Overview
Appendix A4.5 (Division A4.5) addresses indoor environmental quality for residential construction — definitions and pollutant-control measures (for example, composite‑wood formaldehyde limits, resilient‑flooring VOC testing and coverage percentages, and thermal‑insulation VOC/NAF requirements in §A4.504.1–§A4.504.3) that reduce occupant exposure to indoor contaminants.
Division A4.6 (Tier 1 and Tier 2) is the voluntary “reach” framework: projects may pursue CALGreen Tier 1 or Tier 2 by meeting the code’s mandatory baseline plus the appendix prerequisites and required number of elective measures; the appendix explains scope and the residential application checklist used to document selections (§A4.601.1, §A4.601.4.2, §A4.602).
Division A4.7 supplies a model adoption ordinance and sample resolution for jurisdictions that want to make these voluntary measures mandatory or adopt tiers locally (§A4.701.1). The model language and guidance help local agencies tailor requirements and document findings for adoption.
In this section
Code references
Grounded in the retrieved California Green Building Standards Code (CALGreen) — click a citation to read the verbatim passage:
CALGreen § 3.1. High relevance — show source text
- From Division A4.3, Water Efficiency and Conservation. 3.1. Comply with at least two elective measures selected from Division A4.3.
- From Division A4.4, Material Conservation and Resource Efficiency. 4.1. Comply with the 20 percent cement reduction requirements in Section A4.403.2. 4.2. Comply with the 10 percent recycled content requirements in Section A4.405.3.1. 4.3. Comply with the 65 percent reduction in construction waste in Section A4.408.1. 4.4. Comply with at least two elective measures selected from Division A4.4.
- From Division A4.5, Environmental Quality. 5.1. Comply with the 90 percent resilient flooring systems requirements in Section A4.504.2. 5.2. Comply with the thermal insulation requirements for Tier 1 in Section A4.504.3. 5.3. Comply with at least one elective measure selected from Division A4.5.
Note: The Residential Occupancies Application Checklist contained in Section A4.602 may be used to show which elective measures are selected.
A4.601.5 Tier 2. To achieve Tier 2 status a project must comply with the following.
Note: The measures necessary to achieve Tier 2 status are very stringent. Cities, counties, and cities and counties considering adoption of Tier 2 as mandatory should carefully consider the stringency of each measure and ensure that the measures are achievable in their location.
A4.601.5.1 Mandatory measures for Tier 2. The project shall meet or exceed all of the mandatory measures in Chapter 4, Divisions 4.1 through 4.5 and Chapter 7 as applicable.
A4.601.5.2 Prerequisite and elective measures for Tier 2. In addition to the mandatory measures, compliance with the following prerequisite and elective measures from Appendix A4 is also required to achieve Tier 2 status.
- From Division A4.1, Planning and Design.
2025 CALIFORNIA GREEN BUILDING STANDARDS CODE APPENDIX A4-21
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
APPENDIX A4 — RESIDENTIAL VOLUNTARY MEASURES
1.1. Comply with the topsoil protection requirements for Tier 1 and Tier 2 in Section A4.106.2.3. 1.2. Comply with the 30 percent permeable paving requirements in Section A4.106.4. 1.3. Comply with the cool roof requirements in Section A4.106.5. 1.4. Comply with the Tier 2 electric vehicle (EV) charging requirements in Section A4.106.8. 1.5. Comply with at least four elective measures selected from Division A4.1. 2. From Division A4.2, Energy Efficiency. 2.1. For newly constructed low-rise residential buildings, comply with the energy efficiency requirements in Sections A4.203.1, A4.203.1.1, Table A4.203.1.1, A4.203.1.2 and A4.203.1.3.
- From Division A4.3, Water Efficiency and Conservation. 3.1. Comply with at least three elective measures selected from Division A4.3.
- From Division A4.4, Material Conservation and Resource Efficiency. 4.1.
CALGreen § 101.7 High relevance — show source text
As specified in Section 101.7, additional prerequisite measures may be included by the enforcing agency to address specific local environmental conditions and may be listed in the Innovative Concepts and Local Environmental Conditions portions of the checklist.
A4.601.3 Elective measures. In addition to the required measures, Tier 1 and Tier 2 buildings must incorporate at least the number of elective measures specified in Sections A4.601.4.2 and A4.601.5.2.
A4.601.4 Tier 1. To achieve Tier 1 status a project must comply with the following:
A4.601.4.1 Mandatory measures for Tier 1. The project shall meet or exceed all of the mandatory measures in Chapter 4, Divisions 4.1 through 4.5 and Chapter 7 as applicable.
A4.601.4.2 Prerequisite and elective measures for Tier 1. In addition to the mandatory measures, compliance with the following prerequisite and elective measures from Appendix A4 is also required to achieve Tier 1 status:
From Division A4.1, Planning and Design. 1.1. Comply with the topsoil protection requirements in Section A4.106.2.3. 1.2. Comply with the 20 percent permeable paving requirements in Section A4.106.4. 1.3. Comply with the cool roof requirements in Section A4.106.5. 1.4. Comply with the Tier 1 electric vehicle (EV) charging requirements in Section A4.106.8. 1.5. Comply with at least two elective measures selected from Division A4.1.
From Division A4.2, Energy Efficiency. 2.1. For newly constructed low-rise residential buildings, comply with the energy efficiency requirements in Sections A4.203.1, A4.203.1.1, Table A4.203.1.1, A4.203.1.2 and A4.203.1.3.
From Division A4.3, Water Efficiency and Conservation. 3.1. Comply with at least two elective measures selected from Division A4.3.
From Division A4.4, Material Conservation and Resource Efficiency. 4.1. Comply with the 20 percent cement reduction requirements in Section A4.403.2. 4.2. Comply with the 10 percent recycled content requirements in Section A4.405.3.1. 4.3. Comply with the 65 percent reduction in construction waste in Section A4.408.1. 4.4. Comply with at least two elective measures selected from Division A4.4.
From Division A4.5, Environmental Quality. 5.1. Comply with the 90 percent resilient flooring systems requirements in Section A4.504.2. 5.2. Comply with the thermal insulation requirements for Tier 1 in Section A4.504.3. 5.3. Comply with at least one elective measure selected from Division A4.5.
Note: The Residential Occupancies Application Checklist contained in Section A4.602 may be used to show which elective measures are selected.
A4.601.5 Tier 2. To achieve Tier 2 status a project must comply with the following.
Note: The measures necessary to achieve Tier 2 status are very stringent. Cities, counties, and cities and counties considering adoption of Tier 2 as mandatory should carefully consider the stringency of each measure and ensure that the measures are achievable in their location.
CALGreen § 8-40 High relevance — show source text
. . . . . . . . . . . . . 8-40
APPENDIX A4 RESIDENTIAL
VOLUNTARY MEASURES. . . . . . . . . . . . . . . . . APPENDIX A4-3
A4.1 Planning and Design . . . . . . . . . . . . . . . . . APPENDIX A4-3 A4.2 Energy Efficiency . . . . . . . . . . . . . . . . . . . . APPENDIX A4-9 A4.3 Water Efficiency and Conservation . . . APPENDIX A4-13 A4.4 Material Conservation and Resource Efficiency . . . . . . . . . . . . . . . . . . . . . . . . APPENDIX A4-15 A4.5 Environmental Quality . . . . . . . . . . . . . . APPENDIX A4-19 A4.6 Tier 1 and Tier 2 . . . . . . . . . . . . . . . . . . . . APPENDIX A4-21
Division A4.6—Residential Occupancies Application Checklist . . . . . . . . . . . . . APPENDIX A4-23 A4.7 Residential Model Ordinance . . . . . . . . . APPENDIX A4-31
APPENDIX A5 NONRESIDENTIAL
VOLUNTARY MEASURES. . . . . . . . . . . . . . . . . APPENDIX A5-3
A5.1 Planning and Design . . . . . . . . . . . . . . . . . APPENDIX A5-3 A5.2 Energy Efficiency . . . . . . . . . . . . . . . . . . . APPENDIX A5-13 A5.3 Water Efficiency and Conservation . . . APPENDIX A5-19 A5.4 Material Conservation and Resource Efficiency . . . . . . . . . . . . . . . . . . . . . . . . APPENDIX A5-25 A5.5 Environmental Quality . . . . . . . . . . . . . . APPENDIX A5-35 A5.6 Voluntary Tiers . . . . . . . . . . . . . . . . . . . . . APPENDIX A5-41 A5.601 CALGren Tier 1 and Tier 2. . . . . . . . . . APPENDIX A5-41
A5.602 CALGreen Verification Guidelines Mandatory Measures Checklist . . . . . . . . . . . . . . . APPENDIX A5-44
A5.602.1 CALGreen Verification Guidelines
Tier 1 Checklist . . . . . . . . . . . . . . . . . APPENDIX A5-48
A5.602.2 CALGreen Verification Guidelines
Tier 2 Checklist . . . . . . . . . . . . . . . . . APPENDIX A5-55
APPENDIX A6 VOLUNTARY STANDARDS FOR HEALTH
CALGreen § 8-6 High relevance — show source text
. . . . . . . . . . . . . . . 8-6 Worksheet (WS-9) 5.409.2 and A5.409.2 Whole Building Life Cycle Assessment: . . . . . . . . . . . . . . . . 8-7 Construction Waste Management (CWM) Plan . . . . . . . . . . . 8-8 Construction Waste Management (CWM) Worksheet. . . . . . 8-9 Construction Waste Management (CWM) Acknowledgment. . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-10 Title 23, Waters, California Code of Regulations . . . . . . . . . 8-11 Commissioning Referenced Standards for Non-energy Systems. . . . . . . . . . . . . . . . . . . . . . . . . 8-13 IES TM-15-11 Table A-1, Table 130.2-A and Table 130.2-B Uplight and Glare Ratings Tables. . . . . . . . . . . . . . 8-40
APPENDIX A4 RESIDENTIAL
VOLUNTARY MEASURES. . . . . . . . . . . . . . . . . APPENDIX A4-3
A4.1 Planning and Design . . . . . . . . . . . . . . . . . APPENDIX A4-3 A4.2 Energy Efficiency . . . . . . . . . . . . . . . . . . . . APPENDIX A4-9 A4.3 Water Efficiency and Conservation . . . APPENDIX A4-13 A4.4 Material Conservation and Resource Efficiency . . . . . . . . . . . . . . . . . . . . . . . . APPENDIX A4-15 A4.5 Environmental Quality . . . . . . . . . . . . . . APPENDIX A4-19 A4.6 Tier 1 and Tier 2 . . . . . . . . . . . . . . . . . . . . APPENDIX A4-21
Division A4.6—Residential Occupancies Application Checklist . . . . . . . . . . . . . APPENDIX A4-23 A4.7 Residential Model Ordinance . . . . . . . . . APPENDIX A4-31
APPENDIX A5 NONRESIDENTIAL
VOLUNTARY MEASURES. . . . . . . . . . . . . . . . . APPENDIX A5-3
CALGreen § 1-5 High relevance — show source text
102 Construction Documents
and Installation Verification . . . . . . . . . . . . . . . . . . . .1-5
103 Building Standards Commission. . . . . . . . . . . . . . . . . . .1-5 104 Department of Housing and Community Development. . . . . . . . . . . . . . . . . .1-6 105 Division of the State Architect . . . . . . . . . . . . . . . . . . . . .1-6
106 Office of Statewide Health Planning and Development . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-6
CHAPTER 2 DEFINITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3
201 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-3
202 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-3
CHAPTER 3 GREEN BUILDING . . . . . . . . . . . . . . . . . . . . . . . . 3-3
301 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-3
302 Mixed Occupancy Buildings . . . . . . . . . . . . . . . . . . . . . . .3-4 303 Phased Projects. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-4 304 Voluntary Tiers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-4 305 CALGreen Tier 1 and CALGreen Tier 2 . . . . . . . . . . . . . .3-4
306 Voluntary Measures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-4
CHAPTER 4 RESIDENTIAL MANDATORY MEASURES . . . . . . 4-3
4.1 Planning and Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-3 4.2 Energy Efficiency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-7 4.3 Water Efficiency and Conservation . . . . . . . . . . . . . . . . .4-9 4.4 Material Conservation and Resource Efficiency . . . . 4-11 4.5 Environmental Quality . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13
CHAPTER 5 NONRESIDENTIAL MANDATORY MEASURES . . 5-3
CALGreen § 509.1 Medium relevance — show source text
SECTION A4.509 —INNOVATIVE CONCEPTS AND LOCAL ENVIRONMENTAL CONDITIONS
A4.509.1 Innovative concepts and local environmental conditions. The provisions of this code are not intended to prevent the use of any alternate material, appliance, installation, device, arrangement, method, design or method of construction not specifically prescribed by this code. This code does not limit the authority of city, county, or city and county government to make necessary changes to the provisions contained in this code pursuant to Section 101.7.1.
APPENDIX A4-20 2025 CALIFORNIA GREEN BUILDING STANDARDS CODE
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
A4 RESIDENTIAL VOLUNTARY MEASURES
DIVISION A4.6 – TIER I AND TIER 2
SECTION A4.601—GENERAL
A4.601.1 Scope. The measures contained in this appendix are not mandatory unless adopted by a city, county, or city and county as specified in Section 101.7. The provisions of this section outline means of achieving enhanced construction or reach levels by incorporating additional green building measures. In order to meet one of the tier levels designers, builders or property owners are required to incorporate additional green building measures necessary to meet the threshold of each level.
A4.601.2 Prerequisite measures. Tier 1 and Tier 2 thresholds require compliance with the mandatory provisions of this code and incorporation of the required prerequisite measures listed in Section A4.601.4.2 for Tier 1 and A4.601.5.2 for Tier 2. Prerequisite measures are also identified in the Residential Occupancies Application Checklist in Section A4.602.
As specified in Section 101.7, additional prerequisite measures may be included by the enforcing agency to address specific local environmental conditions and may be listed in the Innovative Concepts and Local Environmental Conditions portions of the checklist.
A4.601.3 Elective measures. In addition to the required measures, Tier 1 and Tier 2 buildings must incorporate at least the number of elective measures specified in Sections A4.601.4.2 and A4.601.5.2.
A4.601.4 Tier 1. To achieve Tier 1 status a project must comply with the following:
A4.601.4.1 Mandatory measures for Tier 1. The project shall meet or exceed all of the mandatory measures in Chapter 4, Divisions 4.1 through 4.5 and Chapter 7 as applicable.
A4.601.4.2 Prerequisite and elective measures for Tier 1. In addition to the mandatory measures, compliance with the following prerequisite and elective measures from Appendix A4 is also required to achieve Tier 1 status:
- From Division A4.1, Planning and Design. 1.1. Comply with the topsoil protection requirements in Section A4.106.2.3. 1.2. Comply with the 20 percent permeable paving requirements in Section A4.106.4. 1.3. Comply with the cool roof requirements in Section A4.106.5. 1.4. Comply with the Tier 1 electric vehicle (EV) charging requirements in Section A4.106.8. 1.5. Comply with at least two elective measures selected from Division A4.1.
- From Division A4.2, Energy Efficiency. 2.1.
CALGreen § 31F-79 Medium relevance — show source text
2025 CALIFORNIA BUILDING CODE 31F-79
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
MARINE OIL TERMINALS
TABLE 31F-8-2—FIRE HAZARD CLASSIFICATIONS Col2 Col3 Col4 Col5 Col6 Col7 FIRE HAZARD
CLASSIFICATIONSTORED VOLUME (bbls) STORED VOLUME (bbls) STORED VOLUME (bbls) FLOWING VOLUME (bbls) FLOWING VOLUME (bbls) CRITERIA (bbls)* FIRE HAZARD
CLASSIFICATIONStripped VSL VSH VFL VFH VFH LOW y n n y y VFL ≥ VFH, and VT ≤ 1200 LOW n y n y n VSL + VFL ≤ 1200 MEDIUM n n y n y VSH + VFH ≤ 1200 MEDIUM y n n y y VFH > VFL, and VT ≤ 1200 HIGH y n n y y VT > 1200 HIGH n y y y y VT > 1200 HIGH n y n y n VSL + VFL > 1200 HIGH n n y n y VSH + VFH > 1200 y = yes
n = no
Stripped = product purged from pipeline following product transfer event.
VSL = stored volume of low volatility product
VSH = stored volume of high volatility product
VFL = volume of low volatility product flowing through transfer line during ESD.
VFH = volume of high volatility product flowing through transfer line during ESD.
VT = VSL + VSH + VFL + VFH = Total Volume (stored and flowing)
* Quantities are based on maximum flow rate, including simultaneous transfers.y = yes
n = no
Stripped = product purged from pipeline following product transfer event.
VSL = stored volume of low volatility product
VSH = stored volume of high volatility product
VFL = volume of low volatility product flowing through transfer line during ESD.
VFH = volume of high volatility product flowing through transfer line during ESD.
VT = VSL + VSH + VFL + VFH = Total Volume (stored and flowing)
_* Quantities are based on maximum flow rate, including simultaneous transfers.CALGreen § 3-83 Medium relevance — show source text
Exceptions:
1. Exhaust ventilation shall not be required in areas with an approved engineered ventilation system, which maintains a hydrogen gas concentration at less than 25 percent of the lower flammability limit. 2. Mechanical exhaust ventilation for hydrogen shall not be required where the charging equipment utilized is installed and listed for indoor charging of electric vehicles without ventilation.
2025 CALIFORNIA RESIDENTIAL CODE 3-83
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
BUILDING PLANNING
SECTION 339—RESERVED
SECTION R340—POLLUTANT CONTROL
R340.1 Finish material pollutant control. Finish materials including adhesives, sealants, caulks, paints and coatings, aerosol paints and coatings, carpet systems, carpet cushion, carpet adhesive, resilient flooring systems and composite wood products shall meet the volatile organic compound (VOC) emission limits in accordance with the California Green Building Standards Code, Chapter 4, Division 4.5.
3-84 2025 CALIFORNIA RESIDENTIAL CODE
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
CALIFORNIA RESIDENTIAL CODE – MATRIX ADOPTION TABLE
CHAPTER 4 – FOUNDATIONS
(Matrix Adoption Tables are nonregulatory, intended only as an aid to the code user. See Chapter 1 for state agency authority and building applications.)
Adopting agency BSC BSC-
CGSFM HCD Col6 Col7 DSA Col9 Col10 OSHPD Col12 Col13 Col14 Col15 Col16 BSCC DPH AGR DWR CEC CA SL SLC Adopting agency BSC BSC-
CGSFM 1 2 1/AC AC SS SS/CC 1 1R 2 3 4 5 5 5 5 5 5 5 5 5 Adopt entire chapter Adopt entire chapter as
amended (amended
sections listed below)X Adopt only those sections
that are listed belowX Chapter / Section R401.2 X R401.4.1.1 through
R401.4.1.1.5X R404.5.1 X R408.3 X R408.4 X R408.8 X The state agency does not adopt sections identified with the following symbol: †
2025 CALIFORNIA RESIDENTIAL CODE 4-1
CALGreen § 6.4 Medium relevance — show source text
6.4_|||X|||||||||||||||||||||| |907.2.6.5|||X|||||||||||||||||||||| |907.2.9|||X|||||||||||||||||||||| |907.2.9.1|||X|||||||||||||||||||||| |907.2.9.3|||X|||||||||||||||||||||| |907.2.9.4|||X|||||||||||||||||||||| |907.2.9.4.1|||X|||||||||||||||||||||| |907.2.10|||X|||||||||||||||||||||| |907.2.11|||X|||||||||||||||||||||| |907.2.11.1|||X|||||||||||||||||||||| |907.2.11.2|||X|||||||||||||||||||||| |907.2.11.2.1 – 907.2.11.2.6|||X|||||||||||||||||||||| |907.2.11.3|||X|||||||||||||||||||||| |907.2.11.4|||X|||||||||||||||||||||| |907.2.11.6|||X|||||||||||||||||||||| |907.2.11.8|||X|||||||||||||||||||||| |907.2.11.9|||X|||||||||||||||||||||| |907.2.12|||X|||||||||||||||||||||| |907.2.13|||X|||||||||||||||||||||| |907.2.13.1|||X|||||||||||||||||||||| |907.2.13.1.2|||X|||||||||||||||||||||| |907.2.24 with subsections|||X|||||||||||||||||||||| |907.2.25 with subsections|||X|||||||||||||||||||||| |907.2.26 with subsections|||X|||||||||||||||||||||| |907.2.27|||X||||||||||||||||||||||
2025 CALIFORNIA BUILDING CODE 9-3
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
CALIFORNIA BUILDING CODE – MATRIX ADOPTION TABLE
CHAPTER 9 – FIRE PROTECTION AND LIFE SAFETY SYSTEMS—continued
CALGreen § 20.2.2 Medium relevance — show source text
20.2.2_|||X|||||||||||||||||||||| |909.20.2.3|||X|||||||||||||||||||||| |909.20.2.4|||X|||||||||||||||||||||| |909.20.2.5|||X|||||||||||||||||||||| |909.20.3.2|||X|||||||||||||||||||||| |909.20.4.1|||X|||||||||||||||||||||| |909.20.4.2|||X|||||||||||||||||||||| |909.20.6|||X|||||||||||||||||||||| |909.20.6.1|||X|||||||||||||||||||||| |909.20.6.2|||X|||||||||||||||||||||| |910.2.1|||X|||||||||||||||||||||| |910.3.1|||X|||||||||||||||||||||| |911.1|||X|||||||||||||||||||||| |911.1.6|||X|||||||||||||||||||||| |911.1.8|||X|||||||||||||||||||||| |912.4|||X|||||||||||||||||||||| |912.6|||X|||||||||||||||||||||| |913.1|||X|||||||||||||||||||||| |913.5|||X|||||||||||||||||||||| |915.1|||X|X|X|||||||||||||||||||| |915.2|||X|X|X|||||||||||||||||||| |915.2.1|||X|X|X|||||||||||||||||||| |915.2.3|||X|||||||||||||||||||||| |915.4|||X|X|X|||||||||||||||||||| |915.4.1,
Exceptions 2 and 3|||X|X|X|||||||||||||||||||| |915.4.2|||X|X|X|||||||||||||||||||| |915.4.3|||X|||||||||||||||||||||| |915.4.4|||X|X|X|||||||||||||||||||| |915.5.2|||X|X|X|||||||||||||||||||| |915.5.3|||X|X|X|||||||||||||||||||| |915.6|||X|X|X|||||||||||||||||||| |915.6.1|||X|||||||||||||||||||||| |915.7|||X|||X|||||||||||||||||||The state agency does not adopt sections identified with the following symbol: The Office of the State Fire Marshal’s adoption of this chapter or individual sections is applicable to structures regulated by other state agencies pursuant to Section 1.11.
2025 CALIFORNIA BUILDING CODE 9-5
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
9-6 2025 CALIFORNIA BUILDING CODE
on Jul 18, 2025 11:14 AM (CDT) THEREUNDER.
9 FIRE PROTECTION AND LIFE SAFETY SYSTEMS
User notes:
CALGreen § 304.8 Medium relevance — show source text
900
10 400
9980
9590
9240|19 800
18 900
18 100
17 400
16 800|31 400
30 000
28 700
27 600
26 600| |1600
1700
1800
1900
2000|11
11
10
10
NA|23
22
22
21
20|44
42
41
40
39|89
86
84
81
79|134
130
126
122
119|258
250
242
235
229|411
398
386
375
364|727
703
682
662
644|1480
1430
1390
1350
1310|2680
2590
2520
2440
2380|4340
4200
4070
3960
3850|8920
8630
8370
8130
7910|16 200
15 700
15 200
14 800
14 400|25 600
24 800
24 100
23 400
22 700|For SI units: 1 inch = 25 mm, 1 foot = 304.8 mm, 1 cubic foot per hour = 0.0283 m [3] /h, 1 pound-force per square inch = 6.8947 kPa, 1 inch water column = 0.249 kPa
Notes: 1 Table entries are rounded to 3 significant digits. 2 NA means a flow of less than 10 ft3/h (0.283 m 3 /h).
2025 CALIFORNIA PLUMBING CODE 237
), Copyright © 2025 IAPMO, and may not be used for any other purpose or distributed to any other persons or parties.
FUEL GAS PIPING
TABLE 1215.2(2) SCHEDULE 40 METALLIC PIPE [NFPA 54: TABLE 6.2.1(c)]* Col2 Col3 Col4 Col5 Col6 Col7 Col8 Col9 Col10 GAS: GAS: NATURAL NATURAL INLET PRESSURE: INLET PRESSURE: LESS THAN 2 psi LESS THAN 2 psi PRESSURE DROP: PRESSURE DROP: 3.0 in. w.c. 3.0 in. w.c. SPECIFIC GRAVITY: SPECIFIC GRAVITY: 0.60 0.60 INTENDED USE: INITIAL SUPPLY PRESSURE OF 8.0 IN. W.C. OR GREATER INTENDED USE: INITIAL SUPPLY PRESSURE OF 8.0 IN. W.C. OR GREATER INTENDED USE: INITIAL SUPPLY PRESSURE OF 8.0 IN. W.C. OR GREATER **INTENDED USE: INITIAL SUPPLY PRESSURE OF 8.0 IN.
Frequently asked questions
Are the measures in Appendix A4 mandatory statewide?
No — the Tier and many Appendix A4 measures are voluntary at the state level and become mandatory only if a city, county, or city and county adopts them into local ordinance pursuant to the adoption authority described in the code (see §A4.601.1).
What are the main pollutant-control items to watch for in Division A4.5?
Key items include composite wood formaldehyde requirements (§A4.504.1), resilient flooring VOC certification and coverage thresholds (Tier 1 = 90%, Tier 2 = 100%) in §A4.504.2, and thermal‑insulation VOC / no‑added‑formaldehyde provisions in §A4.504.3. Documentation and specified test methods are required.
How should a jurisdiction use the model ordinance in Division A4.7?
Use §A4.701.1 as a template: insert local findings, decide which voluntary measures or tiers to adopt, and include any local environmental or innovative‑concept adjustments. The appendix provides sample resolution and insertion text to simplify local adoption.
More in California Green Building Standards Code (CALGreen)
- Administration (Chapter 1)
- Nonresidential Voluntary Measures (Appendix A5 — divisions A5.1–A5.6, electives & verification)
- Residential Mandatory Measures — Planning & Design; Energy; Water; Materials; Environmental Quality (Chapter 4)
- Definitions (Chapter 2)
- Voluntary Standards for Health Facilities (Appendix A6 / OSHPD guidance)
- Green Building – scope, mixed occupancies, phased projects (Chapter 3)
- Residential Voluntary Measures (Appendix A4 — divisions A4.1–A4.6, tiers & model ordinance)
- Nonresidential Mandatory Measures — Planning & Design; Energy; Water; Materials; Environmental Quality (Chapter 5)
- Compliance verification, construction documents & checklists (Section 102, Chapter 7, Appendix checklists)
- Referenced Organizations and Standards (Chapter 6)
- Voluntary Tiers and CALGreen Tier 1 / Tier 2 (performance tiers, thresholds)
- Installer and Special Inspector Qualifications (Chapter 7)