25-28: SIZE AND SPECIFICATIONS GENERALLY:

A. Water Mains: All city water mains hereafter installed shall have a minimum inside diameter of six inches (6") and shall be of polyvinyl chloride (PVC) or ductile iron, American Water Works Association, classifications or specifications, class 150 or equal. Effective July 1, 1986, asbestos cement pipe will no longer be considered acceptable.

B. Fittings And Valves: All fittings and valves shall be American Water Works Association specifications, class 150 ductile iron or equal. All fire hydrants shall be American Water Works Association specifications and type to be installed shall be approved by the city engineer and the chief of the fire department. (Ord. 623 § 1; Ord. 1352 § A, 6-3-1986)

25-29: ESTIMATE OF COST; APPLICATION ACCOMPANIED BY DEPOSIT OF AMOUNT OF ESTIMATE:

Any application for the extension or installation of water mains shall be accompanied by a deposit of money equal to the estimate of the

public works director or designee for the cost of actual demand size, plus fittings, valves and fire hydrants. Should the actual cost for the installation of the water line be less than the estimate, the applicant will be refunded the difference between the actual cost and the estimated cost. Should the actual cost be greater than the estimate, the applicant must deposit the additional money between the actual cost and the estimated cost and no water service shall be furnished through or by means of the installed line until the additional money has been deposited.

The city council hereby declares it to be its intention that the full cost and expense of actual demand size together with all fittings, valves and fire hydrants be paid by and borne by the applicant. (Ord. 623 § 2; Ord. 1438, 8-21-1990; Ord. 1614 § 3, 9-17-2002)

25-30: DEVELOPER CONSTRUCTION OF FACILITIES:

Whenever a developer is required, as a condition of approval of a development permit, to construct a public facility described in a resolution adopted pursuant to this section, and when such construction is necessary to ensure efficient and timely construction of the facilities network, a reimbursement agreement with the developer shall be offered. The reimbursement amount shall not exceed the actual cost of the construction of the facility by the developer. In the event the actual construction cost of the facility exceeds the fee required of the development project, the city shall enter into a reimbursement agreement for the cost in excess of the fee required for the project, to be paid from the special account established pursuant to this section. (Ord. 1754, 6-2-2009)

25-31: COST TO INCLUDE COST OF EXCAVATION, BACKFILL, FITTINGS, ETC.:

The cost of water mains shall include the cost of all pipes, excavations, backfill, replacement of pavement, block work, safety precautions, valve connections, fittings and fire hydrants cost together with all pipe valve fittings in connection therewith. (Ord. 623 § 4)

25-32: MAINS, FITTINGS, ETC., TO REMAIN PROPERTY OF CITY:

All city mains, valves, fittings and fire hydrants constructed or installed in connection with the aforesaid plan shall be and remain the exclusive property of the city. (Ord. 623 § 5)

25-32.1: CONNECTION NOT MADE UNTIL PRORATED CHARGE PAID:

In no event shall any owner of property benefited by the water line constructed pursuant to this division, or other person in possession or control of such real property, be permitted to connect thereto without first paying, or by written agreement arranging to pay, the prorated charges placed against the property by the city manager. The council may, by resolution, establish provisions whereby property owners may pay water connection fees in installments over a period of time not to exceed three (3) years. (Ord. 901 § B, 4-16-1968)

25-32.2: CONSTRUCTION OF FIRE HYDRANTS AND FINANCING THEREOF:

A. The city may install fire hydrants into all areas within the city and areas subsequently annexed into the city which are not yet served by same as rapidly as funds are available and budgeted therefor by the city council.

B. In the event that a private individual installs fire hydrants in advance of the time the city is able to do so, the city may enter into an agreement with such individual under the terms of which the city will reimburse him for that portion of the total cost of the fire hydrant installation over and above the cost applicable to his premises; provided, however, that the source of funds for such reimbursement shall be the fire hydrant installation charges collected from other users of the hydrant and provided that such an agreement shall terminate within ten (10) years from the date thereof; and, provided further, that the cost returned shall not exceed the actual cost to the individual nor the then current costs for similar quantities of work performed by the city, whichever is smaller. (Ord. 1135 § C, 3-21-1978)

25-32.3: ACREAGE FEE:

A. Purpose: In order to implement the goals and objectives of the water system master plan of the city, and to provide needed water facilities for new development in the planning area, certain public water facilities must be constructed. The city council has determined that a development impact fee is needed in order to finance these public improvements and to pay for the development's fair share of the construction costs of these improvements. In establishing the fee described in the following subsections, the city council has found the fee to be consistent with its general plan and, pursuant to Government Code section 65913.2, has considered the effects of the fee with respect to the city's housing needs as established in the housing element of the general plan.

B. Established: An acreage fee is hereby established upon issuance of certificate of occupancy for development in the city, or upon connection to the city water system to pay for water system improvements. The city council shall, in a council resolution, set forth the specific amount of the fee, describe the benefit and impact area on which the development fee is imposed, list the specific public improvements to be financed, describe the estimated cost of these facilities, describe the reasonable relationships between this fee and the various types of new development and set forth time for payment. As described in the fee resolution, this development fee shall be paid by each developer upon issuance of certificate of occupancy or connection to the water system. On an annual basis, this fee shall be adjusted by the public works director department in accordance with the "Engineering News Record Construction Cost Index" publication.

C. Limited Use Of Fees: The revenues raised by payment of this fee shall be placed in a separate and special account and such revenues, along with any interest earnings on that account, shall be used solely to:

  1. Pay for the city's future construction of water facilities described in the resolution enacted with this section, or to reimburse the

city for those described or listed facilities constructed by the city with funds advanced by the city from other sources; or

  1. Reimburse developers who have been required or permitted as set forth below, to install such listed facilities which are oversized

with supplemental size, length, or capacity. (Ord. 1754, 6-2-2009)

25-32.4: CROSS CONNECTIONS:

No water service connection shall be installed or maintained on the premises of any consumer unless the city water supply is protected

from contamination in accordance with the city council resolution on standards for backflow prevention. (Ord. 1237 § A, 5-19-1981)

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — Porterville Municipal Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.