Chapter 17 — GEOTHERMAL ENERGY SYSTEMS AND AMBIENT TEMPERATURE LOOPS
1716.1 General.
California Mechanical Code (Title 24, Part 4) · 2025 edition · updated 2026-09-10 · California
Italicized text is a California amendment to the model code, as printed in the official publication.
An Ambient Temperature Loop (ATL) distributed energy system shall be installed in accordance with Section 1716.1.1 through Section 1716.6.3 and Section 1717.0. ATL systems shall comply with Part I through Part IV of this chapter, as applicable.
1716.1.1 Fourth Generation (4G) System Config- uration. A fourth-generation system configuration shall be a district geothermal energy system distributing hot water, cold water, or both to the conditioned space or building for a specific use. Where a geothermal energy source is used, such system shall comply with Part I through Part IV of this chapter, Chapter 11, and Chapter 12.
1716.1.2 Fifth Generation (5G) System Configu- rations. An advanced Ambient Temperature Loop (ATL) System or fifth generation (5G) ATL system shall also be capable of interacting with the electric utility system as well as other utility systems and systems compo nents.
The system components shall include, but not limited to, the following:
(1) Thermally diverse buildings with independent hydronic systems
«
«
«
«
GEOTHERMAL ENERGY SYSTEMS AND AMBIENT TEMPERATURE LOOPS
(2) Circulation loop
(3) Global control system
(4) Segment isolation capability
The system components may include, but not limited to, the following:
(1) Electric grid-interactive enabled buildings
(2) Hybrid components
(3) Other renewable systems
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — California Mechanical Code (Title 24, Part 4)
- Chapter 1 — GENERAL CODE PROVISIONS
- Chapter 2 — DEFINITIONS
- Chapter 3 — GENERAL REGULATIONS
- Chapter 4 — VENTILATION AIR
- Chapter 5 — EXHAUST SYSTEMS
- Chapter 6 — DUCT SYSTEMS
- Chapter 7 — COMBUSTION AIR
- Chapter 8 — CHIMNEYS AND VENTS
- Chapter 9 — INSTALLATION OF SPECIFIC APPLIANCES
- Chapter 10 — BOILERS AND PRESSURE VESSELS
- Chapter 11 — REFRIGERATION
- Chapter 12 — HYDRONICS
- Chapter 13 — FUEL GAS PIPING
- Chapter 14 — PROCESS PIPING
- Chapter 15 — SOLAR ENERGY SYSTEMS
- Chapter 16 — STATIONARY POWER PLANTS
▸Chapter 17 — GEOTHERMAL ENERGY SYSTEMS AND AMBIENT TEMPERATURE…
Overview- 1701.1 Applicability. Part I of this chapter shall apply to
- 1701.2 Construction Documents. The construction doc
- 1701.3 Site Survey. A site survey shall be conducted prior
- 1701.4 Used Materials. The installation of used pipe, fittings…
- 1701.5 Contact with Building Material. A ground source
- 1701.6 Strains and Stresses. Piping shall be installed so
- 1701.7 Flood Hazard. Piping located in a flood hazard area
- 1701.8 Pipe Support. Pipe shall be supported in accordance wit…
- 1701.9 Velocities. Ground source heat pump ground-loop
- 1701.10 Chemical Compatibility. Antifreeze and other
- 1701.11 Heat Transfer Fluid. The heat transfer fluid shall
- 1702.1 General. The potable water supply connected to a
- 1703.3 Fittings. For water-based systems, fittings for
- 1703.4 Underground Piping and Submerged Materi-
- 1703.1 Ground-Heat Exchanger Design. The groundheat exchanger …
- 1703.2 Piping and Tubing Materials Standards. For
- 1703.5 Indoor Piping. Indoor piping, fittings, and accessories…
- 1704.1 Heat Pump Distribution System. The heat pump
- 1704.2 Circulating Pumps. The circulating pump shall be
- 1705.1 Where Required. Shutoff valves shall be installed
- 1705.2 Heat Exchangers. Shutoff valves shall be installed
- 1705.3 Central Systems. Shutoff valves shall be installed
- 1705.4 Pressure Vessels. Shutoff valves shall be installed
- 1705.5 Pressure-Reducing Valves. Shutoff valves shall
- 1705.6 Equipment and Appliances. Shutoff valves shall
- 1705.7 Expansion Tanks. Shutoff valves shall be installed
- 1705.8 Reduced Pressure. A pressure relief valve shall
- 1706.1 General. Heat pumps shall be in compliance with
- 1706.2 Heat Exchangers. Heat exchangers used for heat
- 1706.3 Heat-Transfer Medium. The heat-transfer medium
- 1706.4 Insulation. The temperature of surfaces within
- 1707.1 Prior to Construction. Documents for permits
- 1707.2 Equipment, Accessories, Components, and
- 1707.3 Construction Documents. The construction documents for …
- 1707.4 Site Survey Requirements. The site survey shall
- 1707.5 Subsurface Investigation. A subsurface investigation sh…
- 1707.6 Subsurface Conditions. The water well logs and
- 1707.7 Ground-Heat Exchanger Installation Prac-
- 1707.13 Steel Nail Plates. Steel nail plates shall be
- 1707.14 Exterior Piping Protection. Exterior piping shall
- 1707.15 Heat Pump and Distribution System Instal-
- 1707.16 Pressurizing During Installation. Ground
- 1707.17 Horizontal Geothermal Piping - Materials
- 1707.18 Trenches, Excavation, and Backfill. Excavation
- 1707.8 Trenching, Excavation, and Backfill. Prior to
- 1707.9 Trenches, Tunneling, and Driving. Trenches shall
- 1707.10 Excavations and Open Trenches. Excavations
- 1707.11 Protection of Piping, Materials, and Struc-
- 1707.12 Sleeves. In exterior walls, annular space between
- 1708.1 General. The following requirements shall be verified p…
- 1708.2 Operation and Maintenance Manual. An operation and main…
- 1708.3 Labeling and Marking. Ground source heat pump
- 1708.4 Documentation. The ground source heat pump system as-bu…
- 1708.5 Maintenance. The periodic maintenance required,
- 1708.6 Records. The ground source heat pump system constructio…
- 1708.7 System Start-Up. System start-up shall be in accordance…
- 1708.8 Contaminants. Particulate contaminants shall be
- 1709.1 General. Decommissioning of geothermal systems
- 1710.1 Applicability. Part II of this chapter shall apply to
- 1710.2 Piping and Tubing. Piping and tubing for closedloop sys…
- 1710.3 Borehole Piping and Tubing. Borehole piping or
- 1710.4 Underground Fittings. Underground fittings for
- 1710.5 Verification. For closed-loop systems, the system
- 1710.6 Vertical Bores. Vertical bores shall be drilled to a
- 1711.1 Testing. Pressure-testing of the ground-heat
- 1711.2 Individual Loop Pressure Testing. Individual
- 1711.3 Field Pressure Testing – Final. The ground-heat
- 1711.4 Field Flow Testing – Final. Final field flow testing
- 1712.1 Applicability. Part III of this chapter shall apply to
- 1712.2 Test Wells. Test wells drilled to investigate subsurfac…
- 1712.3 Installation of Water Wells. Water supply,
- 1712.4 Setbacks. Open-loop ground-heat exchangers shall
- 1713.1 General. The installation and use of water wells
- 1713.2 Open-Loop Water Well Drilling Logs. The water
- 1713.3 Design Considerations. A groundwater heat
- 1713.4 Water Wells and Injection Wells. Water wells
- 1713.5 Testing and Sampling. Pumping tests and water
- 1713.6 Disinfection. Water wells shall be disinfected upon
- 1714.1 Pumping Test. Water supply wells and injection
- 1714.2 Retesting. Where sediment is present, the problem
- 1714.3 Variable Rate Pump Test. The operating conditions of th…
- 1714.4 Constant Rate Pump Test. The sustainable well
- 1714.5 Water Level Monitoring. Water levels shall be
- 1714.6 Injection Wells. Injection testing shall be performed
- 1714.7 Re-Injected Water. The water quality of re-injected
- 1715.1 General. The installation and use of Direct
- 1715.2 Applicability. Part IV of this chapter shall apply to
- 1715.3 DX Systems. Copper pipe and tubing installed for
- 1715.4 DX System Testing. For direct exchange (DX) systems, ea…
- 1715.5 Indoor Piping. For DX systems, joints shall be
- 1715.6 On Site Storage. For DX systems, copper piping
- 1715.7 System Start-Up. DX system start-up shall be in
- 1715.8 DX Piping. DX Piping should be installed in accordance …
- 1716.1 General. An Ambient Temperature Loop (ATL) distributed …
- 1716.2 Permitting. Permits required for the installation and
- 1716.3 Ambient Loop Temperature Range. The operating loop temp…
- 1716.4 Shutoff Valve. An automatic shutoff valve shall be
- 1716.5 Bypass. The ATL distributed energy system shall
- 1716.6 Metering. Where meters are required by the system
- 1717.1 Thermal Resources. The ambient temperature loop
- 1717.2 District Load Profiles. The district load profile of
- Chapter 18 — REFERENCED STANDARDS
- Appendix A — RESIDENTIAL PLAN EXAMINER REVIEW FORM FOR HVAC SY…
- Appendix B — PROCEDURES TO BE FOLLOWED TO PLACE GAS EQUIPMENT …
- Appendix C — INSTALLATION AND TESTING OF OIL (LIQUID) FUEL-FIR…
- Appendix D — FUEL SUPPLY: MANUFACTURED/MOBILE HOME PARKS AND R…
- Appendix E — SUSTAINABLE PRACTICES
- Appendix F — SIZING OF VENTING SYSTEMS AND OUTDOOR COMBUSTION …
- Appendix G — EXAMPLE CALCULATION OF OUTDOOR AIR RATE
- Appendix H — PROFESSIONAL QUALIFICATIONS
- Appendix I — INDOOR HORTICULTURAL FACILITIES
- Appendix J — CLEAN AIR DELIVERY