Chapter 13 — HEALTH CARE FACILITIES AND MEDICAL GAS AND MEDICAL VACUUM SYSTEMS
1324.5 Initial Pressure Tests – Medical Gas and Vac-
California Plumbing Code (Title 24, Part 5) · 2022 edition · updated 2026-09-10 · California
Italicized text is a California amendment to the model code, as printed in the official publication.
uum Systems. Each section of the piping in medical gas and vacuum systems shall be pressure tested. Initial pressure tests shall be conducted as follows: (1) After blowdown of the distribution piping. (2) After installation of station outlet/inlet rough-in assem blies. (3) Prior to the installation of components of the distribution
piping system that would be damaged by the test pressure (e.g., pressure/vacuum alarm devices, pressure/vacuum indicators, line pressure relief valves). [NFPA 99:5.1.12.2.3.1, 5.1.12.2.3.2] 1324.5.1 Shutoff Valve. The source shutoff valve shall remain closed during tests specified in Section 1324.5 through Section 1324.5.1.2. [NFPA 99:5.1.12.2.3.3]
1324.5.1.1 Required Test Pressure. The test pressure for pressure gases and vacuum systems shall be 1.5 times the system operating pressure but not less than a gauge pressure of 150 psi (1034 kPa). The test pressure shall be maintained until each joint has been examined for leakage by means of a leak detectant that is safe for use with oxygen and does not contain ammonia. [NFPA 99:5.1.12.2.3.4, 5.1.12.2.3.5] 1324.5.1.2 Leaks. Leaks, if any, shall be located, repaired (if permitted), replaced (if required), and retested. [NFPA 99:5.1.12.2.3.6] 1324.5.2 Initial Cross-Connection Test. It shall be determined that no cross-connections exist between the various medical gas and vacuum piping systems. [NFPA 99:5.1.12.2.4] 1324.5.2.1 Atmospheric Pressure. All piping systems shall be reduced to atmospheric pressure.
[NFPA 99:5.1.12.2.4.1] 1324.5.2.2 Sources of Test Gas. Sources of test gas shall be disconnected from all piping systems, except for the one system being tested. [NFPA 99:5.1.12.2.4.2] 1324.5.2.3 System to Be Charged. The system under test shall be charged with oil-free, dry nitrogen NF to a gauge pressure of 50 psi (345 kPa).
[NFPA 99:5.1.12.2.4.3] 1324.5.2.4 Check Outlets and Inlets. After the installation of the individual faceplates with appropriate adapters matching outlet/inlet labels, each individual outlet/inlet in each installed medical gas and vacuum piping system shall be checked to determine that the test gas is being dispensed only from the piping system being tested. [NFPA 99:5.1.12.2.4.4]
«
«
«
«
«
«
«
«
290 2022 CALIFORNIA PLUMBING CODE
HEALTH CARE FACILITIES AND MEDICAL GAS AND MEDICAL VACUUM SYSTEMS
»
»
»
»
»
» »
»
»
»
»
1324.5.2.5 Repeat Test. The cross-connection test referenced in Section 1324.5.2 shall be repeated for each installed medical gas and vacuum piping system. [NFPA 99:5.1.12.2.4.5] 1324.5.2.6 Identification of System. The proper labeling and identification of system outlets/inlets shall be confirmed during these tests. [NFPA 99:5.1.12.2.4.6] 1324.5.3 Initial Piping Purge Tests. The outlets in each medical gas piping system shall be purged to remove any particulate matter from the distribution piping. [NFPA 99:5.1.12.2.5]
d vacuum piping system. [NFPA 99:5.1.12.2.4.5] 1324.5.2.6 Identification of System. The proper labeling and identification of system outlets/inlets shall be confirmed during these tests. [NFPA 99:5.1.12.2.4.6] 1324.5.3 Initial Piping Purge Tests. The outlets in each medical gas piping system shall be purged to remove any particulate matter from the distribution piping. [NFPA 99:5.1.12.2.5]
1324.5.3.1 Procedure. Using appropriate adapters, each outlet shall be purged with an intermittent high-volume flow of test gas until the purge produces no discoloration in a clean white cloth.
[NFPA 99:5.1.12.2.5.1] 1324.5.3.2 Location. The purging required in Section 1324.5.3.1 shall be started at the closest outlet/inlet to the zone valve and continue to the furthest outlet/inlet within the zone. [NFPA 99:5.1.12.2.5.2]
1324.5.4 Standing Pressure Tests – for Positive Pressure Medical Gas Piping Systems. After successful completion of the initial pressure tests under Section 1324.5 through Section 1324.5.1.2, medical gas distribution piping shall be subjected to a standing pressure test. [NFPA 99:5.1.12.2.6]
1324.5.4.1 Time Frame for Testing. Tests shall be conducted after the final installation of station outlet valve bodies, faceplates, and other distribution system components (e.g. pressure alarm devices, pressure indicators, line pressure relief valves, manufactured assemblies, hose). [NFPA 99:5.1.12.2.6.1] 1324.5.4.2 Source Valve. The source valve shall be closed during this test. [NFPA 99:5.1.12.2.6.2] 1324.5.4.3 Length of Testing. The piping systems shall be subjected to a 24 hour standing pressure test using oil-free, dry nitrogen NF. [NFPA 99:5.1.12.2.6.3] 1324.5.4.4 Test Pressure. Test pressures shall be 20 percent above the normal system operating line pressure. [NFPA 99:5.1.12.2.6.4] 1324.5.4.5 Conclusion of Test. The leakage over the 24 hour test shall not exceed 0.5 percent of the starting pressure [e.g., 0.3 psi (2 kPa) starting at 60 psig (414 kPa), 0.125 inch (3.2 mm) HgV starting at 25 inches (635 mm) HgV] except that attributed to specific changes of ambient temperature.
[NFPA 99:5.1.12.2.6.5] 1324.5.4.6 Leaks. Leaks, if any, shall be located, repaired (if permitted) or replaced (if required), and retested. [NFPA 99:5.1.12.2.6.6] 1324.5.4.7 Proof of Testing. The 24 hour standing pressure test of the positive pressure system shall be
witnessed by an ASSE 6020 inspector, an ASSE 6030 verifier, or the Authority Having Jurisdiction or its designee. A form indicating that this test has been performed and witnessed shall be provided to the verifier at the start of the tests required in Section 1324.5.7 through Section 1324.5.11. [NFPA 99:5.1.12.2.6.7]
1324.5.5 Standing Pressure Tests – Medical Vac- uum Piping Systems. After successful completion of the initial pressure tests under Section 1324.5 through Section 1324.5.1.2, vacuum distribution piping shall be subjected to a standing vacuum test. [NFPA 99:5.1.12.2.7] 1324.5.5.1 Timeframe for Testing. Tests shall be conducted after installation of all components of the vacuum system. [NFPA 99:5.1.12.2.7.1] 1324.5.5.2 Length of Testing. The piping systems shall be subjected to a 24 hour standing vacuum test. [NFPA 99:5.1.12.2.7.2] 1324.5.5.3 Test Pressure. Test pressure shall be between 12 inches (305 mm) HgV and full vacuum.
[NFPA 99:5.1.12.2.7.3]
1324.5.5.4 Disconnection of Testing Source. During the test, the source of test vacuum shall be disconnected from the piping system. [NFPA 99:5.1.12.2.7.4] 1324.5.5.5 Conclusion of Test. At the conclusion of the test, there shall be no change in the vacuum other than that attributed to changes of ambient temperature. [NFPA 99:5.1.12.2.7.5] 1324.5.5.6 Proof of Testing. The 24 hour standing pressure test of the vacuum system shall be witnessed by the Authority Having Jurisdiction or its designee. A form indicating that this test has been performed and witnessed shall be provided to the verifier at the start of the tests required in Section 1324.5.7 through Section 1324.5.11. [NFPA 99:5.1.12.2.7.6] 1324.5.5.7 Leaks. Leaks, if any, shall be located, repaired (if permitted) or replaced (if required), and retested. [NFPA 99:5.1.12.2.7.7] 1324.5.6 System Inspection. System inspections shall be performed prior to concealing piping distribution systems in walls, ceilings, chases, trenches, underground, or otherwise hidden from view. [NFPA 99:5.1.12.3.1.1] 1324.5.6.1 Test Gas. The test gas shall be nitrogen NF. [NFPA 99:5.1.12.3.1.2] 1324.5.6.2 Inspection Qualification. Inspections shall be conducted by a party technically competent and experienced in the field of medical gas and vacuum pipeline inspections and testing and meeting the requirements of ASSE 6020, or ASSE 6030. [NFPA 99:5.1.12.3.1.3] 1324.5.6.3 Inspection Personnel. Inspections shall be performed by a party other than the installing contractor. [NFPA 99:5.1.12.3.1.4]
«
«
«
«
«
«
«
«
2022 CALIFORNIA PLUMBING CODE 291
HEALTH CARE FACILITIES AND MEDICAL GAS AND MEDICAL VACUUM SYSTEMS
»
»
1324.5.6.4 Qualifications. Where systems have not been installed by inhouse personnel, inspections shall be permitted by personnel of the organization who meet the requirements of Section 1324.5.6.2.
[NFPA 99:5.1.12.3.1.5] 1324.5.6.5 Inspections. The initial pressure tests performed by the installing contractor shall be witnessed by an ASSE 6020 inspector, an ASSE 6030 verifier, or the Authority Having Jurisdiction or its designee. A form indicating that this test has been performed and witnessed shall be provided to the verifier at the start of the tests required in Section 1324.5.7 through Section 1324.5.11. The presence and correctness of labeling and valve tagging required by this code for all concealed components and piping distribution systems shall be inspected. [NFPA 99:5.1.12.3.2 – 5.1.12.3.2.2] 1324.5.7 System Verification. Verification tests shall be performed only after all tests required in Section 1324.3 through Section 1324.5.5.7, Installer Performed Tests, have been completed. [NFPA 99:5.1.12.4.1.1]
1324.5.7.1 Test Gas. The test gas shall be oil-free, dry nitrogen NF or the system gas where permitted.
[NFPA 5.1.12.4.1.2] 1324.5.7.2 Approved Tester. Testing shall be conducted by a party technically competent and experienced in the field of medical gas and vacuum pipeline testing and meeting the requirements of ASSE 6030, except as required by Section 1324.5.7.3. [NFPA 99:5.1.12.4.1.3] Testing shall be performed by a party other than the installing contractor. [NFPA 99:5.1.12.4.1.5]
«
«
«
means that will allow detection of leaks in an active vacuum system. [NFPA 99:5.1.12.4.9.3] 1324.5.9.2 Pressure Gases. For pressure gases, immediately after the final brazed connection is made and leak-tested, an outlet in the new piping and an outlet in the existing piping that are immediately downstream from the point or area of intrusion shall be purged in accordance with the applicable requirements of Section 1324.5.8. [NFPA 99:5.1.12.4.9.4] 1324.5.9.3 Positive Pressure Gases. Before the new work is used for patient care, positive pressure gases shall be tested for operational pressure and gas concentration in accordance with Section 1324.5.10 and Section 1324.5.11. [NFPA 99:5.1.12.4.9.5] 1324.5.9.4 Permanent Records. Permanent records of these tests shall be maintained in accordance with NFPA 99. [NFPA 99:5.1.12.4.9.6] 1324.5.10 Operational Flow Pressure Drop Test. Operational flow pressure drop tests shall be performed at each station outlet/inlet or terminal where the user makes connections and disconnections. [NFPA 99: 5.1.12.4.10] 1324.5.10.1 Medical-Surgical Vacuum Inlets. Medical-surgical vacuum inlets shall draw 3 SCFM (85 Nl/min) without reducing the vacuum pressure below 12 inch (305 mm) gauge HgV at any adjacent station inlet. [NFPA 99:5.1.12.4.10.4] 1324.5.10.2 Oxygen and Medical Air Outlets. Oxygen and medical air outlets serving Category 1 space shall allow a transient flow rate of 6 SCFM (170 SLPM) for 3 seconds. [NFPA 99:5.1.12.4.10.5] 1324.5.11 Medical Gas Concentration Test. After purging each system with the gas of system designation, the following shall be performed: (1) Each pressure gas source and outlet shall be ana lyzed for concentration of gas, by volume. (2) Analysis shall be conducted with instruments
ng Category 1 space shall allow a transient flow rate of 6 SCFM (170 SLPM) for 3 seconds. [NFPA 99:5.1.12.4.10.5] 1324.5.11 Medical Gas Concentration Test. After purging each system with the gas of system designation, the following shall be performed: (1) Each pressure gas source and outlet shall be ana lyzed for concentration of gas, by volume. (2) Analysis shall be conducted with instruments
designed to measure the specific gas dispensed. (3) Allowable concentrations shall be as indicated in
«
«
[NFPA 5.1.12.4.1.2] makes connections and disconnections. [NFPA 99: 1324.5.7.2 Approved Tester. Testing shall be 5.1.12.4.10]
»
conducted by a party technically competent and 1324.5.10.1 Medical-Surgical Vacuum Inlets.
«
Table 1324.5.11. [NFPA 99:5.1.12.4.11]
Table 1324.5.11. [NFPA 99:5.1.12.4.11]
1324.5.8 Particulate Matter. In order to remove any
»
traces of particulate matter deposited in the pipelines as TABLE 1324.5.11
«
»
»
Where systems have not been installed by inhouse personnel, testing shall be permitted by personnel of that organization who meet the requirements of Section 1324.5.7.2. [NFPA 99:5.1.12.4.1.6] 1324.5.7.3 Cryogenic Fluid Testing. Testing of the cryogenic fluid central supply system shall be conducted by a party technically competent and experienced in the field of cryogenic fluid systems and meeting the requirements of ASSE 6035, in accordance with the mandatory requirements in CGA M-1. [NFPA 99:5.1.12.4.1.4] 1324.5.8 Particulate Matter. In order to remove any traces of particulate matter deposited in the pipelines as a result of construction, a heavy, intermittent purging of the pipeline shall be done. [NFPA 99:5.1.12.4.6] 1324.5.9 Final Tie-In Test. Each joint in the final connection between the new work and the existing system shall be leak-tested with the gas of system designation at the normal operating pressure by means of a leak detectant that is safe for use with oxygen and does not contain ammonia. [NFPA 99:5.1.12.4.9.2]
1324.5.9.1 Vacuum Joints. Vacuum joints shall be tested using an ultrasonic leak detector or other
TABLE 1324.5.11 GAS CONCENTRATIONS
[NFPA 99: TABLE 5.1.12.4.11]
| MEDICAL GAS | CONCENTRATION |
|---|---|
Oxygen USP |
≥99% oxygen |
Oxygen 93 USP |
≥90% oxygen≤96% |
Nitrous oxide USP |
≥99% nitrous oxide |
Nitrogen NF |
≤1% oxygen or≥99% nitrogen |
Medical air USP |
19.5% - 23.5% oxygen |
Other gases |
Named gases by ±1%, or per specification |
292 2022 CALIFORNIA PLUMBING CODE
HEALTH CARE FACILITIES AND MEDICAL GAS AND MEDICAL VACUUM SYSTEMS
(2) The alarm panel shall be located in an area of continuous
surveillance while the facility is in operation. (3) Pressure and vacuum switches/sensors shall be mounted
at the source equipment with a pressure indicator at the master alarm panel. [NFPA 99:5.2.9]
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — California Plumbing Code (Title 24, Part 5)
- Chapter 1 — GENERAL CODE PROVISIONS
- Chapter 2 — DEFINITIONS
- Chapter 3 — GENERAL REGULATIONS
- Chapter 4 — PLUMBING FIXTURES AND FIXTURE FITTINGS
- Chapter 5 — WATER HEATERS
- Chapter 6 — WATER SUPPLY AND DISTRIBUTION
- Chapter 7 — SANITARY DRAINAGE
- Chapter 8 — INDIRECT WASTES
- Chapter 9 — VENTS
- Chapter 10 — TRAPS AND INTERCEPTORS
- Chapter 11 — STORM DRAINAGE
- Chapter 12 — FUEL GAS PIPING
▸Chapter 13 — HEALTH CARE FACILITIES AND MEDICAL GAS AND MEDICA…
Overview- 1302.1 Risk Categories. Activities, systems, or equipment
- 1302.2 Patient Care Spaces. The health care facility’s
- 1302.3 Anesthesia. It shall be the responsibility of the
- 1302.4 Wet Procedure Locations. It shall be the responsibility…
- 1303.1 Drinking Fountain Control Valves. Drinking
- 1303.2 Psychiatric Patient Rooms. Piping and drain
- 1301.1 Applicability. This chapter applies to the special fixt…
- 1301.2 Where Not Applicable. This chapter does not apply
- 1301.3 Conflict of Requirements. The requirements of
- 1301.4 Where Required. Construction and equipment
- 1301.5 Existing Systems. Only the altered, renovated, or
- 1303.3 Locations for Ice Storage. Ice makers or ice storage co…
- 1303.4 Sterilizers and Bedpan Steamers. Sterilizers
- 1303.5 Aspirators. Provisions for aspirators or other watersup…
- 1303.6 Drains. Drains shall be installed on dryers, aftercoole…
- 1303.7 Clinical Sinks. Clinical sinks shall be installed in
- 1303.8 Water Supply for Hospitals. Hospitals shall be
- 1303.9 Work Performed in Occupied Healthcare
- 1304.1 General. The installation of medical gas and medical va…
- 1304.2 Certification of Systems. Certification of medical gas …
- 1304.3 Construction Documents. Before a medical gas
- 1304.4 Extent of Work. Construction documents submitted
- 1304.5 Record. A record of as-built plans and valve identifica…
- 1305.1 Required Operating Pressures. Medical gas and
- 1306.3 Report Items. A report that includes the specific
- 1306.4 Components. Functioning of alarm components
- 1307.1 Terms. Where the terms medical gas or medical support g…
- 1305.2 Minimum Flow Rates. Medical gas and vacuum
- 1305.3 Minimum Station Outlets and Inlets. Station
- 1306.1 Certification. Prior to a medical gas or vacuum system …
- 1306.2 Certification Tests. Certification tests, verified and
- 1307.4 Materials. Materials used in central supply systems
- 1307.2 Nature of Hazards of Gas and Vacuum Sys-
- 1307.3 Permitted Locations for Medical Gases. Central supply s…
- 1308.1 Where Required. Pressure-regulating equipment
- 1308.2 Pressure Relief Valves. All pressure relief valves
- 1308.3 Pressure-Relief Valve Requirements. Central
- 1309.1 Oxygen Requirements. Oxygen concentrator supply units f…
- 1309.2 Particulate Size. Output shall have less than or
- 1309.3 Suitability. Materials of construction on the air side
- 1309.4 Compatible Materials. Materials of construction
- 1309.5 Oxygen Concentrator Components. The components that mak…
- 1309.6 Supply Air Quality. The supply air to the concentrators…
- 1309.7 Electrical Components. The oxygen concentrator
- 1309.8 Vent Valve. A vent valve shall be provided as follows:
- 1309.9 Valved Sample Port. A DN8 (NPS 1/4) valved
- 1309.10 Suitable Filter. At least one 0.1 micron filter suitab…
- 1309.11 Check Valve. A check valve shall be provided at
- 1310.4 Medical Air Receivers. Receivers for medical air
- 1310.5 Valves. A medical air receiver(s) shall be provided
- 1309.12 Outlet Valve. An outlet valve shall be provided to
- 1309.13 Oxygen Concentration Monitor. The oxygen
- 1310.1 Quality of Medical Air. Medical air shall be
- 1310.2 Uses of Medical Air. Medical air sources shall be
- 1310.3 Medical Air Compressors. Medical air compressors shall …
- 1312.2 Medical-Surgical Vacuum Sources. Medicalsurgical vacuum…
- 1312.3 Vacuum Receivers. Receivers for vacuum shall
- 1312.4 Vacuum Filtration. Central supply systems for vacuum sh…
- 1311.1 Air Sources. Air sources for medical air compressors sh…
- 1311.2 Medical Air Compressor Source. The medical
- 1311.3 Air Intakes. Compressor intake piping shall be permitte…
- 1311.4 Location. Medical air intakes shall be located as follo…
- 1311.5 Separate Compressors. Air intakes for separate
- 1311.6 Screening. The end of the intake shall be turned
- 1312.1 General. The vacuum plant shall be installed in a
- 1312.5 Piping Arrangement and Redundancies. Piping arrangement…
- 1312.6 Piping Serviceability. The medical-surgical vacuum rece…
- 1312.7 Shutoff Valve. Medical-surgical vacuum central
- 1313.1 Vacuum Source Exhausts. The medical-surgical
- 1313.2 Location. The exhaust shall be located as follows:
- 1313.3 Screening. The end of the exhaust shall be turned
- 1313.4 Dips and Loops. The exhaust shall be free of dips
- 1313.5 Multiple Pumps. Vacuum exhausts from multiple
- 1314.1 Gas and Vacuum Shutoff Valves. Shutoff valves
- 1314.2 Security. All valves, except valves in zone valve
- 1314.3 Labeled. All valves shall be labeled as to gas supplied…
- 1314.4 Accessibility. Zone valves shall be installed in
- 1314.5 Valve Types. New or replacement valves shall be
- 1314.10 Zone Valves. All station outlets/inlets shall be suppl…
- 1314.11 In-Line Shutoff Valves. Optional in-line valves
- 1314.12 Valves for Future Connections. Future connection valve…
- 1315.1 General. Each station outlet/inlet for medical gases
- 1315.2 Required Valves. Each station outlet shall consist
- 1314.6 Source Valves. A shutoff valve shall be placed at the
- 1314.7 Main Line Valve. A shutoff valve shall be provided
- 1314.8 Riser Valves. Each riser supplied from the main line
- 1314.9 Service Valves. Service valves shall be installed to
- 1315.15 Post Installation. After installation of the piping,
- 1316.1 Isolation. A pressure-relief valve shall not be isolate…
- 1316.2 Pressure and Vacuum Indicator Locations.
- 1317.1 Category 1. All master, area, and local alarm systems u…
- 1315.3 Secondary Valve. The secondary valve (or assembly) shal…
- 1315.4 Identification. Each outlet/inlet shall be legibly iden…
- 1315.5 Threaded Outlets/Fittings. Threaded
- 1315.6 Gas-Specific Station Outlet/Inlet. Each station
- 1315.7 Common Parts. The use of common parts in outlets/inlets…
- 1315.8 Marking of Components. Components of a vacuum station i…
- 1315.9 Components Not Specific to a Vacuum. Components of inle…
- 1315.10 Factory-Installed Copper Inlet Tubes. Factoryinstalled…
- 1315.11 Factory-Installed Copper Outlet Tubes. Factory-install…
- 1315.12 Protection from Damage. Station outlets/inlets
- 1315.13 Multiple Wall Outlets/Inlets. When multiple wall
- 1315.14 Nonstandard Operation Pressures. Station
- 1318.1 General. The provisions of this section shall apply
- 1318.2 Cleaning. Tubes, valves, fittings, station outlets, and
- 1318.3 Delivery. Each length of tube shall be delivered
- 1318.4 Tubes for Medical Gas Systems. Tubes shall be
- 1318.5 Manufacturer Markings. ASTM B819, medical gas
- 1318.6 Documentation. The installer shall furnish documentatio…
- 1319.1 Tubes for Medical Vacuum Systems. Piping for
- 1320.1 General. This section sets forth the requirements for
- 1320.2 Changes in Direction. Positive pressure patient
- 1321.1 Brazed Joints and Fittings. Fittings shall be
- 1321.2 Tube Joints. Brazed tube joints shall be the socket
- 1321.3 Filler Metals. Filler metals shall bond with and be
- 1321.4 Copper-to-Copper Joints. Copper-to-copper
- 1321.5 Accessible. Joints to be brazed in place shall be
- 1321.6 Purging. Braze joints shall be continuously purged
- 1321.7 Tube Ends. Tube ends shall be cut square using a
- 1321.8 Cleaning Procedures. The interior surfaces of
- 1321.9 Brazing Dissimilar Metals. Flux shall only be
- 1321.10 Nitrogen Purge. When brazing, joints shall be
- 1321.11 Assembling and Heating Brazed Joints. Tube
- 1321.12 Inspection of Brazed Joints. After brazing, the
- 1322.1 Welded Joints Procedure. Welded joints for
- 1322.6 Other Types of Fittings. Listed or approved metallic ga…
- 1322.7 Prohibited Joints. The following joints shall be
- 1323.1 Required Pipe Sizing. Piping systems shall be
- 1322.2 Welding for Stainless Tube. Stainless tube shall
- 1322.3 Memory Metal Fittings. Memory metal fittings
- 1322.4 Axially Swaged Fittings. Axially swaged, elastic
- 1322.5 Threaded Fittings. Threaded fittings shall meet the
- 1323.2 Pipe Protection. Piping shall be protected against
- 1323.3 Location of Piping. Piping risers shall be permitted to…
- 1323.5 Frost Protection. Buried piping outside of buildings sh…
- 1323.4 Pipe Support. Piping shall be supported from the
- 1323.6 Connectors. Hose and flexible connectors, both
- 1323.7 Prohibited System Interconnections. Two or
- 1323.8 Manufacturer’s Instructions. The installation of
- 1323.9 Changes in System Use. Where a positive-pressure medica…
- 1323.10 Qualifications of Installers. The installation of
- 1323.11 Qualification of Brazing Procedures and
- 1323.12 Breaching or Penetrating Medical Gas Pip-
- 1323.13 Labeling, Identification and Operating Pres-
- 1323.14 Identification of Shutoff Valves. Shutoff valves
- 1323.15 Identification. Station outlets and inlets shall be
- 1324.1 Where Required. Inspection and testing shall be
- 1324.2 Breached Systems. All systems that are breached
- 1324.3 Test Gas. The test gas shall be oil-free, dry nitrogen
- 1324.4 Initial Piping Blowdown. Piping in medical gas
- 1324.5 Initial Pressure Tests – Medical Gas and Vac-
- 1325.11 Category 2 Distribution. Level 2 systems shall
- 1325.12 Labeling and Identification. Category 2 systems shall …
- 1325.13 Performance Criteria and Testing — Cate-
- 1326.1 General. Category 3 piped gas and vacuum systems
- 1326.2 Nature of Hazards of Gas and Vacuum Sys-
- 1326.3 Medical Air Supply Systems. Category 3 systems shall co…
- 1326.4 Oxygen Central Supply Systems Using Con-
- 1326.5 Medical–Surgical Vacuum. Category 3 systems
- 1325.1 General. Category 2 piped gas or piped vacuum system re…
- 1325.2 Nature of Hazards of Gas and Vacuum Sys-
- 1325.3 Central Supply Systems. Category 2 systems
- 1325.4 Category 2 Medical Air Supply Systems. Category 2 syste…
- 1325.5 Oxygen Concentrators. Oxygen supply systems
- 1325.6 Category 2 Medical-Surgical Vacuum. Category 2 systems …
- 1325.7 Valves. Category 2 systems shall comply with Section 13…
- 1325.8 Station Outlets and Inlets. Category 2 systems
- 1325.9 Pressure and Vacuum Indicators. Category 2
- 1325.10 Warning Systems (Category 2). Warning systems associat…
- 1327.4 Initial Pressure Test. Each section of the piping in
- 1326.6 Valves. Category 3 systems shall comply with Section 13…
- 1326.7 Station Outlets and Inlets. Category 3 systems
- 1326.8 Pressure and Vacuum Indicators. Category 3
- 1326.9 Warning Systems. Warning systems associated
- 1326.10 Distribution. Category 3 systems shall comply
- 1326.11 Labeling and Identification. Category 3 systems
- 1327.1 General. Dental gas and vacuum systems shall comply wit…
- 1327.2 Emergency Shutoff Valves (Oxygen and
- 1327.3 Warning Systems (Oxygen and Nitrous
- 1327.5 Maximum Copper Tube Support Spacing. The
- 1327.8 Verifier Operational Pressure Test. Operational
- 1327.6 Maximum Plastic Pipe Support Spacing. The
- 1327.7 Standing Pressure Tests for Oxygen and
- Chapter 14 — FIRESTOP PROTECTION
- Chapter 15 — ALTERNATE WATER SOURCES FOR NONPOTABLE APPLICATIONS
- Chapter 16 — NONPOTABLE RAINWATER CATCHMENT SYSTEMS
- Chapter 17 — REFERENCED STANDARDS
- Appendix A — RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYS…
- Appendix B — EXPLANATORY NOTES ON COMBINATION WASTE AND VENT S…
- Appendix C — ALTERNATE PLUMBING SYSTEMS
- Appendix D — SIZING STORM WATER DRAINAGE SYSTEMS
- Appendix E — MANUFACTURED/MOBILE HOME PARKS AND RECREATIONAL V…
- Appendix F — FIREFIGHTER BREATHING AIR REPLENISHMENT SYSTEMS
- Appendix G — SIZING OF VENTING SYSTEMS
- Appendix H — PRIVATE SEWAGE DISPOSAL SYSTEMS
- Appendix I — INSTALLATION STANDARDS
- Appendix J — COMBINATION OF INDOOR AND OUTDOOR COMBUSTION AND …
- Appendix K — POTABLE RAINWATER CATCHMENT SYSTEMS
- Appendix L — SUSTAINABLE PRACTICES
- Appendix M — PEAK WATER DEMAND CALCULATOR
- Appendix N — IMPACT OF WATER TEMPERATURE ON THE POTENTIAL FOR …