1710.6 Vertical Bores. Vertical bores shall be drilled to a

California Mechanical Code (Title 24, Part 4) · 2025 edition · updated 2026-09-10 · California

Italicized text is a California amendment to the model code, as printed in the official publication.

depth to provide complete insertion of the u-bend pipe to its specified depth. The borehole diameter shall be sized for the installation and placement of the heat exchange u-bend and the tremie used to place the grouting material. ANSI/ CSA/IGSHPA C448 shall be used for vertical loop depth and borehole diameter sizing guidance. The u-bend joint and pipe shall be visually inspected for integrity in accordance with the manufacturer’s installation instructions. The u-bend joint and pipe shall be pressurized to not less than 100 psi (689 kPa), not to exceed the pressure rating of the pipe at the test temperature, for 1 hour to check for leaks before insertion into the borehole.

1710.6.1 Backfill. Bentonite grout and thermallyenhanced bentonite grout, where used to seal and backfill each borehole, shall comply with NSF/ANSI/CAN 60. Boreholes shall be backfilled in accordance with the Authority Having Jurisdiction.

1710.6.2 U-Bends and Headers. Headers, u-bends and ground loop pipes shall be pressure-tested in accordance with ANSI/ CSA/IGSHPA C448, or as required by the Authority Having Jurisdiction. Before testing, heat fusion joints shall be cooled to ambient temperature. Mechanical joints shall be completely assembled. Flushing and purging to remove air and debris shall be completed before testing. The assembly shall be filled with water (or water/antifreeze solution) and purged at a minimum flow rate of 2 feet per second (0.6 m/s) to remove air, but not more than the maximum flow velocity recommended by the pipe and fittings manufacturer to remove debris.

1710.6.2.1 Test Pressure. The maximum test pressure shall be 1.5 times the system design pressure, as determined by Section 1710.6.2.3, or Section 1710.6.2.4, not to exceed 100 psi (689 kPa). Components or devices with lower pressure-ratings than the pipe shall be protected from excessive pressure during testing by removing or isolating from the test section.

Exception: Where lower pressure-rated components or devices cannot be removed or isolated from the test section, the maximum test pressure shall not exceed the pressure rating of the component or device.

1710.6.2.2 Testing Procedure. The test section and the test liquid shall be at the same temperature. The test section shall be filled with liquid and purged of air. The test section shall be brought to the specified test pressure. Test pressure shall be maintained for 4 hours, with additional fluid added as needed. The test pressure shall be reduced by 10 psi (69 kPa) and monitored for 1 hour with no addition of pres

sure or additional fluid. A passing test is indicated where after a period of 1 hour no visual leakage is observed, and pressure remains equal to or greater than 95 percent of the original pressure.

1710.6.2.3 Calculation of Static Pressure (Water). For water, the static pressure applied shall be equivalent to 0.43 psig (2.96 kPa) per foot (305 mm) of elevation.

1710.6.2.4 Calculation of Static Pressure (Other Fluids). For fluids of different density, the static pressure shall be calculated using the density of the system fluid.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — California Mechanical Code (Title 24, Part 4)
California Mechanical Code (Title 24, Part 4)
  1. Chapter 1 — GENERAL CODE PROVISIONS
  2. Chapter 2 — DEFINITIONS
  3. Chapter 3 — GENERAL REGULATIONS
  4. Chapter 4 — VENTILATION AIR
  5. Chapter 5 — EXHAUST SYSTEMS
  6. Chapter 6 — DUCT SYSTEMS
  7. Chapter 7 — COMBUSTION AIR
  8. Chapter 8 — CHIMNEYS AND VENTS
  9. Chapter 9 — INSTALLATION OF SPECIFIC APPLIANCES
  10. Chapter 10 — BOILERS AND PRESSURE VESSELS
  11. Chapter 11 — REFRIGERATION
  12. Chapter 12 — HYDRONICS
  13. Chapter 13 — FUEL GAS PIPING
  14. Chapter 14 — PROCESS PIPING
  15. Chapter 15 — SOLAR ENERGY SYSTEMS
  16. Chapter 16 — STATIONARY POWER PLANTS
  17. Chapter 17 — GEOTHERMAL ENERGY SYSTEMS AND AMBIENT TEMPERATURE…
    Overview
    1. 1701.1 Applicability. Part I of this chapter shall apply to
    2. 1701.2 Construction Documents. The construction doc
    3. 1701.3 Site Survey. A site survey shall be conducted prior
    4. 1701.4 Used Materials. The installation of used pipe, fittings…
    5. 1701.5 Contact with Building Material. A ground source
    6. 1701.6 Strains and Stresses. Piping shall be installed so
    7. 1701.7 Flood Hazard. Piping located in a flood hazard area
    8. 1701.8 Pipe Support. Pipe shall be supported in accordance wit…
    9. 1701.9 Velocities. Ground source heat pump ground-loop
    10. 1701.10 Chemical Compatibility. Antifreeze and other
    11. 1701.11 Heat Transfer Fluid. The heat transfer fluid shall
    12. 1702.1 General. The potable water supply connected to a
    13. 1703.3 Fittings. For water-based systems, fittings for
    14. 1703.4 Underground Piping and Submerged Materi-
    15. 1703.1 Ground-Heat Exchanger Design. The groundheat exchanger …
    16. 1703.2 Piping and Tubing Materials Standards. For
    17. 1703.5 Indoor Piping. Indoor piping, fittings, and accessories…
    18. 1704.1 Heat Pump Distribution System. The heat pump
    19. 1704.2 Circulating Pumps. The circulating pump shall be
    20. 1705.1 Where Required. Shutoff valves shall be installed
    21. 1705.2 Heat Exchangers. Shutoff valves shall be installed
    22. 1705.3 Central Systems. Shutoff valves shall be installed
    23. 1705.4 Pressure Vessels. Shutoff valves shall be installed
    24. 1705.5 Pressure-Reducing Valves. Shutoff valves shall
    25. 1705.6 Equipment and Appliances. Shutoff valves shall
    26. 1705.7 Expansion Tanks. Shutoff valves shall be installed
    27. 1705.8 Reduced Pressure. A pressure relief valve shall
    28. 1706.1 General. Heat pumps shall be in compliance with
    29. 1706.2 Heat Exchangers. Heat exchangers used for heat
    30. 1706.3 Heat-Transfer Medium. The heat-transfer medium
    31. 1706.4 Insulation. The temperature of surfaces within
    32. 1707.1 Prior to Construction. Documents for permits
    33. 1707.2 Equipment, Accessories, Components, and
    34. 1707.3 Construction Documents. The construction documents for …
    35. 1707.4 Site Survey Requirements. The site survey shall
    36. 1707.5 Subsurface Investigation. A subsurface investigation sh…
    37. 1707.6 Subsurface Conditions. The water well logs and
    38. 1707.7 Ground-Heat Exchanger Installation Prac-
    39. 1707.13 Steel Nail Plates. Steel nail plates shall be
    40. 1707.14 Exterior Piping Protection. Exterior piping shall
    41. 1707.15 Heat Pump and Distribution System Instal-
    42. 1707.16 Pressurizing During Installation. Ground
    43. 1707.17 Horizontal Geothermal Piping - Materials
    44. 1707.18 Trenches, Excavation, and Backfill. Excavation
    45. 1707.8 Trenching, Excavation, and Backfill. Prior to
    46. 1707.9 Trenches, Tunneling, and Driving. Trenches shall
    47. 1707.10 Excavations and Open Trenches. Excavations
    48. 1707.11 Protection of Piping, Materials, and Struc-
    49. 1707.12 Sleeves. In exterior walls, annular space between
    50. 1708.1 General. The following requirements shall be verified p…
    51. 1708.2 Operation and Maintenance Manual. An operation and main…
    52. 1708.3 Labeling and Marking. Ground source heat pump
    53. 1708.4 Documentation. The ground source heat pump system as-bu…
    54. 1708.5 Maintenance. The periodic maintenance required,
    55. 1708.6 Records. The ground source heat pump system constructio…
    56. 1708.7 System Start-Up. System start-up shall be in accordance…
    57. 1708.8 Contaminants. Particulate contaminants shall be
    58. 1709.1 General. Decommissioning of geothermal systems
    59. 1710.1 Applicability. Part II of this chapter shall apply to
    60. 1710.2 Piping and Tubing. Piping and tubing for closedloop sys…
    61. 1710.3 Borehole Piping and Tubing. Borehole piping or
    62. 1710.4 Underground Fittings. Underground fittings for
    63. 1710.5 Verification. For closed-loop systems, the system
    64. 1710.6 Vertical Bores. Vertical bores shall be drilled to a
    65. 1711.1 Testing. Pressure-testing of the ground-heat
    66. 1711.2 Individual Loop Pressure Testing. Individual
    67. 1711.3 Field Pressure Testing – Final. The ground-heat
    68. 1711.4 Field Flow Testing – Final. Final field flow testing
    69. 1712.1 Applicability. Part III of this chapter shall apply to
    70. 1712.2 Test Wells. Test wells drilled to investigate subsurfac…
    71. 1712.3 Installation of Water Wells. Water supply,
    72. 1712.4 Setbacks. Open-loop ground-heat exchangers shall
    73. 1713.1 General. The installation and use of water wells
    74. 1713.2 Open-Loop Water Well Drilling Logs. The water
    75. 1713.3 Design Considerations. A groundwater heat
    76. 1713.4 Water Wells and Injection Wells. Water wells
    77. 1713.5 Testing and Sampling. Pumping tests and water
    78. 1713.6 Disinfection. Water wells shall be disinfected upon
    79. 1714.1 Pumping Test. Water supply wells and injection
    80. 1714.2 Retesting. Where sediment is present, the problem
    81. 1714.3 Variable Rate Pump Test. The operating conditions of th…
    82. 1714.4 Constant Rate Pump Test. The sustainable well
    83. 1714.5 Water Level Monitoring. Water levels shall be
    84. 1714.6 Injection Wells. Injection testing shall be performed
    85. 1714.7 Re-Injected Water. The water quality of re-injected
    86. 1715.1 General. The installation and use of Direct
    87. 1715.2 Applicability. Part IV of this chapter shall apply to
    88. 1715.3 DX Systems. Copper pipe and tubing installed for
    89. 1715.4 DX System Testing. For direct exchange (DX) systems, ea…
    90. 1715.5 Indoor Piping. For DX systems, joints shall be
    91. 1715.6 On Site Storage. For DX systems, copper piping
    92. 1715.7 System Start-Up. DX system start-up shall be in
    93. 1715.8 DX Piping. DX Piping should be installed in accordance …
    94. 1716.1 General. An Ambient Temperature Loop (ATL) distributed …
    95. 1716.2 Permitting. Permits required for the installation and
    96. 1716.3 Ambient Loop Temperature Range. The operating loop temp…
    97. 1716.4 Shutoff Valve. An automatic shutoff valve shall be
    98. 1716.5 Bypass. The ATL distributed energy system shall
    99. 1716.6 Metering. Where meters are required by the system
    100. 1717.1 Thermal Resources. The ambient temperature loop
    101. 1717.2 District Load Profiles. The district load profile of
  18. Chapter 18 — REFERENCED STANDARDS
  19. Appendix A — RESIDENTIAL PLAN EXAMINER REVIEW FORM FOR HVAC SY…
  20. Appendix B — PROCEDURES TO BE FOLLOWED TO PLACE GAS EQUIPMENT …
  21. Appendix C — INSTALLATION AND TESTING OF OIL (LIQUID) FUEL-FIR…
  22. Appendix D — FUEL SUPPLY: MANUFACTURED/MOBILE HOME PARKS AND R…
  23. Appendix E — SUSTAINABLE PRACTICES
  24. Appendix F — SIZING OF VENTING SYSTEMS AND OUTDOOR COMBUSTION …
  25. Appendix G — EXAMPLE CALCULATION OF OUTDOOR AIR RATE
  26. Appendix H — PROFESSIONAL QUALIFICATIONS
  27. Appendix I — INDOOR HORTICULTURAL FACILITIES
  28. Appendix J — CLEAN AIR DELIVERY

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.