Skip to content

Earlier editions: 20222019

Chapter 16 — NONPOTABLE RAINWATER CATCHMENT SYSTEMS

1601.5 Maintenance and Inspection — 2025 California Plumbing Code

California Plumbing Code (Title 24, Part 5) · 2025 edition · updated 2026-09-25 · California

CBSC: official editions, supplements and errata

Italicized text is a California amendment to the model code, as printed in the official publication.

Cite as: 2025 California Plumbing Code (Title 24, Part 5) § 1601.5 · Effective January 1, 2026 · Official source: Building Standards Commission

Rainwater catchment systems and components shall be inspected and maintained in accordance with with the manufacturer’s recommendations and/or as required by the enforcing agency .

TABLE 1601.5 MINIMUM ALTERNATE WATER SOURCE TESTING, INSPECTION, AND MAINTENANCE FREQUENCY

DESCRIPTION MINIMUM FREQUENCY



Inspect and clean filters and
screens, and replace (where
necessary).
Every 3 months






Inspect and verify that
disinfection, filters, and water
quality treatment devices and
systems are operational and
maintaining minimum water
quality requirements as
determined by the Authority
Having Jurisdiction.
In accordance with manufac-
turer’s instructions and the
Authority Having Jurisdiction.



Inspect and clear debris from
rainwater gutters, downspouts,
and roof washers.
Every 6 months




Inspect and clear debris from
the roof or another above-
ground rainwater collection
surfaces.
Every 6 months




Remove tree branches and
vegetation overhanging a roof
or other aboveground rainwater
collection surfaces.
As needed


Inspect pumps and verify
operation.
After initial installation and
every 12 months thereafter


Inspect valves and verify
operation.
After initial installation and
every 12 months thereafter


Inspect pressure tanks and
verify operation.
After initial installation and
every 12 months thereafter


Clear debris from and inspect
storage tanks, locking devices,
and verify operation.
After initial installation and
every 12 months thereafter


Inspect caution labels and
marking.
After initial installation and
every 12 months thereafter


Cross-connection inspection
and test.*
After initial installation and
every 12 months thereafter




Test water quality of rainwater
catchment systems required by
Section 1603.4 to maintain a
minimum water quality.
Every 12 months. After system
renovation or repair.
  • The cross-connection test shall be performed in the presence of the Authority Having Jurisdiction in accordance with the requirements of this chapter.

1601.5.1 Maintenance Responsibility. The required maintenance and inspection of rainwater catchment systems shall be the responsibility of the property owner unless otherwise required by the Authority Having Jurisdiction.

NONPOTABLE RAINWATER CATCHMENT SYSTEMS

Explained in plain English

Guides that cite this section.

Get a plain-English answer with a citation back to this text.

Ask AI about this code
▸Contents — California Plumbing Code (Title 24, Part 5)

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.