Part 20 — REASONABLE ACCOMMODATION›Chapter 156 — SMALL RESIDENTIAL SOLAR ENERGY SYSTEM PERMITS
§ 156.07 EXPEDITED PERMIT REVIEW AND INSPECTION REQUIREMENTS.
Baldwin Park Zoning Code · 2026-06 edition · updated 2026-09-09 · Baldwin Park
(A) The Building Department shall adopt an administrative, nondiscretionary review process to expedite the approval of small residential rooftop solar energy system applications within 30 days of adoption of this chapter. For an application for a small residential rooftop solar energy system that meets the requirements of the approved checklist and standard plan, the Building Department shall issue a building permit or other non-discretionary permit in a timely manner and no later than five working days from the day of submittal. A Building Official may require an applicant to apply for a use permit if the Official finds, based on substantial evidence, that the solar energy system could have a specific, adverse impact upon the public health and safety. Such decisions may be appealed pursuant to the procedures outlined in § 150.011 of this Code.
(B) Review of the application shall be limited to the Building Official's review of whether the applicant meets local, state and federal health and safety requirements.
(C) If a use permit is required, a Building Official may deny an application for the use permit if the official makes written findings based upon substantive evidence in the record that the proposed installation would have a specific, adverse impact upon public health or safety and there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. Such findings shall include the basis for the rejection of the potential feasible alternative for preventing the adverse impact. Such decisions may be appealed pursuant to procedures outlined in § 150.011 of this Code.
(D) Any condition imposed on an application shall be designed to mitigate the specific, adverse impact upon health and safety at the lowest possible cost. The city shall use its best efforts to ensure that the selected method, condition,
or mitigation meets the conditions of Cal. Civil Code § 714(d)(l)(A)-(B).
(E) The City shall not condition the approval of an application on the approval of an association as defined in Cal. Civil Code § 4080.
(F) If an application for a small residential rooftop solar energy system is deemed incomplete, a written correction notice detailing all deficiencies in the application and any additional information or documentation required to be eligible for expedited permitting shall be sent to the applicant for resubmission.
(G) Only one inspection shall be required and performed by the Building Department for small residential rooftop solar energy systems eligible for expedited review.
(H) The inspection shall be done in a timely manner and should include consolidated inspections. An inspection will be scheduled within two business days of a request and will provide the applicant with a two-hour inspection window.
(I) If the small residential rooftop solar energy system fails inspection, subsequent inspection(s) is/are authorized and re-inspection fees may be assessed if the installation repeatedly fails to meet the safety standards of the Building and Electrical Codes or if access to the work site is limited or restricted repeatedly.
(Ord. 1380, passed 9-16-15)
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — Baldwin Park Zoning Code
- Chapter 10 — GENERAL PROVISIONS
- Chapter 15 — ADMINISTRATIVE ENFORCEMENT OF CODE VIOLATIONS
- Chapter 30 — CITY COUNCIL
- Chapter 31 — CITY OFFICIALS AND EMPLOYEES
- Chapter 32 — COMMISSIONS, AGENCIES AND AUTHORITIES
- Chapter 33 — PERSONNEL SYSTEM
- Chapter 34 — FINANCE; PURCHASING
- Chapter 35 — TAXATION
- Chapter 36 — EMERGENCY ORGANIZATIONS
- Chapter 37 — PROPERTY
- Chapter 39 — DECORUM AT COUNCIL MEETINGS
- Chapter 40 — CAMPAIGN CONTRIBUTION LIMITS AND PENALTIES
- Chapter 50 — SOLID WASTE MANAGEMENT
- Chapter 51 — SEWERS
- Chapter 52 — STORM WATER AND URBAN RUNOFF POLLUTION PREVENTION
- Chapter 53 — CONSTRUCTION AND DEMOLITION MATERIALS MANAGEMENT
- Chapter 70 — GENERAL PROVISIONS
- Chapter 71 — TRAFFIC REGULATIONS
- Chapter 72 — STOPPING, STANDING AND PARKING
- Chapter 74 — PARKING SCHEDULES
- Chapter 90 — ABANDONED VEHICLES
- Chapter 91 — ALARM SYSTEMS
- Chapter 92 — ANIMAL CONTROL
- Chapter 93 — FIRE PREVENTION; FIREWORKS
- Chapter 94.5 — SMOKEFREE MULTI-FAMILY HOUSING
- Chapter 95.5 — SEIZURE AND FORFEITURE OF VEHICLES
- Chapter 96 — PUBLIC PARKS
- Chapter 97 — STREETS, SIDEWALKS AND PUBLIC PLACES
- Part 1 — GENERAL PROVISIONS
- Part 2 — UNDERGROUND UTILITY DISTRICTS
- Part 1 — ADMINISTRATIVE PROVISIONS
- Part 2 — DEFINITIONS
- Part 3 — ORGANIZATION AND ENFORCEMENT
- Part 4 — EXISTING BUILDINGS AND BUILDING SERVICE EQUIPMENT
- Part 5 — PERMITS
- Part 6 — APPLICATION REQUIREMENTS
- Part 7 — PERMIT ISSUANCE
- Part 8 — FEES
- Part 9 — INSPECTIONS
- Part 10 — CERTIFICATE OF OCCUPANCY
- Part 11 — ADOPTION AND AMENDMENT OF THE CALIFORNIA BUILDING CO…
- Part 12 — ADOPTION AND AMENDMENTS OF THE
- Part 13 — ADOPTION OF THE CALIFORNIA MECHANICAL CODE
- Part 14 — ADOPTION OF THE CALIFORNIA PLUMBING CODE
- Part 15 — ADOPTION OF THE CALIFORNIA ENERGY CODE
- Part 16 — ADOPTION OF THE CALIFORNIA WILDLAND-UBRAN INTERFACE …
- Part 17 — ADOPTION OF THE CALIFORNIA HISTORICAL BUILDING CODE
- Part 18 — ADOPTION OF THE CALIFORNIA EXISTING BUILDING CODE
- Part 19 — ADOPTION OF THE CALIFORNIA REFERENCED STANDARDS CODE
- Part 20 — ADOPTION OF THE CALIFORNIA FIRE CODE WITH LOS ANGELE…
- Part 1 — PERMITTED USES AND DEVELOPMENT STANDARDS
- Part 2 — SMALL-LOT SINGLE-FAMILY DEVELOPMENTS
- Part 3 — HOUSING INCENTIVES
- Part 4 — MOBILE HOME PARKS
- Part 5 — URBAN DEVELOPMENT UNITS AND URBAN LOT SPLITS
- Part 1 — ADULT-ORIENTED BUSINESSES
- Part 2 — ALCOHOL SALES
- Part 3 — GAME ARCADES AND INTERNET CAFES
- Part 4 — ANIMAL KEEPING
- Part 5 — BILLIARD AND POOL HALLS
- Part 6 — CHILD DAY CARE FACILITIES AND LARGE-FAMILY DAY CARE H…
- Part 7 — DRIVE-THROUGH ESTABLISHMENTS
- Part 8 — HOME OCCUPATIONS
- Part 9 — HOTELS AND MOTELS
- Part 10 — CANNABIS RETAILERS
- Part 11 — ACCESSORY DWELLING UNITS AND JUNIOR ACCESSORY DWELLI…
- Part 12 — SERVICE STATIONS
- Part 13 — SOLAR PANELS
- Part 14 — VEHICLE STORAGE
- Part 15 — PUBLIC TELEPHONES
- Part 16 — EMERGENCY SHELTERS
- Part 17 — MASSAGE ESTABLISHMENTS AND SERVICES
- Part 18 — MEDICAL AND ADULT CANNABIS CULTIVATION, MANUFACTURIN…
- Part 1 — GENERAL PROVISIONS
- Part 2 — DESIGN REVIEW
- Part 3 — ZONING CLEARANCE
- Part 4 — SIGN PERMIT
- Part 5 — TEMPORARY USE PERMIT
- Part 6 — ZONING CODE INTERPRETATION
- Part 7 — ADMINISTRATIVE ADJUSTMENT
- Part 8 — VARIANCE
- Part 9 — CONDITIONAL USE PERMIT
- Part 10 — HISTORIC DESIGNATION
- Part 11 — HISTORIC STRUCTURE WORK PERMIT
- Part 12 — HISTORIC STRUCTURE DEMOLITION PERMIT
- Part 13 — WIRELESS FACILITY ENCROACHMENT PERMIT
- Part 14 — SPECIFIC PLAN
- Part 15 — ZONING CODE TEXT AND ZONING MAP AMENDMENTS
- Part 16 — GENERAL PLAN TEXT AND MAP AMENDMENTS
- Part 17 — DEVELOPMENT AGREEMENT
- Part 18 — DOWNTOWN OVERLAY
- Part 19 — DEVELOPMENT PLAN (PLANNED DEVELOPMENT OVERLAY)
▸Part 20 — REASONABLE ACCOMMODATION
Overview- 153.220 DEFINITIONS
- Chapter 154 — DEVELOPMENT FEES
- Chapter 155 — FLOODPLAIN MANAGEMENT
▸Chapter 156 — SMALL RESIDENTIAL SOLAR ENERGY SYSTEM PERMITS
- Chapter 157 — PERMIT PROCESS FOR ELECTRIC VEHICLE CHARGING STA…