Skip to content

Title 18Division I — Subdivisions

Chapter 18.20 — FINAL PARCEL MAPS

Buena Park Planning Code · 2026-07 edition · updated 2026-07-25 · Buena Park

§ 18.20.010. Preparation standards and specifications.

The parcel map shall be prepared by or under the direction of a registered civil engineer or licensed land surveyor, shall show the location of streets and property lines bounding the property, and shall conform to all of the provisions of Section 66445 of the Map Act. (Prior code § 27-33.01)

§ 18.20.020. Required certificates and acknowledgements.

Certificates and acknowledgements required for final parcel maps shall be the same as for final tract maps.

(Prior code § 27-33.02)

§ 18.20.030. Certificate formats.

The final parcel map certificate format for engineers and recorders shall be the same as for final tract maps.

(Prior code § 27-33.03)

§ 18.20.040. Field survey or filed data for boundaries.

Parcel maps shall be based upon a field survey or compiled from recorded or filed data when sufficient survey information exists on filed maps to locate and retrace the exterior boundary lines of the parcel map if the location of at least one of the boundary lines can be established from an existing monumented line. S.M.A. Section 66448. (Prior code § 27-33.04)

Downloaded from https://ecode360.com/BU4909 on 2026-07-06

City of Buena Park, CA

SUBDIVISIONS AND FLOODPLAIN MANAGEMENT

§ 18.24.010

§ 18.24.050

Get a plain-English answer with a citation back to this text.

Ask AI about this code
Contents — Buena Park Planning Code

GoCodebook provides public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.