1210.12 Systems Containing Flammable Gas-Air
California Plumbing Code (Title 24, Part 5) · 2022 edition · updated 2026-09-10 · California
Italicized text is a California amendment to the model code, as printed in the official publication.
Mixtures. Systems containing flammable gas-air mixtures shall be in accordance with Section 1210.12.1 through Section 1210.12.6.
1210.12.1 Required Components. A central premix system with a flammable mixture in the blower or compressor shall consist of the following components: (1) Gas-mixing machine in the form of an automatic
gas-air proportioning device combined with a downstream blower or compressor.
FUEL GAS PIPING
(2) Flammable mixture piping, minimum Schedule 40. (3) Automatic firecheck(s). (4) Safety blowout(s) or backfire preventers for systems
utilizing flammable mixture lines above 2 1 ⁄ 2 inches (65 mm) nominal pipe size (NPS) or the equivalent.
[NFPA 54:7.11.1] 1210.12.2 Optional Components. The following components shall also be permitted to be utilized in any type of central premix system: (1) Flowmeter(s) (2) Flame arrester(s) [NFPA 54:7.11.2] 1210.12.3 Additional Requirements. Gas-mixing machines shall have nonsparking blowers and shall be constructed so that a flashback does not rupture machine casings. [NFPA 54:7.11.3]
1210.12.4 Special Requirements for Mixing Blowers. A mixing blower system shall be limited to applications with minimum practical lengths of mixture piping, limited to a maximum mixture pressure of 10 inches water column (2.5 kPa) and limited to gases containing no more than 10 percent hydrogen. The blower shall be equipped with a gas control valve at its air entrance arranged so that gas is admitted to the airstream, entering the blower in proper proportions for correct combustion by the type of burners employed, the said gas control valve being of either the zero governor or mechanical ratio valve type that controls the gas and air adjustment simultaneously. No valves or other obstructions shall be installed between the blower discharge and the burner or burners. [NFPA 54:7.11.4] 1210.12.5 Installation of Gas-Mixing Machines. Installation of gas-mixing machines shall comply with the following: (1) The gas-mixing machine shall be located in a well ventilated area or in a detached building or cutoff room provided with room construction and explosion vents in accordance with sound engineering principles. Such rooms or below-grade installations shall have adequate positive ventilation. (2) Where gas-mixing machines are installed in well ventilated areas, the type of electrical equipment shall be in accordance with NFPA 70 for general service conditions unless other hazards in the area prevail. Where gas-mixing machines are installed in small detached buildings or cutoff rooms, the electrical equipment and wiring shall be installed in accordance with NFPA 70 for hazardous locations (Articles 500 and 501, Class I, Division 2). (3) Air intakes for gas-mixing machines using com pressors or blowers shall be taken from outdoors whenever practical. (4) Controls for gas-mixing machines shall include inter locks and a safety shutoff valve of the manual reset type in the gas supply connection to each machine arranged to automatically shut off the gas supply in
for hazardous locations (Articles 500 and 501, Class I, Division 2). (3) Air intakes for gas-mixing machines using com pressors or blowers shall be taken from outdoors whenever practical. (4) Controls for gas-mixing machines shall include inter locks and a safety shutoff valve of the manual reset type in the gas supply connection to each machine arranged to automatically shut off the gas supply in
2022 CALIFORNIA PLUMBING CODE 223
FUEL GAS PIPING
the event of high or low gas pressure. Except for open burner installations only, the controls shall be interlocked so that the blower or compressor stops operating following a gas supply failure. Where a system employs pressurized air, means shall be provided to shut off the gas supply in the event of air failure. (5) Centrifugal gas-mixing machines in parallel shall be
reviewed by the user and equipment manufacturer before installation, and means or plans for minimizing the effects of downstream pulsation and equipment overload shall be prepared and utilized as needed. [NFPA 54:7.11.5.1 – 7.11.5.5]
1210.12.6 Use of Automatic Firechecks, Safety Blowouts, or Backfire Preventers. Automatic firechecks and safety blowouts or backfire preventers shall be provided in piping systems distributing flammable air-gas mixtures from gas-mixing machines to protect the piping and the machines in the event of flashback, in accordance with the following: (1) Approved automatic firechecks shall be installed
upstream as close as practical to the burner inlets following the firecheck manufacturer’s instructions. (2) A separate manually operated gas valve shall be pro vided at each automatic firecheck for shutting off the flow of the gas-air mixture through the firecheck after a flashback has occurred. The valve shall be located upstream as close as practical to the inlet of the automatic firecheck. Caution: These valves shall not be reopened after a flashback has occurred until the firecheck has cooled sufficiently to prevent re-ignition of the flammable mixture and has been reset properly. (3) A safety blowout or backfiring preventer shall be
h the firecheck after a flashback has occurred. The valve shall be located upstream as close as practical to the inlet of the automatic firecheck. Caution: These valves shall not be reopened after a flashback has occurred until the firecheck has cooled sufficiently to prevent re-ignition of the flammable mixture and has been reset properly. (3) A safety blowout or backfiring preventer shall be
provided in the mixture line near the outlet of each gas-mixing machine where the size of the piping is larger than 2 1 ⁄ 2 inches (65 mm) NPS, or equivalent, to protect the mixing equipment in the event of an explosion passing through an automatic firecheck. The manufacturer’s instructions shall be followed when installing these devices, particularly after a disc has burst. The discharge from the safety blowout or backfire preventer shall be located or shielded so that particles from the ruptured disc cannot be directed toward personnel. Wherever there are interconnected installations of gas-mixing machines with safety blowouts or backfire preventers, provision shall be made to keep the mixture from other machines from reaching any ruptured disc opening. Check valves shall not be used for this purpose. (4) Large-capacity premix systems provided with explo sion heads (rupture discs) to relieve excessive pressure in pipelines shall be located at and vented to a safe outdoor location. Provisions shall be provided for automatically shutting off the supply of the gas-air mixture in the event of rupture. [NFPA 54:7.11.6]
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — California Plumbing Code (Title 24, Part 5)
- Chapter 1 — GENERAL CODE PROVISIONS
- Chapter 2 — DEFINITIONS
- Chapter 3 — GENERAL REGULATIONS
- Chapter 4 — PLUMBING FIXTURES AND FIXTURE FITTINGS
- Chapter 5 — WATER HEATERS
- Chapter 6 — WATER SUPPLY AND DISTRIBUTION
- Chapter 7 — SANITARY DRAINAGE
- Chapter 8 — INDIRECT WASTES
- Chapter 9 — VENTS
- Chapter 10 — TRAPS AND INTERCEPTORS
- Chapter 11 — STORM DRAINAGE
▸Chapter 12 — FUEL GAS PIPING
Overview- 1201.1 Applicability. The regulations of this chapter shall
- 1202.1 General. Coverage of piping systems shall extend
- 1202.2 Piping System Requirements. Requirements for
- 1202.3 Applications. This code shall not apply to the followin…
- 1203.1 Inspection Notification. Upon completion of the
- 1203.2 Excavation. Excavations required for the installation o…
- 1203.3 Type of Inspections. The Authority Having Jurisdiction …
- 1203.4 Inspection Waived. In cases where the work
- 1204.1 Issuance. Whereupon final piping inspection, the
- 1204.2 Gas Supplier. A copy of the certificate of such final
- 1204.3 Unlawful. It shall be unlawful for a serving gas suppli…
- 1205.1 Authorized Personnel. It shall be unlawful for a
- 1205.2 Outlets. It shall be unlawful to turn on or connect gas
- 1206.1 Disconnection. The Authority Having Jurisdiction
- 1206.2 Notice. Where such disconnection has been made, a
- 1206.3 Capped Outlets. It shall be unlawful to remove or
- 1207.1 General. Where temporary use of gas is desired, and
- 1208.1 Installation of Piping System. Where required
- 1208.2 Provision for Location of Point of Delivery.
- 1208.3 Interconnections Between Gas Piping Sys-
- 1208.4 Sizing of Gas Piping Systems. Gas piping systems shall …
- 1208.5 Maximum Operating Pressure in Buildings.
- 1208.6 Acceptable Piping Materials and Joining
- 1208.7 Gas Meters. Gas meters shall be selected for the
- 1208.8 Gas Pressure Regulators. A line pressure regulator shal…
- 1208.9 Overpressure Protection Required. Where the
- 1208.10 Overpressure Protection Devices. Overpressure protecti…
- 1208.12 Backpressure Protection. Protective devices
- 1208.13 Low-Pressure Protection. A protective device
- 1208.11 Pressure Limitation Requirements. Where piping systems…
- 1208.14 Shutoff Valves. Shutoff valves shall be approved
- 1208.15 Expansion and Flexibility. Piping systems shall
- 1209.1 General. Where automatic excess flow valves are
- 1210.1 Piping Underground. Underground gas piping
- 1210.2 CSST Piping Systems. CSST piping systems shall
- 1210.3 Installation of Aboveground Piping. Piping
- 1210.5 Piping in Vertical Chases. Where gas piping
- 1210.4 Concealed Piping in Buildings. Gas piping in
- 1210.6 Gas Pipe Turns. Changes in direction of gas pipe
- 1210.7 Drips and Sediment Traps. For other than dry gas
- 1210.8 Outlets. Outlets shall be located and installed in
- 1210.9 Manual Gas Shutoff Valves. An accessible gas
- 1210.10 Prohibited Devices. Devices shall not be placed
- 1210.11 Systems Containing Gas-Air Mixtures Out-
- 1210.12 Systems Containing Flammable Gas-Air
- 1211.1 Pipe and Tubing Other than CSST. Each aboveground porti…
- 1211.2 Bonding of CSST Gas Piping. CSST gas piping
- 1211.3 Arc-Resistant Jacketed CSST. CSST listed with
- 1211.4 Prohibited Use. Gas piping shall not be used as a
- 1211.5 Lightning Protection System. Where a lightning
- 1211.6 Electrical Circuits. Electrical circuits shall not util…
- 1211.7 Electrical Connections. All electrical connections
- 1211.8 Earthquake-Actuated Gas Shutoff Valves. Earth-
- 1212.1 Connecting Appliances and Equipment.
- 1212.2 Suspended Low-Intensity Infrared Tube
- 1212.3 Use of Nonmetallic Gas Hose Connectors.
- 1212.4 Injection (Bunsen) Burners. Injection (Bunsen)
- 1212.5 Connection of Portable and Mobile Industrial
- 1212.6 Appliance Shutoff Valves and Connections.
- 1212.7 Quick-Disconnect Devices. Quick-disconnect
- 1212.8 Gas Convenience Outlets. Appliances shall be
- 1212.9 Sediment Trap. Where a sediment trap is not incorporate…
- 1212.10 Installation of Piping. Piping shall be installed in
- 1212.11 Liquefied Petroleum Gas Facilities and Pip-
- 1213.1 Piping Installations. Prior to acceptance and initial o…
- 1213.2 Test Preparation. Test preparation shall comply
- 1213.3 Test Pressure. This inspection shall include an air,
- 1213.4 Detection of Leaks and Defects. The piping system shall…
- 1213.5 Piping System Leak Test. Leak checks using fuel
- 1213.6 Purging Requirements. The purging of piping
- 1214.1 General. The following regulations shall comply
- 1214.2 Volume. The hourly volume of gas required at each
- 1214.3 Gas Appliances. Where the gas appliances to be
- 1214.4 Size of Piping Outlets. The size of the supply piping o…
- 1215.1 Pipe Sizing Methods. Where the pipe size is to be
- 1215.2 Sizing of Gas Piping Systems. Sizing of piping
- 1215.3 Sizing Equations. The inside diameter of smooth
- 1215.5 Engineering Methods. For conditions other than
- 1215.6 Variable Gas Pressure. Where the supply gas
- 1215.4 Sizing of Piping Sections. To determine the size
- Chapter 13 — HEALTH CARE FACILITIES AND MEDICAL GAS AND MEDICA…
- Chapter 14 — FIRESTOP PROTECTION
- Chapter 15 — ALTERNATE WATER SOURCES FOR NONPOTABLE APPLICATIONS
- Chapter 16 — NONPOTABLE RAINWATER CATCHMENT SYSTEMS
- Chapter 17 — REFERENCED STANDARDS
- Appendix A — RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYS…
- Appendix B — EXPLANATORY NOTES ON COMBINATION WASTE AND VENT S…
- Appendix C — ALTERNATE PLUMBING SYSTEMS
- Appendix D — SIZING STORM WATER DRAINAGE SYSTEMS
- Appendix E — MANUFACTURED/MOBILE HOME PARKS AND RECREATIONAL V…
- Appendix F — FIREFIGHTER BREATHING AIR REPLENISHMENT SYSTEMS
- Appendix G — SIZING OF VENTING SYSTEMS
- Appendix H — PRIVATE SEWAGE DISPOSAL SYSTEMS
- Appendix I — INSTALLATION STANDARDS
- Appendix J — COMBINATION OF INDOOR AND OUTDOOR COMBUSTION AND …
- Appendix K — POTABLE RAINWATER CATCHMENT SYSTEMS
- Appendix L — SUSTAINABLE PRACTICES
- Appendix M — PEAK WATER DEMAND CALCULATOR
- Appendix N — IMPACT OF WATER TEMPERATURE ON THE POTENTIAL FOR …