Section 506E — ENGINEERING CRITERIA FOR EVALUATION AND RETROFIT.
506E.5 Conformance Period.
San Francisco Building Inspection Commission Codes · 2022 edition · ingested 2026-07-08 · San Francisco
506E.5 Conformance Period. Any building retrofitted in compliance with this Chapter and properly maintained shall not, within a period of 15 years after the operative date of this Chapter, be identified as a seismic hazard pursuant to any local building standards adopted after the date of the building seismic retrofit unless the building incurred disproportionate damage, or otherwise has been damaged or altered so that it no longer meets the engineering criteria under which it was retrofitted.