Skip to content

Part 2 — DESIGN REVIEW

Baldwin Park Zoning Code · 2026-06 edition · updated 2026-07-06 · Baldwin Park

§ 153.210.160 INTENT AND PURPOSE.

The design review process is established to improve the general standards and orderly development of the city through review of the design, layout and other features of proposed developments and their environs prior to submission of plans to the Building Division for plan check. The Baldwin Park Design Guidelines Manual establishes standards and policies that will promote and enhance good design, site relationships and other aesthetic considerations in the city. The primary objective of the Design Guidelines is to provide for functional site planning, integrate architectural elements within a project and within streetscapes, protect privacy and ensure the provision of highquality projects.

(Ord. 1346, passed 5-2-12)

§ 153.210.170 APPLICABILITY.

(A) Design review clearance. Design review clearance must be obtained prior to the issuance of any permit for the construction of any building or structure. Design review is required for the following:

(1) All new construction or exterior alteration of any existing building or structure in the R-G, R-3, C-1, C-2, F- C, I-C, I, OS, MU-1 and MU-2 zones;

(2) All new construction or exterior alteration of any existing building or structure in the R-1-7,500 or R-1 zones which also requires a conditional use permit, administrative adjustment or a variance;

(3) All new construction or exterior alteration of any existing building or structure in the R-1-7,500 or R-1 zones that involves 200 square feet or more of floor area or will extend the structure to a second floor;

(4) All new construction of five or more single-family dwelling units as part of a subdivision map;

(5) All new construction or exterior alteration of any existing sign which exceeds 40 feet in height or 300 square feet in sign area; and

(6) All new construction or alteration of any wireless communication facility on private property, including city owned property not located within the public right-of-way.

(B) Design review required for discretionary permits. For any development project or action requiring the issuance of a discretionary permit pursuant to the requirements of this chapter, design review shall be conducted in conjunction with staff-level review of such permit. The recommendations of the Design Review Committee that is composed of the Director of Community Development, the City Engineer, a representative from the Police Department, a representative from the Fire Department and the City Planner as the chairperson shall be forwarded to the Approving Authority for consideration with the associated development application. Following final Approving Authority action on the application and prior to the issuance of building permits for any approved application, the Design Review Committee shall reserve the authority to ensure final design plans substantially conform to the conditions imposed by the Approving Authority.

(Ord. 1346, passed 5-2-12)

§ 153.210.180 DETERMINATION.

Design review clearance shall be granted, or conditionally granted or denied when the Design Review Committee finds the proposed use, development or structure to comply with all applicable provisions of the Design Guidelines are compatible with the design of adjacent land uses, and possess acceptable architectural design and aesthetic quality. (Ord. 1346, passed 5-2-12)

§ 153.210.190 RECORD OF REVIEW.

The authorized signature of the Director of Community Development on a designated form, or a stamp approval on a set of plans, shall signify approval of design review.

(Ord. 1346, passed 5-2-12)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Baldwin Park Zoning Code
Baldwin Park Zoning Code
  1. Chapter 10 — GENERAL PROVISIONS
  2. Chapter 15 — ADMINISTRATIVE ENFORCEMENT OF CODE VIOLATIONS
  3. Chapter 30 — CITY COUNCIL
  4. Chapter 31 — CITY OFFICIALS AND EMPLOYEES
  5. Chapter 32 — COMMISSIONS, AGENCIES AND AUTHORITIES
  6. Chapter 33 — PERSONNEL SYSTEM
  7. Chapter 34 — FINANCE; PURCHASING
  8. Chapter 35 — TAXATION
  9. Chapter 36 — EMERGENCY ORGANIZATIONS
  10. Chapter 37 — PROPERTY
  11. Chapter 39 — DECORUM AT COUNCIL MEETINGS
  12. Chapter 40 — CAMPAIGN CONTRIBUTION LIMITS AND PENALTIES
  13. Chapter 50 — SOLID WASTE MANAGEMENT
  14. Chapter 51 — SEWERS
  15. Chapter 52 — STORM WATER AND URBAN RUNOFF POLLUTION PREVENTION
  16. Chapter 53 — CONSTRUCTION AND DEMOLITION MATERIALS MANAGEMENT
  17. Chapter 70 — GENERAL PROVISIONS
  18. Chapter 71 — TRAFFIC REGULATIONS
  19. Chapter 72 — STOPPING, STANDING AND PARKING
  20. Chapter 74 — PARKING SCHEDULES
  21. Chapter 90 — ABANDONED VEHICLES
  22. Chapter 91 — ALARM SYSTEMS
  23. Chapter 92 — ANIMAL CONTROL
  24. Chapter 93 — FIRE PREVENTION; FIREWORKS
  25. Chapter 94.5 — SMOKEFREE MULTI-FAMILY HOUSING
  26. Chapter 95.5 — SEIZURE AND FORFEITURE OF VEHICLES
  27. Chapter 96 — PUBLIC PARKS
  28. Chapter 97 — STREETS, SIDEWALKS AND PUBLIC PLACES
  29. Part 1 — GENERAL PROVISIONS
  30. Part 2 — UNDERGROUND UTILITY DISTRICTS
  31. Part 1 — ADMINISTRATIVE PROVISIONS
  32. Part 2 — DEFINITIONS
  33. Part 3 — ORGANIZATION AND ENFORCEMENT
  34. Part 4 — EXISTING BUILDINGS AND BUILDING SERVICE EQUIPMENT
  35. Part 5 — PERMITS
  36. Part 6 — APPLICATION REQUIREMENTS
  37. Part 7 — PERMIT ISSUANCE
  38. Part 8 — FEES
  39. Part 9 — INSPECTIONS
  40. Part 10 — CERTIFICATE OF OCCUPANCY
  41. Part 11 — ADOPTION AND AMENDMENT OF THE CALIFORNIA BUILDING CO…
  42. Part 12 — ADOPTION AND AMENDMENTS OF THE
  43. Part 13 — ADOPTION OF THE CALIFORNIA MECHANICAL CODE
  44. Part 14 — ADOPTION OF THE CALIFORNIA PLUMBING CODE
  45. Part 15 — ADOPTION OF THE CALIFORNIA ENERGY CODE
  46. Part 16 — ADOPTION OF THE CALIFORNIA WILDLAND-UBRAN INTERFACE …
  47. Part 17 — ADOPTION OF THE CALIFORNIA HISTORICAL BUILDING CODE
  48. Part 18 — ADOPTION OF THE CALIFORNIA EXISTING BUILDING CODE
  49. Part 19 — ADOPTION OF THE CALIFORNIA REFERENCED STANDARDS CODE
  50. Part 20 — ADOPTION OF THE CALIFORNIA FIRE CODE WITH LOS ANGELE…
  51. Part 1 — PERMITTED USES AND DEVELOPMENT STANDARDS
  52. Part 2 — SMALL-LOT SINGLE-FAMILY DEVELOPMENTS
  53. Part 3 — HOUSING INCENTIVES
  54. Part 4 — MOBILE HOME PARKS
  55. Part 5 — URBAN DEVELOPMENT UNITS AND URBAN LOT SPLITS
  56. Part 1 — ADULT-ORIENTED BUSINESSES
  57. Part 2 — ALCOHOL SALES
  58. Part 3 — GAME ARCADES AND INTERNET CAFES
  59. Part 4 — ANIMAL KEEPING
  60. Part 5 — BILLIARD AND POOL HALLS
  61. Part 6 — CHILD DAY CARE FACILITIES AND LARGE-FAMILY DAY CARE H…
  62. Part 7 — DRIVE-THROUGH ESTABLISHMENTS
  63. Part 8 — HOME OCCUPATIONS
  64. Part 9 — HOTELS AND MOTELS
  65. Part 10 — CANNABIS RETAILERS
  66. Part 11 — ACCESSORY DWELLING UNITS AND JUNIOR ACCESSORY DWELLI…
  67. Part 12 — SERVICE STATIONS
  68. Part 13 — SOLAR PANELS
  69. Part 14 — VEHICLE STORAGE
  70. Part 15 — PUBLIC TELEPHONES
  71. Part 16 — EMERGENCY SHELTERS
  72. Part 17 — MASSAGE ESTABLISHMENTS AND SERVICES
  73. Part 18 — MEDICAL AND ADULT CANNABIS CULTIVATION, MANUFACTURIN…
  74. Part 1 — GENERAL PROVISIONS
  75. Part 2 — DESIGN REVIEW
  76. Part 3 — ZONING CLEARANCE
  77. Part 4 — SIGN PERMIT
  78. Part 5 — TEMPORARY USE PERMIT
  79. Part 6 — ZONING CODE INTERPRETATION
  80. Part 7 — ADMINISTRATIVE ADJUSTMENT
  81. Part 8 — VARIANCE
  82. Part 9 — CONDITIONAL USE PERMIT
  83. Part 10 — HISTORIC DESIGNATION
  84. Part 11 — HISTORIC STRUCTURE WORK PERMIT
  85. Part 12 — HISTORIC STRUCTURE DEMOLITION PERMIT
  86. Part 13 — WIRELESS FACILITY ENCROACHMENT PERMIT
  87. Part 14 — SPECIFIC PLAN
  88. Part 15 — ZONING CODE TEXT AND ZONING MAP AMENDMENTS
  89. Part 16 — GENERAL PLAN TEXT AND MAP AMENDMENTS
  90. Part 17 — DEVELOPMENT AGREEMENT
  91. Part 18 — DOWNTOWN OVERLAY
  92. Part 19 — DEVELOPMENT PLAN (PLANNED DEVELOPMENT OVERLAY)
  93. Part 20 — REASONABLE ACCOMMODATION

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.