Chapter 13 — HEALTH CARE FACILITIES AND MEDICAL GAS AND MEDICAL VACUUM SYSTEMS
California Plumbing Code (Title 24, Part 5) · 2022 edition · updated 2026-09-10 · California
Italicized text is a California amendment to the model code, as printed in the official publication.
Sections in this part
- 1302.1 Risk Categories. Activities, systems, or equipment
- 1302.2 Patient Care Spaces. The health care facility’s
- 1302.3 Anesthesia. It shall be the responsibility of the
- 1302.4 Wet Procedure Locations.
- 1303.1 Drinking Fountain Control Valves. Drinking
- 1303.2 Psychiatric Patient Rooms. Piping and drain
- 1301.1 Applicability.
- 1301.2 Where Not Applicable. This chapter does not apply
- 1301.3 Conflict of Requirements. The requirements of
- 1301.4 Where Required. Construction and equipment
- 1301.5 Existing Systems. Only the altered, renovated, or
- 1303.3 Locations for Ice Storage.
- 1303.4 Sterilizers and Bedpan Steamers. Sterilizers
- 1303.5 Aspirators.
- 1303.6 Drains.
- 1303.7 Clinical Sinks. Clinical sinks shall be installed in
- 1303.8 Water Supply for Hospitals. Hospitals shall be
- 1303.9 Work Performed in Occupied Healthcare
- 1304.1 General.
- 1304.2 Certification of Systems.
- 1304.3 Construction Documents. Before a medical gas
- 1304.4 Extent of Work. Construction documents submitted
- 1304.5 Record.
- 1305.1 Required Operating Pressures. Medical gas and
- 1306.3 Report Items. A report that includes the specific
- 1306.4 Components. Functioning of alarm components
- 1307.1 Terms.
- 1305.2 Minimum Flow Rates. Medical gas and vacuum
- 1305.3 Minimum Station Outlets and Inlets. Station
- 1306.1 Certification.
- 1306.2 Certification Tests. Certification tests, verified and
- 1307.4 Materials. Materials used in central supply systems
- 1307.2 Nature of Hazards of Gas and Vacuum Sys-
- 1307.3 Permitted Locations for Medical Gases.
- 1308.1 Where Required. Pressure-regulating equipment
- 1308.2 Pressure Relief Valves. All pressure relief valves
- 1308.3 Pressure-Relief Valve Requirements. Central
- 1309.1 Oxygen Requirements.
- 1309.2 Particulate Size. Output shall have less than or
- 1309.3 Suitability. Materials of construction on the air side
- 1309.4 Compatible Materials. Materials of construction
- 1309.5 Oxygen Concentrator Components.
- 1309.6 Supply Air Quality.
- 1309.7 Electrical Components. The oxygen concentrator
- 1309.8 Vent Valve. A vent valve shall be provided as follows:
- 1309.9 Valved Sample Port. A DN8 (NPS 1/4) valved
- 1309.10 Suitable Filter.
- 1309.11 Check Valve. A check valve shall be provided at
- 1310.4 Medical Air Receivers. Receivers for medical air
- 1310.5 Valves. A medical air receiver(s) shall be provided
- 1309.12 Outlet Valve. An outlet valve shall be provided to
- 1309.13 Oxygen Concentration Monitor. The oxygen
- 1310.1 Quality of Medical Air. Medical air shall be
- 1310.2 Uses of Medical Air. Medical air sources shall be
- 1310.3 Medical Air Compressors.
- 1312.2 Medical-Surgical Vacuum Sources.
- 1312.3 Vacuum Receivers. Receivers for vacuum shall
- 1312.4 Vacuum Filtration.
- 1311.1 Air Sources.
- 1311.2 Medical Air Compressor Source. The medical
- 1311.3 Air Intakes.
- 1311.4 Location. Medical air intakes shall be located as follows:
- 1311.5 Separate Compressors. Air intakes for separate
- 1311.6 Screening. The end of the intake shall be turned
- 1312.1 General. The vacuum plant shall be installed in a
- 1312.5 Piping Arrangement and Redundancies. Piping arrangement shall be as follows:
- 1312.6 Piping Serviceability.
- 1312.7 Shutoff Valve. Medical-surgical vacuum central
- 1313.1 Vacuum Source Exhausts. The medical-surgical
- 1313.2 Location. The exhaust shall be located as follows:
- 1313.3 Screening. The end of the exhaust shall be turned
- 1313.4 Dips and Loops. The exhaust shall be free of dips
- 1313.5 Multiple Pumps. Vacuum exhausts from multiple
- 1314.1 Gas and Vacuum Shutoff Valves. Shutoff valves
- 1314.2 Security. All valves, except valves in zone valve
- 1314.3 Labeled.
- 1314.4 Accessibility. Zone valves shall be installed in
- 1314.5 Valve Types. New or replacement valves shall be
- 1314.10 Zone Valves.
- 1314.11 In-Line Shutoff Valves. Optional in-line valves
- 1314.12 Valves for Future Connections.
- 1315.1 General. Each station outlet/inlet for medical gases
- 1315.2 Required Valves. Each station outlet shall consist
- 1314.6 Source Valves. A shutoff valve shall be placed at the
- 1314.7 Main Line Valve. A shutoff valve shall be provided
- 1314.8 Riser Valves. Each riser supplied from the main line
- 1314.9 Service Valves. Service valves shall be installed to
- 1315.15 Post Installation. After installation of the piping,
- 1316.1 Isolation.
- 1316.2 Pressure and Vacuum Indicator Locations.
- 1317.1 Category 1.
- 1315.3 Secondary Valve.
- 1315.4 Identification.
- 1315.5 Threaded Outlets/Fittings. Threaded
- 1315.6 Gas-Specific Station Outlet/Inlet. Each station
- 1315.7 Common Parts.
- 1315.8 Marking of Components.
- 1315.9 Components Not Specific to a Vacuum.
- 1315.10 Factory-Installed Copper Inlet Tubes.
- 1315.11 Factory-Installed Copper Outlet Tubes.
- 1315.12 Protection from Damage. Station outlets/inlets
- 1315.13 Multiple Wall Outlets/Inlets. When multiple wall
- 1315.14 Nonstandard Operation Pressures. Station
- 1318.1 General. The provisions of this section shall apply
- 1318.2 Cleaning. Tubes, valves, fittings, station outlets, and
- 1318.3 Delivery. Each length of tube shall be delivered
- 1318.4 Tubes for Medical Gas Systems. Tubes shall be
- 1318.5 Manufacturer Markings. ASTM B819, medical gas
- 1318.6 Documentation.
- 1319.1 Tubes for Medical Vacuum Systems. Piping for
- 1320.1 General. This section sets forth the requirements for
- 1320.2 Changes in Direction. Positive pressure patient
- 1321.1 Brazed Joints and Fittings. Fittings shall be
- 1321.2 Tube Joints. Brazed tube joints shall be the socket
- 1321.3 Filler Metals. Filler metals shall bond with and be
- 1321.4 Copper-to-Copper Joints. Copper-to-copper
- 1321.5 Accessible. Joints to be brazed in place shall be
- 1321.6 Purging. Braze joints shall be continuously purged
- 1321.7 Tube Ends. Tube ends shall be cut square using a
- 1321.8 Cleaning Procedures. The interior surfaces of
- 1321.9 Brazing Dissimilar Metals. Flux shall only be
- 1321.10 Nitrogen Purge. When brazing, joints shall be
- 1321.11 Assembling and Heating Brazed Joints. Tube
- 1321.12 Inspection of Brazed Joints. After brazing, the
- 1322.1 Welded Joints Procedure. Welded joints for
- 1322.6 Other Types of Fittings.
- 1322.7 Prohibited Joints. The following joints shall be
- 1323.1 Required Pipe Sizing. Piping systems shall be
- 1322.2 Welding for Stainless Tube. Stainless tube shall
- 1322.3 Memory Metal Fittings. Memory metal fittings
- 1322.4 Axially Swaged Fittings. Axially swaged, elastic
- 1322.5 Threaded Fittings. Threaded fittings shall meet the
- 1323.2 Pipe Protection. Piping shall be protected against
- 1323.3 Location of Piping.
- 1323.5 Frost Protection.
- 1323.4 Pipe Support. Piping shall be supported from the
- 1323.6 Connectors. Hose and flexible connectors, both
- 1323.7 Prohibited System Interconnections. Two or
- 1323.8 Manufacturer’s Instructions. The installation of
- 1323.9 Changes in System Use.
- 1323.10 Qualifications of Installers. The installation of
- 1323.11 Qualification of Brazing Procedures and
- 1323.12 Breaching or Penetrating Medical Gas Pip-
- 1323.13 Labeling, Identification and Operating Pres-
- 1323.14 Identification of Shutoff Valves. Shutoff valves
- 1323.15 Identification. Station outlets and inlets shall be
- 1324.1 Where Required. Inspection and testing shall be
- 1324.2 Breached Systems. All systems that are breached
- 1324.3 Test Gas. The test gas shall be oil-free, dry nitrogen
- 1324.4 Initial Piping Blowdown. Piping in medical gas
- 1324.5 Initial Pressure Tests – Medical Gas and Vac-
- 1325.11 Category 2 Distribution. Level 2 systems shall
- 1325.12 Labeling and Identification.
- 1325.13 Performance Criteria and Testing — Cate-
- 1326.1 General. Category 3 piped gas and vacuum systems
- 1326.2 Nature of Hazards of Gas and Vacuum Sys-
- 1326.3 Medical Air Supply Systems.
- 1326.4 Oxygen Central Supply Systems Using Con-
- 1326.5 Medical–Surgical Vacuum. Category 3 systems
- 1325.1 General.
- 1325.2 Nature of Hazards of Gas and Vacuum Sys-
- 1325.3 Central Supply Systems. Category 2 systems
- 1325.4 Category 2 Medical Air Supply Systems.
- 1325.5 Oxygen Concentrators. Oxygen supply systems
- 1325.6 Category 2 Medical-Surgical Vacuum.
- 1325.7 Valves.
- 1325.8 Station Outlets and Inlets. Category 2 systems
- 1325.9 Pressure and Vacuum Indicators. Category 2
- 1325.10 Warning Systems (Category 2).
- 1327.4 Initial Pressure Test. Each section of the piping in
- 1326.6 Valves. Category 3 systems shall comply with Section 1314.0. [NFPA 99:5.3.4]
- 1326.7 Station Outlets and Inlets. Category 3 systems
- 1326.8 Pressure and Vacuum Indicators. Category 3
- 1326.9 Warning Systems. Warning systems associated
- 1326.10 Distribution. Category 3 systems shall comply
- 1326.11 Labeling and Identification. Category 3 systems
- 1327.1 General. Dental gas and vacuum systems shall comply with this code and NFPA 99.
- 1327.2 Emergency Shutoff Valves (Oxygen and
- 1327.3 Warning Systems (Oxygen and Nitrous
- 1327.5 Maximum Copper Tube Support Spacing. The
- 1327.8 Verifier Operational Pressure Test. Operational
- 1327.6 Maximum Plastic Pipe Support Spacing. The
- 1327.7 Standing Pressure Tests for Oxygen and
(Matrix Adoption Tables are non-regulatory, intended only as an aid to the code user. See Chapter 1 for state agency authority and building applications.)
| Adopting Agency | BSC | BSC- CG |
SFM | HCD | DSA | OSHPD | BSCC | DPH | AGR | DWR | CEC | CA | SL | SLC | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Adopting Agency | **BSC ** | BSC- CG |
SFM | 1 | 2 | 1-AC | **AC ** | SS | SS/CC | 1 | 1R | 2 | 3 | 4 | 5 | 5 | 5 | 5 | 5 | 5 | 5 | 5 | 5 |
| Adopt Entire Chapter | X | ||||||||||||||||||||||
| Adopt Entire Chapter as amended (amended sections listed below) |
|||||||||||||||||||||||
| Adopt only those sections that are listed below |
**X ** | **X ** | **X ** | **X ** | **X ** | X | |||||||||||||||||
| Chapter/Section | |||||||||||||||||||||||
| 1304.1.1 | **X ** | **X ** | **X ** | **X ** | **X ** | X | |||||||||||||||||
| 1304.1.2 | **X ** | **X ** | **X ** | **X ** | **X ** | X |
This state agency does not adopt sections identified with the following symbol: The Office of the State Fire Marshal’s adoption of this chapter or individual sections is applicable to structures regulated by other state agencies pursuant to Section 1.11.0.
2022 CALIFORNIA PLUMBING CODE 267
268 2022 CALIFORNIA PLUMBING CODE
CHAPTER 13
HEALTH CARE FACILITIES AND MEDICAL GAS AND MEDICAL VACUUM SYSTEMS
1302.0 Design Requirements.¶
1303.0 Health Care Facilities.¶
1301.0 General Requirements.¶
1304.0 Medical Gas and Medical Vacuum Piping Sys-¶
tems.
1305.0 System Performance.¶
1307.0 Central Supply Systems.¶
1306.0 System Certification.¶
1308.0 Pressure-Regulating Equipment.¶
1309.0 Oxygen Concentrator Supply Units.¶
1310.0 Category 1 Medical Air Central Supply Sys-¶
tems.
1311.0 Compressor Intake.¶
1312.0 Medical Surgical Vacuum Central Supply Sys-¶
tems.
1313.0 Medical-Surgical Vacuum Exhaust.¶
1314.0 Valves.¶
1315.0 Station Outlets and Inlets.¶
1316.0 Pressure and Vacuum Indicator Locations.¶
1317.0 Warning Systems.¶
1318.0 Piping Materials for Field-Installed Positive¶
Pressure Medical Gas Systems.
1319.0 Piping Materials for Field-Installed Medical-¶
Surgical Vacuum Systems.
1320.0 Joints and Connections.¶
1321.0 Brazed Joints.¶
1322.0 Welded Joints.¶
1323.0 Installation of Piping and Equipment.¶
1324.0 Performance Criteria and Testing Category 1¶
(Gases, Medical Surgical Vacuum).
1326.0 Category 3 Piped Gas and Vacuum Systems.¶
1325.0 Category 2 Piped Gas and Vacuum Systems.¶
1327.0 Dental Gas and Vacuum Systems.¶
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — California Plumbing Code (Title 24, Part 5)
- Chapter 1 — GENERAL CODE PROVISIONS
- Chapter 2 — DEFINITIONS
- Chapter 3 — GENERAL REGULATIONS
- Chapter 4 — PLUMBING FIXTURES AND FIXTURE FITTINGS
- Chapter 5 — WATER HEATERS
- Chapter 6 — WATER SUPPLY AND DISTRIBUTION
- Chapter 7 — SANITARY DRAINAGE
- Chapter 8 — INDIRECT WASTES
- Chapter 9 — VENTS
- Chapter 10 — TRAPS AND INTERCEPTORS
- Chapter 11 — STORM DRAINAGE
- Chapter 12 — FUEL GAS PIPING
▸Chapter 13 — HEALTH CARE FACILITIES AND MEDICAL GAS AND MEDICA…
Overview- 1302.1 Risk Categories. Activities, systems, or equipment
- 1302.2 Patient Care Spaces. The health care facility’s
- 1302.3 Anesthesia. It shall be the responsibility of the
- 1302.4 Wet Procedure Locations. It shall be the responsibility…
- 1303.1 Drinking Fountain Control Valves. Drinking
- 1303.2 Psychiatric Patient Rooms. Piping and drain
- 1301.1 Applicability. This chapter applies to the special fixt…
- 1301.2 Where Not Applicable. This chapter does not apply
- 1301.3 Conflict of Requirements. The requirements of
- 1301.4 Where Required. Construction and equipment
- 1301.5 Existing Systems. Only the altered, renovated, or
- 1303.3 Locations for Ice Storage. Ice makers or ice storage co…
- 1303.4 Sterilizers and Bedpan Steamers. Sterilizers
- 1303.5 Aspirators. Provisions for aspirators or other watersup…
- 1303.6 Drains. Drains shall be installed on dryers, aftercoole…
- 1303.7 Clinical Sinks. Clinical sinks shall be installed in
- 1303.8 Water Supply for Hospitals. Hospitals shall be
- 1303.9 Work Performed in Occupied Healthcare
- 1304.1 General. The installation of medical gas and medical va…
- 1304.2 Certification of Systems. Certification of medical gas …
- 1304.3 Construction Documents. Before a medical gas
- 1304.4 Extent of Work. Construction documents submitted
- 1304.5 Record. A record of as-built plans and valve identifica…
- 1305.1 Required Operating Pressures. Medical gas and
- 1306.3 Report Items. A report that includes the specific
- 1306.4 Components. Functioning of alarm components
- 1307.1 Terms. Where the terms medical gas or medical support g…
- 1305.2 Minimum Flow Rates. Medical gas and vacuum
- 1305.3 Minimum Station Outlets and Inlets. Station
- 1306.1 Certification. Prior to a medical gas or vacuum system …
- 1306.2 Certification Tests. Certification tests, verified and
- 1307.4 Materials. Materials used in central supply systems
- 1307.2 Nature of Hazards of Gas and Vacuum Sys-
- 1307.3 Permitted Locations for Medical Gases. Central supply s…
- 1308.1 Where Required. Pressure-regulating equipment
- 1308.2 Pressure Relief Valves. All pressure relief valves
- 1308.3 Pressure-Relief Valve Requirements. Central
- 1309.1 Oxygen Requirements. Oxygen concentrator supply units f…
- 1309.2 Particulate Size. Output shall have less than or
- 1309.3 Suitability. Materials of construction on the air side
- 1309.4 Compatible Materials. Materials of construction
- 1309.5 Oxygen Concentrator Components. The components that mak…
- 1309.6 Supply Air Quality. The supply air to the concentrators…
- 1309.7 Electrical Components. The oxygen concentrator
- 1309.8 Vent Valve. A vent valve shall be provided as follows:
- 1309.9 Valved Sample Port. A DN8 (NPS 1/4) valved
- 1309.10 Suitable Filter. At least one 0.1 micron filter suitab…
- 1309.11 Check Valve. A check valve shall be provided at
- 1310.4 Medical Air Receivers. Receivers for medical air
- 1310.5 Valves. A medical air receiver(s) shall be provided
- 1309.12 Outlet Valve. An outlet valve shall be provided to
- 1309.13 Oxygen Concentration Monitor. The oxygen
- 1310.1 Quality of Medical Air. Medical air shall be
- 1310.2 Uses of Medical Air. Medical air sources shall be
- 1310.3 Medical Air Compressors. Medical air compressors shall …
- 1312.2 Medical-Surgical Vacuum Sources. Medicalsurgical vacuum…
- 1312.3 Vacuum Receivers. Receivers for vacuum shall
- 1312.4 Vacuum Filtration. Central supply systems for vacuum sh…
- 1311.1 Air Sources. Air sources for medical air compressors sh…
- 1311.2 Medical Air Compressor Source. The medical
- 1311.3 Air Intakes. Compressor intake piping shall be permitte…
- 1311.4 Location. Medical air intakes shall be located as follo…
- 1311.5 Separate Compressors. Air intakes for separate
- 1311.6 Screening. The end of the intake shall be turned
- 1312.1 General. The vacuum plant shall be installed in a
- 1312.5 Piping Arrangement and Redundancies. Piping arrangement…
- 1312.6 Piping Serviceability. The medical-surgical vacuum rece…
- 1312.7 Shutoff Valve. Medical-surgical vacuum central
- 1313.1 Vacuum Source Exhausts. The medical-surgical
- 1313.2 Location. The exhaust shall be located as follows:
- 1313.3 Screening. The end of the exhaust shall be turned
- 1313.4 Dips and Loops. The exhaust shall be free of dips
- 1313.5 Multiple Pumps. Vacuum exhausts from multiple
- 1314.1 Gas and Vacuum Shutoff Valves. Shutoff valves
- 1314.2 Security. All valves, except valves in zone valve
- 1314.3 Labeled. All valves shall be labeled as to gas supplied…
- 1314.4 Accessibility. Zone valves shall be installed in
- 1314.5 Valve Types. New or replacement valves shall be
- 1314.10 Zone Valves. All station outlets/inlets shall be suppl…
- 1314.11 In-Line Shutoff Valves. Optional in-line valves
- 1314.12 Valves for Future Connections. Future connection valve…
- 1315.1 General. Each station outlet/inlet for medical gases
- 1315.2 Required Valves. Each station outlet shall consist
- 1314.6 Source Valves. A shutoff valve shall be placed at the
- 1314.7 Main Line Valve. A shutoff valve shall be provided
- 1314.8 Riser Valves. Each riser supplied from the main line
- 1314.9 Service Valves. Service valves shall be installed to
- 1315.15 Post Installation. After installation of the piping,
- 1316.1 Isolation. A pressure-relief valve shall not be isolate…
- 1316.2 Pressure and Vacuum Indicator Locations.
- 1317.1 Category 1. All master, area, and local alarm systems u…
- 1315.3 Secondary Valve. The secondary valve (or assembly) shal…
- 1315.4 Identification. Each outlet/inlet shall be legibly iden…
- 1315.5 Threaded Outlets/Fittings. Threaded
- 1315.6 Gas-Specific Station Outlet/Inlet. Each station
- 1315.7 Common Parts. The use of common parts in outlets/inlets…
- 1315.8 Marking of Components. Components of a vacuum station i…
- 1315.9 Components Not Specific to a Vacuum. Components of inle…
- 1315.10 Factory-Installed Copper Inlet Tubes. Factoryinstalled…
- 1315.11 Factory-Installed Copper Outlet Tubes. Factory-install…
- 1315.12 Protection from Damage. Station outlets/inlets
- 1315.13 Multiple Wall Outlets/Inlets. When multiple wall
- 1315.14 Nonstandard Operation Pressures. Station
- 1318.1 General. The provisions of this section shall apply
- 1318.2 Cleaning. Tubes, valves, fittings, station outlets, and
- 1318.3 Delivery. Each length of tube shall be delivered
- 1318.4 Tubes for Medical Gas Systems. Tubes shall be
- 1318.5 Manufacturer Markings. ASTM B819, medical gas
- 1318.6 Documentation. The installer shall furnish documentatio…
- 1319.1 Tubes for Medical Vacuum Systems. Piping for
- 1320.1 General. This section sets forth the requirements for
- 1320.2 Changes in Direction. Positive pressure patient
- 1321.1 Brazed Joints and Fittings. Fittings shall be
- 1321.2 Tube Joints. Brazed tube joints shall be the socket
- 1321.3 Filler Metals. Filler metals shall bond with and be
- 1321.4 Copper-to-Copper Joints. Copper-to-copper
- 1321.5 Accessible. Joints to be brazed in place shall be
- 1321.6 Purging. Braze joints shall be continuously purged
- 1321.7 Tube Ends. Tube ends shall be cut square using a
- 1321.8 Cleaning Procedures. The interior surfaces of
- 1321.9 Brazing Dissimilar Metals. Flux shall only be
- 1321.10 Nitrogen Purge. When brazing, joints shall be
- 1321.11 Assembling and Heating Brazed Joints. Tube
- 1321.12 Inspection of Brazed Joints. After brazing, the
- 1322.1 Welded Joints Procedure. Welded joints for
- 1322.6 Other Types of Fittings. Listed or approved metallic ga…
- 1322.7 Prohibited Joints. The following joints shall be
- 1323.1 Required Pipe Sizing. Piping systems shall be
- 1322.2 Welding for Stainless Tube. Stainless tube shall
- 1322.3 Memory Metal Fittings. Memory metal fittings
- 1322.4 Axially Swaged Fittings. Axially swaged, elastic
- 1322.5 Threaded Fittings. Threaded fittings shall meet the
- 1323.2 Pipe Protection. Piping shall be protected against
- 1323.3 Location of Piping. Piping risers shall be permitted to…
- 1323.5 Frost Protection. Buried piping outside of buildings sh…
- 1323.4 Pipe Support. Piping shall be supported from the
- 1323.6 Connectors. Hose and flexible connectors, both
- 1323.7 Prohibited System Interconnections. Two or
- 1323.8 Manufacturer’s Instructions. The installation of
- 1323.9 Changes in System Use. Where a positive-pressure medica…
- 1323.10 Qualifications of Installers. The installation of
- 1323.11 Qualification of Brazing Procedures and
- 1323.12 Breaching or Penetrating Medical Gas Pip-
- 1323.13 Labeling, Identification and Operating Pres-
- 1323.14 Identification of Shutoff Valves. Shutoff valves
- 1323.15 Identification. Station outlets and inlets shall be
- 1324.1 Where Required. Inspection and testing shall be
- 1324.2 Breached Systems. All systems that are breached
- 1324.3 Test Gas. The test gas shall be oil-free, dry nitrogen
- 1324.4 Initial Piping Blowdown. Piping in medical gas
- 1324.5 Initial Pressure Tests – Medical Gas and Vac-
- 1325.11 Category 2 Distribution. Level 2 systems shall
- 1325.12 Labeling and Identification. Category 2 systems shall …
- 1325.13 Performance Criteria and Testing — Cate-
- 1326.1 General. Category 3 piped gas and vacuum systems
- 1326.2 Nature of Hazards of Gas and Vacuum Sys-
- 1326.3 Medical Air Supply Systems. Category 3 systems shall co…
- 1326.4 Oxygen Central Supply Systems Using Con-
- 1326.5 Medical–Surgical Vacuum. Category 3 systems
- 1325.1 General. Category 2 piped gas or piped vacuum system re…
- 1325.2 Nature of Hazards of Gas and Vacuum Sys-
- 1325.3 Central Supply Systems. Category 2 systems
- 1325.4 Category 2 Medical Air Supply Systems. Category 2 syste…
- 1325.5 Oxygen Concentrators. Oxygen supply systems
- 1325.6 Category 2 Medical-Surgical Vacuum. Category 2 systems …
- 1325.7 Valves. Category 2 systems shall comply with Section 13…
- 1325.8 Station Outlets and Inlets. Category 2 systems
- 1325.9 Pressure and Vacuum Indicators. Category 2
- 1325.10 Warning Systems (Category 2). Warning systems associat…
- 1327.4 Initial Pressure Test. Each section of the piping in
- 1326.6 Valves. Category 3 systems shall comply with Section 13…
- 1326.7 Station Outlets and Inlets. Category 3 systems
- 1326.8 Pressure and Vacuum Indicators. Category 3
- 1326.9 Warning Systems. Warning systems associated
- 1326.10 Distribution. Category 3 systems shall comply
- 1326.11 Labeling and Identification. Category 3 systems
- 1327.1 General. Dental gas and vacuum systems shall comply wit…
- 1327.2 Emergency Shutoff Valves (Oxygen and
- 1327.3 Warning Systems (Oxygen and Nitrous
- 1327.5 Maximum Copper Tube Support Spacing. The
- 1327.8 Verifier Operational Pressure Test. Operational
- 1327.6 Maximum Plastic Pipe Support Spacing. The
- 1327.7 Standing Pressure Tests for Oxygen and
- Chapter 14 — FIRESTOP PROTECTION
- Chapter 15 — ALTERNATE WATER SOURCES FOR NONPOTABLE APPLICATIONS
- Chapter 16 — NONPOTABLE RAINWATER CATCHMENT SYSTEMS
- Chapter 17 — REFERENCED STANDARDS
- Appendix A — RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYS…
- Appendix B — EXPLANATORY NOTES ON COMBINATION WASTE AND VENT S…
- Appendix C — ALTERNATE PLUMBING SYSTEMS
- Appendix D — SIZING STORM WATER DRAINAGE SYSTEMS
- Appendix E — MANUFACTURED/MOBILE HOME PARKS AND RECREATIONAL V…
- Appendix F — FIREFIGHTER BREATHING AIR REPLENISHMENT SYSTEMS
- Appendix G — SIZING OF VENTING SYSTEMS
- Appendix H — PRIVATE SEWAGE DISPOSAL SYSTEMS
- Appendix I — INSTALLATION STANDARDS
- Appendix J — COMBINATION OF INDOOR AND OUTDOOR COMBUSTION AND …
- Appendix K — POTABLE RAINWATER CATCHMENT SYSTEMS
- Appendix L — SUSTAINABLE PRACTICES
- Appendix M — PEAK WATER DEMAND CALCULATOR
- Appendix N — IMPACT OF WATER TEMPERATURE ON THE POTENTIAL FOR …