Chapter 10 — BOILERS AND PRESSURE VESSELS
1003.2 Controls. Required electrical, mechanical, safety,
California Mechanical Code (Title 24, Part 4) · 2019 edition · updated 2026-09-10 · California
Italicized text is a California amendment to the model code, as printed in the official publication.
and operating controls shall carry the approval of an approved testing agency or be accepted by the Authority Having Jurisdiction. Electrical controls shall be of such design and construction as to be suitable for installation in the environment in which they are located.
1003.2.1 Automatic Boilers. Automatic boilers shall be equipped with controls and limit devices in accordance with ASME CSD-1 or Table 1003.2.1.
be consistent with the volume and capacity of the system, and shall be designed for a hydrostatic test pressure of two and one-half times the allowable working pressure of the system. Expansion tanks for systems designed to operate at more than 30 pounds-force per square inch (psi) (207 kPa) shall comply with ASME BPVC Section VIII. Provisions shall be made for draining the tank without emptying the system.
Get a plain-English answer with a citation back to this text.
Ask AI about this code▸Contents — California Mechanical Code (Title 24, Part 4)
- Chapter 1 — GENERAL CODE PROVISIONS
- Chapter 2 — DEFINITIONS
- Chapter 3 — GENERAL REGULATIONS
- Chapter 4 — VENTILATION AIR
- Chapter 5 — EXHAUST SYSTEMS
- Chapter 6 — DUCT SYSTEMS
- Chapter 7 — COMBUSTION AIR
- Chapter 8 — CHIMNEYS AND VENTS
- Chapter 9 — INSTALLATION OF SPECIFIC APPLIANCES
▸Chapter 10 — BOILERS AND PRESSURE VESSELS
Overview- 1001.0 General.1001.1 Applicability. The requirements of this …
- 1001.2 Boiler Rooms and Enclosures. Boiler rooms and
- 1001.3 Air for Combustion and Ventilation. Air for
- 1001.4 Drainage. For heating or hot-water-supply boiler
- 1001.5 Mounting. Equipment shall be set or mounted on a
- 1001.6 Chimneys or Vents. Boilers shall be connected to
- 1002.1 General.1002.0 Standards. Pressure vessels shall be con…
- 1002.2 Oil-Burning Boilers. Oil-burning boilers shall
- 1002.3 Electric Boilers. Electric boilers shall be listed and
- 1002.4 Solid-Fuel-Fired Boilers. Solid-fuel-fired boilers
- 1002.5 Dual Purpose Water Heater. Water heaters utilized for c…
- 1003.1 Safety Requirements.1003.0 Detailed Requirements. The c…
- 1003.2 Controls. Required electrical, mechanical, safety,
- 1004.4 Minimum Capacity of Closed-Type Tank. The
- 1003.3 Gauges. Steam boilers shall be provided with a
- 1003.4 Stack Dampers. Stack dampers on boilers fired
- 1003.5 Welding. Welding on pressure vessels shall be done
- 1004.1 General.1004.0 Expansion Tanks. An expansion tank shall…
- 1004.2 Open-Type Expansion Tanks. Open type expansion tanks sh…
- 1004.3 Closed-Type Systems. Closed-type systems shall
- 1005.2 Discharge Piping. The discharge piping serving a
- 1005.5 Vacuum Relief Valve. Hot-water heating systems
- 1008.0 Low-Water Cutoff.1008.1 General. Hot water boilers and …
- 1005.3 Splash Shield. Where the operating temperature
- 1005.4 Hazardous Discharge. Where the discharge from
- 1010.1 General. 1010.0 Clearance for Access. Where boilers are…
- 1010.2 Power Boilers. Power boilers having a steam-generating …
- 1010.3 Steam-Heating Boilers, Hot Water Boilers, andPower Boil…
- 1012.1 General.1012.0 Operating Adjustments and Instructions. …
- 1013.1 General.1013.0 Inspections and Tests. An installation f…
- 1011.1 General. 1011.0 Boilers, Stokers, and Steam Generators.…
- 1013.2 Operating Permit. It shall be unlawful to operate a
- 1013.3 Maintenance Inspection. The Authority Having
- 1013.4 Power and Miniature Boilers. Power boilers and
- 1013.6 Automatic Steam-Heating Boilers. Automatic
- 1013.7 Unfired Pressure Vessels. Unfired pressure vessels shal…
- 1014.1 General. Pressure Vessels. Boilers and pressure vessels…
- Chapter 11 — REFRIGERATION
- Chapter 12 — HYDRONICS
- Chapter 13 — FUEL GAS PIPING
- Chapter 14 — PROCESS PIPING
- Chapter 15 — SOLAR ENERGY SYSTEMS
- Chapter 16 — STATIONARY POWER PLANTS
- Chapter 17 — REFERENCED STANDARDS
- Appendix A — RESIDENTIAL PLAN EXAMINER REVIEW FORM FOR HVAC SY…
- Appendix B — PROCEDURES TO BE FOLLOWED TO PLACE GAS EQUIPMENT …
- Appendix C — INSTALLATION AND TESTING OF OIL (LIQUID) FUEL-FIR…
- Appendix D — FUEL SUPPLY: MANUFACTURED/MOBILE HOME PARKS AND R…
- Appendix E — SUSTAINABLE PRACTICES
- Appendix F — SIZING OF VENTING SYSTEMS AND OUTDOOR COMBUSTION …
- Appendix G — EXAMPLE CALCULATION OF OUTDOOR AIR RATE