Section 609.0 — INSTALLATION, TESTING, UNIONS AND LOCATION

San Francisco Building Inspection Commission Codes · 2022 edition · ingested 2026-07-08 · San Francisco

609.11.2 Add the following section:

609.11.2 Air Chambers. Air chambers shall be installed on all hot and cold water outlets supplying quick-acting valves to provide water hammer relief. The size of each air chamber shall be 24 times the diameter of the fixture supply.

609.11.3 Add the following section:

609.11.3 Quick-Acting Valves. The following valves shall be considered quick-acting: flushometers, single-handle faucets, single-handle tub and tub/shower combination control valves, single-handle shower control valves, rapid response electric solenoid valves (such as used on ice-makers, clothes washers, etc.) and any other appliance or fixture that dispenses water in a quick open and close method in its operation.

Chapter 7 SANITARY DRAINAGE

Part I – DRAINAGE SYSTEMS Col2 Col3
Part I – DRAINAGE SYSTEMS

GoCodebook provides limited public access, search, citation, multilingual explanation, and practical interpretation of legally adopted building regulations. It is not a substitute for the official ICC or California code publications.