Chapter 15 — ALTERNATE WATER SOURCES FOR NONPOTABLE APPLICATIONS
1503.7 Drawings and Specifications. The Authority
California Plumbing Code (Title 24, Part 5) · 2019 edition · updated 2026-09-10 · California
Italicized text is a California amendment to the model code, as printed in the official publication.
Having Jurisdiction may require the following information to be included with or in the plot plan before a permit is issued for a gray water system, or at a time during the construction thereof: (1) Plot plan drawn to scale and completely dimensioned,
showing lot lines and structures, direction and approxi
Exception: It is not the intent of this section to require that all gray water must be handled by an irrigation field or dis- posal field. It is acceptable for excess gray water to be diverted to the building sewer through a diverter valve or overflow drain as permitted in this chapter.
1503.8.1 Residential Occupancies. The gray water discharge for residential occupancies shall be calculated by water use records, calculations of local daily per person interior water use, or the following procedure: (1) The number of occupants of each dwelling unit shall
be calculated as follows:
(1) Plot plan drawn to scale and completely dimensioned,
showing lot lines and structures, direction and approximate slope of surface, location of present or proposed retaining walls, drainage channels, water supply lines, wells, paved areas and structures on the plot, number of bedrooms and plumbing fixtures in each structure, location of private sewage disposal system and expansion area or building sewer connecting to the public sewer, and location of the proposed gray water system. (2) Details of construction necessary to ensure compliance
with the requirements of this chapter, together with a full
(1) The number of occupants of each dwelling unit shall
be calculated as follows: First Bedroom 2 occupants Each additional bedroom 1 occupant (2) The estimated gray water flows of each occupant
shall be calculated as follows:
« «
(2) Details of construction necessary to ensure compliance
with the requirements of this chapter, together with a full description of the complete installation, including installation methods, construction, and materials. (3) Details for holding tanks shall include dimensions, struc tural calculations, bracings, and such other pertinent data
(2) The estimated gray water flows of each occupant
shall be calculated as follows: Showers, bathtubs, 25 gallons (95 L) and lavatories per day/occupant Laundry 15 gallons (57 L) per day/occupant (3) The total number of occupants shall be multiplied
by the applicable estimated gray water discharge as
(3) Details for holding tanks shall include dimensions, struc tural calculations, bracings, and such other pertinent data as required. (4) A log of soil formations and groundwater level as
determined by test holes dug in proximity to proposed
1503.8.2.1 Lavatories. Daily discharge from lava- tories may be determined by the following equation:
A log of soil formations and groundwater level as
determined by test holes dug in proximity to proposed irrigation and/or disposal area, together with a statement of water absorption characteristics of the soil at the proposed site as determined by approved percolation tests. Exceptions: (1) The Authority Having Jurisdiction shall permit the
use of Table 1504.2 instead of percolation tests.
(3) The total number of occupants shall be multiplied
by the applicable estimated gray water discharge as provided above and the type of fixtures connected to the gray water system. 1503.8.2 Commercial, Industrial, and Institu-tional Occupancies. The Authority Having Jurisdic- tion may utilize the gray water discharge procedures listed below,, water use records or other documentation to estimate gray water discharge.
(1) The Authority Having Jurisdiction shall permit the
use of Table 1504.2 instead of percolation tests. (2) The Enforcing Agency may waive the requirement
for identification of groundwater level and/or soil
(2) The Enforcing Agency may waive the requirement
for identification of groundwater level and/or soil absorption qualities based on knowledge of local conditions. (3) The absence of groundwater in a test hole three (3)
vertical feet (915 mm) below the deepest irrigation
(Equation 15.1) Occupants X lavatory flow rate X 3
Where: The number of occupants = square footage of the building divided by the occupant load factor from the California Plumbing Code Chapter 4, Table A. Lavatory fixture flow rate, new construction = That from the California Green Building Standards (CAL- Green) Code Section 5.303.2.3 Lavatory fixture flow rate, existing fixtures = Actual flow rate for existing fixtures 3 = Average number of uses per person per day 1503.8.2.2 Showers. Daily gray water discharge from showers may be determined by the following equation:
(Equation 15.2) Number of daily uses X shower flow rate X 5 minutes 1503.8.2.3 Commercial Clothes Washers. Daily gray water discharge from commercial clothes washers may be determined by the following equa- tion:
Where: The number of occupants = square footage of the building divided by the occupant load factor from the California Plumbing Code Chapter 4, Table A. Lavatory fixture flow rate, new construction = That from the California Green Building Standards (CAL- Green) Code Section 5.303.2.3 Lavatory fixture flow rate, existing fixtures = Actual flow rate for existing fixtures 3 = Average number of uses per person per day 1503.8.2.2 Showers. Daily gray water discharge from showers may be determined by the following equation:
(3) The absence of groundwater in a test hole three (3)
vertical feet (915 mm) below the deepest irrigation or disposal point shall be sufficient to satisfy this section unless seasonal high groundwater levels have been documented to rise to within this area. (5) Distance between the plot and surface waters such as
lakes, ponds, rivers or streams, and the slope of the plot
(5) Distance between the plot and surface waters such as
lakes, ponds, rivers or streams, and the slope of the plot and the surface water, wherein close proximity. charge.1503.8 Procedure for Estimating Gray Water Dis- Gray water systems shall be designed to distribute the total amount of estimated gray water on a daily basis. The water discharge for gray water systems shall be determined in accordance with Section 1503.8.1 or Section 1503.8.2.
2019 CALIFORNIA PLUMBING CODE 315
ALTERNATE WATER SOURCES FOR NONPOTABLE APPLICATIONS any other purpose or distributed to any other persons or parties.
(Equation 15.3) Cubic feet of capacity X Water Factor X 6
(7) Surge tank shall be structurally designed to with stand anticipated earth or other loads. Surge tank covers shall be capable of supporting an earth load of not less than 300 pounds per square foot (lb/ft 2 ) (1465 kg/m 2 ) where the tank is designed for underground installation. (8) Where a surge tank is installed underground, the sys tem shall be designed so that the tank overflow will
(7) Surge tank shall be structurally designed to with stand anticipated earth or other loads. Surge tank
Where: Water Factor = Gallons per cubic foot 6 = Average number of uses per day Note: Cubic feet of capacity and Water Factor are con- tained in product specifications or are available from the washer manufacturer. 1503.8.3 Daily Discharge. Gray water systems using tanks shall be designed to minimize the amount of time gray water is held in the tank and shall be sized to dis- tribute the total amount of estimated gray water on a daily basis. Exception: Approved on-site treated nonpotable gray water systems.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — California Plumbing Code (Title 24, Part 5)
- Chapter 1 — GENERAL CODE PROVISIONS
- Chapter 2 — DEFINITIONS
- Chapter 3 — GENERAL REGULATIONS
- Chapter 4 — PLUMBING FIXTURES AND FIXTURE FITTINGS
- Chapter 5 — WATER HEATERS
- Chapter 6 — WATER SUPPLY AND DISTRIBUTION
- Chapter 7 — SANITARY DRAINAGE
- Chapter 8 — INDIRECT WASTES
- Chapter 9 — VENTS
- Chapter 10 — TRAPS AND INTERCEPTORS
- Chapter 11 — STORM DRAINAGE
- Chapter 12 — FUEL GAS PIPING
- Chapter 13 — HEALTH CARE FACILITIES AND MEDICAL GAS AND MEDICA…
- Chapter 14 — FIRESTOP PROTECTION
▸Chapter 15 — ALTERNATE WATER SOURCES FOR NONPOTABLE APPLICATIONS
Overview- 1501.0 General.1501.1 Applicability [BSC-CG, DWR & HCD 1]. The
- 1501.2 System Design. Alternate water source systems
- 1501.3 Permit [BSC-CG, HCD 1, DWR]. It shall be unlawful for a…
- 1501.4 Component Identification. System components
- 1501.5 Maintenance and Inspection 1, DWR]. Alternate water sou…
- 1501.6 Operation and Maintenance Manual [BSC-
- 1501.7 Minimum Water Quality Requirements [BSC-
- 1501.8 Material Compatibility. Alternate water source systems …
- 1501.9 Signage [BSC-CG, HCD 1, HCD 2, HCD 1-AC, &DWR]. Signage…
- 1501.10 System Controls. Controls for pumps, valves, and
- 1501.11 Hose Bibbs for Single-Family Dwellings [HCD1]. Hose bi…
- 1502.2 Supply System Inspection and Test. Alternate
- 1502.3 Cross-Connection Inspection and Testing. An
- 1502.6 Sizing. Unless otherwise provided for in this chapter, …
- 1503.1 General. The provisions of this section shall apply
- 1502.4 Separation Requirements. Underground alternate
- 1502.5 Abandonment. Alternate water source systems that
- 1503.2 System Requirements. Gray water shall be permitted to b…
- 1503.3 Connections to Potable and Reclaimed(Recycled) Water Sy…
- 1503.4 Location. No gray water system or part thereof shall
- 1503.5 Plot Plan Submission. No permit for a gray water
- 1503.6 Prohibited Location. Where there is insufficient
- 1503.7 Drawings and Specifications. The Authority
- 1503.9 Gray Water System Components. Gray water
- 1504.2 Required Area of Subsurface Irrigation
- 1504.3 Determination of Maximum Absorption Capac-
- 1504.4 Groundwater Level. No excavation for an irrigation fiel…
- 1504.5 Irrigation, Disposal Field and Mulch Basin Con-structio…
- 1504.6 Reserved.
- 1504.7 Reserved.
- 1504.8 Gray Water System Color and Marking Infor-mation. Press…
- 1504.9 Other Collection and Distribution Systems. Other collec…
- 1504.10 Testing. Building drains and vents for gray water
- 1504.11 Maintenance. Gray water systems and components shall b…
- 1505.0 Recycled Water 1505.1 General. The provisions of Supply…
- 1505.3 System Changes. No changes or connections shall
- 1505.4 Connections to Potable or Reclaimed (Recy-cled) Water S…
- 1505.2 Permit. It shall be unlawful for a person to construct,
- 1505.5 Initial Cross-Connection Test. A cross-connection test …
- 1505.6 Recycled Water Recycled water supply system materials s…
- 1505.8 Valves. Valves, except fixture supply control valves,
- 1505.9 Hose Bibbs. Hose bibbs shall not be allowed on
- 1505.10 Required Appurtenances. The recycled water
- 1505.11 Pipe Separation in Trenches. Reclaimed (recycled) wate…
- 1505.12 Signage. Signs in rooms and water closet tanks in
- 1505.13 Inspection and Testing. Recycled water supply
- 1505.15 Maintenance and Inspection. Recycled water
- 1506.0 On-Site Treated Nonpotable Gray Water Sys-
- 1506.2 Plumbing Plan Submission. No permit for an
- 1506.3 System Changes. No changes or connections shall
- 1506.4 Connections to Potable or Reclaimed (Recy-
- 1506.5 Initial Cross-Connection Test. A cross-connection test …
- 1506.6 On-Site Treated Nonpotable tem Materials. On-site treat…
- 1506.7 On-Site Treated Nonpotable Devices and Systems. Devices…
- 1506.9 Design and Installation. The design and installation of…
- 1506.10 Valves. Valves, except fixture supply control
- 1506.11 Signs. Signs in buildings using on-site treated nonpot…
- 1506.12 Inspection and Testing. On-site treated nonpotable gra…
- Chapter 16 — NONPOTABLE RAINWATER CATCHMENT SYSTEMS
- Chapter 17 — REFERENCED STANDARDS
- Appendix A — RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYS…
- Appendix B — EXPLANATORY NOTES ON COMBINATION WASTE AND VENT S…
- Appendix C — ALTERNATE PLUMBING SYSTEMS
- Appendix D — SIZING STORM WATER DRAINAGE SYSTEMS
- Appendix E — MANUFACTURED/MOBILE HOME PARKS AND RECREATIONAL V…
- Appendix F — FIREFIGHTER BREATHING AIR REPLENISHMENT SYSTEMS
- Appendix G — SIZING OF VENTING SYSTEMS
- Appendix H — PRIVATE SEWAGE DISPOSAL SYSTEMS
- Appendix I — INSTALLATION STANDARD FOR PEX TUBING SYSTEMS FOR …
- Appendix J — COMBINATION OF INDOOR AND OUTDOOR COMBUSTION AND …
- Appendix K — POTABLE RAINWATER CATCHMENT SYSTEMS
- Appendix L — SUSTAINABLE PRACTICES
- Appendix M — PEAK WATER DEMAND CALCULATOR