CALGreen · California Green Building Standards Code (CALGreen)
Compliance verification, construction documents & checklists (Section 102, Chapter 7, Appendix checklists)
This hub orients users to CALGreen Section 102 submittal rules, the Chapter 7/inspection pathway, commissioning documentation, and appendix checklists and templates.
Last reviewed: July 6, 2026
Overview
This part of CALGreen establishes what must be shown on plans and in supporting documents at permit submittal, and how evidence of conformance is provided to the enforcing agency. Section 102 requires submission of construction documents and other data with permit applications, calls for documents to be sufficiently clear to show the location, nature and scope of proposed green building features, and requires documentation of conformance (see §102.1–§102.3).
Verification spans plan intake through on‑site inspection and final reporting. Chapter 7 and related inspection sections provide the enforcement and inspection pathways (including inspection reports under §§702.2 and 703.1), while Chapter 8 contains sample compliance forms and templates to support submittals and commissioning documentation. Commissioning requirements and the required commissioning plan and commissioning report (for example, §5.410.2.3 and §5.410.2.6) illustrate the type of plan, checklist and completed report information CALGreen expects in the construction documents and final submittal.
Appendix checklists (for example, the A4/A5 appendix application checklists and the Tier checklists such as A5.602 series) are the primary tools for organizing mandatory and voluntary measures, tracking references to plan sheets/specs, and providing the designer/owner declaration required by the code. Sample verification checklists and compliance forms are published in the appendices and in Chapter 8 templates to simplify plan intake and inspection.
In this section
Code references
Grounded in the retrieved California Green Building Standards Code (CALGreen) — click a citation to read the verbatim passage:
CALGreen § 3.2 High relevance — show source text
3.2 Compliance Method:
Compliance is achieved by including commissioning requirements in the project specifications. The commissioning specifications should include the following:
Primary (and optionally all) commissioning requirements are included in the general specification division (typically Division 1) and clear cross references of all commissioning requirements to and from the general division are included to ensure all subcontractors are held to them.
A list of the systems and assemblies covered by the commissioning requirements.
Roles and responsibilities of all parties, including: i. General contractor and subcontractors, vendors, construction manager ii. Commissioning provider lead
8-16 2025 CALIFORNIA GREEN BUILDING STANDARDS CODE
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
COMPLIANCE FORMS, WORKSHEETS AND REFERENCE MATERIAL
iii. Owner, facility staff iv. Architect and design engineers v. Include the noncontractor parties in the construction specifications (information used only to provide the contractor with context for their work).
vi. Include who writes checklists and tests, who reviews and approves test forms, who directs tests, who executes tests, who documents test results, and who approves completed tests. These roles may vary by system or assembly.
Meeting requirements
Commissioning schedule management procedures
Issue and noncompliance management procedures
Requirements for execution and documentation of installation, checkout and start up, including controls point-to-point checks and calibrations
Specific testing requirements by system, including: i. Monitoring and trending ii. Opposite season or deferred testing requirements, functions and modes to be tested
iii. Conditions of test
iv. Acceptance criteria, and any allowed sampling v. Include details of the format and rigor of the test forms required to document test execution vi. Include example forms is recommended 9. Submittal review requirements and approval process. 10. Content, authority and approval process of the commissioning plan. 11. Commissioning documentation and reporting requirements. 12. Facility staff training requirements and verification procedures. 13. O&M manual review and approval procedures. 14. System’s manual development and approval requirements and procedures.
- Definitions section.
3.3 Enforcement:
At their discretion, the inspector confirms demonstrated compliance at Plan Intake by: a) Receipt of a copy of the commissioning specifications, or b) Receipt of a form signed by the owner or owner’s representative or designer of record attesting that the owner-approved commissioning specifications are included in the construction documents.
Reference: 4 Commissioning plan
CALGreen Section 5.410.2.3, Commissioning plan.
4.1 Intent:
The Commissioning Plan (Cx Plan) establishes the commissioning process guideline for the project and commissioning team’s level of effort by identifying the required Cx activities to ensure that the Owner’s Project Requirements (OPR) and the Basis of Design (BOD) are met. The Cx Plan also includes a commissioning schedule from design to occupancy.
4.2 Compliance Method:
Compliance is demonstrated by preparation of a project-specific Cx Plan that includes the elements listed in the code section above. The following gives guidance for developing the components of the commissioning plan:
- General project information - Provide project-identifying information including but not limited to the following: i. Project name, owner, location. ii. Building type, building area. iii. Project schedule. iv. Contact information of individual/company providing the commissioning services.
California Green Building Standards Code (CALGreen) High relevance — show source text
600
|87 300
|169 000
| |20
|1280
|2560
|4610
|7990
|12 100
|21 700
|60 000
|116 000
| |30
|1030
|2050
|3710
|6420
|9690
|17 400
|48 200
|93 200
| |40
|878
|1760
|3170
|5490
|8300
|14 900
|41 200
|79 700
| |50
|778
|1560
|2810
|4870
|7350
|13 200
|36 600
|70 700
| |60
|705
|1410
|2550
|4410
|6660
|12 000
|33 100
|64 000
| |70
|649
|1300
|2340
|4060
|6130
|11 000
|30 500
|58 900
| |80
|603
|1210
|2180
|3780
|5700
|10 200
|28 300
|54 800
| |90
|566
|1130
|2050
|3540
|5350
|9610
|26 600
|51 400
| |100
|535
|1070
|1930
|3350
|5050
|9080
|25 100
|48 600
| |125
|474
|949
|1710
|2970
|4480
|8050
|22 300
|43 000
| |150
|429
|860
|1550
|2690
|4060
|7290
|20 200
|39 000
| |175
|395
|791
|1430
|2470
|3730
|6710
|18 600
|35 900
| |200
|368
|736
|1330
|2300
|3470
|6240
|17 300
|33 400
| |250
|326
|652
|1180
|2040
|3080
|5530
|15 300
|29 600
| |300
|295
|591
|1070
|1850
|2790
|5010
|13 900
|26 800
| |350
|272
|544
|981
|1700
|2570
|4610
|12 800
|24 700
| |400
|253
|506
|913
|1580
|2390
|4290
|11 900
|22 900
| |450
|237
|475
|856
|1480
|2240
|4020
|11 100
|21 500
| |500
|224
|448
|809
|1400
|2120
|3800
|10 500
|20 300
| |550
|213
|426
|768
|1330
|2010
|3610
|9990
|19California Green Building Standards Code (CALGreen) High relevance — show source text
300
|43 000
| |150
|429
|860
|1550
|2690
|4060
|7290
|20 200
|39 000
| |175
|395
|791
|1430
|2470
|3730
|6710
|18 600
|35 900
| |200
|368
|736
|1330
|2300
|3470
|6240
|17 300
|33 400
| |250
|326
|652
|1180
|2040
|3080
|5530
|15 300
|29 600
| |300
|295
|591
|1070
|1850
|2790
|5010
|13 900
|26 800
| |350
|272
|544
|981
|1700
|2570
|4610
|12 800
|24 700
| |400
|253
|506
|913
|1580
|2390
|4290
|11 900
|22 900
| |450
|237
|475
|856
|1480
|2240
|4020
|11 100
|21 500
| |500
|224
|448
|809
|1400
|2120
|3800
|10 500
|20 300
| |550
|213
|426
|768
|1330
|2010
|3610
|9990
|19 300
| |600
|203
|406
|733
|1270
|1920
|3440
|9530
|18 400
| |650
|194
|389
|702
|1220
|1840
|3300
|9130
|17 600
| |700
|187
|374
|674
|1170
|1760
|3170
|8770
|16 900
| |750
|180
|360
|649
|1130
|1700
|3050
|8450
|16 300
| |800
|174
|348
|627
|1090
|1640
|2950
|8160
|15 800
| |850
|168
|336
|607
|1050
|1590
|2850
|7890
|15 300
| |900
|163
|326
|588
|1020
|1540
|2770
|7650
|14 800
| |950
|158
|317
|572
|990
|1500
|2690
|7430
|14 400
| |1000
|154
|308
|556
|963
|1450
|2610
|7230
|14 000
| |1100
|146
|293
|528
|915
|1380
|2480
|6870
|13 300
| |1200
|139
|279
|504
|873
|1320
|2370
|6550
|12 700
| |1300
|134
|267
|482
|836
|1260
|2270
|6270
|12CALGreen § 6.2.3 High relevance — show source text
Review record drawings on the systems/equipment a. Explain location or delivery contact of the record drawings b. Review record drawings, revisions and changes to original design drawings. c. Review equipment schedules and compare with actual installed systems
6.2.3 Enforcement:
At their discretion, the inspector confirms demonstrated compliance during on-site enforcement by:
- In the event appropriate maintenance staff is made available to receive training for each equipment type and/or system installed in the building. a. Receipt of a copy of the written training program and completed attendance forms, or b. Receipt of a form signed by the owner or owner’s representative attesting that the training program and delivery of training has been completed.
- In the event appropriate maintenance staff are unavailable to receive training for each equipment type and/or system installed in the building. a. Receipt of a copy of the training program provided to the owner or owner’s representative, or b. Receipt of a form signed by the owner or owner’s representative attesting that the written training program has been provided.
2025 CALIFORNIA GREEN BUILDING STANDARDS CODE 8-21
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
COMPLIANCE FORMS, WORKSHEETS AND REFERENCE MATERIAL
Reference: 7 Commissioning report
CALGreen Section 5.410.2.6, Commissioning report.
7.1 Intent:
The commissioning report documents the commissioning process and test results. The report includes confirmation from the commissioning agent verifying that commissioned systems meet the conditions of the Owner’s Project Requirements (OPR), Basis of Design (BOD) and contract documents.
7.2 Compliance Method:
The components of the commissioning report include the following and are defined as follows:
- Executive summary of process and results of commissioning program, including observations, conclusions and any outstanding items.
- History of any system deficiencies and how resolved a. Include outstanding deficiencies and plans for resolution b. Include plans for seasonal testing scheduled for a later date
- System performance test results and evaluations
- Summary of training process completed and scheduled
- Attach commissioning process documents a. Commissioning plan b. Owner’s Project Requirements (OPR) c. Basis of Design (BOD)
d. Executed installation checklists
e. Executed Functional Performance Test (FPT) forms
f. Recommendations for end-of-warranty review activities
7.3 Enforcement:
At their discretion, the inspector confirms demonstrated compliance during on-site enforcement by: a) Receipt of a copy of the commissioning report, or b) Receipt of a form signed by the owner or owner’s representative attesting that the Cx Report has been completed.
8-22 2025 CALIFORNIA GREEN BUILDING STANDARDS CODE
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
COMPLIANCE FORMS, WORKSHEETS AND REFERENCE MATERIAL
PART 2 SAMPLE FORMS AND TEMPLATES FOR COMMISSIONING
Note: Following are examples of templates and/or forms that may be used or adopted for verification compliance with commissioning. Code users may provide their own documents as permitted by the enforcing agency. For each subsection of commissioning, samples are provided; in a few cases with narrative templates, and in most cases with compliance forms. Simplified forms or more detailed forms, but not both, may be selected to submit for each project.
CALGreen COMPLIANCE FORM
OWNER’S PROJECT REQUIREMENTS (OPR)
CALGreen § 3.1 High relevance — show source text
O101.2 Qualifications. Registered design professionals shall possess the knowledge, skills and abilities necessary to demonstrate compliance with this code.
O101.3 Construction document preparation. Construction documents required by this code shall be prepared in adequate detail and submitted for review and approval in accordance with Section 107.
O101.3.1 Review. Construction documents submitted in accordance with this code shall be reviewed for code compliance with the appropriate code provisions in accordance with Section 107.
O101.4 Construction. Construction shall comply with the approved construction documents submitted in accordance with this code, and shall be verified and approved to demonstrate compliance with this code.
O101.4.1 Facility operating policies and procedures. Policies, operations, training and procedures shall comply with approved documents submitted in accordance with this code, and shall be verified and approved to demonstrate compliance with this code.
O101.4.2 Maintenance. Maintenance of the performance-based design shall be ensured throughout the life of the building or portion thereof.
O101.4.3 Changes. The owner or the owner’s authorized agent shall be responsible to ensure that any change to the facility, process or system does not increase the hazard level beyond that originally designed without approval and that changes shall be documented in accordance with the code.
O101.5 Documentation. The registered design professional shall prepare appropriate documentation for the project, clearly detailing the approach and rationale for the design submittal, the construction and the future use of the building, facility or process.
O101.5.1 Reports and manuals. The design report shall document the steps taken in the design analysis, clearly identifying the criteria, parameters, inputs, assumptions, sensitivities and limitations involved in the analysis. The design report shall clearly identify bounding conditions, assumptions and sensitivities that clarify the expected uses and limitations of the performance analysis. This report shall verify that the design approach is in compliance with the applicable codes and acceptable methods and shall be submitted for concurrence by the building official prior to the construction documents being completed. The report shall document the design features to be incorporated based on the analysis.
The design report shall address the following:
Project scope.
Goals and objectives.
Performance criteria.
Hazard scenarios.
Design fire loads and hazards.
Final design.
Evaluation.
APPENDIX O-2 2025 CALIFORNIA BUILDING CODE
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
APPENDIX O—PERFORMANCE-BASED APPLICATION
- Bounding conditions and critical design assumptions.
- Critical design features.
- System design and operational requirements.
- Operational and maintenance requirements.
- Commissioning testing requirements and acceptance criteria.
- Frequency of certificate renewal.
- Supporting documents and references.
- Preliminary site and floor plans.
O101.5.2 Design submittal. Applicable construction documents shall be submitted to the building official for review. The documents shall be submitted in accordance with the jurisdiction’s procedures and in sufficient detail to obtain appropriate permits.
O101.6 Review. Construction documents submitted in accordance with this code shall be reviewed for code compliance with the appropriate code provisions.
O101.6.1 Peer review. The owner or the owner’s authorized agent shall be responsible for retaining and furnishing the services of a registered design professional or recognized expert, who will perform as a peer reviewer, where required and approved by the building official.
CALGreen § 5.508.2 High relevance — show source text
000 square feet or more|5.508.2
through
5.508.2.6.3||||| |||END OF MANDATORY PROVISIONS||||||Documentation Author's / Responsible Designer's Declaration Statement
□ Mandatory: I attest that this mandatory provisions checklist is accurate and complete.Col2 Signature: Signature: Company: Date: Address: License: City/State/Zip: Phone: 2025 CALIFORNIA GREEN BUILDING STANDARDS CODE APPENDIX A5-47
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
APPENDIX A5 — NONRESIDENTIAL VOLUNTARY MEASURES
A5.602.1
CALGreen VERIFICATION GUIDELINES
TIER 1 CHECKLIST
Application: This checklist shall be used for nonresidential projects that meet the following: new construction, or building additions of 1,000 square feet or greater, or building alterations with a permit valuation of $200,000 or more pursuant to Section 301.3, AND are adopting Tier 1 voluntary measures.
Note: All applicable mandatory requirements in Chapter 5 shall be met prior to applying Tier 1 voluntary measures.
Instructions:
Comply with all Tier 1 prerequisite measures from the various categories shown on the table below.
Add a “ Y ” to all mandatory and Tier 1 prerequisite measures in the appropriate columns.
Select the required number of additional electives from those categories shown on the table below and add a “ Y ” on the selected elective and add an “ N ” on the rest.
Count the total number of Tier 1 prerequisite measures plus the additional electives and write down the total number at the end of the checklist. Determine if the required number of Tier 1 measures have been selected to achieve Tier 1 compliance.
Y = Yes (section has been selected and/or included) N = No (section has not been selected and/or included) O = Other (provide explanation)
[N] = New construction pursuant to Section 301.3
[A] = Additions and/or Alterations pursuant to Section 301.3
CHAPTER 5
DIVISIONSCol2 SECTION TITLE CODE
SECTIONY N O PLAN SHEET,
SPEC OR
ATTACHDIVISION 5.1
Planning and
Design
(continued)Mandatory Deconstruction and reuse of existing structures,
Scope with Exception5.105.1 DIVISION 5.1
Planning and
Design
(continued)Mandatory Reuse of existing building & Verification of compliance with note 5.105.2 and 5.105.2.1 DIVISION 5.1
Planning and
Design
(continued)Mandatory Storm water pollution prevention for projects that disturb
less than 1 acre of land5.106.1 through
5.106.2DIVISION 5.1
Planning and
Design
(continued)Mandatory Short-term bicycle parking 5.106.4.1. CALGreen § 2.3 High relevance — show source text
Landscape Irrigation Systems a. Provide narrative description of system—type, performance, water usage b. Describe reason for system selection—why chosen system is better than alternatives, issues such as performance, efficiency, reliability, flexibility, expandability, cost, owner preference, simplicity c. Sequence of Operation—operating schedules, setpoints d. Describe how system meets the OPR
- Water Reuse Systems a. Provide narrative description of system—type, performance, capacity, reuse purpose b. Describe reason for system selection—why chosen system is better than alternatives, issues such as performance, efficiency, reliability, flexibility, expandability, cost, owner preference, simplicity c. Sequence of Operation—operating schedules, setpoints d. Describe how system meets the OPR
2.3 Enforcement:
At their discretion, the building official confirms demonstrated compliance at Plan Intake by: a) Receipt of a copy of the BOD document, or b) Receipt of a form signed by the architect, engineer or designer of record, attesting that the BOD has been completed and meets the requirements of the OPR.
Reference: 3 Commissioning measures shown in the construction documents
CALGreen Section 5.410.2, Commissioning.
This section provides details for element 3: Commissioning measures shown in the construction documents.
3.1 Intent:
Include commissioning measures or requirements in the construction documents (plans and specifications). Commissioning measures or requirements should be clear, detailed and complete to clarify the commissioning process.
3.2 Compliance Method:
Compliance is achieved by including commissioning requirements in the project specifications. The commissioning specifications should include the following:
Primary (and optionally all) commissioning requirements are included in the general specification division (typically Division 1) and clear cross references of all commissioning requirements to and from the general division are included to ensure all subcontractors are held to them.
A list of the systems and assemblies covered by the commissioning requirements.
Roles and responsibilities of all parties, including: i. General contractor and subcontractors, vendors, construction manager ii. Commissioning provider lead
8-16 2025 CALIFORNIA GREEN BUILDING STANDARDS CODE
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
COMPLIANCE FORMS, WORKSHEETS AND REFERENCE MATERIAL
iii. Owner, facility staff iv. Architect and design engineers v. Include the noncontractor parties in the construction specifications (information used only to provide the contractor with context for their work).
vi. Include who writes checklists and tests, who reviews and approves test forms, who directs tests, who executes tests, who documents test results, and who approves completed tests. These roles may vary by system or assembly.
Meeting requirements
Commissioning schedule management procedures
Issue and noncompliance management procedures
Requirements for execution and documentation of installation, checkout and start up, including controls point-to-point checks and calibrations
Specific testing requirements by system, including: i. Monitoring and trending ii. Opposite season or deferred testing requirements, functions and modes to be tested
iii. Conditions of test
California Green Building Standards Code (CALGreen) High relevance — show source text
500
|25 500
| |125
|168
|352
|663
|1360
|2040
|3930
|6260
|11 100
|22 600
| |150
|153
|319
|601
|1230
|1850
|3560
|5670
|10 000
|20 500
| |175
|140
|293
|553
|1140
|1700
|3270
|5220
|9230
|18 800
| |200
|131
|273
|514
|1056
|1580
|3050
|4860
|8580
|17 500
| |250
|116
|242
|456
|936
|1400
|2700
|4300
|7610
|15 500
| |300
|105
|219
|413
|848
|1270
|2450
|3900
|6890
|14 100
| |350
|96
|202
|380
|780
|1170
|2250
|3590
|6340
|12 900
| |400
|90
|188
|353
|726
|1090
|2090
|3340
|5900
|12 000
| |450
|84
|176
|332
|681
|1020
|1960
|3130
|5540
|11 300
| |500
|80
|166
|313
|643
|964
|1860
|2960
|5230
|10 700
| |550
|76
|158
|297
|611
|915
|1760
|2810
|4970
|10 100
| |600
|72
|151
|284
|583
|873
|1680
|2680
|4740
|9660
| |650
|69
|144
|272
|558
|836
|1610
|2570
|4540
|9250
| |700
|66
|139
|261
|536
|803
|1550
|2470
|4360
|8890
| |750
|64
|134
|252
|516
|774
|1490
|2380
|4200
|8560
| |800
|62
|129<CALGreen § 102.1 High relevance — show source text
- The application checklist identifies which measures are required by this code and allows users to check off which voluntary items have been selected to meet voluntary tier levels if desired or mandated by a city, county, or city and county.
SECTION 102—CONSTRUCTION DOCUMENTS AND INSTALLATION VERIFICATION
102.1 Submittal documents. Construction documents and other data shall be submitted in one or more sets with each application for a permit. Where special conditions exist, the enforcing agency is authorized to require additional construction documents to be prepared by a licensed design professional and may be submitted separately.
Exception: The enforcing agency is authorized to waive the submission of construction documents and other data not required to be prepared by a licensed design professional.
102.2 Information on construction documents. Construction documents shall be of sufficient clarity to indicate the location, nature and scope of the proposed green building feature and show that it will conform to the provisions of this code, the California Building Standards Code and other relevant laws, ordinances, rules and regulations as determined by the enforcing agency.
102.3 Verification. Documentation of conformance for applicable green building measures shall be provided to the enforcing agency. Alternate methods of documentation shall be acceptable when the enforcing agency finds that the proposed alternate documentation is satisfactory to demonstrate substantial conformance with the intent of the proposed green building measure.
[HCD] Documentation of conformance for applicable green building measures shall be provided to the enforcing agency. All projects shall submit a completed Residential Occupancies Application Checklist that includes Chapter 4 residential mandatory measures and Tier 1 or Tier 2, as applicable. References to the measure-specific documentation used to show compliance shall be included. Alternate methods of documentation shall be acceptable when the enforcing agency finds that the proposed alternate documentation is satisfactory to demonstrate substantial conformance with the intent of the proposed green building measure.
Note: HCD’s Residential Occupancies Application Checklist that includes the minimum criteria for documentation is available at: http://www.hcd.ca.gov/building-standards/calgreen/cal-green-forms.shtml.
SECTION 103—BUILDING STANDARDS COMMISSION
103.1 BSC-CG. Specific scope of application of the agency responsible for enforcement, the enforcement agency, and the specific authority to adopt and enforce such provisions of this code, unless otherwise stated.
- Application— All occupancies where no state agency has the authority to adopt green building standards applicable to those occupancies. Enforcing agency— State or local agency specified by the applicable provisions of law. Authority cited— Health and Safety Code Sections 18930.5(a), 18938 and 18940.5. Reference— Health and Safety Code, Division 13, Part 2.5, commencing with Section 18901.
- Graywater systems. The construction, installation and alteration of graywater systems for indoor and outdoor uses in nonresidential occupancies. Application— All occupancies where no state agency has the authority to adopt green building standards applicable to those occupancies. Enforcing agency— State or local agency specified by the applicable provisions of law. Authority cited— Health and Safety Code Section 18941.8. Reference— Health and Safety Code Section 18941.8.
103.1.1 Adopting agency identification. The provisions of this code applicable to buildings identified in this section will be identified in the Matrix Adoption Tables under the acronym BSC-CG.
2025 CALIFORNIA GREEN BUILDING STANDARDS CODE 1-5
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
ADMINISTRATION
CALGreen § 303.3 High relevance — show source text
Additions and Alterations See Non-
residential Additions and Alterations Administration Chapter 1 Air Quality and Exhaust, Indoor – see Indoor Air Quality and Exhaust Appliances A4.303.3, A5.303.3, Appendix A6.1 (OSHPD) A5.207 Application Checklists A4.602, A5.602, Appendix A6.1 (OSHPD)
Bird Friendly Building Design A5.107 Building Envelope A4.204, Appendix A6.1 (OSHPD) A5.205 Building orientation Appendix A6.1(OSHPD), A5.204.6 Fenestration products and exterior doors Appendix A6.1(OSHPD), A5.205.1 Insulation and roofing products Appendix A6.1(OSHPD), A5.205.3 Life cycle assessment 5.409, A5.409 Building Maintenance and Operation 4.410, 5.410 Commissioning 5.410.2, A5.410.3 Sample compliance forms and templates Chapter 8 Operation and maintenance manual 4.410.1, 5.410.4.5 Recycling by occupants Appendix A6.1(OSHPD), A5.410, 5.410.1 Testing and adjusting 5.410.4
Commissioning Commissioning Appendix A6.1 (OSHPD) A5.204, 5.410.2 Commissioning plan 5.410.2.3 Commissioning report 5.410.2.6 Construction Waste Reduction, Disposal and Recycling Appendix A6.1 (OSHPD) A5.408, 4.408, 5.408 Construction waste management 4.408.1, 5.408.1 Construction waste management plan 4.408.2, 5.408.1.1 Enhanced construction waste reduction
A4.408.1, A5.408.3.1 Excavated soil and land clearing debris 5.408.3
Deconstruction and Reuse of Existing Materials 4.105, A4.105 Reuse of materials A4.105.2
Deconstruction and Reuse of Existing Structures 5.105, A5.105 (Reserved) 4.105 Reuse of existing building 5.105.2, Chapter 8 (WS-3), A5.105.2, Chapter 8 (WS-6) Definitions Chapter 2 Durability, Enhanced and Reduced Maintenance 4.406, A4.406, A5.406 Choice of materials A5.406.1
Electric Vehicle (EV) Charging 4.106.4, 5.106.5.3, 5.106.5.5, 5.106.5.6, A4.106.8,
A5.106.5.3
INDEX
CALGreen § 7-104 High relevance — show source text
- Section 7-104 in the California Administrative Code for the Office of the Statewide Health Planning and Development.
1-4 2025 CALIFORNIA GREEN BUILDING STANDARDS CODE
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
ADMINISTRATION
101.9 Effective date of this code. Only those standards approved by the California Building Standards Commission that are effective at the time an application for a building permit is submitted shall apply to the plans and specifications for, and to the construction performed under, that permit. For the effective dates of the provisions contained in this code, see the appropriate application checklist and the History Note page of this code.
101.10 Mandatory requirements. This code contains both mandatory and voluntary green building measures. Mandatory and voluntary measures are identified in the appropriate application checklist contained in this code.
101.11 Effective use of this code. The following steps shall be used to establish which provisions of this code are applicable to a specific occupancy:
- Establish the type of occupancy.
- Verify which state agency has authority for the established occupancy by reviewing the authorities list in Sections 103 through 106.
- Once the appropriate agency has been identified, find the chapter which covers the established occupancy.
- The Matrix Adoption Tables at the beginning of Chapters 4 and 5 identify the mandatory green building measures necessary to meet the minimum requirements of this code for the established occupancy.
- Voluntary tier measures are contained in Appendix Chapters A4 and A5. A checklist containing each green building measure, both required and voluntary, is provided at the end of each appendix chapter. Each measure listed in the application checklist has a section number which correlates to a section where more information about the specific measure is available.
- The application checklist identifies which measures are required by this code and allows users to check off which voluntary items have been selected to meet voluntary tier levels if desired or mandated by a city, county, or city and county.
SECTION 102—CONSTRUCTION DOCUMENTS AND INSTALLATION VERIFICATION
102.1 Submittal documents. Construction documents and other data shall be submitted in one or more sets with each application for a permit. Where special conditions exist, the enforcing agency is authorized to require additional construction documents to be prepared by a licensed design professional and may be submitted separately.
Exception: The enforcing agency is authorized to waive the submission of construction documents and other data not required to be prepared by a licensed design professional.
102.2 Information on construction documents. Construction documents shall be of sufficient clarity to indicate the location, nature and scope of the proposed green building feature and show that it will conform to the provisions of this code, the California Building Standards Code and other relevant laws, ordinances, rules and regulations as determined by the enforcing agency.
102.3 Verification. Documentation of conformance for applicable green building measures shall be provided to the enforcing agency. Alternate methods of documentation shall be acceptable when the enforcing agency finds that the proposed alternate documentation is satisfactory to demonstrate substantial conformance with the intent of the proposed green building measure.
[HCD] Documentation of conformance for applicable green building measures shall be provided to the enforcing agency. All projects shall submit a completed Residential Occupancies Application Checklist that includes Chapter 4 residential mandatory measures and Tier 1 or Tier 2, as applicable. References to the measure-specific documentation used to show compliance shall be included. Alternate methods of documentation shall be acceptable when the enforcing agency f
CALGreen § 504.8.3 High relevance — show source text
NONRESIDENTIAL OCCUPANCIES APPLICATION CHECKLIST [OSHPD 1, 2 and 4] — continued
FEATURE OR MEASURE COMPLIANCE LEVELS Col3 Col4 NOTES FEATURE OR MEASURE Mandatory
CALGreenVOLUNTARY
CALGreenVOLUNTARY
CALGreenVOLUNTARY
CALGreenFEATURE OR MEASURE Mandatory
CALGreenTier 1 Tier 2 Tier 2 **A6.504.8.3 Paints and coatings.**Architectural paints and coatings shall comply with Table
A6.504.8.3.
A6.504.8.3.2 Verification.
**A6.504.8.4 Carpet systems.**All carpet installed in the building interior shall meet the
testing and product requirements of one of the standards listed in Section A6.504.8.3.
**A6.504.8.4.1 Carpet cushion.**All carpet cushion installed in the building interior shall
meet the requirements of the Carpet and Rug Institute Green Label program.
**A6.504.8.4.2 Carpet adhesive.**All carpet adhesive shall meet the requirements of Table
A6.504.8.1.
**A6.504.8.5 Composite wood products.**Hardwood plywood, particleboard and medium
density fiberboard composite wood products used on the interior or exterior of the building
shall meet the requirements for formaldehyde as specified in Table A6.504.8.
**A6.504.8.5.2 Documentation.**Verification of compliance with this section shall be
provided as requested by the enforcing agency. Documentation shall include at least one
of the following.
1. Product certifications and specifications
2. Chain of custody certifications
3. Other methods acceptable to the enforcing agency
**A6.504.4.9 Acoustical ceilings and wall panels.**Comply with Chapter 8 in Title 24, Part 2
and with the VOC-emission limits defined in the CHPS Low-emitting Materials List. **A6.504.5 Hazardous particulates and chemical pollutants.**Minimize and control pollutant
entry into buildings and cross-contamination of regularly occupied areas.
**A6.504.5.1 Entryway systems.**Install permanent entryway systems measuring at least six
feet in the primary direction of travel to capture dirt and particulates at entryways directly
connected to the outdoors as listed in Items 1 through 3 in Section A6.504.5.1.
**A6.504.9 Environmental tobacco smoke (ETS) control.
Frequently asked questions
What must be included with a permit application to satisfy CALGreen submittal requirements?
Construction documents and other supporting data that clearly indicate the location, nature and scope of the proposed green building features must be submitted; the enforcing agency may require additional documents prepared by licensed professionals where special conditions exist. See §102.1 and §102.2 for the submittal standards.
How does CALGreen require verification at plan intake and during construction?
Documentation of conformance for applicable measures must be provided to the enforcing agency at plan intake, and alternate documentation may be accepted at the agency’s discretion; inspection and inspection reports (including those referenced in Chapters 7 and related sections) are used during construction and at completion to demonstrate substantial conformance.
Where do I find the checklists and sample forms to organize submittals and inspections?
Appendix application checklists (A4/A5 and their Tier checklists such as A5.602 et seq.) list mandatory and voluntary measures with places to reference plan sheets/specs, and Chapter 8 and the appendices contain sample compliance forms, templates and verification worksheets you can use or adapt.
More in California Green Building Standards Code (CALGreen)
- Administration (Chapter 1)
- Nonresidential Voluntary Measures (Appendix A5 — divisions A5.1–A5.6, electives & verification)
- Residential Mandatory Measures — Planning & Design; Energy; Water; Materials; Environmental Quality (Chapter 4)
- Definitions (Chapter 2)
- Voluntary Standards for Health Facilities (Appendix A6 / OSHPD guidance)
- Green Building – scope, mixed occupancies, phased projects (Chapter 3)
- Residential Voluntary Measures (Appendix A4 — divisions A4.1–A4.6, tiers & model ordinance)
- Nonresidential Mandatory Measures — Planning & Design; Energy; Water; Materials; Environmental Quality (Chapter 5)
- Compliance verification, construction documents & checklists (Section 102, Chapter 7, Appendix checklists)
- Referenced Organizations and Standards (Chapter 6)
- Voluntary Tiers and CALGreen Tier 1 / Tier 2 (performance tiers, thresholds)
- Installer and Special Inspector Qualifications (Chapter 7)
Ask about the CALGreen
Get cited, plain-English answers on the California Green Building Standards Code (CALGreen) for your project — any code section, any scenario.
Start Free TrialRelated in the CALGreen
Administration (Chapter 1)
Definitions (Chapter 2)
Green Building – scope, mixed occupancies, phased projects (Chapter 3)
Nonresidential Mandatory Measures — Planning & Design; Energy; Water; Materials; Environmental Quality (Chapter 5)
Residential Mandatory Measures — Planning & Design; Energy; Water; Materials; Environmental Quality (Chapter 4)
Voluntary Tiers and CALGreen Tier 1 / Tier 2 (performance tiers, thresholds)
Residential Voluntary Measures (Appendix A4 — divisions A4.1–A4.6, tiers & model ordinance)
Nonresidential Voluntary Measures (Appendix A5 — divisions A5.1–A5.6, electives & verification)
California Green Building Standards Code (CALGreen)