1208.10 Overpressure Protection Devices.
California Plumbing Code (Title 24, Part 5) · 2022 edition · updated 2026-09-10 · California
Italicized text is a California amendment to the model code, as printed in the official publication.
Overpressure protection devices shall be one of the following: (1) Pressure relief valve. (2) Monitor regulator. (3) Series regulator installed upstream from the line regula tor and set to continuously limit the pressure on the inlet of the line regulator to the maximum values specified by Section 1208.11 or less. (4) Automatic shutoff device installed in series with the line
pressure regulator and set to shut off when the pressure on the downstream piping system reaches the maximum values specified by Section 1208.11 or less. This device shall be designed so that it will remain closed until manually reset. [NFPA 54:5.9.3.1] 1208.10.1 Separate Devices. The devices in Section 1208.10 shall be installed either as an integral part of the service or line pressure regulator or as separate units. Where separate overpressure protection devices are installed, they shall comply with Section 1208.10.2 through Section 1208.10.7. [NFPA 54:5.9.3.2]
«
«
2022 CALIFORNIA PLUMBING CODE 217
to 2 psi (14 kPa) or less upon a failure of the line pressure regulator. [NFPA 54:5.9.2.1]
1208.11.1 Overpressure Protection Required. Where piping systems serving appliances designed to operate with a gas supply pressure greater than 14 inches water column (3.5 kPa) are required to be equipped with overpressure protection by Section 1208.9, each overpressure protection device shall be adjusted to limit the gas pressure to each connected appliance as required by the appliance manufacturer’s installation instructions.
[NFPA 54:5.9.2.2] 1208.11.2 Overpressure Protection Devices. Each overpressure protection device installed to meet the requirements of this section shall be capable of limiting the pressure to its connected appliance(s) as required by this section independently of any other pressure control equipment in the piping system. [NFPA 54:5.9.2.3] 1208.11.3 Detection of Failure. Each gas piping system for which an overpressure protection device is required by this section shall be designed and installed so that a failure of the primary pressure control device(s) is detectable. [NFPA 54:5.9.2.4] 1208.11.4 Flow Capacity. If a pressure relief valve is used to meet the requirements of this section, it shall have a flow capacity such that the pressure in the protected system is maintained at or below the limits specified in Section 1208.11 under the following conditions: (1) The line pressure regulator for which the relief valve
is providing overpressure protection has failed wide open. (2) The gas pressure at the inlet of the line pressure reg ulator for which the relief valve is providing overpressure protection is not less than the regulator’s normal operating inlet pressure. [NFPA 54:5.9.2.5]
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — California Plumbing Code (Title 24, Part 5)
- Chapter 1 — GENERAL CODE PROVISIONS
- Chapter 2 — DEFINITIONS
- Chapter 3 — GENERAL REGULATIONS
- Chapter 4 — PLUMBING FIXTURES AND FIXTURE FITTINGS
- Chapter 5 — WATER HEATERS
- Chapter 6 — WATER SUPPLY AND DISTRIBUTION
- Chapter 7 — SANITARY DRAINAGE
- Chapter 8 — INDIRECT WASTES
- Chapter 9 — VENTS
- Chapter 10 — TRAPS AND INTERCEPTORS
- Chapter 11 — STORM DRAINAGE
▸Chapter 12 — FUEL GAS PIPING
Overview- 1201.1 Applicability. The regulations of this chapter shall
- 1202.1 General. Coverage of piping systems shall extend
- 1202.2 Piping System Requirements. Requirements for
- 1202.3 Applications. This code shall not apply to the followin…
- 1203.1 Inspection Notification. Upon completion of the
- 1203.2 Excavation. Excavations required for the installation o…
- 1203.3 Type of Inspections. The Authority Having Jurisdiction …
- 1203.4 Inspection Waived. In cases where the work
- 1204.1 Issuance. Whereupon final piping inspection, the
- 1204.2 Gas Supplier. A copy of the certificate of such final
- 1204.3 Unlawful. It shall be unlawful for a serving gas suppli…
- 1205.1 Authorized Personnel. It shall be unlawful for a
- 1205.2 Outlets. It shall be unlawful to turn on or connect gas
- 1206.1 Disconnection. The Authority Having Jurisdiction
- 1206.2 Notice. Where such disconnection has been made, a
- 1206.3 Capped Outlets. It shall be unlawful to remove or
- 1207.1 General. Where temporary use of gas is desired, and
- 1208.1 Installation of Piping System. Where required
- 1208.2 Provision for Location of Point of Delivery.
- 1208.3 Interconnections Between Gas Piping Sys-
- 1208.4 Sizing of Gas Piping Systems. Gas piping systems shall …
- 1208.5 Maximum Operating Pressure in Buildings.
- 1208.6 Acceptable Piping Materials and Joining
- 1208.7 Gas Meters. Gas meters shall be selected for the
- 1208.8 Gas Pressure Regulators. A line pressure regulator shal…
- 1208.9 Overpressure Protection Required. Where the
- 1208.10 Overpressure Protection Devices. Overpressure protecti…
- 1208.12 Backpressure Protection. Protective devices
- 1208.13 Low-Pressure Protection. A protective device
- 1208.11 Pressure Limitation Requirements. Where piping systems…
- 1208.14 Shutoff Valves. Shutoff valves shall be approved
- 1208.15 Expansion and Flexibility. Piping systems shall
- 1209.1 General. Where automatic excess flow valves are
- 1210.1 Piping Underground. Underground gas piping
- 1210.2 CSST Piping Systems. CSST piping systems shall
- 1210.3 Installation of Aboveground Piping. Piping
- 1210.5 Piping in Vertical Chases. Where gas piping
- 1210.4 Concealed Piping in Buildings. Gas piping in
- 1210.6 Gas Pipe Turns. Changes in direction of gas pipe
- 1210.7 Drips and Sediment Traps. For other than dry gas
- 1210.8 Outlets. Outlets shall be located and installed in
- 1210.9 Manual Gas Shutoff Valves. An accessible gas
- 1210.10 Prohibited Devices. Devices shall not be placed
- 1210.11 Systems Containing Gas-Air Mixtures Out-
- 1210.12 Systems Containing Flammable Gas-Air
- 1211.1 Pipe and Tubing Other than CSST. Each aboveground porti…
- 1211.2 Bonding of CSST Gas Piping. CSST gas piping
- 1211.3 Arc-Resistant Jacketed CSST. CSST listed with
- 1211.4 Prohibited Use. Gas piping shall not be used as a
- 1211.5 Lightning Protection System. Where a lightning
- 1211.6 Electrical Circuits. Electrical circuits shall not util…
- 1211.7 Electrical Connections. All electrical connections
- 1211.8 Earthquake-Actuated Gas Shutoff Valves. Earth-
- 1212.1 Connecting Appliances and Equipment.
- 1212.2 Suspended Low-Intensity Infrared Tube
- 1212.3 Use of Nonmetallic Gas Hose Connectors.
- 1212.4 Injection (Bunsen) Burners. Injection (Bunsen)
- 1212.5 Connection of Portable and Mobile Industrial
- 1212.6 Appliance Shutoff Valves and Connections.
- 1212.7 Quick-Disconnect Devices. Quick-disconnect
- 1212.8 Gas Convenience Outlets. Appliances shall be
- 1212.9 Sediment Trap. Where a sediment trap is not incorporate…
- 1212.10 Installation of Piping. Piping shall be installed in
- 1212.11 Liquefied Petroleum Gas Facilities and Pip-
- 1213.1 Piping Installations. Prior to acceptance and initial o…
- 1213.2 Test Preparation. Test preparation shall comply
- 1213.3 Test Pressure. This inspection shall include an air,
- 1213.4 Detection of Leaks and Defects. The piping system shall…
- 1213.5 Piping System Leak Test. Leak checks using fuel
- 1213.6 Purging Requirements. The purging of piping
- 1214.1 General. The following regulations shall comply
- 1214.2 Volume. The hourly volume of gas required at each
- 1214.3 Gas Appliances. Where the gas appliances to be
- 1214.4 Size of Piping Outlets. The size of the supply piping o…
- 1215.1 Pipe Sizing Methods. Where the pipe size is to be
- 1215.2 Sizing of Gas Piping Systems. Sizing of piping
- 1215.3 Sizing Equations. The inside diameter of smooth
- 1215.5 Engineering Methods. For conditions other than
- 1215.6 Variable Gas Pressure. Where the supply gas
- 1215.4 Sizing of Piping Sections. To determine the size
- Chapter 13 — HEALTH CARE FACILITIES AND MEDICAL GAS AND MEDICA…
- Chapter 14 — FIRESTOP PROTECTION
- Chapter 15 — ALTERNATE WATER SOURCES FOR NONPOTABLE APPLICATIONS
- Chapter 16 — NONPOTABLE RAINWATER CATCHMENT SYSTEMS
- Chapter 17 — REFERENCED STANDARDS
- Appendix A — RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYS…
- Appendix B — EXPLANATORY NOTES ON COMBINATION WASTE AND VENT S…
- Appendix C — ALTERNATE PLUMBING SYSTEMS
- Appendix D — SIZING STORM WATER DRAINAGE SYSTEMS
- Appendix E — MANUFACTURED/MOBILE HOME PARKS AND RECREATIONAL V…
- Appendix F — FIREFIGHTER BREATHING AIR REPLENISHMENT SYSTEMS
- Appendix G — SIZING OF VENTING SYSTEMS
- Appendix H — PRIVATE SEWAGE DISPOSAL SYSTEMS
- Appendix I — INSTALLATION STANDARDS
- Appendix J — COMBINATION OF INDOOR AND OUTDOOR COMBUSTION AND …
- Appendix K — POTABLE RAINWATER CATCHMENT SYSTEMS
- Appendix L — SUSTAINABLE PRACTICES
- Appendix M — PEAK WATER DEMAND CALCULATOR
- Appendix N — IMPACT OF WATER TEMPERATURE ON THE POTENTIAL FOR …