107A.3 Plan review fees.
San Francisco Building Inspection Commission Codes · 2022 edition · ingested 2026-07-08 · San Francisco
107A.3 Plan review fees.
(a) When submittal documents are required by Section 106A.3.2, a plan review fee shall be paid at the time of filing an application for a permit for which plans are required pursuant to Section 106A.3.2. Said plan review fee shall be based on the valuation determined by Section 107A.1. See Section 110A, Table 1A-A – Building Permit Fees – for applicable fee.
The plan review fees specified in this section are separate fees from the permit issuance fees specified in Section 107A.2 and are in addition to the permit fees.
When submittal documents are incomplete or changed so as to require additional plan review or when the project involves deferred submittal items as defined in Section 106A.3.4.2, an additional plan review fee shall be charged as shown in Section 110A, Table 1A-B – Other Building Permit and Plan Review Fees.
(b) If a project involves voluntary seismic retrofit upgrades to soft-story, wood-frame buildings, as defined by the Building Official, the applicant for said project shall be exempt from the proportionate share of plan review fees specified under this Chapter that is related to such retrofit work, provided all permit conditions and timelines are met.
107A.3.1 Reduced plan review fee. A reduced plan review fee shall be collected for reviewing submittal documents identical to those filed within one year of the original approved construction documents for which the full plan review fee was paid. For this purpose, plans may be considered identical when they contain only such minor differences as exterior finishes, or if they are identical but opposite hand. See Section 110A, Table 1A-B – Other Building Permit and Plan Review Fees – for the second and each subsequent set of identical submittal documents within the stated time period. To obtain this reduction, the applicant shall submit a copy of the original approved construction documents for which the full plan review fee was paid.
When the submittal documents are substantially changed from those that were previously approved, an additional full plan review fee shall be charged. See Section 110A, Table 1A-B – Other Building Permit and Plan Review Fees – for applicable fee.
107A.3.2 Tenant improvement work. An application for tenant improvement work shall state at the time of filing whether the permit is to include the partition and other improvement work for the entire building. If this work is not to be included, the valuation shall be reduced accordingly. The installation of such work shall then require permits for alteration work, the fees for which shall be in accordance with Section 110A, Table 1A-A – Building Permit Fees.
107A.3.3 Improvement work. When the application is for first-time improvement work in a new building and the valuation of such work was included in the valuation of the original building permit, the valuation for each alteration permit for part or all of such work shall be shown as $500, and the permit fee shall be collected accordingly.
107A.3.4 Site permit and addenda fees. The permit fee for projects submitted under the site permit and addenda process shall be based on Section 110A, Table 1A-A – Building Permit Fees and additional fees as stated in Table 1A-B – Other Building Permit and Plan Review Fees. Twenty-five percent of the plan review fee shall be paid at the time of site permit application submittal, and shall be credited toward the final plan review fee payment at the time of the first construction addendum submittal as determined by the Building Official. One hundred percent of the permit issuance fee shall be paid at the time of the first construction addendum issuance as determined by the Building Official.