materials for recycling, including (at a minimum) paper, corrugated cardboard, glass, plastics, organic waste and metals, or meet a lawfully enacted local recycling ordinance, if more restrictive.
Exception: Rural jurisdictions that meet and apply for the exemption in Public Resources Code 42649.82 (a)(2)(A) et seq. shall also be exempt from the organic waste portion of this section.
5.410.1.1 Additions. All additions conducted within a 12-month period under single or multiple permits, resulting in an increase of 30 percent or more in floor area, shall provide recycling areas on site.
Exception: Additions within a tenant space resulting in less than a 30-percent increase in the tenant space floor area.
5.410.1.2 Sample ordinance. Space allocation for recycling areas shall comply with Chapter 18, Part 3, Division 30 of the Public Resources Code. Chapter 18 is known as the California Solid Waste Reuse and Recycling Access Act of 1991 (Act).
Note: A sample ordinance for use by local agencies may be found in Appendix A of the document at the CalRecycle’s web site.
5.410.2 Commissioning. [N] New buildings 10,000 square feet and over. For new buildings 10,000 square feet and over, building commissioning shall be included in the design and construction processes of the building project to verify that the building systems and components meet the owner’s or owner representative’s project requirements. Commissioning shall be performed in accor
5-26 2025 CALIFORNIA GREEN BUILDING STANDARDS CODE
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
NONRESIDENTIAL MANDATORY MEASURES
dance with this section by trained personnel with experience on projects of comparable size and complexity. For I-occupancies that are not regulated by OSHPD or for I-occupancies and L-occupancies that are not regulated by the California Energy Code Section 100.0 Scope, all requirements in Sections 5.410.2 through 5.410.2.6 shall apply.
Note: For energy-related systems under the scope (Section 100) of the California Energy Code, including heating, ventilation, air conditioning (HVAC) systems and controls, indoor lighting systems and controls, as well as water heating systems and controls, refer to California Energy Code Section 120.8 for commissioning requirements.
Commissioning requirements shall include:
- Owner’s or owner representative’s project requirements.
- Basis of design.
- Commissioning measures shown in the construction documents.
- Commissioning plan.
- Functional performance testing.
- Documentation and training.
- Commissioning report.
Exceptions:
Unconditioned warehouses of any size.
Areas less than 10,000 square feet used for offices or other conditioned accessory spaces within unconditioned warehouses.
Tenant improvements less than 10,000 square feet as described in Section 303.1.1.
Open parking garages of any size, or open parking garage areas, of any size, within a structure.
Note: For the purposes of this section, unconditioned shall mean a building, area or room which does not provide heating and/or air conditioning.
Informational Note:
CALGreen § 1-1 Medium relevance — show source text
2025 CALIFORNIA GREEN BUILDING STANDARDS CODE APPENDIX A6.1-1
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
APPENDIX A6.1-2 2025 CALIFORNIA GREEN BUILDING STANDARDS CODE
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
A6 VOLUNTARY STANDARDS FOR HEALTH FACILITIES [OSHPD 1, 2 & 4]
DIVISION A6.1 – SITE PLANNING AND DESIGN
SECTION A6.106—SITE DEVELOPMENT
A6.106.9 Building orientation. Locate and orient the building as follows:
- When site and location permit, orient the building with the long sides facing north and south.
- Protect the building from thermal loss, drafts and degradation of the building envelope caused by wind and wind-driven materials such as dust, sand, snow and leaves, with building orientation and landscape features. Note: For information on sun angles and shading, visit: http://www2.aud.ucla.edu/energy-design-tools/.
Calculations may be made using the Solar-2 tool.
DIVISION A6.2 – ENERGY EFFICIENCY
SECTION A6.202—DEFINITIONS
A6.202.1 Definitions. The following words and terms shall, for the purposes of this chapter and as used elsewhere in this code, have the meanings shown herein.
ENERGY STAR. A joint program of the US Environmental Protection Agency and the US Department of Energy. ENERGY STAR is a voluntary program designed to identify and promote energy-efficient products and practices.
SECTION A6.203—PERFORMANCE APPROACH
A6.203.2 Energy performance. It is the intent of this code to encourage green buildings to achieve exemplary performance in the area of energy efficiency.
A6.203.2.1 CALGreen Tier 1. [OSHPD 1] To achieve CALGreen [Tier 1, buildings must comply with the latest edition of “Savings By](http://www.energysoft.com/ep/ 2007SBDHProcedures.pdf) Design, Healthcare Modeling Procedures” found online at http://www.energysoft.com/ep/ 2007SBDHProcedures.pdf.
A6.203.2.2 CALGreen Tier 2. [OSHPD 1] To achieve CALGreen Tier 2, buildings must exceed the latest edition of “Savings By Design, Healthcare Modeling Procedures” by a minimum of 15 percent.
SECTION A6.204—PRESCRIPTIVE APPROACH
A6.204.1 ENERGY STAR equipment and appliances. All equipment and appliances provided by the builder shall be ENERGY STAR labeled if ENERGY STAR is applicable to that equipment or appliance.
A6.204.4 Commissioning. [OSHPD 1 & 4] Building commissioning shall be included in the design and construction processes of the building project to verify that the building’s energy related systems are installed, calibrated and perform according to the owner’s project requirements, basis of design and construction documents.
The owner and designer shall designate an individual as the Commissioning Authority (CxA) to lead, review and oversee the completion of the commissioning process activities. The owner shall document the Owner’s Project Requirements (OPR).
Frequently asked questions
What does CALGreen require at the shell phase for a phased project?
At the shell phase, only the green building measures relevant to the building components and systems that are newly constructed (i.e., the shell elements) apply — follow §303.1 to determine which measures are applicable .
Do later tenant improvements have to meet the same CALGreen measures as the initial build?
No — the initial tenant improvements must comply with the code, and subsequent tenant improvements are scoped under Section 301.3 for nonresidential additions and alterations (so different thresholds and applicability may apply) per §303.1.1 and §301.3 .
Are there common exceptions for tenant improvements in CALGreen?
Yes. For example, some nonresidential requirements (like full building commissioning) include exceptions for tenant improvements under 10,000 sq ft; other requirements treat shell buildings differently for bicycle parking and site handling of excavated soil in phased projects — see the cited sections in Chapter 5 for specifics .
More in California Green Building Standards Code (CALGreen)
- Administration (Chapter 1)
- Nonresidential Voluntary Measures (Appendix A5 — divisions A5.1–A5.6, electives & verification)
- Residential Mandatory Measures — Planning & Design; Energy; Water; Materials; Environmental Quality (Chapter 4)
- Definitions (Chapter 2)
- Voluntary Standards for Health Facilities (Appendix A6 / OSHPD guidance)
- Green Building – scope, mixed occupancies, phased projects (Chapter 3)
- Residential Voluntary Measures (Appendix A4 — divisions A4.1–A4.6, tiers & model ordinance)
- Nonresidential Mandatory Measures — Planning & Design; Energy; Water; Materials; Environmental Quality (Chapter 5)
- Compliance verification, construction documents & checklists (Section 102, Chapter 7, Appendix checklists)
- Referenced Organizations and Standards (Chapter 6)
- Voluntary Tiers and CALGreen Tier 1 / Tier 2 (performance tiers, thresholds)
- Installer and Special Inspector Qualifications (Chapter 7)