Chapter 6 — WATER SUPPLY AND DISTRIBUTION
604.1 Pipe, Tube, and Fittings.
California Plumbing Code (Title 24, Part 5) · 2022 edition · updated 2026-09-12 · California
CBSC: official editions, supplements and errata
Italicized text is a California amendment to the model code, as printed in the official publication.
Pipe, tube, fittings, solvent cement, thread sealants, solders, and flux used in potable water systems intended to supply drinking water shall comply with NSF 61. Where pipe fittings and valves are made from copper alloys containing more than 15 percent zinc by weight and are used in plastic piping systems, they shall be resistant to dezincification and stress corrosion cracking in compliance with NSF 14.
Materials used in the water supply system, except valves and similar devices, shall be of a like material, except where otherwise approved by the Authority Having Jurisdiction.
2022 CALIFORNIA PLUMBING CODE 145
WATER SUPPLY AND DISTRIBUTION
TABLE 604.1 MATERIALS FOR BUILDING SUPPLY AND WATER DISTRIBUTION PIPING AND FITTINGS
| MATERIAL | BUILDING SUPPLY PIPE AND FITTINGS |
WATER DISTRIBUTION PIPE AND FITTINGS |
REFERENCED STANDARD(S) PIPE |
REFERENCED STANDARD(S) FITTINGS |
|---|---|---|---|---|
| Copper and Copper Alloys |
X | X | ASTM B42, ASTM B43, ASTM B75, ASTM B88, ASTM B135, ASTM B251, ASTM B302, ASTM B447 |
ASME B16.15, ASME B16.18, ASME B16.22, ASME B16.26, ASME B16.502, ASME B16.51, ASSE 1061, ASTM F3226, IAPMO PS 117 |
| CPVC | X | X | ASTM D2846, ASTM F441, ASTM F442, CSA B137.6 |
ASSE 1061, ASTM D2846, ASTM F437, ASTM F438, ASTM F439, ASTM F1970, CSA B137.6 |
| CPVC-AL-CPVC | X | X | ASTM F2855 | ASTM D2846 |
| Ductile-Iron | X | X | AWWA C151 | ASME B16.4, AWWA C110, AWWA C153 |
| Galvanized Steel | X | X | ASTM A53 | –– |
| Malleable Iron | X | X | –– | ASME B16.3 |
| PE | X1 | –– | ASTM D2239, ASTM D2737, ASTM D3035, AWWA C901, CSA B137.1 |
ASTM D2609, ASTM D2683, ASTM D3261, ASTM F1055, CSA B137.1 |
| PE-AL-PE | X | X | ASTM F1282, CSA B137.9 | ASTM F1282, ASTM F1974, CSA B137.9 |
| PE-AL-PEX | X | X | ASTM F1986 | ASTM F1986 |
| PE-RT | X | X | ASTM F2769, CSA B137.18 | ASSE 1061, ASTM D3261, ASTM F1055, ASTM F1807, ASTM F2098, ASTM F2159, ASTM F2735, ASTM F2769, CSA B137.18 |
| PEX | X | X | ASTM F876, CSA B137.5, AWWA C9041 |
ASSE 1061, ASTM F877, ASTM F1807, ASTM F1960, ASTM F2080, ASTM F2159, ASTM F2735, CSA B137.5 |
| PEX-AL-PEX | X | X | ASTM F1281, CSA B137.10 | ASTM F1281, ASTM F1974, ASTM F2434, CSA B137.10 |
| PP | X | X | ASTM F2389, CSA B137.11 | ASTM F2389, CSA B137.11 |
| PVC | X1 | –– | ASTM D1785, ASTM D2241, AWWA C900 |
ASTM D2464, ASTM D2466, ASTM D2467, ASTM F1970, AWWA C907 |
| Stainless Steel | X | X | ASTM A269, ASTM A312, ASTM A554, ASTM A778 |
ASTM F3226, IAPMO PS 117 |
Notes: 1 For building supply or exterior cold-water applications, not for water distribution piping. 2 For brazed fittings only. 3 When PEX tubing is placed in soil and is used in potable water systems intended to supply drinking water to fixtures or appliances, the tubing or piping shall be sleeved with a material approved for potable water use in soil or other material that is impermeable to solvents or petroleum products. 4 PEX tubing shall meet or exceed the requirements of ASTM F876-2015a or an equivalent or more stringent standard when used in continuously recircu- lating hot water systems and the PEX tubing is exposed to the hot water 100% of the time. 5 [For BSC, DSA-SS, DSA-SS/CC, HCD 1 & HCD 2] The use of PEX-AL-PEX in potable water supply systems is not adopted.
Materials for building water piping and building supply piping shall comply with the applicable standards referenced in Table 604.1. Exception: [OSHPD 1, 2, 3, 4 & 5] Use of CPVC is not per- mitted for applications under authority of the Office of Statewide Health Planning and Development.
604.1.1 Local Authority to Approve CPVC Pipe Within Residential Buildings Under Specified Conditions. [HCD 1 & HCD 2] The local responsible building official of any city, county, or city and county, shall authorize by permit the use of CPVC for hot and cold water distribution systems within the interior of res-
146 2022 CALIFORNIA PLUMBING CODE
idential buildings provided all of the following conditions are satisfied: (a) Permit Conditions. Any building permit issued pur-
suant to Section 604.1.1 shall be conditioned on compliance with the mitigation measures set forth in this section. (b) Approved Materials. Only CPVC plumbing mate-
rial listed as an approved material and installed in accordance with this code may be used. (c) Installation and Use. Any installation and use of
CPVC plumbing material pursuant to this section shall comply with all applicable requirements of this code and the manufacturer’s installation instructions. (d) Certification of Compliance. Prior to issuing a
building permit pursuant to Section 604.1.1, the building official shall require as part of the permit- ting process that the contractor, or the appropriate plumbing subcontractors, provide written certifica- tion: (1) that is required in subdivision (e), and (2) that he or she will comply with the flushing proce- dures and worker safety measures of this code and the manufacturer’s installation instructions. (e) Worker Safety. Any contractor applying for a build-
ing permit that includes the use of CPVC plumbing materials authorized pursuant to this section shall include in the permit application a signed written certification stating that: (1) They are aware of the health and safety hazards
associated with CPVC plumbing installations; (2) They have included in their Injury and Illness
Prevention Plan the hazards associated with CPVC plumbing pipe installations; and (3) The worker safety training elements of their
Injury and Illness Prevention Plan meet the Department of Industrial Relation’s guidelines. (f) Findings of Compliance. The building official shall not give final permit approval of any CPVC plumbing materials installed pursuant to Section 604.1.1 unless he or she finds that the material has been installed in compliance with the requirements of this code and the manufacturer’s installation instructions. (g) Penalties. Any contractor or subcontractor found to
have failed to comply with the flushing, ventilation, and glove requirements of this code and the manu- facturer’s installation instructions shall be subject to the penalties in Health and Safety Code, Division 13, Part 1.5, Chapter 6 (Section 17995 et seq.). In addition, if during the conduct of any building inspection the building official finds that the venti- lation and glove requirements of this code, are being violated, such building officials shall cite the con- tractor or subcontractor for that violation. (h) Special Requirements for CPVC Installation
within Residential Structures. In addition to the other requirements in the California Plumbing Code, all installations of CPVC pipe within resi- dential structures shall meet the following:
WATER SUPPLY AND DISTRIBUTION
(i) Flushing Procedures. All installations of CPVC pipe within residential structures shall be flushed twice over a period of at least one (1) week. The pipe system shall be first flushed for at least 10 minutes and then filled and allowed to stand for no less than 1 week, after which all the branches of the pipe system must be flushed long enough to fully empty the con- tained volume. At the time of the fill, each fix- ture shall have a removable tag applied stating: “This new plumbing system was first filled on (date) by (name). The California Department of Housing and Community Development requires that the sys- tem be flushed after standing at least one week after the fill date specified above. If the system is used ear- lier than one week after the fill date, the water must be allowed to run for at least two minutes prior to use for human consumption. This tag may not be removed prior to flushing, except by the homeowner.” (ii) Worker Safety Measures. Mechanical ventila-
tion sufficient to maintain exposures below the relevant exposure limits established by state regulation shall be provided in enclosed spaces. This ventilation shall be directed at the breath- ing zone of the worker installing the pipe. Where mechanical ventilation is not practical, respirators, suitable for organic vapors, shall be used. For the purpose of this subdivision, an enclosed space is defined as: (1) A space less than 100 square feet of floor
area under a ceiling with a height of 10 feet or less, and which does not have openings (consisting of doors, windows, or unfin- ished walls) on at least two sides; (2) Crawl spaces having a height of less than
three feet; (3) Enclosed attics that have a roof and ceil-
ing; or (4) Trenches having a depth greater than 24
inches. Installers of CPVC pipe within residential struc- tures shall use non-latex thin gauge (4 millime- ters) nitrile gloves, or other gloves providing an equivalent or better degree of protection during the installation of the CPVC plumbing system. Gloves shall be provided to all workers by the contractor, or plumbing subcontractor, and shall be replaced upon contamination by cements. 604.1.2 PEX. [HCD 1 & HCD 2] All installations of PEX pipe where it is the initial plumbing piping installed in new construction shall be flushed twice over a period of at least one week. The pipe system shall be first flushed for at least 10 minutes and then filled and allowed to stand for no less than 1 week, after which all the branches of the pipe system must be flushed long enough to fully empty the contained volume. This provision shall not apply to the installation of PEX pipe where it replaces an existing pipe system of any material.
2022 CALIFORNIA PLUMBING CODE 147
WATER SUPPLY AND DISTRIBUTION
(1) At the time of fill, each fixture shall have a remov-
able tag applied stating: (a) “This new plumbing system was first filled and
_flushed on ______ (date) by ____________ (name). The State of California requires that the system be flushed after standing at least one week after the fill date specified above. If this system is used earlier than one week after the fill date, the water must be allowed to run for at least two minutes prior to use for human con- sumption. This tag may not be removed prior to the completion of the required second flushing, except by the building owner or occupant.” (2) Prior to issuing a building permit to install PEX
pipe, the building official shall require as part of the permitting process that the contractor, or the appro- priate plumbing subcontractors, provide written cer- tification that he or she will comply with the flushing procedures set forth in the code. (3) The building official shall not give final permit
approval of any PEX plumbing installation unless he or she finds that the material has been installed in compliance with the requirements of the code, including the requirements to flush and tag the sys- tems. (4) Any contractor or subcontractor found to have
failed to comply with the PEX flushing requirements shall be subject to the penalties in Health and Safety Code, Division 13, Part 1.5, Chapter 6 (Section 17995, et seq.).
Get a plain-English answer with a citation back to this text.
Ask AI about this code